Loading...
HomeMy WebLinkAboutR-3944100 l7rJ 0 I W I — W 0 a i tri w m z J IL PROJECT INFORMATION ENGINEERED PRODUCT MANAGER: JOESHEEHY ADS SALES REP: 253-255-6302 JOE.SH EEHY@ADS-PI PE.COM PROJECT NO: 169073 BRAD BARRON 206406-0141 BRAD.BARRON@ADS-PI PE.COM STORMWATER CHAMBER SPECIFICATIONS ADVANCED DRAINAGE SYSTEMS, INC. SUNSET COURT LLLP RENTON, WASHINGTON 1. CHAMBERS SHALL BE STORMTECH SC-740, SC-310, OR APPROVED EQUAL. 2. CHAMBERS SHALL BE MANUFACTURED FROM VIRGIN POLYPROPYLENE OR POLYETHYLENE RESINS. 3. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORT PANELS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 4. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG -DURATION DEAD LOADS AND 2) SHORT -DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 5. CHAMBERS SHALL MEET ASTM F2922 (POLYETHYLENE) OR ASTM F2418-16 (POLYPROPYLENE), "STANDARD SPECIFICATION FOR THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 6. CHAMBERS SHALL BE DESIGNED AND ALLOWABLE LOADS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 7. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. THE CHAMBER MANUFACTURER SHALL SUBMIT THE FOLLOWING UPON REQUEST TO THE SITE DESIGN ENGINEER FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE: a. A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY AASHTO FOR THERMOPLASTIC PIPE. b. A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET. THE 50 YEAR CREEP MODULUS DATA SPECIFIED IN ASTM F2418 OR ASTM F2922 MUST BE USED AS PART OF THE AASHTO STRUCTURAL EVALUATION TO VERIFY LONG-TERM PERFORMANCE. c. STRUCTURAL CROSS SECTION DETAIL ON WHICH THE STRUCTURAL EVALUATION IS BASED. 8. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. ..I S ADS, INC. IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-3101SC-740 SYSTEM 1. STORMTECH SC-310 & SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE -CONSTRUCTION MEETING WITH THE INSTALLERS. 2. STORMTECH SC-310 & SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/SC-780 CONSTRUCTION GUIDE". 3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: • STONESHOOTER LOCATED OFF THE CHAMBER BED. • BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. • BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6. MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm). 8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT 1. STORMTECH SC-310 & SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC-310 & SC-740 CHAMBERS IS LIMITED: • NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. • NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". • WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS AASHTO MATERIAL COMPACTION / DENSITY MATERIAL LOCATION DESCRIPTION CLASSIFICATIONS REQUIREMENT FINAL FILL: FILL MATERIAL FOR LAYER'D' STARTS FROM THE TOP OF THE'C' LAYER TO THE BOTTOM ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER PREPARE PER SITE DESIGN ENGINEER'S PLANS. D OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT N/A PAVED INSTALLATIONS MAY HAVE STRINGENT GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE SUBGRADE REQUIREMENTS. MATERIAL AND PREPARATION REQUIREMENTS. MAY BE PART OF THE'D' LAYER BEGIN COMPACTIONS AFTER 12" (300 mm) OF AASHTO M145' MATERIAL OVER THE CHAMBERS IS REACHED. INITIAL FILL: FILL MATERIAL FOR LAYER 'C' GRANULAR WELL -GRADED SOIUAGGREGATE MIXTURES, <35% A-1, A-2-4, A-3 COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX STARTS FROM THE TOP OF THE EMBEDMENT FINES OR PROCESSED AGGREGATE. LIFTS TO A MIN. 95% PROCTOR DENSITY FOR C STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE OR WELL GRADED MATERIAL AND 95% RELATIVE TOP OF THE CHAMBER. NOTE THAT PAVEMENT MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU AASHTO M43' DENSITY FOR PROCESSED AGGREGATE SUBBASE MAY BE A PART OF THE'C' LAYER. OF THIS LAYER. 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, MATERIALS. ROLLER GROSS VEHICLE WEIGHT 9,10 NOT TO EXCEED 12,000Ibs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 Ibs (89 kN). EMBEDMENT STONE: FILL SURROUNDING THE AASHTO M43' B CHAMBERS FROM THE FOUNDATION STONE ('A' CLEAN, CRUSHED, ANGULAR STONE 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. LAYER) TO THE'C' LAYER ABOVE. FOUNDATION STONE: FILL BELOW CHAMBERS AASHTO M43 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT A FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) CLEAN, CRUSHED, ANGULAR STONE 3, 357, 4,467, 5, 56, 57 SURFACE. " OF THE CHAMBER. PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS— PAVEMENT LAYER (DESIGNED PERIMETER STONE (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 12"(300 \IATrA_ SC-740 END CAP SUBGRADE SOILS , (SEE NOTE 4) TBY SITE DESIGN ENGINEER) 'TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED 8' STALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, 18" INCREASE COVER TO 24 I600 mml. (2.4 m) (450 mm) MIN* MAX 6" (150 mm1 MIN (150 mm) MIN 51" (1295 mm) 30" (760 mm) . DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN 712-00 mm) TYP 1. SC-740 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM 1`2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS", OR ASTM F2922 "STANDARD SPECIFICATION FOR POLYETHYLENE (PE) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS. 4. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 6. ONCE LAYER'C' IS PLACED, ANY SOIUMATERIAL CAN BE PLACED IN LAYER'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER'C' OR'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. 1932 First Ave Suite 201 Seattle, WA 98101 p. 206.725.1211 f, 206.973.5344 engineering p l l c WWW,Ipdengineering.com L 1�� Zoo NO. z I H 0 U t O z z 0 _ LLu I W Q o U Z of O N C < H w 3 W 'e ` Of w H O � d ° 0 i U m b� > N a� J F DD o w z - 2 O LU .12K K g� < CD J �a � Yl e �y IN ao o zm ¢w SHEET 3 OF 5 ADDENDUM ##3 ADDENDUM W4 CONFORMED SET PERMIT REVISIONS FINAL PERMIT SET REVISION CONCEPTUAL LAYOUT kl[el is Call 3 Working Days Before You DIG! y-800-424-5555 (16) STORMTECH SC-740 CHAMBERS • MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET #7 FOR MANIFOLD SIZING GUIDANCE. (8) STORMTECH SC-740 END CAPS DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE INSTALLED WITH 6" COVER STONE, 6" BASE STONE, 40% STONE VOID NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. INSTALLED SYSTEM VOLUME: 1,565 CF (PERIMETER STONE INCLUDED) • THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER AREA OF SYSTEM: 803 FT' COVER REQUIREMENTS ARE MET. PERIMETER OF SYSTEM: 119 FT • NOT FOR CONSTRUCTION: THIS LAYOUT IS FOR DIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIRED STORAGE VOLUME CAN BE ACHIEVED ON SITE. PROPOSED ELEVATIONS MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED): 354.30 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC): 348.30 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC): 347.80 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT): 347.80 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT): 347.80 TOP OF STONE: 346.80 TOP OF CHAMBER: 346.30 12 TOP MANIFOLD INVERT: 344.84 12" BOTTOM CONNECTION: 343.90 24" ISOLATOR ROW INVERT: 343.81 BOTTOM OF CHAMBER: 343.80 BOTTOM OF STONE: 343.30 12" ADS N-12 BOTTOM CONNECTION MAXIMUM OUTLET FLOW 2.0 CFS INVERT 1.2" ABOVE CHAMBER BASE (SEE NOTES) Q 6ER N m INSPECTION PORT (TYP 2 PLACES) COVER ENTIRE ISOLATOR ROW WITH ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE 8' (2.4 m) MIN WIDE STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES CATCH BASIN OR MANHOLE SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT — 39.18' 30.08' — ISOLATOR ROW ISOLATOR // W 24" PREFABRICATED END CAP, PART# SC740EPE24B TYP OF ALL SC-740 24" CONNECTIONS AND ISOLATOR ROWS SC-740 CHAMBE 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE -FABRICATED END CAP PART* SC740EPE24B SC-740 ISOLATOR ROW DETAIL NTS ll 14 PLACE MINIMUM 12.5' OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS 12" X 12" ADS N-12 TOP MANIFOLD MAXIMUM INLET FLOW 4.1 ICES INVERT 12.5" ABOVE CHAMBER BASE (SEE NOTES) STRUCTURE (PER ENGINEER'S PLAN) W/ELEVATED BYPASS MANIFOLD [RELOCATED] (DESIGN BY ENGINEER / PROVIDED BY OTHERS) (TYP 2 PLACES) z U LLU 0 i O Z TION PORT Q cm K w W Q 0 U 1 Z Z � 1 N n A Q O = Z Q� W H w SC-740 END CAP H o O � 1 a ......-.. _.............------ ...._ ..CS 315WTK WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR ROWS CONCRETE COLLAF B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE PAVEMENT i) MIRRORS ON POLES OR CAMERAS MAYBE USED TO AVOID A CONFINED SPACE ENTRY ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN CONCRETE SLAB C. VACUUM STRUCTURE SUMP AS REQUIRED 8" (200 mm) MIN THICKNESS STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. FLEXSTORM CATCH n STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. PART# 6212NYF) WITH USE OF OPEN GRATE NOTES 6" (150 mm) INSERTA TEE PART# 61PSSTIP/688PERUE 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS INSERTA TEE TO BE CENTEREE OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. ON CORRUGATION CRESI 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. e WIPI.r:1LIIl 5 5 17 SURVEYED: SCALE: 5 5 17 DESIGNED:P 5 19 17 6 29 17 SWP 7 13 17 CHECKED: DATE APPR APPROVED: 1/'=20/ ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM TH CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 12" (300 mm) NYLOPLAST INLINE DRAIN BODY W/SOLID HINGED COVER OR GRATE PART# 2712AG6NIP o N° a SOLID COVER: 1299CGC m o w GRATE: 1299CGS z < _ 2O LU K io zaa 6" (150 mm) PVC SCH40 g w 3 PIPE (BY OTHERS) _ � = o 2y SC-740 CHAMBER w� a o SC-740 6" INSPECTION PORT DETAIL NTS CITY OF RENTON Planning/Building/Public Works Dept. _ x c �a m oOa E SHEET 4 OF 5 R-394410 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING �H LAnn Fowler 07/13/2017 SURFACE WATER UTILITY rstraka 07/14/2017Ul SUNSET COURT APARTMENTS 1144-1158 HARRINGTON AVE NE RENTON, WA 98056 STORMTECH DETAILS DATE: 5/5/2017 PAGE DRAWING NO: C2.4 SHEET: 1 O OF: 0) LO Iq 0 0 (0 -J Q J u� 1 �D V! Z W H Q CL a cr 0 0 H W a) Z r� V!