Hearing Examiner Public Hearing
Clark H. Close, Principal Planner
May 16, 2023
Project Location
Project Background
Project Proposal
Perspectives
Process to Date
Renton Municipal Code Analysis
Availability of Public Services
Staff Recommendation
Presentation Overview
2
SITE
Source: Bing Maps –Bird’s eye
N 8th St
Location
3
Source: COR Maps
N 8th StPark Ave N
Project Background
4
Generally flat site and mostly impervious surfaces.
Vacant one-story retail building (former Fry’s Electronics store) and surface parking lot.
Existing improvements to be demolished.
Prior to becoming Fry’s -cleared by 1965 and developed as a paved parking lot for Boeing by 1968.
Remained as a Boeing parking lot until 2002.
Source: Exhibit 16 (Year 1990)
N 8th StPark Ave N
Project Proposal
5
Requesting master site plan, preliminary planned urban development, and SEPA environmental review to construct 1,179residential units and approx. 48,761 sf of retail space in 3 phases.
Start of Construction: P1 –2024, P2 –2029, and P3 –2034. Each phase of construction would last two (2) years.
Commercial & Mixed Use (CMU) land use designation
Urban Center-2 (UC-2) zoning district.
Urban Design District ‘C’ overlay district.
City Center Community Planning Area.
High Seismic Hazard Areas and Johns Creek -Piped Stream are mapped on the site.
City Center
Community
Planning Area
Source: COR Maps
Source: Exhibit 2 Site Plan
BLDG A BLDG B BLDG C
Project Proposal
6
The proposed would include 3 mixed
use buildings over 3 phases.
Phase 1:
Building A –8 stories (approx.
84 feet above level 1 FFE).
696,496 SF with 25,697 SF of
ground level commercial space.
419 dwelling units (du).
635 parking stalls.
Source: Exhibit 2 Site Plan
Garden Ave N
N 10th StBLDG A
Source: Exhibit 9 Perspectives
Project Proposal
7
Phase 2:
Building B –7 stories (approx.
74 feet above level 1 FFE).
582,385 SF with 13,195 SF of
ground level commercial space.
375 dwelling units (du).
488 parking stalls.
Source: Exhibit 2 Site Plan
BLDG B
Source: Exhibit 9 Perspectives
Project Proposal
8
Phase 3:
Building C –7 stories (approx.
74 feet above level 1 FFE).
591,702 SF with 9,869 SF of
ground level commercial space.
385 dwelling units (du).
490 parking stalls.
Source: Exhibit 2 Site Plan
BLDG C
Source: Exhibit 9 Perspectives
Building A -SW Perspective
9Sources: Exhibit 9 Perspectives and Exhibit 10 Exterior Elevations
Building B -NW Perspective
10Sources: Exhibit 9 Perspectives and Exhibit 10 Exterior Elevations
Building C -SW Perspective
11Sources: Exhibit 9 Perspectives and Exhibit 10 Exterior Elevations
Building 3 -SW Perspective
Source: Exhibit 5 Landscape Plans 12
Process to Date
13
Neighborhood
Meeting
Feb. 22, 2022
Acceptance/
Complete
Dec. 14, 2022
and Jan. 3,
2023
Environmental
‘ SEPA’ Review
DNS-M
April 18, 2023
Staff
Recommendation
to HEX
May 9, 2023
Public
Hearing
Today
RMC Analysis
14
The proposal is:
Consistent with relevant Comprehensive Plan Land Use policies.
Compliant with all relevant zoning regulations and design district standards if all
conditions of approval are complied with.
Complies with master plan and critical areas regulations if all conditions of approval
are complied with.
There are safe walking routes to the school bus stop.
Adequate public services and facilities to accommodate the proposed development.
RMC Analysis
15
The proposal is:
Compliant with planned urban development applicability standards, decision criteria analysis,
and development standards if all conditions of approval are complied with.
Through the PPUD application the applicant is proposing to modify a number of development
regulations:
Development Standards:
Varied building setbacks on Garden Ave N and N 8th St
Structured Parking Garages:
Orient retail uses toward Garden Ave N and allowing limited lobby and parking
structure space along the frontage width of N 8th St.
Pedestrian Amenities:
With limited ground floor commercial uses along N 8th St, allowing corresponding
limited pedestrian overhead weather protection along the south street facing
elevation of Building C in Phase 3.
Ground level detail:
Allowing limited transparent windows and/or doors for the portion of the
ground floor façade that is between 4’ & 8’ above the ground on N 8th St.
RMC Analysis, cont.
16
Through the PPUD application the applicant is proposing to modify a number of
development regulations:
Street Frontage Landscaping Required:
Associated with the requested building setback modification. Where
buildings are not located, landscaping includes a mixture of trees, shrubs,
groundcover, and hardscape.
Tandem Parking:
Supportive of the requested 20 tandem parking stalls per phase.
Commercial Area Requirements:
With the retail/grocery ready space allow Phase 2 –12% and Phase 3 –9.4%
of the required 20% gross commercial floor area of the building footprint.
Eliminate private balconies/patios in the interior corner units to maximize the amount
of natural light and ventilation to courtyard units.
Availability of Public Services
17
Police and Fire Prevention staff indicated
that sufficient resources exist to furnish
services to the proposed development.
Fire protection would be provided by
RRFA.
It is anticipated that the Renton School
District can accommodate any additional
students at the following schools:
Hazelwood Elementary School, Risdon
Middle School, and Renton High School.
Water and sewer service is provided by
the City of Renton.
Source: hazelwood.rentonschools.us
Source: Google Maps
Source: rentonhs.rentonschools.us
Availability of Public Services
18
Preliminary Technical Information Report (TIR)
prepared by KPFF Consulting Engineers -treat
new pollution-generating impervious surfaces
using a series of proprietary water quality vaults
designed to provide enhanced water quality
treatment.
Storm drainage improvements would comply
with the current version of the City of Renton
Surface Water Design Manual (SWDM).
School, Park, Transportation, and Fire Impact
Fee would be required.
Recommendation
19
Staff recommends approval of the 800 Garden Master Site Plan and Preliminary
Planned Urban Development application, File No. File No. LUA22-000415, ECF, SA-M,
PPUD, subject to 24 conditions of approval.