HomeMy WebLinkAboutCA_ Hydraulic_Calculations_230425_V1 NFPA-13D Multi-Purpose Fire Sprinkler System
PELTRAM PLUMBING, LLC
1929 WEST VALLY HWY S. SUITE 101
AUBURN, WA 98001-6575
• Job Name – Edenfield
• Address – 6567 SE 8th Pl
• Lot # - 5
• Bldg. Permit # - B23000758
• Parcel # - 1423059013
• Plan # - 63-40-01.13.0XB
• System Type – NFPA 13D (2016) 3.3.9.3* Multipurpose Piping System.4/19/2023F23002158
V1
RECEIVED
04/26/2023
aalexander
BUILDING DIVISION
By: cthomas
Date: 05/01/2023
FIRE DEPARTMENT
For Construction Subject to
Corrections Noted in Red
APPROVED
NFPA-13D Hydraulic Calculations
Peltram Plumbing, LLC
Designer of Record: Clyde J. Ward Jr. CoC 2970-0908-A* Level 1
WATER SUPPLY INFO
Name of Contractor
Peltram Plumbing, LLC
UBI #604295656
1929 West Valley Hwy S. Suite 101 Auburn, WA 98001
Main #253-249-0200 Fax #253-891-9248
• Job Name – Edenfield
• Address – 6567 SE 8th Pl
• Lot # - 5
• Bldg. Permit # - B23000758
• Parcel # - 1423059013
• Plan # - 63-40-01.13.0XB
SYSTEM DESIGN NOTES
• Type of Calculation – NFPA 13D (2016)
• Hydraulically Most Remote Single Sprinkler Calculated – H.12
• Hydraulically Most Remote 2 Sprinklers Calculated – H.3, H.4
• Hydraulically Most Remote Mult-Sprinkler Calculated - NA
• Listed Flow/Pressure @ Remote Head / H.12 RFC49LL-20 20gpm @ 16.7psi
• Listed Flow/Pressure @ Remote Head / H.3 RFC49LL-16 13gpm @ 7psi
• Listed Flow/Pressure @ Remote Head / H.4 RFC49LL-16 13gpm @ 7psi
• Listed Flow/Pressure @ Remote Head / NA
• Maximum Listed Spacing – 20’ x 20’
• Elevation at Highest Point – 24’
Date:
Location:
Source:
Date: 4/19/2023
Summary of All Hydraulic Calculations HydraCAD-R v4.0
Peltram Plumbing, LLC. Page 1
Plan #63-40-01.13.0XB Date 4/19/2023
-------------------------------------------------------------------------------
**************************************************
Most Demanding Calculation Summary:
Hydraulically Most Remote Single Sprinkler:
Reference Point ..................... H.12
Design Flow at Manifold ............ 20
Total Flow at Supply ............... 20
Design Pressure at Supply .......... 48.53
Pressure Available at Total Flow .... 69.67
Pressure Safety Margin .............. 21.14
Hydraulically Most Remote 2 Sprinkler Calculation:
Reference Point 1 .................. H.4
Reference Point 2 .................. H.3
Design Flow at Manifold ............. 26.2484
Total Flow at Supply . ............. 26.2484
Design Pressure at Supply .......... 47.68
Pressure Available at Total Flow .... 69.45
Pressure Safety Margin .............. 21.77
**************************************************
*************************************************************
Calculated Results Color Legend:
Color Level of Pressure Design Pressure
Code Demand Required
Red ****** Most Demanding ........ 48.53 psi
Yellow **** Intermediate Demand ... 35.14 - 48.52 psi
Green ** Least Demanding ....... 21.75 - 35.13 psi
*************************************************************
******************************************************************
Sprinkler Flow - Supply & Manifold Pressure Summary
1st 1st 2nd 2nd Sprk Design Test
Head K- Head K- Flow Supply Manifold Demand
Ref Factor Ref Factor (gpm) Press-psi Press-psi Level
H.1 4.9 13.0 29.16 14.28 Green **
H.2 4.9 20.0 48.35 27.40 Yellow ****
H.3 4.9 13.0 29.18 14.31 Green **
H.4 4.9 13.0 28.74 13.86 Green **
H.5 4.9 13.0 28.96 14.08 Green **
H.6 4.9 13.0 22.89 8.02 Green **
H.7 4.9 13.0 22.87 7.99 Green **
H.8 4.9 13.0 29.58 14.70 Green **
H.9 4.9 20.0 46.63 25.68 Yellow ****
H.10 4.9 20.0 42.66 21.71 Yellow ****
H.11 4.9 20.0 42.31 21.36 Yellow ****
Summary of All Hydraulic Calculations HydraCAD-R v4.0
Peltram Plumbing, LLC. Page 2
Plan #63-40-01.13.0XB Date 4/19/2023
-------------------------------------------------------------------------------
Sprinkler Flow - Supply & Manifold Pressure Summary (con't.)
