HomeMy WebLinkAboutPRE23-000131_Meeting SummaryPREAPPLICATION MEETING FOR
Rowing Center Dock Replacement Phase II
PRE 23-000131
CITY OF RENTON
Department of Community & Economic Development
Planning Division
May 25, 2023
Contact Information:
Planner: Jill Ding, 425.430.6598, jding@rentonwa.gov
Public Works Plan Reviewer: Michael Sippo, 425-430-7298, msippo@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org
Building Department Reviewer: Rob Shuey, 425.430.7235
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
formal submittal.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: May 22, 2023
TO: Michael Sippo, Development Engineering
FROM: Jill Ding, Planning
SUBJECT: Renton Rowing Dock Replacement (Parcel number 072305-9001)
PRE23-000131
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s) 072305-
9001. The following comments are based on the pre-application submittal made to the City of Renton by
the applicant.
WATER
1. Water Service is not a requirement for this project.
SEWER
1. Sewer service is not a requirement for this project.
SURFACE WATER
1. City records indicate that there is a 60” surface water main that outfalls underneath or adjacent
to the docks. The location and nature of the main is unknown and consideration will need to be
taken if work occurs near the main’s mapped location through the permitting process.
2. Refer to Figure 1.1.2.A – Flow Chart in the 2022 RSWDM to determine what type of drainage
review is required for this site. A drainage study complying with the 2022 City of Renton Surface
Water Manual will be required. Based on the City’s flow control map, this site falls within the
Peak Rate Flow Control Standard (Existing Conditions). The site is located in the Lake Washington
drainage basin. Drainage report and drainage plans based on 2022 City of Renton Surface Water
Design Manual are required to be provided. A preliminary drainage plan and drainage report,
including the application of flow control BMPs, shall be included with the land use application.
The final drainage plan and drainage report should be submitted with the utility construction
permit application.
3. The development is subject to a Targeted Drainage Review - Category 1 and must demonstrate
that the proposed project complies with a minimum 1 core requirement (Core Requirement #5 -
PRE23-000131
Page 3 of 3
May 22, 2023
Erosion and Sediment Control) and 5 of 6 special requirements (SR #1 - Area Specific
Requirements, #2 - Flood Hazard Delineation, #3 - Flood Protection Facilities, #4 - Source Control,
and #6 - Aquifer Protection) as outlined in the RSWDM. Additional requirements may be applied
by CED based on project or site-specific conditions. Documentation of compliance is required.
4. Erosion control and stormwater pollution prevention measures to meet the City requirements per
Core Requirement #5 of the 2022 RSWDM shall be provided. During construction, the contractor
shall prevent all dust, drips, debris and spills from coming in contact with the water’s surface
5. Please refer to the 2022 RSWDM, pg. 5-17 “Material” when choosing the type of material to be
used for the pilings.
6. Please provide documentation to substantiate the fish window time frame of July 16 to December
31. A Hydraulic Project Approval (HPA) will be required
7. The grate shall be treated to prevent leaching of metals. A leachable metal surface consists of, or
is coated with a non-ferrous metal that is soluble in water. Refer to the 2022 RSWDM, pg. 6-19
“Use of Metal Materials” when considering the grating material to be used for the dock’s surface.
8. A geotechnical report for the site is required and shall be submitted with the land use application.
Information concerning the soils, geology, drainage patterns, vegetation present, water table and
soil permeability, with recommendations of appropriate on-site BMP options with typical designs
for the site from the geotechnical engineer, shall be submitted with the application. The geotech
report should include an on-site infiltration test to clearly show if the site is suitable or unsuitable
for infiltration. The geotech report should discuss critical areas in the site and if there any wet
season construction restrictions.
9. A Construction Stormwater General Permit from Department of Ecology may be required due to
the overwater nature of the construction activity being proposed. A Stormwater Pollution
Prevention Plan (SWPPP) is required for this site.
