HomeMy WebLinkAbout7945.04 E 2023 0509AEarth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
FIELD REPORT
Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0509A
Date Tue 5/9/2023 Weather 70°F Clear
Arrival/Departure Time(s) 11AM; 11:45AM, 1:15PM; 2:45PM Travel Time (hr) 1.0
Project Name Canopy Property
Location 4130 Lincoln Ave NE, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact Century Communities | Stacia Bloom
General Contractor Info/Contact
Contractor #2 Info/Contact
Reviewed By LAC
Initials/Date
RAC
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was onsite to observe road over excavation and grading, and sewer backfill in alley 2.
Roadway Subgrade
While onsite, ESNW rep observed the contractor over excavating approximately 2’ in depth in alley 3.
Rep probed the base of the excavation with a ½” steel T-probe and observed dense soil conditions,
suitable for fabric, quarry spalls, and approximately a foot of 1 ¼” minus crushed rock.
Sewer Backfill
While onsite, ESNW rep observed the contractor excavating a trench approximately 11’ deep into native
clay with gravel. ESNW rep observed the contractor bed the sewer pipe with pea gravel and backfill the
trench in approximately 12” lifts. A large hoe pack was used to compact the soil with good effort. ESNW
rep took compaction tests and observed adequate compaction of at least 95% of the modified proctor at
the tested locations. Please see map and table below.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
123 Sewer Main Fill -4 2 128.2 13.1 121.7 95
124 Sewer Main Fill SG 2 128.2 14.3 122.1 95
Report ID 7945.04 E 2023 0509A Page 2 of 3
Earth Solutions NW, LLC
Over Excavation
123, 124
Report ID 7945.04 E 2023 0509A Page 3 of 3
Earth Solutions NW, LLC