1. EXISTING CONDITIONS:
6. REGULATORY REQUIREMENTS:
Ir-
N
A. CONTACT ALL NECESSARY UTILITY PURVEYORS TO COORDINATE UTILITY CUTOFFS AND
A. COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND SAFETY
REMOVALS. VERIFY THAT ALL APPROPRIATE SERVICES HAVE BEEN DISCONNECTED.
REGULATIONS. IF THERE ARE ANY CONFLICTS AMONG REFERENCED STANDARDS, THE MORE
't
STRINGENT REQUIREMENTS SHALL GOVERN.
6
B. CONFORM TO LOCAL GOVERNING REQUIREMENTS REGARDING NOISE CONTROL.
�
B. OBTAIN ALL NECESSARY PERMITS.
i
C. MAINTAIN SAFE VEHICULAR AND PEDESTRIAN TRAFFIC ROUTES:
0
7. SAFETY SYSTEMS:
w
2. ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, ALLEYS, SIDEWALKS, AND ADJACENT
FACILITIES.
A. PROTECT ALL EXCAVATION IN EXCESS OF FOUR -FEET IN DEPTH WITH A SAFETY SYSTEM
CONFORMING TO THE REFERENCED REQUIREMENTS.
3. DO NOT CLOSE OR OBSTRUCT STREETS, FIRE LANES, SIDEWALKS, ALLEYS OR PASSAGEWAYS
WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION.
B. THE CONTRACTOR'S EXCAVATION SAFETY SYSTEM SHALL BE DESIGNED BY A QUALIFIED
PERSON AND MEET THE REFERENCED REQUIREMENTS.
4. IF REQUIRED BY GOVERNING AUTHORITIES, PROVIDE ALTERNATE ROUTES AROUND CLOSED OR
co
OBSTRUCTED TRAFFIC WAYS.
C. ALL EXCAVATION NOT REQUIRING TRENCH SAFETY SYSTEMS SHALL ALSO MEET THE WISHA
z
SAFETY STANDARDS AND CITY OF RENTON REQUIREMENTS.
A. VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES AT POINTS OF CONNECTION PRIOR
O
TO COMMENCING WORK ON NEW UTILITY THAT IS TO BE CONNECTED TO THE EXISTING
8. EXCAVATION:
UTILITY. COORDINATE WITH OWNER'S REPRESENTATIVE IF ACTUAL CONDITIONS ARE AT
VARIANCE WITH PLANS.
A. MATERIALS NOT DESIGNATED FOR SALVAGE SHALL BE BROKEN UP, LOADED, AND LEGALLY
Q
DISPOSED OF BY THE CONTRACTOR. CARE SHALL BE TAKEN REMOVING ITEMS TO ENSURE
B. VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES SUFFICIENTLY IN ADVANCE OF
THAT DAMAGE DOES NOT OCCUR TO THE EXISTING TREES AND IMPROVEMENTS WHICH ARE
TO ALLOW FOR COORDINATION AND MITIGATION OF CONFLICTS WITHOUT
TO REMAIN IN PLACE. ALL REMOVALS SHALL BE ACCOMPLISHED BY MAKING A NEAT
QCONSTRUCTION
DOWN TIME.
VERTICAL SAWCUT AT THE LIMITS OF REMOVAL. ALL CONCRETE WALK REMOVALS SHALL BE
SAWCUT AT THE NEXT ADJACENT JOINT. ADJACENT MATERIALS DESIGNATED TO REMAIN
5. DIMENSIONS AND LAYOUTS:
THAT ARE DAMAGED BY THE CONTRACTOR DURING THE WORK SHALL BE REPLACED AT NO
z
ADDITIONAL COST TO THE OWNER.
Q
A. THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING ALL BENCHMARKS AND STAKES AND IS
REQUIRED TO REPLACE ANY STAKES OR BENCHMARKS THAT ARE DISPLACED OR MISSING.
B. SPRINKLE EXCAVATED MATERIAL AND ACCESS ROADS AS NECESSARY TO LIMIT DUST TO THE
z
LOWEST PRACTICABLE LEVEL. DO NOT USE WATER TO SUCH AN EXTENT AS TO CAUSE
O
B. THE CONTRACTOR IS RESPONSIBLE FOR REVIEW OF ALL UTILITY PURVEYOR AND CITY
FLOODING, CONTAMINATED RUNOFF, OR ICING.