10. The current City of Renton Surface Water Standard Plans that shall be used in all drainage
submittals are available online at the City of Renton website
11. The development is not subject to stormwater system development charges (SDC fee).
TRANSPORTATION
1. Construction mitigation shall take into account project impacts to park, fire, vehicle, bicycle and
pedestrian traffic where the site accesses from Nishiwaki Ln. Construction staging will need to
take into account the ability of emergency vehicles to utilize the drives and the park turnaround
area.
2. A conceptual pedestrian and bicycle detour and signage plan shall be submitted with the land-
use application for review by the City’s Transportation and Parks Department as applicable and
if staging will occur offsite.
3. A traffic impact analysis is not required.
General Comments
1. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer
shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-
to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
2. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate
sheets.
PRE23-000131
Page 3 of 3
May 22, 2023
3. Fees quoted in this document reflect the fees applicable in the year 2023 only and will be assessed
based on the fee that is current at the time of the permit application or issuance, as applicable to the
permit type. Please visit www.rentonwa.gov for the current development fee schedule.
4. A demo permit is required for the demolition of the existing structures. The demo permit shall be
acquired through the building department.
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: May 25, 2023
TO: Pre-application File No. 23-000131
FROM: Jill Ding, Senior Planner
SUBJECT: Rowing Center Dock Replacement Phase II – 1060 Nishiwaki Ln
(Parcel No. 0723059001)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other design
changes required by City staff or made by the applicant. The applicant is encouraged to review
all applicable sections of the Renton Municipal Code. The Development Regulations are
available online at www.rentonwa.gov.
Project Proposal: The subject property is located at 1060 Nishiwaki Ln (Parcel No. 0723059001).
The proposed project site is currently developed with an existing rowing center. The proposal is
phase II of the larger Renton Rowing Center Dock Replacement Project. Phase I was completed
under LUA16-000448. The applicant is proposing to replace an existing, 65’ by 20’ solid timber
deck (Float B) with a new 118’ by 10’ deck with 20% grating (Float E), and a 3’ by 35’ deck with
20% grating (Float F). The existing Float B totals 1,300 square feet in area, proposed Floats E and
F would total 1,285 square feet in area. The project site is located within Lake Washington and is
subject to the requirements of the Shoreline Management Act and Shoreline Master Program.
No changes in access are proposed. The project site is located within the Shoreline Aquatic
Designation of Lake Washington, Reach I.
Current Use: The site is currently developed with an existing rowing center.
Shoreline Master Program: The project site is located within Lake Washington and would be
subject to the requirements of the Aquatic Designation. Boat houses, boat launching, and boat
moorage uses are outright permitted uses within the Aquatic Designation, provided the use is
water-dependent (RMC 4-3-090E.1).
General Criteria for Use and Approval of All New or Expanded Piers and Docks:
i. Piers and docks shall be designed to minimize interference with the public use and
enjoyment of the water surface and shoreline, nor create a hazard to navigation.
Rowing Center Dock Replacement, Phase II
Page 2 of 6
May 25, 2023
ii. The dock or pier shall not result in the unreasonable interference with the use of
adjacent docks and/or piers.
iii. The use of floating docks in lieu of other types of docks is to be encouraged in those
areas where scenic values are high and where substantial conflicts with recreational
boaters and fishermen will not be created.
iv. The expansion of existing piers and docks is preferred over the construction of new.
v. The responsibility rests on the applicant to affirmatively demonstrate the need for the
proposed pier or dock in his/her application for a permit, except for a dock accessory to
a single family residence on an existing lot.
vi. All piers and docks shall result in no net loss of ecological functions. Docks, piers, and
mooring buoys, including those accessory to single family residences, shall avoid, or if
that is not possible, minimize and mitigate adverse impacts to shoreline ecological
functions such that no net loss of ecological functions results.
vii. Over-water construction not required for moorage purposes is regulated as a
recreation use.
viii. New or expanded piers and docks allowed for water-dependent uses shall be
consistent with the following criteria:
(a) Water-dependent uses shall specify the specific need for over-water location
and shall be restricted to the minimum size necessary to meet the needs of the
proposed water-dependent use.
