Loading...
HomeMy WebLinkAboutR-424602Cfl It CV 0 LU 2 LU v! z O a J_ LL Ir LU a C� G rr O CV C) CV yo- GENERAL CONSTRUCTION NOTES: 1. THE DESIGN AND CONSTRUCTION OF ALL WORK ON THIS PROJECT SHALL CONFORM TO THE LATEST REVISION AND/OR VERSION OF ALL CODES AND REFERENCE STANDARDS. 2. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS AND MEASUREMENTS AT THE SITE AND REPORT TO THE ENGINEER ANY DISCREPANCIES OR UNSATISFACTORY CONDITIONS WHICH MAY ADVERSELY AFFECT THE PROPER COMPLETION OF THE JOB BEFORE PROCEEDING WITH THE WORK. 3. DO NOT SCALE DRAWINGS. 4. ALL DIMENSIONS ON THE DRAWINGS ARE IN FEET AND INCHES UNLESS NOTED OTHERWISE. 5. MAINTAIN A SET OF DRAWINGS ON SITE AND UPDATE FREQUENTLY WITH CONSTRUCTION RECORD INFORMATION. 6. THE LANDOWNER/OPERATOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL PERMITS AND EASEMENTS. THIS INCLUDES ALL FEDERAL, STATE AND LOCAL PERMITS. THE LANDOWNER/OPERATOR IS TO ENSURE THAT THE CONTRACTOR HAS ACQUIRED ALL PERMITS. 7. THE LANDOWNER/OPERATOR IS RESPONSIBLE FOR CHECKING AND COMPLYING WITH ALL LOCAL ORDINANCES THAT MAY AFFECT THE PROJECT. 8. ALL CONSTRUCTION SHALL BE CARRIED OUT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. ALL COMPONENTS OF THE COMPLETED SYSTEM SHALL CONFORM TO THE LINES, GRADES, ELEVATIONS, DIMENSIONS AND MATERIALS SHOWN ON THE PLANS. 9. ANY CHANGES IN THE PLANS OR SPECIFICATIONS MUST BE APPROVED BY GHD PRIOR TO BEING MADE. CHANGES ARE TO BE REVIEWED BY THE LANDOWNER/OPERATOR FOR CONCURRENCE. SUBSTITUTIONS FROM SPECIFIED PRODUCTS AND MATERIALS SHALL BE APPROVED BY THE ENGINEER PRIOR TO ORDERING OF MATERIALS. 10. APPROVED SHALL MEAN APPROVED IN WRITING BY THE ENGINEER OF RECORD. 11. GHD MAKES NO REPRESENTATION AS TO THE EXISTENCE OR NONEXISTENCE OF ANY UTILITIES AT THE CONSTRUCTION SITE. IT IS THE RESPONSIBILITY OF THE LANDOWNER/OPERATORS AND CONTRACTORS TO ASSURE THEMSELVES THAT NO HAZARD EXISTS OR THAT NO DAMAGE WILL OCCUR TO UTILITIES. DIGGERS HOTLINE SHOULD BE NOTIFIED AT 811 (JULIEBEFOREYOUDIG.COM) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO EXCAVATION. 12. ALL DISTURBED AREAS SHALL BE RESTORED TO PRECONSTRUCTION CONDITIONS SUCH AS CONCRETE FINISH TOPSOILED, FERTILIZED, SEEDED, AND MULCHED OR OTHERWISE STABILIZED AS REQUIRED ON THE CONSTRUCTION PLANS. 13. CLEAR AND GRUB ALL AREAS NECESSARY FOR THE CONSTRUCTION OF ALL STRUCTURES. 14. DELIVER, HANDLE, AND STORE ALL MATERIALS IN A MANNER AS TO AVOID ANY DAMAGE. HEALTH AND SAFETY NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR KNOWING AND FOLLOWING ALL APPROPRIATE SAFETY STANDARDS. 