FIELD REPORT
Date Project Name Project No. Report No.
2/13/2023 Renton Elementary School 16 20180398E003 085
Location Municipality AESI Project Manager AESI Field Rep
1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Elise Freeman
Permit No. Client/Owner Attn Requested By
B21004604 Renton School District No. 403 Ed Thomson Contractor
Engineer/Architect General Contractor Grading Contractor Weather
CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy 40s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences Inc. (AESI) was on-site today in the morning to perform compaction tests over electrical trench backfill.
Electrical Trench Backfill
Prior to our arrival, the contractor backfilled 3’ electrical trenches around the site. The backfill was placed and compacted using a
vibratory hoe pac. In most areas, the contractor used a 2 1/4” ballast for backfill. AESI assessed those areas utilizing a ½” diameter
steel soils probe that did not penetrate more than an inch. In some sections (Fig. 1), the contractor backfilled using trench spoils
composed of native till. AESI performed compaction tests on the native fill using a nuclear densometer gauge that met or exceeded the
minimum compaction requirements of 95%.
Table 1: Compaction Test Results
Test
No.
Approx. Approx. Proctor
(pcf)/Opt. %
Moisture
%
Moisture
Dry
Density
(pcf)
%Compaction Pass/Fail Location Depth from final
grade (ft)
1 See Figure 1 0 133.5 / 8.2% 7.7 127.2 95 Pass
2 See Figure 1 0 133.5 / 8.2% 9.6 126.5 95 Pass
3 See Figure 1 0 133.5 / 8.2% 10.7 127.1 95 Pass
16
Date Project Name Project No. Report No.
2/13/2023 Renton ES 16 20180398E003 085
Page 2 of 2
FIELD REPORT
Figure 1: Approximate locations of electrical trench backfilled observed today, highlighted in blue. Test locations indicated with
red arrows.
3
2
1