SW 1/4 OF SEC. 4, TWP. 23 N., RNG. 5 E., W.M.
CITY OF RENTON, STATE OF WASHINGTON
TEMPORARY CONSTRUCTION 1
ENTRANCE (15'x50') C3
AREA TO REMAIN
UNDISTURBED (TYP)
EXIST _
EXIST / GATE
SHED �
EXIST
SHED - r
�16
EXIST
GRAVEL
ROAD
EROSION CONTROL NOTES
AREA TO REMAIN
UNDISTURBED (TYP)
TEMPORARY
SILT FENCE z
PROJECT
BOUNDARY
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY,
WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING
MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED
ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO
CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND
OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE
APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION
AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS
CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED
AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE
DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND
SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT
CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED.
THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION
CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO
BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES
AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE
EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE
SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE
THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY
BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE
RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE
AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS,
OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED
FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH 30TH) OR SEVEN DAYS
DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH
THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE
APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER
DESIGN MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED
WITHIN SEVEN (7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A
MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A
CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE
CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL
AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED
BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE
MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE
AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED
TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS
SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF
THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO
THE CITY OF RENTON FOR REVIEW.
Know what's below.
Call 48 hours before you dig.
CIVIL ENGINEERING • SURVEYING • LAND PLANNING
145 SW 155th Street, Ste. 102, Seattle, Washington 98166
Phone: (206) 244-4141 Fax: (206) 244-4455
OF
i
0
HYDROSEED ALL DISTURBED
PERVIOUS AREAS (TYP) A�
EXIST
GATE
BRUSH77-_,
r
GRAPHIC SCALE
( IN FEET )
1" = 20' (22x34)
1" = 40' (11X17)
')- -,0.,:
RECOMMENDED CONSTRUCTION SEQUENCE
EROSION AND SEDIMENT CONTROL RECOMMENDED CONSTRUCTION
SEQUENCE
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE
CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. CONSTRUCT SEDIMENT PONDS AND TRAPS.
8. GRADE AND STABILIZE CONSTRUCTION ROADS.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE
DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT
DEVELOPMENT.
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF
THE SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S
RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO
THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS
ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL
STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS
DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH
STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT.
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE
STABILIZED AND BMPS REMOVED IF APPROPRIATE.
4 PER CITY REVIEW COMMENTS
3 ADD TREE PROTECTION
29647 2 CHANGE PAVED ACCESS
�O CIS 1 CHANGE EQ COMPOUND SIZE PER ARCH
ILL NO. I REVISION
EXIST
ASPHALT
m
SURVEYED:
PN/CB
3/16/23
HMD
DESIGNED:
HMD
10/27/22
HMD
10/10/22
HMD
DRAWN` DAS
1/3/22
HMD
CHECKED:
HMD
BY
DATE
AP P R
APPROVED:
HMD
EXIST CONIC
SIDEWALK
EXIST GRAVEL
I
36B
368368} . .
EXIST
'F U TI LI I I G�
POLE
POWER/TELCO
ROUTE
EXIST CONIC
SIDEWALK
PROPOSED TOWER
LOCATION
SITE TBM
REBAR & CAP
ELEV = 363.54
II(
FIELD COORDINATE STOCKPILE
LOCATION. COVER PER NOTES
0
a ,
a
o. .
vv
D a
a v
v
a o.
Je
\ LIGHT POLE
> �) TO REMAIN ,
01
PROTECT EXIST
TREE, TYP o`
4 TREE PROTECTION
C3 FENCING, TYP
TEMPORARY SUMP FOR
CONCRETE WASHOUT
PROJECT
BOUNDARY
HYDROSEED ALL DISTURBED
PERVIOUS AREAS (TYP)
i +
0
TEMPORARY('2 \
SILT FENCE C3
\ I
AREA TO REMAIN
I UNDISTURBED (TYP)
m
SWPPS NOTES
1. PROVIDE PLASTIC COVERING OR OTHER SUITABLE MEANS FOR KEEPING
RAINFALL AND RUNOFF OFF OF POTENTIALLY POLLUTING MATERIALS AND
WASTES.
2. LIGHTING IS REQUIRED IF FUELING (PROVIDED BY SERVICE TRUCKS) OCCURS
AT NIGHT.
3. DRIP PANS OR PLASTIC SHEETING IS REQUIRED WHEN EQUIPMENT
MAINTENANCE IS PERFORMED ON -SITE.
4. CONTRACTOR SHALL DEVELOP A SPILL PREVENTION PLAN AND MAINTAIN
APPROPRIATE SPILL RESPONSE SUPPLIES FOR ANY TOXIC OR HAZARDOUS
LIQUIDS STORED OR USED ON SITE.
°
EX BUILDING
TO REMAIN
N
C'7
Cfl
O
N
N
Al
u
H
H
Q
W
I
R-424013 al
IN COMPLIANCE WITH CITY OF RENTON STANDARDS oF,
O
DEVELOPMENT ENGINEERING ` (o
Scott Warlick 4/6/2023 O
I
W
J
II—
V
SCALE: DATE:
»_ f HORIZONTAL NADCAL VD1983/1991 ' 12/15/21 U
1 =20 o CITY O E CROWN CASTLE 831070 - A -TEAM I
FIELDBOOK: N/A Z
RENTON TESC PLAN PAGE' N A
;R
ONE INCH DATUMUOF 2902 NE 12TH ST DRAWING N0:
AT FULL SCALE Planning/Building/Public Works Dept. 04168.184 O
IF NOT ONE INCH RENTON WA 98056
SCALE ACCORDINGLY
7 SHEET: C2 OF: 3