RECORDS RELATIVE TO THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS
RESPONSIBLE FOR AVOIDING DAMAGE TO THESE FACILITIES AND SHALL RESTORE ALL
C. IN THE EVENT THE CONTRACTOR ENCOUNTERS UTILITY LINES NOT SHOWN ON THE SITE
Q
UTILITIES AT CONTRACTOR'S OWN EXPENSE. THE CONTRACTOR IS TO NOTIFY THE OWNER'S
PLAN OR OTHERWISE INDICATED TO BE SAVED, REMOVED, OR ABANDONED, THE LOCATION
N
REPRESENTATIVE IMMEDIATELY IF UNDERGROUND UTILITIES NOT SHOWN ON RECORD
OF SUCH LINES SHALL BE MARKED IN THE FIELD AND THE OWNER'S REPRESENTATIVE
_
DOCUMENTS ARE ENCOUNTERED.
NOTIFIED.
Z
C. THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING, SETTING AND MARKING ALL LINE
9. FILL MATERIALS:
LOCATION STAKES. A QUALIFIED LAYOUT ENGINEER, SURVEYOR, OR TECHNICAL SPECIALIST
w
MUST BE ASSIGNED TO THE CONTRACTOR'S CREW FOR THIS WORK AND SHALL BE ON SITE
A. IF ANY FILL IS ANTICIPATED TO BE BROUGHT TO THE SITE THE APPLICANT SHALL SUBMIT
0
AT ALL TIMES WHEN WORK REQUIRING CONTROL IS BEING PERFORMED, TOGETHER WITH
A SOURCE STATEMENT CERTIFIED BY A PROFESSIONAL ENGINEER OR GEOLOGIST LICENSED
O
ALL NECESSARY EQUIPMENT, SUPPLIES AND INSTRUMENTS RELATED THERETO. THIS
IN THE STATE OF WASHINGTON MEETING THE REQUIREMENTS OF RMC 4-4-060N.4 OR
EQUIPMENT AND PERSONNEL MUST BE AVAILABLE, AT NO ADDITIONAL COST TO THE OWNER
PROVIDE DOCUMENTATION THAT FILL WILL BE OBTAINED FROM A WASHINGTON STATE
OR OWNER'S REPRESENTATIVE, FOR THE PURPOSE OF VERIFYING LAYOUT AND CERTIFYING
DEPARTMENT OF TRANSPORTATION (WSDOT) APPROVED SOURCE AS ALLOWED BY RMC
THE ACCURACY OF WORK ON THE SITE.
4-4-060N.4.G.
=
GRADING NOTES
CONSTRUCTION NOISE NOTES
u
B. ALL MATERIAL WHICH IS PROPOSED TO BE USED AS FILL, BEDDING OR BACKFILL SHALL BE
GRADED AND TESTED FOR MOISTURE CONTENT AND COMPACTABILITY. GRADATION AND TEST
RESULTS SHALL BE SUBMITTED FOR REVIEW AND ACCEPTANCE BY THE OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. SEE SPECIFICATIONS FOR INFORMATION
AND RESTRICTIONS ON THE USE OF RECYCLED MATERIAL AS FILL.
C. MATERIAL USED IN FILLING SHALL BE APPROPRIATE TO THE SITE AND THE INTENDED USE
OF THAT PORTION OF THE SITE.
D. TOPSOIL SHALL NOT BE USED AS A FILL MATERIAL.
E. NO FROZEN OR THAWING MATERIAL SHALL BE USED IN A FILL.
F. COMMON FILL MATERIAL SHALL CONSIST OF ON -SITE EXCAVATED SOILS FREE OF ORGANIC
AND DELETERIOUS MATERIAL AND OF SUCH SIZE AND GRADATION THAT THE SPECIFIED
COMPACTION CAN BE READILY ATTAINED. THE MOISTURE OF COMMON FILL MATERIAL AT
THE TIME OF PLACEMENT SHALL BE WITHIN A RANGE OF ONE PERCENT ABOVE TO TWO
PERCENT BELOW THE OPTIMUM MOISTURE CONTENT FOR COMPACTION.
G. GRAVEL BORROW: PER SECTION 9-03.14(1) OF WSDOT.
H. STRUCTURAL FILL SHALL BE NON -ORGANIC SOIL, ACCEPTABLE TO THE OWNER'S
REPRESENTATIVE, PLACED IN MAXIMUM 8-INCH LOOSE LIFTS, WITH EACH LIFT BEING
COMPACTED TO AT LEAST 95% OF THE MODIFIED PROCTOR MAXIMUM DENSITY USING
ASTM:D 1557. STRUCTURAL FILL SHALL BE PLACED AND COMPACTED WITHIN 2% OF THE
OPTIMUM MOISTURE CONTENT.
