HomeMy WebLinkAbout20160674E003 Bethany Corner 2023-04-19 TESC 121.pdf
www.aesgeo.com
This document is considered DRAFT until reviewed and initialed by an AESI Project Manager
Temporary Erosion and
Sediment Control Monitoring
DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO.
4/19/2023 Bethany Corner 20160674E003 121
LOCATION CITY MUNICIPALITY CSWGP
16451 111th Ave SE Renton Renton WAR307077
PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL
4/12/2023
Mark Seek (Tiger Mountain
Homes) P/C, 40's 0.05" 0.60"
AESI FIELD REP Catherine Ikeda AESI PROJECT MANAGER Matthew A. Miller,
P.E.
Catherine Ikeda
QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS)
CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS
Asphalt pavement No
WHEEL WASH SEDIMENT TRACK OUT
N/A Some sediment trackout
ROADWAY SURFACE CATCH BASIN
Asphalt silt socks installed, along 165th St
LIMITS BUFFER AREA STABILIZATION
Silt fence, wood fence Landscaping grass, bark
SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation)
Installed along S and W perimeter None observed
COVER MEARSURES OVERALL STRAW
Fair - exposed soils N/A
PLASTIC SHEETING HYDROSEED
N/A N/A
CONVEYENCE CHANNEL CHECK DAMS
N/A N/A
STOCKPILE COVER PIPE SLOPE DRAINS
N/A N/A
LEVEL SPREADER LANDSCAPE/MULCH
South side of site Sidewalk planters and yard landscaping - active
SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET
Detention vault N/A
SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION
(Creek, Wetland, or Lake) (Clear, Turbid, Sheen)
Concrete (detention vault) N/A
WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL
Yes 3.58 6.5 BMPs fair
SAMPLE LOCATION AREAS OF CONCERN
SE of site: 111th Ave swale outfall Exposed soils
CORRECTIVE ACTIONS
add straw or landscaping over exposed soils, clear sediment trackout
PAST CORRECTIVE ACTIONS
None
Is this site in compliance with the terms and conditions
of the SWPP and CSWGP discharge Permit?
Yes
www.aesgeo.com
TESC REPORT
DATE CSWGP PROJECT NO. TESC REPORT NO.
4/19/2023 WAR307077 20130674E003 121
Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance
111th Ave Swale
outfall
3.58 NTU 6.5 Yes
ADDITIONAL COMMENTS:
AESI was onsite for a weekly TESC visit. No discharge was observed at the time of visit. AESI took a water sample from
the 111th Ave swale outfall. The turbidity of the water came back at 3.58 NTU. This is in compliance with the SWPP. AESI
noted that the contractor was still landscaping and working on driveways at the time of visit.