Loading...
HomeMy WebLinkAboutp_revision_Solera_AS_230322_vCORRIDORUNIT2HR FIRE WALL OR FIRE BARRIER PER PLANS AND ASSEMBLIESFLOOR JOIST PER STRUCT.MEP AND SPRINKLERS TO BE BIDDER DESIGNED. PENETRATIONS SHALL COMPLY WITH IBC SECTION 714 FOR 2HR FIRE WALL1-HR RATED FLOOR ASSEMBLY PER SECTIONSUNITCORRIDORSHEATHING PER STRUCT. ON CORRIDOR SIDE OF WALLEXTEND 2 LAYERS GWB TO UNDERSIDE OF FLOOR SHEATHING, CUT GWB TIGHT AROUND HANGERSFIRE CAULK JOINTPLUMBING WALL AS OCCURS, SEE UNIT PLANSBEAM ACROSS CORRIDOR (BEYOND) PER STRUCT.TOP FLANGE OR FACE MOUNT HANGER PER STRUCTURALSOLID RIMBOARD PER STRUCTURALPROVIDE SOLID FILLER AS ALLOWED BY MANUF. BOTH SIDES OF I-JOIST WEB AT HANGERS11959REGISTEREDARCHITECTSCOTT W GLAZEBROOKSTATE OF WASHINGTONTiscareno Associates PS 1200 Sixth Avenue, Suite 605 Seattle, WA 98101 T: 206.325.3356 F: 206.701.9769© 2022 TISCARENO ASSOCIATES PSDRAWING NO.Solera Renton Building A03/21/23ASK001FIRE WALL/FIRE BARRIER@CORRIDORBUILDING PERMIT #S:B21003521 - BUILDING A-NORTHB21003522 - BUILDING A-SOUTHUPON APPROVAL THIS DETAIL REPLACES SIMILAR HANGER CONDITIONS AT THE FOLLOWING DETAILS IN THE CONSTRUCTION DOCUMENTS:ON SHEET:AA610: DETAILS 17-19, 23, 24, 27, 29, 30AA611: DETAILS 2, 3, 8, 12,13, 17, 18PR18000333PR21000291B21003522V5 Post IssuanceREVISION Received: 03/24 /2023 / aalexanderBUILDING DIV ISION APPROVEDBUILDING DIVISIONTHIS SET O F A PPROVED PLANS MUST BE ON T HE JOB A T A LLTIMES D URING CONSTRUC TION . THIS BU ILD ING IS NOT TO BEOCCUPIED UNTI L A FTER FIN AL INSP ECTION BY THE RENTONBUILD ING D IV ISION AND RECE IPT OF CERT IFIC ATE OFOCCUPANCY.APPROVAL SH ALL NOT BE CONSTRUED AS THE AUTHOR ITY TOVIOLATE OR CANCEL ANY PROV ISIONS OF CODES , OR DINANC ES,OR OTHER REGULAT IONS ENFORCED BY TH IS C ITY .DATE : 04 /10 /2023