10.COMPACTION:
REQUIRED COMPACTION: COMPACT FILLS AND BACKFILLS TO THE FOLLOWING MINIMUM RELATIVE
COMPACTION (PERCENTAGE OF MAXIMUM DRY DENSITY DETERMINED IN ACCORDANCE WITH
ASTM D1557).
LOCATIONS REQUIRED MINIMUM RELATIVE
COMPACTION
UTILITY TRENCHES: 95%
UNDER WALKS AND PAVING: 95%
AGAINST WALLS: 90%
PLANTING AND LANDSCAPE AREAS: 85%
OTHER: 95%
11.FIELD QUALITY CONTROL:
A. THE OWNER'S TESTING AGENCY SHALL PERFORM TESTING. THE OWNER'S TESTING IS ONLY
TO VERIFY CONFORMANCE WITH THE PROJECT PLANS. THE CONTRACTOR IS RESPONSIBLE
FOR CONFIRMING THAT THE WORK MEETS THE REQUIREMENTS OF THE SPECIFICATIONS
AND THE CITY OF RENTON.
SWPPS PLAN NOTES
ry
1. ALL WORK SHALL BE IN CONFORMANCE WITH THE "GEOTECHNICAL ENGINEERING STUDY,
1. FOR ALL
COMMERCIAL, MULTI -FAMILY, AND NEW SINGLE-FAMILY HOMES,
1. NO HAZARDOUS LIQUID PRODUCTS, INCLUDING BUT NOT LIMITED TO PETROLEUM PRODUCTS,
w
PROPOSED HOUSING DEVELOPMENT, 1144-1158 HARRINGTON AVENUE NORTHEAST",
CONSTRUCTION -RELATED NOISE IS ALLOWED:
FUEL, SOLVENTS, DETERGENTS, PAINT, PESTICIDES, CONCRETE ADMIXTURES AND FORM OILS
m
GEOTECH CONSULTANTS, INC. OCT 15, 2015.
SHALL BE STORED ON -SITE WITHOUT PRIOR APPROVAL. IF REQUESTED, THE CONTRACTOR
7 AM TO
8 PM MON-FRI
SHALL PROVIDE FOR SPILL CONTAINMENT IN ACCORDANCE WITH KING COUNTY AND CITY OF
0
2. THE PROJECT GEOTECHNICAL ENGINEER OF RECORD OR HIS REPRESENTATIVE MUST BE
9 AM TO
8 PM SAT, WORK ON THIS DAY IS BY CITY PERMISSION ONLY
RENTON REQUIREMENTS. CONTRACTOR SHALL PROVIDE A LIST OF THE TYPES AND SIZES OF
Z
ONSITE DURING CRITICAL EARTHWORK OPERATIONS. THE GEOTECHNICAL ENGINEER SHALL
NO WORK
SHALL BE PERMITTED ON SUNDAY.
LIQUIDS THAT WILL BE STORED/HANDLED ON SITE. CONTRACTOR WILL ALSO SHOW THE
I
OBSERVE ALL EXCAVATIONS AND FILL AREAS. IN ADDITION, THE ENGINEER SHALL INSPECT
PROPOSED LOCATION FOR STORAGE ON A PROJECT SITE PLAN AND WILL PROVIDE A
THE SOIL CUTS PRIOR TO CONSTRUCTION OF WALLS AND INSPECT THE COMPACTION IN
FILL AREAS. THE ENGINEER MUST SUBMIT FIELD REPORTS IN WRITING TO THE PCD
INSPECTOR FOR SOILS VERIFICATION AND FOUNDATION CONSTRUCTION. ALL EARTHWORK
SHOULD BE IN CONFORMANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL
REPORT.
3. THE GEOTECHNICAL ENGINEER MUST BE PRESENT AT THE PRE -CONSTRUCTION MEETING(S).
IN ADDITION, THE FOLLOWING CONSTRUCTION STAGES MUST BE INSPECTED, MONITORED,
AND TESTED AS NECESSARY BY THE GEOTECHNICAL ENGINEER OF RECORD:
A. SITE CLEARING AND STRIPPING OF ORGANIC TOPSOIL FOR ALL AREAS TO RECEIVE
STRUCTURAL FILL, PAVEMENTS, OR FOUNDATIONS.