1st 1st 2nd 2nd Sprk Design Test
Head K- Head K- Flow Supply Manifold Demand
Ref Factor Ref Factor (gpm) Press-psi Press-psi Level
H.12 4.9 20.0 48.53 27.58 -Red- ******
H.13 4.9 13.0 29.56 14.68 Green **
H.14 4.9 13.0 23.23 8.36 Green **
H.15 4.9 13.0 28.14 13.26 Green **
H.16 4.9 13.0 28.29 13.41 Green **
H.17 4.9 13.0 28.27 13.39 Green **
H.18 4.9 13.0 28.67 13.79 Green **
H.19 4.9 13.0 28.19 13.31 Green **
H.20 4.9 13.0 23.29 8.41 Green **
H.21 4.9 13.0 23.08 8.20 Green **
H.22 4.9 13.0 23.51 8.63 Green **
H.23 4.9 13.0 23.80 8.92 Green **
H.24 4.9 13.0 24.01 9.13 Green **
H.25 4.9 13.0 28.77 13.89 Green **
H.26 4.9 13.0 22.70 7.82 Green **
H.27 4.9 13.0 28.49 13.61 Green **
H.28 4.9 13.0 28.56 13.68 Green **
H.29 4.9 13.0 23.28 8.40 Green **
H.30 4.9 20.0 45.68 24.73 Yellow ****
H.31 4.9 13.0 27.88 13.00 Green **
H.32 4.9 13.0 28.10 13.22 Green **
H.33 4.9 13.0 28.36 13.48 Green **
H.34 4.9 13.0 28.48 13.60 Green **
H.35 4.9 13.0 28.53 13.65 Green **
H.36 4.9 13.0 22.13 7.25 Green **
H.37 4.9 13.0 23.07 8.20 Green **
H.38 4.9 13.0 22.74 7.86 Green **
H.39 4.9 13.0 21.79 6.91 Green **
H.40 4.9 13.0 21.75 6.87 Green **
H.4 4.9 H.3 4.9 26.3 47.68 19.39 Yellow ****
H.3 4.9 H.15 4.9 26.9 46.73 17.66 Yellow ****
H.15 4.9 H.16 4.9 26.1 44.79 16.74 Yellow ****
H.16 4.9 H.4 4.9 26.4 46.33 17.95 Yellow ****
H.8 4.9 H.25 4.9 26.7 46.50 17.69 Yellow ****
H.25 4.9 H.32 4.9 26.6 45.12 16.36 Yellow ****
H.35 4.9 H.34 4.9 26.1 45.76 17.80 Yellow ****
H.6 4.9 H.7 4.9 26.1 38.90 10.94 Yellow ****
H.7 4.9 H.26 4.9 26.1 38.79 10.71 Yellow ****
H.26 4.9 H.21 4.9 26.4 38.89 10.51 Yellow ****
H.21 4.9 H.6 4.9 26.2 39.40 11.28 Yellow ****
H.21 4.9 H.37 4.9 26.1 39.08 11.13 Yellow ****
H.37 4.9 H.38 4.9 26.3 39.54 11.30 Yellow ****
H.38 4.9 H.39 4.9 26.8 37.45 8.46 Yellow ****
H.26 4.9 H.38 4.9 26.1 38.10 10.06 Yellow ****
H.21 4.9 H.20 4.9 26.1 40.15 12.09 Yellow ****
H.20 4.9 H.29 4.9 26.1 40.48 12.53 Yellow ****
H.29 4.9 H.37 4.9 26.1 40.19 12.13 Yellow ****
Summary of All Hydraulic Calculations HydraCAD-R v4.0
Peltram Plumbing, LLC. Page 3
Plan #63-40-01.13.0XB Date 4/19/2023
-------------------------------------------------------------------------------
Sprinkler Flow - Supply & Manifold Pressure Summary (con't.)
1st 1st 2nd 2nd Sprk Design Test
Head K- Head K- Flow Supply Manifold Demand
Ref Factor Ref Factor (gpm) Press-psi Press-psi Level
H.24 4.9 H.23 4.9 26.1 41.95 13.93 Yellow ****
******************************************************************
Note: TEST MANIFOLD PRESSURE includes 7' elevation adjustment
for relocation of orifice created by test device
**************************************************
Sprinkler Interconnection Verification Summary
Head Non- Total Required
Ref: Flowing Flowing Cont'ns Pressure (psi)
H.1 2 0 2 29.16
H.2 2 0 2 48.35
H.3 1 0 1 29.18
H.4 2 0 2 28.74
H.5 2 0 2 28.96
H.6 2 0 2 22.89
H.7 2 0 2 22.87
H.8 2 0 2 29.58
H.9 2 0 2 46.63
H.10 2 0 2 42.66
H.11 2 0 2 42.31
H.12 2 0 2 48.53
H.13 2 0 2 29.56
H.14 2 0 2 23.23
H.15 2 0 2 28.14
H.16 2 0 2 28.29
H.17 2 0 2 28.27
H.18 2 0 2 28.67
H.19 2 0 2 28.19
H.20 2 0 2 23.29
H.21 2 0 2 23.08
H.22 2 0 2 23.51
H.23 2 0 2 23.80
H.24 2 0 2 24.01
H.25 2 0 2 28.77
H.26 2 0 2 22.70
H.27 2 0 2 28.49
H.28 2 0 2 28.56
H.29 2 0 2 23.28
H.30 2 0 2 45.68
H.31 2 0 2 27.88
H.32 2 0 2 28.10
H.33 2 0 2 28.36
H.34 2 0 2 28.48
H.35 2 0 2 28.53
H.36 2 0 2 22.13
H.37 2 0 2 23.07
H.38 2 0 2 22.74
H.39 2 0 2 21.79
H.40 2 0 2 21.75
**************************************************
Summary of All Hydraulic Calculations HydraCAD-R v4.0
Peltram Plumbing, LLC. Page 4
Plan #63-40-01.13.0XB Date 4/19/2023
-------------------------------------------------------------------------------
======================================================
Pipe Lengths
Pipe From To Computer Calc'd
Ref. Hd Ref Hd Ref Length Length
1 : H.1 - H.5 = 7 7
2 : H.3 - H.2 = 8 8
3 : H.4 - H.3 = 10 10
4 : H.7 - H.6 = 10 10
5 : H.12 - H.1 = 10 10
6 : H.5 - H.9 = 6 6
7 : H.2 - H.13 = 18 18
8 : T.41 - H.6 = 5 5
9 : H.16 - H.4 = 10 10
10 : T.42 - H.7 = 5 5
11 : H.13 - H.8 = 8 8
12 : H.8 - H.12 = 18 18
13 : H.9 - T.43 = 7 7
14 : T.44 - T.41 = 15 15
15 : H.14 - T.42 = 4 4
16 : H.24 - H.10 = 17 17
17 : H.11 - H.24 = 14 14
18 : H.11 - T.43 = 22 22
19 : H.10 - H.23 = 9 9
20 : T.44 - H.15 = 4 4
21 : H.15 - T.45 = 11 11
22 : H.21 - T.41 = 5 5
23 : T.45 - H.16 = 1 1
24 : H.17 - T.44 = 5 5
25 : H.14 - H.22 = 8 8
26 : T.43 - H.19 = 4 4
27 : H.23 - H.22 = 12 12
28 : H.21 - H.20 = 10 10
29 : T.42 - H.26 = 9 9
30 : H.18 - H.25 = 15 15
31 : H.27 - H.18 = 9 9
32 : H.28 - H.17 = 5 5
33 : H.19 - T.46 = 4 4
34 : H.25 - H.28 = 15 15
35 : H.27 - T.46 = 9 9
36 : H.35 - T.45 = 15 15
37 : H.20 - H.29 = 12 12
38 : T.46 - H.30 = 9 9
39 : H.26 - T.48 = 10 10
40 : H.34 - H.35 = 13 13
41 : H.30 - H.31 = 13 13
42 : H.32 - H.33 = 9 9
43 : T.47 - H.32 = 8 8
44 : H.33 - H.34 = 7 7
45 : H.31 - T.47 = 4 4
46 : H.36 - T.48 = 6 6
47 : T.48 - H.38 = 2 2
Summary of All Hydraulic Calculations HydraCAD-R v4.0
Peltram Plumbing, LLC. Page 5
Plan #63-40-01.13.0XB Date 4/19/2023
-------------------------------------------------------------------------------
Pipe Lengths (con't.)
