HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-11-14_TESC_029Temporary Erosion and Sediment Control Monitoring DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO. 11/14/2022 Renton ES 16 20180398E003 029 LOCATION CITY MUNICIPALITY CSWGP 1075 Duvall Ave NE Renton Renton WAR310781 PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL 11/07/2022 Renton School District 403 Clear 30F 0 0.14 AESI FIELD REP Bruce Guenzler AESI PROJECT MANAGER Bruce Guenzler QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS) CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS Gravel, quarry spalls Locked chain link fences WHEEL WASH SEDIMENT TRACK OUT N/A City construction in right of way, not under this permit ROADWAY SURFACE CATCH BASIN Crushed rock, quarry spalls Silt socks installed in catch basins LIMITS BUFFER AREA STABILIZATION Marked by chain link fences N/A SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation) Installed along site perimeter None observed COVER MEARSURES OVERALL STRAW Good, actively using stockpiles Covering exposed soils and slopes PLASTIC SHEETING HYDROSEED N/A Hydroseed covering exposed soils on N and W end of site CONVEYENCE CHANNEL CHECK DAMS Temporary channels on north and south end of site directing water to catch basin Temporary check dams and swale on NE end of site STOCKPILE COVER PIPE SLOPE DRAINS Actively using stockpiles N/A LEVEL SPREADER LANDSCAPE/MULCH N/A N/A SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET Temporary sediment ponds on NE and W end of site N/A SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION (Creek, Wetland, or Lake) (Clear, Turbid, Sheen) Covered with hydroseed and quarry spalls Clear puddles WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL No discharge N/A N/A BMP's adequate SAMPLE LOCATION AREAS OF CONCERN Temporary swale in NE corner of site Silt fence CORRECTIVE ACTIONS PAST CORRECTIVE ACTIONS Is this site in compliance with the terms and conditions of the SWPP and CSWGP discharge Permit? Yes www.aesgeo.com This document is considered DRAFT until reviewed and initialed by an AESI Project Manager TESC REPORT DATE CSWGP PROJECT NO. TESC REPORT NO. 11/14/2022 WAR310781 20180398E003 029 Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance ADDITIONAL COMMENTS: The contractor is using temporary check dams and swales onsite to impound the water. The swale has adequate water storage for now and will work as a temporary short term solution. The contractor has acquired a Baker tank and notified AESI that a permit from King County is pending to allow storm water discharge to the sanitary sewer system with higher turbidity limits. www.aesgeo.com