B. CUT SLOPES OVER FOUR FEET HIGH.
C. BENCHING FOR FILL TO BE PLACED ON SLOPES.
D. INSPECTION OF PROPOSED IMPORT FILL MATERIAL, PRIOR TO PLACEMENT.
NO DELIVERIES SHALL BE SCHEDULED PRIOR TO 7:00 AM OR AFTER 6:00 PM.
PROPOSED METHOD OF SECONDARY CONTAINMENT. THE OWNER'S REPRESENTATIVE AND KING
COUNTY SHALL REVIEW AND APPROVE THE PLAN PRIOR TO STORAGE.
2. CONSTRUCTION -RELATED NOISE IS NOT ALLOWED OUTSIDE OF ALLOWABLE HOURS, LEGAL
HOLIDAYS, OR SUNDAYS.
2.
CONSTRUCTION WASTE SHALL BE PROMPTLY REMOVED FROM THE SITE AND SHALL NOT BE
STOCKPILED.
3.
NO STATIONARY FUEL TANKS SHALL BE ALLOWED.
MOBILIZATION/STOCKPILE
AREA NOTES
4.
FUELING OF CONSTRUCTION EQUIPMENT SHALL BE A MOBILE FUEL TRUCK AND SHALL BE
ALLOWED ONLY IN PAVED AREAS. CONTRACTOR SHALL PROVIDE A PLAN FOR FUELING AREA
1. ANY EXCAVATED MATERIAL REMOVED FROM THE CONSTRUCTION SITE AND DEPOSITED ON
SPILL CONTAINMENT TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON WITH A
PROPERTY WITHIN THE CITY LIMITS MUST BE DONE IN COMPLIANCE WITH A VALID
PROPOSED METHOD OF SECONDARY CONTAINMENT. THE OWNER'S REPRESENTATIVE AND CITY
CLEARING & GRADING PERMIT. LOCATIONS FOR THE MOBILIZATION AREA AND STOCKPILED
OF RENTON, SHALL REVIEW AND APPROVE THE PLAN PRIOR TO FUELING. ALL SPILLS,
MATERIAL MUST BE APPROVED BY THE CITY INSPECTOR AT LEAST 24 HOURS IN ADVANCE
CONTAINMENT, AND CLEAN UP SHALL BE THE CONTRACTOR'S RESPONSIBILITY AND AT THEIR
OF ANY DUMPING.
2. HAULING HOURS WITHIN THE RIGHT-OF-WAY ARE RESTRICTED TO MON-FRI 8:30 - 3:30.
OWN EXPENSE.
5.
FUELING OF CONSTRUCTION EQUIPMENT SHALL ONLY BE ALLOWED DURING DAYLIGHT HOURS.
CONSTRUCTION SEQUENCE
6.
THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL EQUIPMENT THAT REQUIRES
SIGNIFICANT REPAIR. MINOR REPAIRS OR MAINTENANCE MAY BE ALLOWED ON SITE IN AN
E. PLACEMENT OF STRUCTURAL FILL, INCLUDING OBSERVATION OF PROPER MOISTURE 1
CONTENT, LIFT THICKNESS, AND MINIMUM COMPACTION.
F. SUBGRADES FOR RETAINING WALLS, FOUNDATIONS, AND FOR THE BASE OF
ROCKERIES.
2
G. INSTALLATION OF SUBSURFACE DRAINAGE FACILITIES.
H. UTILITY TRENCH BEDDING AND BACKFILL, INCLUDING OBSERVATION OF PROPER 3.
MOISTURE CONTENT, LIFT THICKNESS, AND MINIMUM COMPACTION. 4.
I. UTILITIES ON STEEP SLOPES; SLOPE ANCHORS AND/OR BACKFILL SLOPE 5.
STABILIZATION.
6.
J. ANY UNUSUAL SEEPAGE, SLOPE, OR SUBGRADE CONDITION AS DELINEATED IN THE
GEOTECHNICAL REPORT OR DISCOVERED IN THE FIELD. 7.
8.
4. AT THE END OF CONSTRUCTION, THE GEOTECHNICAL ENGINEER SHALL SUBMIT A FINAL 9.
SUMMARY LETTER VERIFYING THAT CRITICAL STAGES OF CONSTRUCTION HAVE BEEN
INSPECTED AND ARE IN CONFORMANCE WITH GEOTECHNICAL REPORT. 10.
11.
12.
STREET SWEEPING NOTES 13.
