HomeMy WebLinkAbout7945.04 S 2023 0515Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 S 2023 0515 Date Mon 5/15/2023 Weather 77°F, Sunny Arrival/Departure Time(s) 9:45-10:10 Travel Time (hr)0.25 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep., CESCL No., Phone No. & Report Statement Jeannie Bratulina, ECO-3-6272223, (206) 376-4906 “This report is true, accurate, and complete to the best of my knowledge and belief.” Client Info/Contact Century Communities | Stacia Bloom Permit No(s). WAR311273 Reviewed By JLG Initials/Date N/A Asst Field Supervisor Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Type of visit:  Weekly  Monthly  Post–Storm Event Precipitation since last inspection (approximate): 0.00 inches Precipitation in last 24 hours (approximate): 0.00 inches Phase of active construction (check all that apply): Pre-construction Clearing, demolition, or grading Infrastructure or roads Concrete pours Vertical construction Utilities Off-site improvements Site temporarily stabilized Final stabilization Was water quality sampling part of this inspection? Yes No If “Yes”: •Record results in the table below. •Hanna Turbidity Meter No. 16 Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes MP-1 Beehive on Lincoln Ave NE - - N/A Water moved from the vault to the Water Tectonics treatment system on-site then piped to beehive Report ID 7945.04 S 2023 0515 Page 2 of 3 Earth Solutions NW, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N - Site perimeter marked by silt fence and chainlink fence - Concrete barrier blocks and high visibility fence utilized along perimeter of NW vault excavation 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck G N - Stabilized construction entrance off of Lincoln Ave NE using quarry spalls - Sweeper truck on-site; continue to utilize along NE 40th and Lincoln Ave NE as needed 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N - Stormwater vault at NW corner of site - Sandbag berm utilized before slope 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Water Truck F N - Silt fence installed where needed for sediment control - Curb installation underway - Majority of on-site road is freshly paved; gravel base applied to unpaved road sections - Construction of second vault at NW corner of site underway; quarry spalls added in various points to control flows 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Stockpiles F N - Exposed soils are covered in plastic and anchored down with sandbags, hydroseeded or actively worked - Cover any stockpiles with plastic sheeting if unworked 7+ days 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors G N - Plastic sheeting on slopes - Upper slopes hydroseeded and covered in grass; straw placed throughout slope where needed 7. Protect Drain Inlets • Catch Basin Inserts G N - Inserts removed while catch basins are being worked on; replace inserts once work is completed 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets F N - Rock-lined swales throughout site direct water from East to West towards vault; quarry spalls scarce in a few areas of the swale on the East side of the site, still working as intended 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling G N - Storage shack on-site - Plastic-lined concrete washout constructed at SW corner of site 10. Control Dewatering G N - Water moved from the vault to the Water Tectonics treatment system on-site then piped to beehive on Lincoln Ave NE when needed 11. Maintain BMPs F N - See details below 12. Maintain SWPPP & Site Logbook G N - Available upon request 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement - - N/A Do existing BMPs need to be modified or removed, or do other BMPs need to be installed?  Yes  No List the action items in the table below: Element # Description and Location Action Required Completion Date Report ID 7945.04 S 2023 0515 Page 3 of 3 Earth Solutions NW, LLC BMP LEGEND CONSTRUCTION ENTRANCE CHAINLINK FENCE SWALE STORMWATER VAULT HYDROSEEDED LOTS PLASTIC SHEETING STRAW MONITORING POINT STOCKPILE CONCRETE WASHOUT SILT FENCE HIGH VISIBILITY FENCE SANDBAG