Pipe From To Computer Calc'd
Ref. Hd Ref Hd Ref Length Length
48 : H.29 - H.37 = 13 13
49 : H.39 - H.36 = 7 7
50 : H.37 - H.38 = 10 10
51 : H.39 - S.1 = 9 9
52 : T.47 - H.40 = 21 21
53 : H.40 - S.1 = 7 7
------------------------------------------------------
Total Pipe Length ........... = 504 504
======================================================
Company NamePage 1 Plan #63-40-01.13.0XB - One Head Calculation (H.12)Date 4/19/2023 10203040E50R60U70S80S90E100R110P12013014015050 100 150 200 250 300 350 400 450FLOW ( N ^ 1.85 )City Water Supply:Demand:C1C2C1 - Static Pressure : 70 C2 - Residual Pressure: 20 C2 - Residual Flow : 300 D1 - Elevation : 10.394 D2 - System Flow : 20.024 D2 - System Pressure : 48.529 Hose ( Demand ) : _______D3 - System Demand : 20.024 Safety Margin : 21.137 D1D2Water Supply Curve CComputer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company NamePage 2 Plan #63-40-01.13.0XB - One Head Calculation (H.12)Date 4/19/2023 Fitting Legend Abbrev.Name ½¾11¼1½22½33½456810121416182024 E NFPA 13 90' Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 Eel *ProPEX 90 Elbow - EP 3.72.34.610.4812.8812.2800000000000000 Etb *ProPEX Tee - Branch - EP 2.30.829.1411.5413.2200000000000000 Etr *ProPEX Tee - Run - EP 10.20.23.961.842.8600000000000000 Fsp Flow Switch Potter VSR Fitting generates a Fixed Loss Based on Flow T NFPA 13 90' Flow thru Tee 3 4 5 6 8 10121517202530355060718191101121 Xwm NFPA 13D Water Meter Fitting generates a Fixed Loss Based on Flow Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Fittings Used SummaryComputer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 3
Plan #63-40-01.13.0XB - One Head Calculation (H.12) Date 4/19/2023
SUPPLY ANALYSIS
Node at Static Residual Available
Source Pressure Pressure Flow Pressure Total Demand Required Pressure
CITY 70.0 20 300.0 69.666 20.02 48.529
NODE ANALYSIS
Pressure Discharge
Node Tag Elevation Node Type at Node at Node Notes
H.12 124.0 4.9 16.7 20.02
H.1 124.0 17.92
H.5 124.0 18.52
H.9 124.0 19.4
T.43 124.0 20.0
H.11 112.0 25.45
H.24 112.0 25.65
H.10 112.0 25.92
H.23 112.0 26.02
H.22 112.0 26.14
H.14 112.0 26.23
T.42 112.0 26.34
H.26 112.0 26.57
T.48 112.0 26.83
H.36 112.0 27.32
H.39 112.0 27.75
S.1 106.0 30.61
H.40 112.0 27.78
T.47 124.0 21.08
H.31 124.0 20.99
H.30 124.0 20.67
T.46 124.0 20.34
H.27 124.0 20.38
H.18 124.0 20.4
H.25 124.0 20.46
H.28 124.0 20.51
H.17 124.0 20.54
T.44 124.0 20.55
T.41 112.0 26.21
H.21 112.0 26.3
H.20 112.0 26.44
H.29 112.0 26.55
H.37 112.0 26.68
H.38 112.0 26.77
H.8 124.0 17.49
H.13 124.0 18.05
H.2 124.0 18.85
H.3 124.0 19.21
H.4 124.0 19.85
H.16 124.0 20.3
T.45 124.0 20.35
H.35 124.0 20.6
Flow Summary - NFPA 2007
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 4
Plan #63-40-01.13.0XB - One Head Calculation (H.12) Date 4/19/2023
NODE ANALYSIS (cont.)