1. CONTRACTOR SHALL IMMEDIATELY SWEEP THE PAVED CITY RIGHT-OF-WAY WHEN DIRT 14.
OR OTHER CONSTRUCTION RELATED DEBRIS IS DEPOSITED.
15.
DUST SUPPRESSION 17.
DUST FROM CLEARING, GRADING, AND OTHER CONSTRUCTION ACTIVITIES SHALL BE
MINIMIZED AT ALL TIMES.
2. IMPERVIOUS SURFACES ON OR NEAR THE CONSTRUCTION AREA SHALL BE SWEPT,
VACUUMED, OR OTHERWISE MAINTAINED TO SUPPRESS DUST ENTRAINMENT.
3. ANY DUST SUPPRESSANTS USED SHALL BE APPROVED BY THE
CITY OF RENTON. PETROCHEMICAL DUST SUPPRESSANTS ARE
PROHIBITED. WATERING THE SITE TO SUPPRESS DUST IS ALSO
PROHIBITED UNLESS IT CAN BE DONE IN A WAY THAT KEEPS
SEDIMENT OUT OF THE PUBLIC DRAINAGE SYSTEM.
APPROVED AREA. THE CONTRACTOR SHALL SUBMIT A PLAN FOR THE PROPOSED LOCATION
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRE -CONSTRUCTION MEETING
OF VEHICLE MAINTENANCE AND REPAIR AND SHALL INDICATE THE PROPOSED METHOD OF
MUST BE HELD BETWEEN CITY OF RENTON, THE APPLICANT, AND THE APPLICANT'S
CONTAINMENT FOR POSSIBLE LEAKING VEHICLE FLUIDS. THE CONTRACTOR SHALL ALSO
CONSTRUCTION REPRESENTATIVE. CONDUCT A PRE -CONSTRUCTION MEETING WALK THROUGH
PROVIDE A PLAN TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON FOR THE
WITH THE CITY PROJECT PLANNER, ENGINEERING, INSPECTOR AND ARBORIST TO REVIEW TREE
COLLECTION, STORAGE, AND DISPOSAL OF VEHICLE FLUIDS. THE OWNER'S REPRESENTATIVE
PROTECTION FENCING AND CLEARING LIMITS.
AND CITY OF RENTON SHALL REVIEW AND APPROVE PLAN PRIOR TO ANY ON -SITE
VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES.
MAINTENANCE.
CONTACT ALL UTILITY COMPANIES THAT MAY BE AFFECTED BY THE PROPOSED
CONSTRUCTION. THE ONE CALL CALL NUMBER IS 1-800-424-5555.
7. TRUCK WASHOUT SHALL NOT BE ALLOWED ON SITE. THE CONTRACTOR SHALL PROVIDE
VERIFY GRADES PRIOR TO CONSTRUCTION. FLAG CLEARING LIMITS.
TRUCK WASHOUT OFF -SITE AT AN APPROVED AND LEGAL LOCATION.
ESTABLISH STAGING AREA. INSTALL STABILIZED CONSTRUCTION ENTRANCES, SITE ACCESS
ROUTES, CONSTRUCTION PADS AND LAYDOWN AREA AS NECESSARY TO STABILIZE SITE.
8. CONTRACTOR SHALL PROVIDE TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON THE
INSTALL REINFORCED SILT FENCE, TREE PROTECTION FENCE, AND OTHER TESC MEASURES
LOCATION OF SPILL RESPONSE MATERIALS. CONTRACTOR WILL ALSO IDENTIFY DISPOSAL
AS INDICATED ON PLAN AND AS NECESSARY TO PREVENT EROSION AND STABILIZE SITE.
METHODS FOR CONTAMINATED WATER AND SOIL AFTER A SPILL.
ESTABLISH SEDIMENT SETTLING TANKS AND OTHER CONSTRUCTION STORMWATER CONTROL
9. THE CONTRACTOR SHALL PROVIDE A REPORT TO THE OWNER'S REPRESENTATIVE AND CITY
ELEMENTS.
OF RENTON IDENTIFYING THE PERSONNEL RESPONSIBLE FOR POLLUTION PREVENTION,
CLEAR & GRUB AREAS OF THE SITE TO BE ROUGH GRADED OR FILLED.
INCLUDING CONTACT INFORMATION, AND CLEARLY LISTING THE RESPONSIBILITIES OF THESE
REMOVE UNSUITABLE BEARING MATERIAL AS IN DICTATED ON THE PLAN AND AS REQUIRED.
