This document is considered DRAFT until reviewed and initialed by an AESI Project Manager
Temporary Erosion and
Sediment Control Monitoring
DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO.
10/12/2022 Renton ES 16 20180398E003 024
LOCATION CITY MUNICIPALITY CSWGP
1075 Duvall Ave NE Renton Renton WAR310781
PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL
10/03/2022 Renton School District 403 Sunny, 60's 0.00" 0.00"
AESI FIELD REP Catherine Ikeda AESI PROJECT MANAGER Bruce Guenzler
Catherine Ikeda
QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS)
CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS
Gravel, quarry spalls Locked chain link fences
WHEEL WASH SEDIMENT TRACK OUT
N/A City construction in right of way, not under this permit
ROADWAY SURFACE CATCH BASIN
Crushed rock, quarry spalls Silt socks installed in catch basins
LIMITS BUFFER AREA STABILIZATION
Marked by chain link fences N/A
SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation)
Installed along site perimeter None observed
COVER MEARSURES OVERALL STRAW
Good, no slopes exposed N/A
PLASTIC SHEETING HYDROSEED
N/A N/A
CONVEYENCE CHANNEL CHECK DAMS
N/A N/A
STOCKPILE COVER PIPE SLOPE DRAINS
N/A N/A
LEVEL SPREADER LANDSCAPE/MULCH
N/A N/A
SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET
N/A N/A
SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION
(Creek, Wetland, or Lake) (Clear, Turbid, Sheen)
N/A N/A
WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL
N/A N/A N/A BMP's adequate
SAMPLE LOCATION AREAS OF CONCERN
N/A N/A
CORRECTIVE ACTIONS
None
PAST CORRECTIVE ACTIONS
N/A
Is this site in compliance with the terms and conditions
of the SWPP and CSWGP discharge Permit?
Yes
www.aesgeo.com
TESC REPORT
DATE CSWGP PROJECT NO. TESC REPORT NO.
10/12/2022 WAR310781 20180398E003 024
Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance
ADDITIONAL COMMENTS:
No substantial precipitation. No offsite storm water discharge.