Pressure Discharge
Node Tag Elevation Node Type at Node at Node Notes
H.34 124.0 20.77
H.33 124.0 20.86
H.32 124.0 20.98
H.19 124.0 20.17
H.15 124.0 20.5
H.6 112.0 26.23
H.7 112.0 26.31
UDG1 100.0 39.47
MTR 100.0 43.02
CITY 100.0 48.53
Flow Summary - NFPA 2007
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 5
Plan #63-40-01.13.0XB - One Head Calculation (H.12) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
*Remote Head to Supply
H.12 124 4.90 11.73 1 Eel 2.3 10.000 150 16.700
to 0.0 4.600 0.0
H.1 124 11.73 0.862 0.0 14.600 0.0834 1.218 Vel = 6.45
H.1 124 0.0 1 Etr 0.2 7.000 150 17.918
to 0.0 0.200 0.0
H.5 124 11.73 0.862 0.0 7.200 0.0835 0.601 Vel = 6.45
H.5 124 0.0 1 Eel 2.3 6.000 150 18.519
to 0.0 4.600 0.0
H.9 124 11.73 0.862 0.0 10.600 0.0835 0.885 Vel = 6.45
H.9 124 0.0 1 Etr 0.2 7.000 150 19.404
to 0.0 0.200 0.0
T.43 124 11.73 0.862 0.0 7.200 0.0835 0.601 Vel = 6.45
T.43 124 -7.92 1 Etb 0.8 22.000 150 20.005
to 0.0 2.000 5.197
H.11 112 3.81 0.862 0.0 24.000 0.0104 0.250 Vel = 2.09
H.11 112 0.0 1 Eel 2.3 14.000 150 25.452
to 0.0 4.600 0.0
H.24 112 3.81 0.862 0.0 18.600 0.0104 0.194 Vel = 2.09
H.24 112 0.0 1 2Eel 4.6 17.000 150 25.646
to 0.0 9.200 0.0
H.10 112 3.81 0.862 0.0 26.200 0.0104 0.273 Vel = 2.09
H.10 112 0.0 1 Etr 0.2 9.000 150 25.919
to 0.0 0.200 0.0
H.23 112 3.81 0.862 0.0 9.200 0.0104 0.096 Vel = 2.09
H.23 112 0.0 1 0.0 12.000 150 26.015
to 0.0 0.0 0.0
H.22 112 3.81 0.862 0.0 12.000 0.0104 0.125 Vel = 2.09
H.22 112 0.0 1 Etr 0.2 8.000 150 26.140
to 0.0 0.200 0.0
H.14 112 3.81 0.862 0.0 8.200 0.0105 0.086 Vel = 2.09
H.14 112 0.0 1 Etb 0.8 4.000 150 26.226
to Eel 2.3 6.600 0.0
T.42 112 3.81 0.862 0.0 10.600 0.0104 0.110 Vel = 2.09
T.42 112 2.38 1 Etr 0.2 9.000 150 26.336
to 0.0 0.200 0.0
H.26 112 6.19 0.862 0.0 9.200 0.0257 0.236 Vel = 3.40
H.26 112 0.0 1 Etr 0.2 10.000 150 26.572
to 0.0 0.200 0.0
T.48 112 6.19 0.862 0.0 10.200 0.0255 0.260 Vel = 3.40
T.48 112 3.61 1 Etb 0.8 6.000 150 26.832
to Etr 0.2 2.200 0.0
H.36 112 9.8 0.862 0.0 8.200 0.0599 0.491 Vel = 5.39
H.36 112 0.0 1 Etr 0.2 7.000 150 27.323
to 0.0 0.200 0.0
H.39 112 9.8 0.862 0.0 7.200 0.0599 0.431 Vel = 5.39
H.39 112 0.0 1.25 T 2.44 9.000 150 27.754
to 0.0 2.440 2.599
S.1 106 9.8 1.054 0.0 11.440 0.0225 0.257 Vel = 3.60
Final Calculations - Hazen-Williams
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 6
Plan #63-40-01.13.0XB - One Head Calculation (H.12) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
S.1 106 -20.02 1.25 T 2.44 7.000 150 30.610
to 0.0 2.440 -2.599
H.40 112 -10.22 1.054 0.0 9.440 -0.0243 -0.229 Vel = 3.76
H.40 112 0.0 1 Etb 0.8 21.000 150 27.782
to Etr 0.2 2.200 -5.197
T.47 124 -10.22 0.862 0.0 23.200 -0.0648 -1.503 Vel = 5.62
T.47 124 4.24 1 0.0 4.000 150 21.082
to 0.0 0.0 0.0
H.31 124 -5.98 0.862 0.0 4.000 -0.0240 -0.096 Vel = 3.29
H.31 124 0.0 1 Etr 0.2 13.000 150 20.986
to 0.0 0.200 0.0
H.30 124 -5.98 0.862 0.0 13.200 -0.0239 -0.316 Vel = 3.29
H.30 124 0.0 1 Eel 2.3 9.000 150 20.670
to 0.0 4.600 0.0
T.46 124 -5.98 0.862 0.0 13.600 -0.0240 -0.326 Vel = 3.29
T.46 124 7.92 1 Etb 0.8 9.000 150 20.344
to 0.0 2.000 0.0
H.27 124 1.94 0.862 0.0 11.000 0.0030 0.033 Vel = 1.07
H.27 124 0.0 1 Etr 0.2 9.000 150 20.377
to 0.0 0.200 0.0
H.18 124 1.94 0.862 0.0 9.200 0.0029 0.027 Vel = 1.07
H.18 124 0.0 1 Etr 0.2 15.000 150 20.404
to Eel 2.3 4.800 0.0
H.25 124 1.94 0.862 0.0 19.800 0.0030 0.059 Vel = 1.07
H.25 124 0.0 1 0.0 15.000 150 20.463