2. HARD HATS MUST BE WORN BY ANYONE ON THE SITE WHO MAY BE EXPOSED TO FALLING OBJECTS OR ANYONE WITHIN OPERATING RANGE OF OVERHEAD CONSTRUCTION EQUIPMENT. OVERHEAD CONSTRUCTION EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, BACKHOES, CRANES, DRAGLINES AND FRONT-END LOADERS. EQUIPMENT OPERATORS WITHIN ENCLOSED VEHICLES ARE ALSO REQUIRED TO WEAR HARD HATS. FOUNDATION, EXCAVATION AND BACKFILL NOTES 1. BACKFILL MATERIAL AROUND WALLS SHALL BE NATIVE MATERIAL FREE FROM ORGANIC AND DELETERIOUS MATERIAL. SOFT CLAY MATERIAL SHALL NOT BE USED AS BACKFILL MATERIAL UNLESS APPROVED BY THE GEOTECHNICAL ENGINEER. 2. BACKFILL TO BE PLACED AND COMPACTED IN ACCORDANCE WITH IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS DIVISION 2 - EARTHWORK. 3. THE LINE OF SLOPE BETWEEN ADJACENT EXCAVATIONS FOR FOOTINGS SHALL NOT EXCEED THE LIMITS DETERMINED BY THE GEOTECHNICAL ENGINEER. DESIGN AND CONSTRUCT ADEQUATE SHORING AS REQUIRED. SHORING IS TO BE DESIGNED BY A PROFESSIONAL ENGINEER. 4. MINIMUM ALLOWABLE SOIL BEARING CAPACITY OF 1,500 PSF, MINIMUM SOIL SUBGRADE MODULUS OF K=100 PCI. CAST -IN -PLACE CONCRETE NOTES 1. ALL MATERIALS AND CONSTRUCTION PRACTICES SHALL BE IN ACCORDANCE WITH THE LATEST APPLICABLE ACI SPECIFICATIONS/GUIDELINES. THESE INCLUDE, BUT ARE NOT LIMITED TO, ACI 301, 304R, 305, 306, 308, 315. 2. CONCRETE DESIGN IN ACCORDANCE WITH ACI 318-14. MINIMUM CONCRETE COMPRESSIVE STRENGTH SHALL BE 4,500 PSI AT 28 DAYS. CONTRACTOR MUST PROVIDE MIX DESIGN TO OWNER FOR APPROVAL. 3. CONCRETE FORMS SHALL HAVE SUFFICIENT STRENGTH AND RIGIDITY TO HOLD THE CONCRETE AND WITHSTAND THE NECESSARY PRESSURE, TAMPING, AND VIBRATION WITHOUT DEFLECTION FROM THE PRESCRIBED LINES. THEY SHALL BE MORTAR -TIGHT AND CONSTRUCTED SO THAT THEY CAN BE REMOVED WITHOUT HAMMERING OR PRYING AGAINST THE CONCRETE. THE INSIDE OF THE FORMS SHALL BE OILED WITH A NON -STAINING MINERAL OIL OR THOROUGHLY WETTED BEFORE CONCRETE IS PLACED. 4. METAL TIES OR ANCHORAGES SHALL BE FULL DIMENSION. NOMINAL SIZE WALL TIES ARE NOT PERMITTED. WALL TIE ENDS MUST BE BROKEN OFF MINIMUM 1/2" INSIDE THE WALL AND PATCHED WITH AN APPROVED PATCHING MATERIAL. TIE PATCHING IS REQUIRED ON BOTH THE INSIDE AND OUTSIDE OF CONCRETE STRUCTURES. 5. ALL CONCRETE FOR WALLS SHALL BE CONSOLIDATED WITH INTERNAL TYPE MECHANICAL VIBRATORS. CONCRETE SHALL BE PLACED CONTINUOUSLY IN HORIZONTAL LIFTS NOT GREATER THAN 20 INCHES AND AS TO NOT CREATE COLD JOINTS. CONCRETE BEING PLACED SHALL NOT BE DROPPED FROM A HEIGHT GREATER THAN 6 FEET. 6. DO NOT PLACE BACKFILL LOADS ON WALLS UNTIL THE CONCRETE HAS ACHIEVED 100% OF THE 28-DAY DESIGN STRENGTH. 7. NO CUTTING OR DRILLING IN HARDENED CONCRETE IS PERMITTED WITHOUT APPROVAL FROM THE ENGINEER. 8. PIPES, HOLES, AND PENETRATIONS TO BE INSTALLED BETWEEN REINFORCING. DO NOT CUT REBAR FOR PIPES, HOLES, AND OTHER PENETRATIONS, UNLESS DONE IN ACCORDANCE WITH DRAWINGS. 9. PROVIDE 1" CHAMFER ON ALL EXPOSED CONCRETE EDGES. 