Loading...
HomeMy WebLinkAboutNilePower.xls Mobilization Power trench - Dig and backfill power trench, export all native material, import 5/8" minus backfill Traffic control - for trench Crossing 7th St - Saw cut, cross street, export native, import 5/8" minus, patch Traffic control - crosing Crossing Nile - Dig bore pits, bore and backfill Traffic control - bore Conduit - (3) 4" runs Alternate # 1 - demo and replace sidewalks if needed Exclusions - sales tax, permits, permit fees, inspection fees, connection fees, contaminated or hazardous soils or structures, staking, engineering, striping, fencing LAND CLEARING HAULING SITE PREP ROAD BUILDING LOGGING GENERAL EXCAVATION BOWEN CONSTRUCTION INC. P.O. Box 42 Buckley, Wa 98321 Phone 360 829 6632 Estimate only - no plans ATTN : RE : Fax 360 829 66635 Dan Off site power - Nile - Renton Date : Total = 5/3/2023 5000 58260 5625 10150 1250 19500 2600 16200 14160 132745