to 0.0 0.0 0.0
H.28 124 1.94 0.862 0.0 15.000 0.0030 0.045 Vel = 1.07
H.28 124 0.0 1 Eel 2.3 5.000 150 20.508
to 0.0 4.600 0.0
H.17 124 1.94 0.862 0.0 9.600 0.0030 0.029 Vel = 1.07
H.17 124 0.0 1 Etr 0.2 5.000 150 20.537
to 0.0 0.200 0.0
T.44 124 1.94 0.862 0.0 5.200 0.0031 0.016 Vel = 1.07
T.44 124 4.05 1 2Etb 1.6 15.000 150 20.553
to 0.0 4.000 5.197
T.41 112 5.99 0.862 0.0 19.000 0.0241 0.457 Vel = 3.29
T.41 112 -2.38 1 Eel 2.3 5.000 150 26.207
to 0.0 4.600 0.0
H.21 112 3.61 0.862 0.0 9.600 0.0095 0.091 Vel = 1.98
H.21 112 0.0 1 Eel 2.3 10.000 150 26.298
to 0.0 4.600 0.0
H.20 112 3.61 0.862 0.0 14.600 0.0095 0.138 Vel = 1.98
H.20 112 0.0 1 Etr 0.2 12.000 150 26.436
to 0.0 0.200 0.0
H.29 112 3.61 0.862 0.0 12.200 0.0094 0.115 Vel = 1.98
H.29 112 0.0 1 Etr 0.2 13.000 150 26.551
to 0.0 0.200 0.0
H.37 112 3.61 0.862 0.0 13.200 0.0095 0.125 Vel = 1.98
Final Calculations : Hazen-Williams
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 7
Plan #63-40-01.13.0XB - One Head Calculation (H.12) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
H.37 112 0.0 1 0.0 10.000 150 26.676
to 0.0 0.0 0.0
H.38 112 3.61 0.862 0.0 10.000 0.0094 0.094 Vel = 1.98
H.38 112 0.0 1 Eel 2.3 2.000 150 26.770
to 0.0 4.600 0.0
T.48 112 3.61 0.862 0.0 6.600 0.0094 0.062 Vel = 1.98
0.0
T.48 3.61 26.832 K Factor = 0.70
*New Path
H.12 124 8.30 1 0.0 18.000 150 16.700
to 0.0 0.0 0.0
H.8 124 8.3 0.862 0.0 18.000 0.0440 0.792 Vel = 4.56
H.8 124 0.0 1 Eel 2.3 8.000 150 17.492
to 0.0 4.600 0.0
H.13 124 8.3 0.862 0.0 12.600 0.0440 0.554 Vel = 4.56
H.13 124 0.0 1 Etr 0.2 18.000 150 18.046
to 0.0 0.200 0.0
H.2 124 8.3 0.862 0.0 18.200 0.0440 0.801 Vel = 4.56
H.2 124 0.0 1 Etr 0.2 8.000 150 18.847
to 0.0 0.200 0.0
H.3 124 8.3 0.862 0.0 8.200 0.0440 0.361 Vel = 4.56
H.3 124 0.0 1 Eel 2.3 10.000 150 19.208
to 0.0 4.600 0.0
H.4 124 8.3 0.862 0.0 14.600 0.0440 0.642 Vel = 4.56
H.4 124 0.0 1 Etr 0.2 10.000 150 19.850
to 0.0 0.200 0.0
H.16 124 8.3 0.862 0.0 10.200 0.0440 0.449 Vel = 4.56
H.16 124 0.0 1 Etr 0.2 1.000 150 20.299
to 0.0 0.200 0.0
T.45 124 8.3 0.862 0.0 1.200 0.0442 0.053 Vel = 4.56
T.45 124 -4.05 1 Eel 2.3 15.000 150 20.352
to 0.0 4.600 0.0
H.35 124 4.25 0.862 0.0 19.600 0.0128 0.250 Vel = 2.34
H.35 124 0.0 1 Etr 0.2 13.000 150 20.602
to 0.0 0.200 0.0
H.34 124 4.25 0.862 0.0 13.200 0.0128 0.169 Vel = 2.34
H.34 124 0.0 1 0.0 7.000 150 20.771
to 0.0 0.0 0.0
H.33 124 4.25 0.862 0.0 7.000 0.0127 0.089 Vel = 2.34
H.33 124 0.0 1 Etr 0.2 9.000 150 20.860
to 0.0 0.200 0.0
H.32 124 4.25 0.862 0.0 9.200 0.0127 0.117 Vel = 2.34
H.32 124 0.0 1 Etr 0.2 8.000 150 20.977
to 0.0 0.200 0.0
T.47 124 4.25 0.862 0.0 8.200 0.0128 0.105 Vel = 2.34
0.0
T.47 4.25 21.082 K Factor = 0.93
*New Path
Final Calculations : Hazen-Williams
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 8
Plan #63-40-01.13.0XB - One Head Calculation (H.12) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
T.43 124 7.92 1 Etr 0.2 4.000 150 20.005
to 0.0 0.200 0.0
H.19 124 7.92 0.862 0.0 4.200 0.0402 0.169 Vel = 4.35
H.19 124 0.0 1 Etr 0.2 4.000 150 20.174
to 0.0 0.200 0.0
T.46 124 7.92 0.862 0.0 4.200 0.0405 0.170 Vel = 4.35
0.0
T.46 7.92 20.344 K Factor = 1.76
*New Path
T.45 124 4.05 1 Etb 0.8 11.000 150 20.352
to 0.0 2.000 0.0
H.15 124 4.05 0.862 0.0 13.000 0.0117 0.152 Vel = 2.23
H.15 124 0.0 1 Etr 0.2 4.000 150 20.504
to 0.0 0.200 0.0
T.44 124 4.05 0.862 0.0 4.200 0.0117 0.049 Vel = 2.23
0.0
T.44 4.05 20.553 K Factor = 0.89