10. THE STEEL REINFORCED CONCRETE PADS LOAD BEARING CAPACITIES WERE DESIGNED WITH A PRESUMPTIVE LOAD BEARING ASSUMPTION OF SOIL BEARING CAPACITY OF 1,500 LBS/SF PER SECTION 1806.2 AND PRESUMPTIVE LOAD BEARING VALUES TABLE 1806.2 11. REINFORCING STEEL SHALL BE NEW DEFORMED BARS CONFORMING TO ASTM A615, GRADE 60 SPECIFICATIONS. ALL REINFORCING MATERIAL SHALL BE FREE OF DIRT, LOOSE RUST, SCALE OIL, PAINT OR OTHER COATINGS. WELDING OF REINFORCEMENT STEEL IS NOT PERMITTED. 12. REINFORCING STEEL AND WATERSTOP SHALL BE ACCURATELY PLACED IN POSITION AS SHOWN ON THE PLANS AND FIRMLY ANCHORED TO PREVENT DISPLACEMENT DURING PLACEMENT OF CONCRETE. INSERTION OF STEEL INTO FRESH CONCRETE IS NOT PERMITTED. 13. BAR SPLICE AND DEVELOPMENT LENGTHS ARE TO BE IN ACCORDANCE WITH ACI 318-11 CL. 12.2.3, AS LISTED BELOW. UNLESS NOTED OTHERWISE ON DRAWINGS. BAR SIZE LAP SPLICE LENGTH (FOR SLABS) DEVELOPMENT LENGTH HOOK LENGTH HOOK DEVELOPMENT LENGTH #3 12" 9" 6" 7" #4 15" 12" 8" 101, #5 191, 15" 101, 12" #6 23" 181, 12" 15" #7 33" 25" 14" 17" #8 371' 291' 16" 191, (BASED ON STANDARD WEIGHT CONCRETE, GRADE 60 REINFORCING BARS, F'C = 4,500 PSI) MULTIPLY THE LAP & DEVELOPMENT LENGTHS ABOVE BY 1.3 FOR TOP BARS AND 1.5 FOR EPDXY COATED BARS MULTIPLY THE HOOK DEVELOPMENT LENGTHS ABOVE BY 1.2 FOR EPDXY COATED BARS. 14. WHEN BARS OF DIFFERENT SIZE ARE LAP SPLICED, LAP LENGTH SHALL BE THE LARGER OF: A) DEVELOPMENT LENGTH OF LARGER BAR B) LAP LENGTH OF SMALLER BAR 15. THE MIN. CLEAR DISTANCE BETWEEN REINFORCING STEEL AND SURFACE OF CONCRETE MUST BE AS FOLLOWS: WALLS: 2" TO EXT. & INT. FACE FOOTINGS & SLABS: 3" TO BOTTOM FACE CAST AGAINST EARTH, 2" TO TOP FACE AND SIDES 16. REINFORCING IS TO BE GENERALLY DETAILED IN ACCORDANCE WITH CRSI MANUAL OF STANDARD PRACTICE (LATEST EDITION). 17. IF THE DEPTH OF A FOOTING/FOUNDATION IS SUCH THAT A HOOK DEVELOPMENT LENGTH CANNOT BE ACHIEVED FOR THE VERTICAL WALL DOWELS, THE HORIZONTAL LEG LENGTH OF THE DOWEL SHALL BE EQUIVALENT TO THE DEVELOPMENT LENGTH OF THE BAR. 18. BARS LABELED "MID" TO BE LOCATED AT MID -DEPTH OF THE SECTION. 19. ALL REINFORCING AND WATERSTOP TO BE INSPECTED BY THE ENGINEER BEFORE POURING CONCRETE. 20. CONSTRUCTION JOINTS SHALL BE MADE AND LOCATED SO AS NOT TO IMPAIR THE STRENGTH OF THE STRUCTURE. IF CONSTRUCTION JOINTS ARE NOT SPECIFICALLY LOCATED ON THE DRAWINGS AND THERE IS ANY DOUBT CONCERNING THE LOCATION, THE CONTRACTOR MUST CONSULT WITH THE ENGINEER. 21. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF THE SET CONCRETE SHALL BE THOROUGHLY CLEANED AND BE IN DAMP CONDITION WITH NO FREE WATER ON THE SURFACE, IMMEDIATELY BEFORE PLACING ADJACENT CONCRETE. REINFORCING STEEL PROJECTED THROUGH A CONSTRUCTION JOINT SHALL BE THOROUGHLY CLEANED OF FLAKY RUST, MUD, OIL, DRIED CONCRETE OR ANY OTHER COATINGS THAT WOULD COMPROMISE THE BOND. 22. CONSTRUCTION JOINTS AS SHOWN ON DRAWING. 