HomeMy WebLinkAboutNilePower.xls
Mobilization
Power trench - Dig and backfill power trench, export all native material, import
5/8" minus backfill
Traffic control - for trench
Crossing 7th St - Saw cut, cross street, export native, import 5/8" minus, patch
Traffic control - crosing
Crossing Nile - Dig bore pits, bore and backfill
Traffic control - bore
Conduit - (3) 4" runs
Alternate # 1 - demo and replace sidewalks if needed
Exclusions - sales tax, permits, permit fees, inspection fees, connection fees,
contaminated or hazardous soils or structures, staking, engineering, striping, fencing
LAND CLEARING HAULING SITE PREP
ROAD BUILDING LOGGING GENERAL EXCAVATION
BOWEN CONSTRUCTION INC.
P.O. Box 42
Buckley, Wa 98321
Phone 360 829 6632
Estimate only - no plans
ATTN :
RE :
Fax 360 829 66635
Dan
Off site power - Nile - Renton
Date :
Total =
5/3/2023
5000
58260
5625
10150
1250
19500
2600
16200
14160
132745