*New Path
T.41 112 2.38 1 Etr 0.2 5.000 150 26.207
to 0.0 0.200 0.0
H.6 112 2.38 0.862 0.0 5.200 0.0044 0.023 Vel = 1.31
H.6 112 0.0 1 2Eel 4.6 10.000 150 26.230
to 0.0 9.200 0.0
H.7 112 2.38 0.862 0.0 19.200 0.0044 0.084 Vel = 1.31
H.7 112 0.0 1 Etr 0.2 5.000 150 26.314
to 0.0 0.200 0.0
T.42 112 2.38 0.862 0.0 5.200 0.0042 0.022 Vel = 1.31
0.0
T.42 2.38 26.336 K Factor = 0.46
*New Path
S.1 106 20.02 1.25 E 1.22 35.000 150 30.610
to T 2.44 3.661 5.599 * * Fixed Loss = 3
UDG1 100 20.02 1.054 Fsp 0.0 38.661 0.0843 3.260 Vel = 7.36
UDG1 100 0.0 1.25 E 3.179 100.000 150 39.469
to T 6.358 9.536 0.0
MTR 100 20.02 1.283 0.0 109.536 0.0324 3.546 Vel = 4.97
MTR 100 0.0 1 E 2.778 25.000 150 43.015
to T 6.945 9.722 2.253 * * Fixed Loss = 2.253
CITY 100 20.02 1.031 Xwm 0.0 34.722 0.0939 3.261 Vel = 7.69
0.0
CITY 20.02 48.529 K Factor = 2.87
Final Calculations : Hazen-Williams
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company NamePage 1 Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4)Date 4/19/2023 10203040E50R60U70S80S90E100R110P12013014015050 100 150 200 250 300 350 400 450FLOW ( N ^ 1.85 )City Water Supply:Demand:C1C2C1 - Static Pressure : 70 C2 - Residual Pressure: 20 C2 - Residual Flow : 300 D1 - Elevation : 10.394 D2 - System Flow : 26.248 D2 - System Pressure : 47.680 Hose ( Demand ) : _______D3 - System Demand : 26.248 Safety Margin : 21.768 D1D2Water Supply Curve CComputer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company NamePage 2 Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4)Date 4/19/2023 Fitting Legend Abbrev.Name ½¾11¼1½22½33½456810121416182024 E NFPA 13 90' Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 Eel *ProPEX 90 Elbow - EP 3.72.34.610.4812.8812.2800000000000000 Etb *ProPEX Tee - Branch - EP 2.30.829.1411.5413.2200000000000000 Etr *ProPEX Tee - Run - EP 10.20.23.961.842.8600000000000000 Fsp Flow Switch Potter VSR Fitting generates a Fixed Loss Based on Flow T NFPA 13 90' Flow thru Tee 3 4 5 6 8 10121517202530355060718191101121 Xwm NFPA 13D Water Meter Fitting generates a Fixed Loss Based on Flow Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Fittings Used SummaryComputer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 3
Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4) Date 4/19/2023
SUPPLY ANALYSIS
Node at Static Residual Available
Source Pressure Pressure Flow Pressure Total Demand Required Pressure
CITY 70.0 20 300.0 69.448 26.25 47.68
NODE ANALYSIS
Pressure Discharge
Node Tag Elevation Node Type at Node at Node Notes
H.3 124.0 4.9 7.04 13.0
H.2 124.0 7.36
H.13 124.0 8.08
H.8 124.0 8.58
H.12 124.0 9.29
H.1 124.0 9.86
H.5 124.0 10.15
H.9 124.0 10.56
T.43 124.0 10.85
H.11 112.0 16.3
H.24 112.0 16.49
H.10 112.0 16.77
H.23 112.0 16.86
H.22 112.0 16.99
H.14 112.0 17.08
T.42 112.0 17.19
H.26 112.0 17.54
T.48 112.0 17.94
H.36 112.0 18.73
H.39 112.0 19.41
S.1 106.0 22.42
H.40 112.0 19.43
T.47 124.0 11.68
H.31 124.0 11.58
H.30 124.0 11.27
T.46 124.0 10.94
H.27 124.0 10.91
H.18 124.0 10.88
H.25 124.0 10.82
H.28 124.0 10.78
H.17 124.0 10.75
T.44 124.0 10.73
T.41 112.0 16.86
H.21 112.0 17.02
H.20 112.0 17.25
H.29 112.0 17.45
H.37 112.0 17.67
H.38 112.0 17.83
H.4 124.0 4.9 7.31 13.25
H.16 124.0 9.27
T.45 124.0 9.51
H.15 124.0 10.43
Flow Summary - NFPA 2007
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 4
Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4) Date 4/19/2023
NODE ANALYSIS (cont.)
