Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-10-12_TESC_024 www.aesgeo.com This document is considered DRAFT until reviewed and initialed by an AESI Project Manager Temporary Erosion and Sediment Control Monitoring DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO. 10/12/2022 Renton ES 16 20180398E003 024 LOCATION CITY MUNICIPALITY CSWGP 1075 Duvall Ave NE Renton Renton WAR310781 PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL 10/03/2022 Renton School District 403 Sunny, 60's 0.00" 0.00" AESI FIELD REP Catherine Ikeda AESI PROJECT MANAGER Bruce Guenzler Catherine Ikeda QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS) CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS Gravel, quarry spalls Locked chain link fences WHEEL WASH SEDIMENT TRACK OUT N/A City construction in right of way, not under this permit ROADWAY SURFACE CATCH BASIN Crushed rock, quarry spalls Silt socks installed in catch basins LIMITS BUFFER AREA STABILIZATION Marked by chain link fences N/A SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation) Installed along site perimeter None observed COVER MEARSURES OVERALL STRAW Good, no slopes exposed N/A PLASTIC SHEETING HYDROSEED N/A N/A CONVEYENCE CHANNEL CHECK DAMS N/A N/A STOCKPILE COVER PIPE SLOPE DRAINS N/A N/A LEVEL SPREADER LANDSCAPE/MULCH N/A N/A SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET N/A N/A SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION (Creek, Wetland, or Lake) (Clear, Turbid, Sheen) N/A N/A WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL N/A N/A N/A BMP's adequate SAMPLE LOCATION AREAS OF CONCERN N/A N/A CORRECTIVE ACTIONS None PAST CORRECTIVE ACTIONS N/A Is this site in compliance with the terms and conditions of the SWPP and CSWGP discharge Permit? Yes www.aesgeo.com TESC REPORT DATE CSWGP PROJECT NO. TESC REPORT NO. 10/12/2022 WAR310781 20180398E003 024 Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance ADDITIONAL COMMENTS: No substantial precipitation. No offsite storm water discharge.