HomeMy WebLinkAboutR-424017O 2'-0"
MATCH EXISTING SURFACE
N
/ /
o �
W // _ _ _ _ _ \ \ EXCAVATION / MAGNETIC
WARNING TAPE
TRENCH
\\\ ` COMPACTED FILL
PER UTILITY CO. REQ.
/ O SAND FILL
\�\/\ � (4) 4"Q1 CONDUITS FOR
�i, //� FIBER WITH (3) 1 1/4"
Q INNERDUCTS
W
UNEXCAVATED AREA
i
MATCH EXISTING SURFACE
O
O --
j
00 \/\\/\\ _ _ _ \ \/\
W I o//\ _ // \ EXCAVATION /MAGNETIC
_J \\ _ _ _ \ \/� WARNING TAPE
\ TRENCH
COMPACTED FILL
U / PER UTILITY CO. REQ.
SAND FILL
(1) 3 0 CONDUIT FOR POWER
ry
U UNEXCAVATED AREA
3
TRENCH DETAILS
J EXISTING ELECTRICAL SERVICE
FROM EXISTING UTILITY PROVIDER
(1) 3- SCH. 40 PVC CONDUIT WITH (3)
#310 (SEE ELECTRICAL SITE PLAN
FOR ROUTING)
M PROPOSED T-MOBILE 200A, 120/240V,
10, 3W METER SOCKET IN NEMA 3R
ENCLOSURE
(1) 3/4- CONDUIT WITH (1) #4 CU
m TO ISOLATED GROUND ROD
T (1) 3- SCH. 40 PVC CONDUIT
WITH (3) #310
(1) 2- SCH. 40 PVC CONDUIT WITH (3)
#310 & (1) #6 GRD FROM GENERATOR
INTEGRATED AUTOMATIC
TRANSFER SWITCH
POWER PANEL PROPOSED 200A CAM-LOK GEN
PLUG PROVIDED WITH PPC
200A, 2P, 120/240V, 10, PROPOSED PPC
3W, NEMA 3R, ASCO
D300L SERIES PTLC, #2 BTCW TO GROUNDING SYSTEM
OR APPROVED EQUAL (DO NOT BEND TO NEUTRAL)
PROPOSED 2" GRC OR LIQUID
PURCELL HPL3 600A TIGHT CONDUIT FOR AC POWER
BATTERY CABINET (CONTRACTOR TO SUPPLY
(BATTERY BACKUP)All- SIZE/QUANTITY CONDUCTORS PER
MANUFACTURER SPECIFICATIONS)
#2 BTCW TO GROUNDING SYSTEM,
PURCELL HPL3 600A TYP. (DO NOT BEND TO NEUTRAL)
SITE SUPPORT CABINET
NOTE:
CONTRACTOR TO CONFIRM WITH
LOCAL UTILITY PROVIDER PRIOR
TO CONSTRUCTION
2 I ELECTRICAL ONE -LINE DIAGRAM
NOT TO
SCALE
NOT TO
SCALE
INFIN Y�
NOTE: \
REFER TO UCR FOR EACH
\ CARRIER.
EXISTING UTILITY POLE —
\ WITH CONDUIT DROP J_
/ 0
/ 0
/
/ °
lof
0
/ 4"
/ � a
/° a
d
w
0
F I I '�
d
4
I/
W
J/. .d
/d
4..d
w
w
�a
d
d
d
. .41
OP
PROPOSED U.G. FIBER ROUTE
FROM PROPOSED TELCO P.O.C.
(T.B.D.) TO PROPOSED TELCO
1 VAULT IN COMPOUND
21 PROPOSED TELCO VAULT
IN COMPOUND
1 PROPOSED T-MOBILE POWER
°I ROUTE FROM METER BANK
TO T-MOBILE H-FRAME
PROPOSED T-MOBILE FIBER
ROUTE FROM TELCO VAULT
TO T-MOBILE H-FRAME
°I
PROPOSED U.G. POWER ROUTE
FROM POWER P.O.C. AT
TRANSFORMER TO METER
01 BANK ON UTILITY H-FRAME
11
EXISTING LIGHT POLE, TYP.
EXISTING POWER ROUTE
0
ll
EXISTING PAD MOUNTED
TRANSFORMER
EXISTING TELCO PEDESTAL
EXISTING TELCO PEDESTAL
❑ EXISTING TELCO VAULT
EXISTING UTILITY POLE
318684-166756
a a
1 22"x" SCALE: 1/" = 1'-0"
UTILITY ROUTING PLAN
11"x1717" SCALE: 1/3232" = 1'-0" 16' 12' 8' 4' 0' 16'
8 100% CONSTRUCTION TJB 03/16/23 SURVEYED: SCALE:
VERTICAL: NAVD 1988
7 100% CONSTRUCTION TJB 02/27/23 DESIGNED: 1 / 1 6"=1 ' HORIZONTAL: NAD 1983/1991 Aoffivak
CITY OF
Q
DRAWN:
6 100% CONSTRUCTION TJB 01 /10/23 TJB RENTON
5 100% CONSTRUCTION TJB 12/19/22
T,1g ONE INCH DATUM VAM19F
4 100% CONSTRUCTION TJB 10/25/22 r CHECKED:
PD AT FULL SCALE Planning/Building/Public Works Dept.
IF NOT ONE INCH
NO. REVISION BY DATE APPR I APPROVED: SCALE ACCORDINGLY
M
O
N
N
A
u
M
O
04
O
O
1
N
Q
J
O
O
O
1
N
00
N
(0
O
O
N
m
Q
W
R-424017 aI
IN COMPLIANCE WITH CITY OF RENTON STANDARDS �
O
DEVELOPMENT ENGINEERING 0 M
Scott Warlick 4/6/2023 00I
W
J
I—
U)
Q
DATE: `
CROWN CASTLE 831070 A -TEAM 03O/16/23
FlEL
UTILITY ROUTING PLAN & DETAILS z
PAGE:
DRAWING N0:
2902 NE 12TH ST O
RENTON, WA 98056 SHEET: E1 OF: 1 7
U