Pressure Discharge
Node Tag Elevation Node Type at Node at Node Notes
H.35 124.0 10.25
H.34 124.0 10.75
H.33 124.0 11.02
H.32 124.0 11.37
H.19 124.0 10.9
H.6 112.0 16.92
H.7 112.0 17.13
UDG1 100.0 33.4
MTR 100.0 39.25
CITY 100.0 47.68
Flow Summary - NFPA 2007
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 5
Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
*Remote Head to Supply
H.3 124 4.90 7.82 1 Etr 0.2 8.000 150 7.040
to 0.0 0.200 0.0
H.2 124 7.82 0.862 0.0 8.200 0.0394 0.323 Vel = 4.30
H.2 124 0.0 1 Etr 0.2 18.000 150 7.363
to 0.0 0.200 0.0
H.13 124 7.82 0.862 0.0 18.200 0.0395 0.718 Vel = 4.30
H.13 124 0.0 1 Eel 2.3 8.000 150 8.081
to 0.0 4.600 0.0
H.8 124 7.82 0.862 0.0 12.600 0.0394 0.496 Vel = 4.30
H.8 124 0.0 1 0.0 18.000 150 8.577
to 0.0 0.0 0.0
H.12 124 7.82 0.862 0.0 18.000 0.0394 0.710 Vel = 4.30
H.12 124 0.0 1 Eel 2.3 10.000 150 9.287
to 0.0 4.600 0.0
H.1 124 7.82 0.862 0.0 14.600 0.0394 0.575 Vel = 4.30
H.1 124 0.0 1 Etr 0.2 7.000 150 9.862
to 0.0 0.200 0.0
H.5 124 7.82 0.862 0.0 7.200 0.0394 0.284 Vel = 4.30
H.5 124 0.0 1 Eel 2.3 6.000 150 10.146
to 0.0 4.600 0.0
H.9 124 7.82 0.862 0.0 10.600 0.0394 0.418 Vel = 4.30
H.9 124 0.0 1 Etr 0.2 7.000 150 10.564
to 0.0 0.200 0.0
T.43 124 7.82 0.862 0.0 7.200 0.0394 0.284 Vel = 4.30
T.43 124 -4.00 1 Etb 0.8 22.000 150 10.848
to 0.0 2.000 5.197
H.11 112 3.82 0.862 0.0 24.000 0.0105 0.252 Vel = 2.10
H.11 112 0.0 1 Eel 2.3 14.000 150 16.297
to 0.0 4.600 0.0
H.24 112 3.82 0.862 0.0 18.600 0.0105 0.195 Vel = 2.10
H.24 112 0.0 1 2Eel 4.6 17.000 150 16.492
to 0.0 9.200 0.0
H.10 112 3.82 0.862 0.0 26.200 0.0105 0.275 Vel = 2.10
H.10 112 0.0 1 Etr 0.2 9.000 150 16.767
to 0.0 0.200 0.0
H.23 112 3.82 0.862 0.0 9.200 0.0104 0.096 Vel = 2.10
H.23 112 0.0 1 0.0 12.000 150 16.863
to 0.0 0.0 0.0
H.22 112 3.82 0.862 0.0 12.000 0.0105 0.126 Vel = 2.10
H.22 112 0.0 1 Etr 0.2 8.000 150 16.989
to 0.0 0.200 0.0
H.14 112 3.82 0.862 0.0 8.200 0.0105 0.086 Vel = 2.10
H.14 112 0.0 1 Etb 0.8 4.000 150 17.075
to Eel 2.3 6.600 0.0
T.42 112 3.82 0.862 0.0 10.600 0.0105 0.111 Vel = 2.10
T.42 112 3.94 1 Etr 0.2 9.000 150 17.186
to 0.0 0.200 0.0
H.26 112 7.76 0.862 0.0 9.200 0.0389 0.358 Vel = 4.27
Final Calculations - Hazen-Williams
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 6
Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
H.26 112 0.0 1 Etr 0.2 10.000 150 17.544
to 0.0 0.200 0.0
T.48 112 7.76 0.862 0.0 10.200 0.0389 0.397 Vel = 4.27
T.48 112 4.86 1 Etb 0.8 6.000 150 17.941
to Etr 0.2 2.200 0.0
H.36 112 12.62 0.862 0.0 8.200 0.0956 0.784 Vel = 6.94
H.36 112 0.0 1 Etr 0.2 7.000 150 18.725
to 0.0 0.200 0.0
H.39 112 12.62 0.862 0.0 7.200 0.0956 0.688 Vel = 6.94
H.39 112 0.0 1.25 T 2.44 9.000 150 19.413
to 0.0 2.440 2.599
S.1 106 12.62 1.054 0.0 11.440 0.0358 0.410 Vel = 4.64
S.1 106 -26.25 1.25 T 2.44 7.000 150 22.422
to 0.0 2.440 -2.599
H.40 112 -13.63 1.054 0.0 9.440 -0.0413 -0.390 Vel = 5.01
H.40 112 0.0 1 Etb 0.8 21.000 150 19.433
to Etr 0.2 2.200 -5.197
T.47 124 -13.63 0.862 0.0 23.200 -0.1102 -2.557 Vel = 7.49
T.47 124 7.67 1 0.0 4.000 150 11.679
to 0.0 0.0 0.0
H.31 124 -5.96 0.862 0.0 4.000 -0.0238 -0.095 Vel = 3.28
H.31 124 0.0 1 Etr 0.2 13.000 150 11.584
to 0.0 0.200 0.0
H.30 124 -5.96 0.862 0.0 13.200 -0.0239 -0.316 Vel = 3.28
H.30 124 0.0 1 Eel 2.3 9.000 150 11.268
to 0.0 4.600 0.0
T.46 124 -5.96 0.862 0.0 13.600 -0.0238 -0.324 Vel = 3.28
T.46 124 3.99 1 Etb 0.8 9.000 150 10.944
to 0.0 2.000 0.0
H.27 124 -1.97 0.862 0.0 11.000 -0.0031 -0.034 Vel = 1.08
H.27 124 0.0 1 Etr 0.2 9.000 150 10.910
to 0.0 0.200 0.0
H.18 124 -1.97 0.862 0.0 9.200 -0.0030 -0.028 Vel = 1.08
H.18 124 0.0 1 Etr 0.2 15.000 150 10.882
to Eel 2.3 4.800 0.0
H.25 124 -1.97 0.862 0.0 19.800 -0.0031 -0.061 Vel = 1.08
H.25 124 0.0 1 0.0 15.000 150 10.821
to 0.0 0.0 0.0
H.28 124 -1.97 0.862 0.0 15.000 -0.0031 -0.046 Vel = 1.08
H.28 124 0.0 1 Eel 2.3 5.000 150 10.775
