Loading...
HomeMy WebLinkAboutR-422115T- IN i 0 LU U) z O 0 Q 0 z Q z O Q N_ z ry LU 0 O 75 U7 0 ry LLI m 0 z_ J m a F) N N N Qw Z J L- \ 7" /o RIM=413.17 - '" CPP=408.67 (NE) >" CMP=403.77 (SE) PVC=406.95 (SW) PVC=409.37 (NW) G�`.L� / 0 s \ \ a 1932 First Ave Suite 201 Seattle, WA 98101 p. 206.725.1211 f. 206.973.5344 engineering pIIc www.lpdengineering.com rr=4vy.i4�i vv� \ CPP=4f� 5/7(SE� // \ =\41 .03 \ ✓ \ CONNECT 12" SD TO EX SDMH \\ o \\ •� \ \ IE 418.57 (12" SE) IN \ \ 42 LF 12" PVC © 1.1 %' \ \ \ \ \ \ IE 418.88 \ \ \ DOWNSPOUT \ \ I \I I I CONNECTION (TYP) f l \\ \\ \ \ I 16 LF 6 PVC @ I\ 2.0% MIN \ \ \ SDCB, RI 426.93 \ \ \ \ F" PVC1423.18 (NE) \ d 42 6. \ SDCO / SD#5A CB ' �E f PVC \+22.35 (SE) \\ IE 420.47 RIM 422.40 (a) \ \ \ / IE 419.03 (12" SE) IN C2.6 \ \ IE 419.03 (12" NW) OUT \ ` 2.50 SDC \ \ \ 43 LF 12" PVC ® 1.2% \ / 422.40 422.45 SD \ \\� \ \ 40 LF FRENCH DRAIN \ \ CIVIL PERMIT RESPONSE 7 PERMIT RE -SUBMITTAL ,- po NO. REVISION -SDCO IE 420.67 SD#5, CB TYPE 1 1 \ \ RIM 422.55 c� 422.55 IE 419.83 (6" SW) IN IE 419.83 (6" SE) IN CIE 419.53 (12" NW) OUT \ O d DOWNSPOUT CONNECTION 13 LF 6" PVC © 2.0% MIN c ,26 51 LF FRENCH DRAIN \ 4 1 I 1 I � 1 I \ I \ I 1 I 26„ I I l � I I I I I � 1 �\ I � I \ I ISDCRlluj\\ \422.44 k 8" PVC=�8.57 (NW) \ IE\ 12" CPP- . 8.44 (SW) \ I now what's below. Call before 'ou dig. \ Dial 811 \ Cfl O N O O O N 10 0 5 10 20 N Q J LEGEND Scale 1In=107 - - PROPERTY LINE EX CONTOUR (INDEX) EX CONTOUR 230_ _ PROPOSED CONTOUR (INDEX) 231 PROPOSED CONTOUR xxx� SPOT ELEVATION FF 78.0 FINISHED FLOOR ELEVATION EX BUILDING PROPOSED BUILDING a CONCRETE PAVEMENT ASPHALT (AC) PAVEMENT HEAVY DUTY ASPHALT PAVEMENT SITE WALL VERTICAL CURB L®J CATCH BASIN TYPE 1 o CATCH BASIN TYPE 2 O AREA DRAIN STORM DRAINAGE PIPE STORM DRAINAGE W/ SLEEVE --------------- FOOTING/SUBSURFACE DRAIN SDCO 0 STORM DRAIN CLEANOUT FDCO e FOOTING DRAIN CLEANOUT DS• DOWNSPOUTS - FRENCH DRAIN SIDE SEWER PIPE SEWER CLEANOUT SIDE SEWER CONNECTION (� SSMH WATER FITTINGS WATER SERVICE LINES WATER SERVICE LINES KEY MAP N R-422115 IN COMPLIANCE WITH CITY OF RENTON STANDARDS 00 0 O i N Ln 00 O N u �, DEVELOPMENT ENGINEERING � J Michael Sippo 01 /27/2023 �� Q FSURFACE WATER UTILITY ah 01 /27/2023 m zFj SURVEYED: SCALE: DATE: HORIZONnTAL: � 1983/1991 ' CITY 0 F LINDBERGH HIGH SCHOOL MODERNIZATION 16 SEPTOK:2022 LU DESIGNED: 16426128TH AVE SEFIELDBOOK:PRI RENTON DRAWN: PAGE: 0/26/22 ONE INCH DATUM NUIV RENTON, WA 98058 DRAWING NO: 2/12/22 CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. GRADING + DRAINAGE PLAN C 2.3 E IF NOT ONE INCH DATE APPR APPROVED: SCALE ACCORDINGLY SHEET: 1 5 OF: 64 LLJ AREA F3- SOUTH SCIENCE 0_