(b) Water-related, water-enjoyment and multiple uses may be allowed as part
of a dock or pier to serve as water-dependent use structures where they are
clearly auxiliary to and in support of water-dependent uses, provided the
minimum size requirement needed to meet the water-dependent use is not
violated.
(c) Public access is required over all docks utilizing public aquatic lands that
serve water-dependent uses, water-enjoyment uses and multiple uses, provided
it does not preclude the water-dependent use.
(d) The dock or pier length shall not extend beyond a length necessary to
provide reasonable and safe moorage.
Pier and Dock Design Criteria – General:
i. Pier Type: All piers and docks shall be built of open pile construction except that
floating docks may be permitted where there is no danger of significant damage to
an ecosystem, where scenic values are high and where one or more of the following
conditions exist:
(a) Extreme water depth, beyond the range of normal length piling.
(b) A soft bottom condition, providing little support for piling.
(c) Bottom conditions that render it not feasible to install piling.
Rowing Center Dock Replacement, Phase II
Page 3 of 6
May 25, 2023
ii. Construction and Maintenance: All piers and docks shall be constructed and
maintained in a safe and sound condition.
iii. Approach: Approaches to piers and docks shall consist of ramps or other
structures that span the entire foreshore to the point of intersection with stable
upland soils. Limited fill or excavation may be allowed landward of the OHWM to
match the upland with the elevation of the pier or dock.
iv. Materials: Applicants for the new construction or extension of piers and docks or
the repair and maintenance of existing docks shall use materials that will not
adversely affect water quality or aquatic plants and animals over the long term.
Materials used for submerged portions of a pier or dock, decking, and other
components that may come in contact with water shall be approved by applicable
State agencies for use in water to avoid discharge of pollutants from wave splash,
rain or runoff. Wood treated with creosote, pentachlorophenol or other similarly
toxic materials is prohibited. Pilings shall be constructed of untreated materials, such
as untreated wood, approved plastic composites, concrete or steel.
v. Pilings: Pile spacing shall be the maximum feasible to minimize shading and avoid
a “wall” effect that would block or baffle wave patterns, currents, littoral drift, or
movement of aquatic life forms, or result in structure damage from driftwood
impact or entrapment. The first piling set shall be spaced at the maximum distance
feasible to minimize shading and shall be no less than eighteen feet (18'). Pilings
beyond the first set of piles shall minimize the size of the piles and maximize the
spacing between pilings to the extent allowed by site-specific engineering or design
considerations.
vi. Minimization of Nearshore Impacts: In order to minimize impacts on nearshore
areas and avoid reduction in ambient light level:
(a) The width of piers, docks, and floats shall be the minimum necessary to
serve the proposed use.
(b) Ramps shall span as much of the nearshore as feasible.
(c) Dock surfaces shall be designed to allow light penetration.
(d) Lights shall avoid illuminating the water surface. Lighting facilities shall be
limited to the minimum extent necessary to locate the pier or dock at night for
docks serving residential uses. Lighting to serve water-dependent uses shall be
the minimum required to accommodate the use and may not be used when the
water-dependent aspects of the use are not in operation.
vii. Covered Moorage: Covered moorage is not allowed on any moorage facility
unless translucent materials are used that allow light penetration through the
canopy, or through the roof of legal, pre-existing boat houses. Temporary vessel
covers must be attached to the vessel. New boat houses are not allowed.
Rowing Center Dock Replacement, Phase II
Page 4 of 6
May 25, 2023
viii. Seaplane Moorage: Seaplane moorage may be accommodated at any dock that
meets the standards of the Shoreline Master Program.
ix. Other Agency Requirements: If deviation from the design standards specified in
subsection E7 of this Section, Piers and Docks, is approved by another agency with
permitting authority, such as the Washington Department of Fish and Wildlife or the
U.S. Army Corps of Engineers, it shall be approved with a variance, subject to all
conditions and requirements of those permitting agencies.