to 0.0 4.600 0.0
H.17 124 -1.97 0.862 0.0 9.600 -0.0030 -0.029 Vel = 1.08
H.17 124 0.0 1 Etr 0.2 5.000 150 10.746
to 0.0 0.200 0.0
T.44 124 -1.97 0.862 0.0 5.200 -0.0031 -0.016 Vel = 1.08
T.44 124 10.77 1 2Etb 1.6 15.000 150 10.730
to 0.0 4.000 5.197
T.41 112 8.8 0.862 0.0 19.000 0.0490 0.931 Vel = 4.84
Final Calculations : Hazen-Williams
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 7
Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
T.41 112 -3.94 1 Eel 2.3 5.000 150 16.858
to 0.0 4.600 0.0
H.21 112 4.86 0.862 0.0 9.600 0.0164 0.157 Vel = 2.67
H.21 112 0.0 1 Eel 2.3 10.000 150 17.015
to 0.0 4.600 0.0
H.20 112 4.86 0.862 0.0 14.600 0.0164 0.239 Vel = 2.67
H.20 112 0.0 1 Etr 0.2 12.000 150 17.254
to 0.0 0.200 0.0
H.29 112 4.86 0.862 0.0 12.200 0.0164 0.200 Vel = 2.67
H.29 112 0.0 1 Etr 0.2 13.000 150 17.454
to 0.0 0.200 0.0
H.37 112 4.86 0.862 0.0 13.200 0.0163 0.215 Vel = 2.67
H.37 112 0.0 1 0.0 10.000 150 17.669
to 0.0 0.0 0.0
H.38 112 4.86 0.862 0.0 10.000 0.0164 0.164 Vel = 2.67
H.38 112 0.0 1 Eel 2.3 2.000 150 17.833
to 0.0 4.600 0.0
T.48 112 4.86 0.862 0.0 6.600 0.0164 0.108 Vel = 2.67
0.0
T.48 4.86 17.941 K Factor = 1.15
*New Path
H.3 124 5.18 1 Eel 2.3 10.000 150 7.040
to 0.0 4.600 0.0
H.4 124 5.18 0.862 0.0 14.600 0.0184 0.269 Vel = 2.85
H.4 124 4.90 13.25 1 Etr 0.2 10.000 150 7.309
to 0.0 0.200 0.0
H.16 124 18.43 0.862 0.0 10.200 0.1926 1.965 Vel = 10.13
H.16 124 0.0 1 Etr 0.2 1.000 150 9.274
to 0.0 0.200 0.0
T.45 124 18.43 0.862 0.0 1.200 0.1925 0.231 Vel = 10.13
T.45 124 -7.67 1 Etb 0.8 11.000 150 9.505
to 0.0 2.000 0.0
H.15 124 10.76 0.862 0.0 13.000 0.0712 0.925 Vel = 5.92
H.15 124 0.0 1 Etr 0.2 4.000 150 10.430
to 0.0 0.200 0.0
T.44 124 10.76 0.862 0.0 4.200 0.0714 0.300 Vel = 5.92
0.0
T.44 10.76 10.730 K Factor = 3.28
*New Path
T.45 124 7.67 1 Eel 2.3 15.000 150 9.505
to 0.0 4.600 0.0
H.35 124 7.67 0.862 0.0 19.600 0.0380 0.745 Vel = 4.22
H.35 124 0.0 1 Etr 0.2 13.000 150 10.250
to 0.0 0.200 0.0
H.34 124 7.67 0.862 0.0 13.200 0.0380 0.502 Vel = 4.22
H.34 124 0.0 1 0.0 7.000 150 10.752
to 0.0 0.0 0.0
H.33 124 7.67 0.862 0.0 7.000 0.0380 0.266 Vel = 4.22
Final Calculations : Hazen-Williams
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Company Name Page 8
Plan #63-40-01.13.0XB - Two Head Calculation (H.3 & H.4) Date 4/19/2023
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftng's Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqv. Ln. Total Pf/Ft Pf
H.33 124 0.0 1 Etr 0.2 9.000 150 11.018
to 0.0 0.200 0.0
H.32 124 7.67 0.862 0.0 9.200 0.0379 0.349 Vel = 4.22
H.32 124 0.0 1 Etr 0.2 8.000 150 11.367
to 0.0 0.200 0.0
T.47 124 7.67 0.862 0.0 8.200 0.0380 0.312 Vel = 4.22
0.0
T.47 7.67 11.679 K Factor = 2.24
*New Path
T.43 124 4.00 1 Etr 0.2 4.000 150 10.848
to 0.0 0.200 0.0
H.19 124 4.0 0.862 0.0 4.200 0.0114 0.048 Vel = 2.20
H.19 124 0.0 1 Etr 0.2 4.000 150 10.896
to 0.0 0.200 0.0
T.46 124 4.0 0.862 0.0 4.200 0.0114 0.048 Vel = 2.20
0.0
T.46 4.00 10.944 K Factor = 1.21
*New Path
T.41 112 3.94 1 Etr 0.2 5.000 150 16.858
to 0.0 0.200 0.0
H.6 112 3.94 0.862 0.0 5.200 0.0112 0.058 Vel = 2.17
H.6 112 0.0 1 2Eel 4.6 10.000 150 16.916
to 0.0 9.200 0.0
H.7 112 3.94 0.862 0.0 19.200 0.0111 0.213 Vel = 2.17
H.7 112 0.0 1 Etr 0.2 5.000 150 17.129
to 0.0 0.200 0.0
T.42 112 3.94 0.862 0.0 5.200 0.0110 0.057 Vel = 2.17
0.0
T.42 3.94 17.186 K Factor = 0.95
*New Path
S.1 106 26.25 1.25 E 1.22 35.000 150 22.422
to T 2.44 3.661 5.599 * * Fixed Loss = 3
UDG1 100 26.25 1.054 Fsp 0.0 38.661 0.1391 5.379 Vel = 9.65
UDG1 100 0.0 1.25 E 3.179 100.000 150 33.400
to T 6.358 9.536 0.0
MTR 100 26.25 1.283 0.0 109.536 0.0534 5.851 Vel = 6.51
MTR 100 0.0 1 E 2.778 25.000 150 39.251
to T 6.945 9.722 3.050 * * Fixed Loss = 3.05
CITY 100 26.25 1.031 Xwm 0.0 34.722 0.1549 5.379 Vel = 10.09
0.0
CITY 26.25 47.680 K Factor = 3.80
Final Calculations : Hazen-Williams