Loading...
HomeMy WebLinkAboutR-424017O 2'-0" MATCH EXISTING SURFACE N / / o � W // _ _ _ _ _ \ \ EXCAVATION / MAGNETIC WARNING TAPE TRENCH \\\ ` COMPACTED FILL PER UTILITY CO. REQ. / O SAND FILL \�\/\ � (4) 4"Q1 CONDUITS FOR �i, //� FIBER WITH (3) 1 1/4" Q INNERDUCTS W UNEXCAVATED AREA i MATCH EXISTING SURFACE O O -- j 00 \/\\/\\ _ _ _ \ \/\ W I o//\ _ // \ EXCAVATION /MAGNETIC _J \\ _ _ _ \ \/� WARNING TAPE \ TRENCH COMPACTED FILL U / PER UTILITY CO. REQ. SAND FILL (1) 3 0 CONDUIT FOR POWER ry U UNEXCAVATED AREA 3 TRENCH DETAILS J EXISTING ELECTRICAL SERVICE FROM EXISTING UTILITY PROVIDER (1) 3- SCH. 40 PVC CONDUIT WITH (3) #310 (SEE ELECTRICAL SITE PLAN FOR ROUTING) M PROPOSED T-MOBILE 200A, 120/240V, 10, 3W METER SOCKET IN NEMA 3R ENCLOSURE (1) 3/4- CONDUIT WITH (1) #4 CU m TO ISOLATED GROUND ROD T (1) 3- SCH. 40 PVC CONDUIT WITH (3) #310 (1) 2- SCH. 40 PVC CONDUIT WITH (3) #310 & (1) #6 GRD FROM GENERATOR INTEGRATED AUTOMATIC TRANSFER SWITCH POWER PANEL PROPOSED 200A CAM-LOK GEN PLUG PROVIDED WITH PPC 200A, 2P, 120/240V, 10, PROPOSED PPC 3W, NEMA 3R, ASCO D300L SERIES PTLC, #2 BTCW TO GROUNDING SYSTEM OR APPROVED EQUAL (DO NOT BEND TO NEUTRAL) PROPOSED 2" GRC OR LIQUID PURCELL HPL3 600A TIGHT CONDUIT FOR AC POWER BATTERY CABINET (CONTRACTOR TO SUPPLY (BATTERY BACKUP)All- SIZE/QUANTITY CONDUCTORS PER MANUFACTURER SPECIFICATIONS) #2 BTCW TO GROUNDING SYSTEM, PURCELL HPL3 600A TYP. (DO NOT BEND TO NEUTRAL) SITE SUPPORT CABINET NOTE: CONTRACTOR TO CONFIRM WITH LOCAL UTILITY PROVIDER PRIOR TO CONSTRUCTION 2 I ELECTRICAL ONE -LINE DIAGRAM NOT TO SCALE NOT TO SCALE INFIN Y� NOTE: \ REFER TO UCR FOR EACH \ CARRIER. EXISTING UTILITY POLE — \ WITH CONDUIT DROP J_ / 0 / 0 / / ° lof 0 / 4" / � a /° a d w 0 F I I '� d 4 I/ W J/. .d /d 4..d w w �a d d d . .41 OP PROPOSED U.G. FIBER ROUTE FROM PROPOSED TELCO P.O.C. (T.B.D.) TO PROPOSED TELCO 1 VAULT IN COMPOUND 21 PROPOSED TELCO VAULT IN COMPOUND 1 PROPOSED T-MOBILE POWER °I ROUTE FROM METER BANK TO T-MOBILE H-FRAME PROPOSED T-MOBILE FIBER ROUTE FROM TELCO VAULT TO T-MOBILE H-FRAME °I PROPOSED U.G. POWER ROUTE FROM POWER P.O.C. AT TRANSFORMER TO METER 01 BANK ON UTILITY H-FRAME 11 EXISTING LIGHT POLE, TYP. EXISTING POWER ROUTE 0 ll EXISTING PAD MOUNTED TRANSFORMER EXISTING TELCO PEDESTAL EXISTING TELCO PEDESTAL ❑ EXISTING TELCO VAULT EXISTING UTILITY POLE 318684-166756 a a 1 22"x" SCALE: 1/" = 1'-0" UTILITY ROUTING PLAN 11"x1717" SCALE: 1/3232" = 1'-0" 16' 12' 8' 4' 0' 16' 8 100% CONSTRUCTION TJB 03/16/23 SURVEYED: SCALE: VERTICAL: NAVD 1988 7 100% CONSTRUCTION TJB 02/27/23 DESIGNED: 1 / 1 6"=1 ' HORIZONTAL: NAD 1983/1991 Aoffivak CITY OF Q DRAWN: 6 100% CONSTRUCTION TJB 01 /10/23 TJB RENTON 5 100% CONSTRUCTION TJB 12/19/22 T,1g ONE INCH DATUM VAM19F 4 100% CONSTRUCTION TJB 10/25/22 r CHECKED: PD AT FULL SCALE Planning/Building/Public Works Dept. IF NOT ONE INCH NO. REVISION BY DATE APPR I APPROVED: SCALE ACCORDINGLY M O N N A u M O 04 O O 1 N Q J O O O 1 N 00 N (0 O O N m Q W R-424017 aI IN COMPLIANCE WITH CITY OF RENTON STANDARDS � O DEVELOPMENT ENGINEERING 0 M Scott Warlick 4/6/2023 00I W J I— U) Q DATE: ` CROWN CASTLE 831070 A -TEAM 03O/16/23 FlEL UTILITY ROUTING PLAN & DETAILS z PAGE: DRAWING N0: 2902 NE 12TH ST O RENTON, WA 98056 SHEET: E1 OF: 1 7 U