23. WATERSTOP SHALL BE MADE OF PVC OR HYDROPHILIC COMPOUND. THE WATERSTOP SHALL BE THE TYPE AND SIZE SPECIFIED ON THE CONSTRUCTION DRAWINGS. ALL PVC WATERSTOP INTERSECTIONS SHALL BE FACTORY WELDED. WATERSTOP SHALL BE THOSE LISTED BELOW OR ENGINEER APPROVED EQUIVALENT. 6-INCH WATERSTOP SHALL BE GREENSTREAK NO. 709 OR ENGINEER APPROVED EQUIVALENT 24. ALL SPECIFIED SEALANTS SHALL BE THOSE LISTED BELOW, AND/OR ENGINEER APPROVED EQUIVALENT. SIKAFLEX 1A - ONE COMPONENT, POLYURETHANE BASED ELASTOMERIC SEALANT 25. CURING COMPOUND SHALL BE A LIQUID MEMBRANE -FORMING COMPOUND SUITABLE FOR SPRAYING ON THE CONCRETE SURFACE. THE CURING COMPOUND SHALL MEET THE REQUIREMENTS OF ASTM C309 TYPE 2 (WHITE PIGMENTED). 26. ISOLATION JOINT MATERIAL SHALL BE MIN. 1/2" THICK ASPHALT IMPREGNATED FIBERBOARD, TO ASTM D1751. 27. EPDXY ANCHORING COMPOUND SHALL BE ULTRABOND1 TWO COMPONENT EPDXY ANCHORING GEL, TESTED IN ACCORDANCE WITH ASTM E488-10 & ASTM E1512-01, OR ENGINEER APPROVED EQUIVALENT. 28. FIELD TEST SHALL BE CONDUCTED ON THE CONCRETE DURING PLACEMENT AND SHALL CONFORM TO A CONCRETE STRENGTH OF 4,500 PSI, AIR ENTRAINMENT OF 6% + OR -, AND A SLUMP OF 5 INCHES. APPROXIMATELY 6 CONCRETE CYLINDERS SHALL BE CAST EVERY 150 CUBIC YARDS AND STRENGTH TESTED AT 7 DAYS AND 28 DAYS. SOIL NOTES 1. SUBGRADE SOILS SHALL BE COMPACTED TO STANDARD PROCTOR 95% MAXIMUM DRY DENSITY PER ASTM D698. 2. SUBBASE SHALL BE 12" GRAVEL TO MEET THE REQUIREMENTS OF SECTION 9-03.12(1)(B) -CLASS B DIVISION 9 MATERIALS - 2023 STANDARD SPECIFICATIONS WSDoT. Irgl MARO�1 of w�sy� UPI, 4- z R-424602 0 W[■ IN COMPLIANCE WITH CITY OF RENTON STANDARDS GHD Inc. ' 9725 Third Avenue NE Suite 204 DEVELOPMENT ENGINEERING Seattle Washington 98115 USA I T 1 425 563 6500 ■� yqi 04/13/2023 www.ghd.com Conditions of Use This document and the ideas and designs incorporated herein, as an instrument professional service, is the property of FOR CITY PERMITTING PURPOSES n who GHD has agreed can use this GHD. This document may only be used by GHD's client (and any other person document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose. SURVEYED: D ISSUE FOR PERMIT - CORRECTED PER CITY COMMENTS 4-5-2023 DESIGNED C ISSUE FOR PERMIT - CORRECTED PER CITY COMMENTS 3-16-2023 B ISSUE FOR PERMIT 1-9-2023 DRAWN: JB A ISSUE FOR PRELIMINARY 12-20-2022 CHECKED NO. REVISION BY DATE APPR APPROVEAV SCALE: DATE: NONE HOR ONiAL• NAD 1983/1991 CITY OF X P O LOGISTICS R E N TO N 4-5-2023 RENTON STORMWATER FILTRATION SYSTEM FIELDBOOK: %R]11207014 PAGE: ONE INCH DATUM 17 * DRAWING N0: AT FULL SCALE Planning/Building/Public Works Dept. CIVIL GENERAL NOTES C-000 IF NOT ONE INCH SCALE ACCORDINGLY SHEET: 2 OF, + LO C) C) C) M CV U 2 LU U) z O a J_ LL Ir LU a O Ir-^ V J