PERSONNEL.
GRADE AND PLACE ACCEPTABLE FILL. AS SITEWORK PROGRESSES, MAINTAIN AND ADJUST
AS NECESSARY.
10.THE CONTRACTOR SHALL PROVIDE A DESCRIPTION OF THE PROCEDURES TO BE USED IN
INSTALL NEW STORM DRAINAGE SYSTEM AND CATCH BASIN INSERTS.
MONITORING THE POLLUTION PREVENTION BMPS AND RESPONDING TO A BMP THAT NEEDS
INSTALL UNDERGROUND UTILITIES.
ATTENTION, INCLUDING RECORD KEEPING.
CONSTRUCT PROPOSED SITE IMPROVEMENTS.
INSTALL AMENDED SOILS ON ALL DISTURBED SOILS NOT COVERED BY HARD SURFACE IN
11.THE CONTRACTOR SHALL PROVIDE A REPORT TO THE OWNER'S REPRESENTATIVE AND CITY
ACCORDANCE WITH PIERCE COUNTY BMP T5.13.
OF RENTON IDENTIFYING THE PERSONNEL RESPONSIBLE FOR SPILL PREVENTION, INCLUDING
COMPLETE FINE GRADING AND FINAL STABILIZATION MEASURES INCLUDING LANDSCAPE
CONTACT INFORMATION, AND CLEARLY LISTING THE RESPONSIBILITIES OF THESE PERSONNEL.
INSTALLATION.
12.THE CONTRACTOR SHALL ALSO PROVIDE A DESCRIPTION OF THE PROCEDURES TO BE
REMOVE EXCESS EXCAVATED MATERIALS, TRASH DEBRIS, AND WASTE MATERIALS. DISPOSE
USED IN MONITORING THE SPILL PREVENTION BMPS AND RESPONDING TO A SPILL INCIDENT,
OF IN AN AUTHORIZED LOCATION.
INCLUDING RECORD KEEPING.
CLEAN STORM DRAINAGE SYSTEM OF ALL SEDIMENT AND DEBRIS.
MAINTAIN TEMPORARY EROSION CONTROL FACILITIES UNTIL SITE IS COMPLETELY STABILIZED.
J A
1932 First Ave of �� WAS/yl �� SURVEYED: SCALE:
` �c�
Suite 201 ,� � DESIGNED:
� z �
Seattle, WA 98101
p.206.725.1211 DRAWN:
f. 206.973.5344 /� �F 6R�p �� CIVIL PERMIT RESPONSE 0/26/2 ONE INCH
mmmo /sTE �`� 7 PERMIT RE -SUBMITTAL 12/12/22 CHECKED: AT FULL SCALE
engineering pIIc pden ineerin .com FSS��NAL ENG\ ,L� N0. REVISION BY DATE APPR C NOT ONE INCH
WWW•i 9 9 APPROVED: SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
CITY OF RENTON EROSION AND SEDIMENT CONTROL (ESC)
STANDARD PLAN NOTES
THE FOLLOWING
IS A
LISTING OF GENERAL NOTES
THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) PLAN
SET. ALL THE
NOTES ON THE LIST MAY NOT
PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS
APPLICANT,
MAY
STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT
RENUMBER
NOR
EDIT THE REMAINING NOTES.
IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED
AFTER THE
ESC
STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF
RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION
STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL
MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED
FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND
TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN
ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF
CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE
CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION
OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO
ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION
OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR
MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT
WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS
CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE
MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR
ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN
STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT,
ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC
BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY
BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR
LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR
REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET
SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH)
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN
CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE
APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS
FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE
PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE
RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE
PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO
THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY
ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN
INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION,
PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND
COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH
ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE
AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM
LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE
BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE
VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED
TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR
AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE
CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN
ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE INTERNATIONAL BUILDING CODE.
UCITY OF
RENTON
Planning/Building/Public Works Dept.
R-422110
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
Ambl
00
O
O
O
i
N
Cfl
Ln
00
O
N
N
A,
u
[DEVELOPMENT ENGINEERING Q
Michael Sippo 01/27/2023 '
LINDBERGH HIGH SCHOOL MODERNIZATION
16426128TH AVE SE
RENTON, WA 98058
TESC + DEMOLITION DETAILS
H
75
00
Z)
DATE.
16 SEPT 2022
W
FIELDBOOK:
(-
PAGE:
DRAWING NO:
C1.8
SHEET: OF:
10 64
^�
I..L