HomeMy WebLinkAboutEX_17_ERC_DNSM_Committee_Determination_and_Notice_20230420
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
Project File Numbers: PR19-000118 / LUA23-000049, ECF, MOD, SA-A
Project Name: Compton Lumber
Applicant: TorJan Ronhovde, Architect / 14900 Interurban Ave S, #138, Tukwila, WA 98168
Project Location: 2940 East Valley Rd (APN's 3023059096, 3023059099, 3023059098, 3023059091)
Project Description: The applicant is requesting a new Administrative Site Plan Review, Environmental (SEPA)
Review, and Street Modification for the construction of a 50,000 square foot lumber and hardware sales building with
outdoor lumber sales and 98 surface parking spaces. A previous Site Plan approval, Environmental (SEPA) Review, and
Street Modification were reviewed and approved on the project site under LUA19-000050 but have since expired. The
project proposal would be constructed across 4 parcels totaling 254,733 square feet (5.85 acres) located within the
Commercial Arterial (CA) zoning designation and Urban Design District D. Access to the site would be provided via two
existing and two new curb cuts off of East Valley Road. A Category III wetland with a standard 75-foot buffer has been
identified and delineated along the east and south property boundaries. The applicant is requesting a 25-foot buffer
reduction with enhancement, which would reduce the buffer to 56.25 feet. A seismic hazard area is also mapped on the
project site. Two existing buildings are proposed to remain, all other buildings would be removed. Of the existing 6 curb
cuts along the project frontage, two are proposed to remain and two would be reconfigured, resulting in a total of 4 curb
cuts. The requested street standards modification would reduce the required sidewalk width to six (6) feet.
Lead Agency: City of Renton
Environmental Review Committee
Department of Community & Economic Development
Date of Decision: April 24, 2023
Mitigation Measures:
1. Project construction shall comply with the recommendations found in the submitted Geotechnical report
prepared by Terra Associates, Inc., dated January 24, 2017.
2. The applicant’s geotechnical engineer shall review the project’s construction and building permit plans to
verify compliance with the submitted geotechnical report. The geotechnical engineer shall submit a sealed
letter stating that he/she has reviewed the construction and building permit plans and in their opinion the
plans and specifications meet the intent of the report.
3. Clean-up and/or remediation of the contaminated soils onsite shall comply with the requirements as outlined
by the Department of Ecology. The applicant shall be required to submit a copy of a No Further Action letter
or comparable from the Department of Ecology prior to the issuance of any Construction or Building Permits
on the project site.
4. Hazardous waste operations worker training, health/safety plan, and site control requirements shall be in
accordance with the requirements outline in WAC 296-843.
5. Any potential contaminated soil encountered during excavations shall be handled in accordance with
Department of Ecology’s requirements including by not limited to: sampling, containment, and disposal at a
permitted facility
6. Project construction shall not disrupt ongoing containment remediation at the site and shall include
procedures to prevent damage to site monitoring wells.
DocuSign Envelope ID: 3B7342F2-7C3E-4B53-A7BD-1B80D65B8919DocuSign Envelope ID: B761902A-805D-4E2F-96AD-5D0699C07F06
Environmental Review Committee Determination
April 24, 2023
Page 2 of 2
SIGNATURES:
Martin Pastucha, Administrator
Public Works, Chair
Date Anjela Barton, Fire Marshal
Renton Regional Fire Authority
Date
Kelly Beymer, Administrator
Parks and Recreation
Date Chip Vincent, Administrator Date
Community and Economic Development
7. An Inadvertent Discovery Plan (IDP) shall be prepared and submitted prior to the issuance of a Civil
Construction Permit.
The City of Renton Environmental Review Committee has determined that probable significant environmental impacts
from the proposed project can be mitigated. An Environmental Impact Statement (EIS) is not required under RCW
43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their
authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts
identified during the environmental review process. Because other agencies of jurisdiction may be involved, the lead
agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on May 8, 2023. Appeals
must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub
Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date
if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance
Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the
appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
DocuSign Envelope ID: 3B7342F2-7C3E-4B53-A7BD-1B80D65B8919
4/24/2023 | 1:53 PM PDT
for
4/24/2023 | 1:52 PM PDT 4/24/2023 | 2:09 PM PDT
4/24/2023 | 3:00 PM PDT
DocuSign Envelope ID: B761902A-805D-4E2F-96AD-5D0699C07F06
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNS-M: The City of Renton Environmental Review Committee (ERC) has determined that the proposed action has
probable significant impacts that can be mitigated through mitigation measures. This DNS-M is issued after using the
optional DNS process in WAC 197-11-355. There is no further comment period.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
April 24, 2023
PROJECT NAME/NUMBER: PR19-000118 Compton Lumber / LUA23-
000049, ECF, MOD, SA-A
PROJECT LOCATION: 2940 East Valley Rd (APN's 3023059096,
3023059099, 3023059098, 3023059091)
APPLICANT/PROJECT CONTACT PERSON: TorJan Ronhovde, Architect / 14900 Interurban Ave S, #138, Tukwila, WA
98168 / torjan@ronhovdearchitects.com
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/c8mFC5H
PROJECT DESCRIPTION: The applicant is requesting a new Administrative Site Plan Review,
Environmental (SEPA) Review, and Street Modification for the construction of a 50,000 square foot lumber and hardware
sales building with outdoor lumber sales and 98 surface parking spaces. A previous Site Plan approval, Environmental
(SEPA) Review, and Street Modification were reviewed and approved on the project site under LUA19-000050 but have
since expired. The project proposal would be constructed across 4 parcels totaling 254,733 square feet (5.85 acres)
located within the Commercial Arterial (CA) zoning designation and Urban Design District D. Access to the site would be
provided via two existing and two new curb cuts off of East Valley Road. A Category III wetland with a standard 75-foot
buffer has been identified and delineated along the east and south property boundaries. The applicant is requesting a
25-foot buffer reduction with enhancement, which would reduce the buffer to 56.25 feet. A seismic hazard area is also
mapped on the project site. Two existing buildings are proposed to remain, all other buildings would be removed. Of the
existing 6 curb cuts along the project frontage, two are proposed to remain and two would be reconfigured, resulting in
a total of 4 curb cuts. The requested street standards modification would reduce the required sidewalk width to six (6)
feet.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on May 8, 2023. Due to
the ongoing state of emergency enacted by Governor’s Proclamation 20-28.14 (and as amended), the City Clerk’s Office
is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at
cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally
due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeal s
NOTICE
DocuSign Envelope ID: B761902A-805D-4E2F-96AD-5D0699C07F06
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR19-000118 Compton Lumber / LUA23-000049, ECF, MOD, SA-A
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be
obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
PUBLIC HEARING: If the Environmental Determination is appealed, a public hearing will be set and all parties notified.
DocuSign Envelope ID: B761902A-805D-4E2F-96AD-5D0699C07F06