Commercial and Industrial – Water Dependent Use Dock Design Standards:
Water-dependent commercial and industrial uses may develop docks and piers to the extent
that they are required for water-dependent use. Public access shall be provided
Maximum Length for Piers and Docks: Minimum needed to serve specific vessels or other water-
dependent uses specified in the application. Maximum: 120 ft. from OHWM. Facilities adjacent
to a designated harbor area: The dock or pier may extend to the lesser of:
a) The general standard, above; or
b) The inner harbor line or such point beyond the inner harbor line as is allowed by formal
authorization by the Washington State Department of Natural Resources (DNR) or other agency
with jurisdiction.
Maximum Length for Floats: Minimum needed to serve specific vessels or other water-
dependent uses specified in the application.
Maximum Width for Piers and Docks: Maximum walkway: 8 ft., but 12 ft. if vehicular access is
required for the approved use. Additional width may be allowed to accommodate public access
in addition to the water-dependent use.
Maximum Width for Ells and Floats: Minimum needed to serve specific vessels or other water-
dependent uses specified in the application.
Maximum width for Ramp Connecting a Pier/Dock to a Float: Minimum needed to serve specific
vessels or other water-dependent uses specified in the application.
Maximum Mooring Pilings: Minimum needed to serve specific vessels or other water-dependent
uses specified in the application.
Setbacks: No portion of a pier or dock may lie closer than 30 ft. to an adjacent property line.
Buoy and Float Regulations:
i. Buoys Preferred: The use of buoys for moorage is preferable to piers, docks, or
floats and buoys may be sited under a shoreline exemption instead of a Substantial
Development Permit, provided they do not exceed the cost threshold.
ii. Floats: Floats shall be allowed under the following conditions:
(a) The float is served by a dock attached to the shore for use of only a tender.
The dock shall be the minimum length to allow access to a tender and may not
exceed a length of forty feet (40').
Rowing Center Dock Replacement, Phase II
Page 5 of 6
May 25, 2023
(b) Floats shall be anchored to allow clear passage on all sides by small
watercraft.
(c) Floats shall not exceed a maximum of one hundred (100) square feet in size.
A float proposed for joint use between adjacent property owners may not
exceed one hundred and fifty (150) square feet per residence. Floats for public
use shall be sized in order to provide for the specific intended use and shall be
limited to the minimum size necessary.
(d) A single family residence may only have one float.
(e) Floats shall not be located a distance of more than eighty feet (80') beyond
the OHWM, except public recreation floats.
Environmental Review: Per WAC 197-11-088, the following activities shall be categorically
exempt from Environmental (SEPA) Review: The repair, remodeling, maintenance, or minor
alteration of existing private or public structures, facilities or equipment, including utilities,
recreation, and transportation facilities involving no material expansions or changes in use
beyond that previously existing; except that, where undertaken wholly or in part on lands
covered by water, only minor repair or replacement of structures may be exempt (examples
include repair or replacement of piling, ramps, floats, or mooring buoys, or minor repair,
alteration, or maintenance of docks). As the proposal includes the replacement of existing
floats with no material expansion in total square footage of the floats, the proposal would be
exempt from Environmental (SEPA) Review.
Permit Requirements: Per WAC 173-27-40 of the Shoreline Management Act, normal
maintenance or repair of existing structures or developments, including damage by accident,
fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or
cessation from a lawfully established condition. "Normal repair" means to restore a
development to a state comparable to its original condition, including but not limited to its size,
shape, configuration, location and external appearance, within a reasonable period after decay
or partial destruction, except where repair causes substantial adverse effects to shoreline
resource or environment. Replacement of a structure or development may be authorized as
repair where such replacement is the common method of repair for the type of structure or
development and the replacement structure or development is comparable to the original
structure or development including but not limited to its size, shape, configuration, location and
external appearance and the replacement does not cause substantial adverse effects to
shoreline resources or environment. The proposed replacement floats would be exempt from a
Shoreline Substantial Development Permit as the proposed floats would not exceed the
square footage of the existing floats. A Lake Study would required with the shoreline
exemption application to verify that the proposal would result in no net loss of ecological
functions. A Shoreline Exemption application would be reviewed within an estimated time
frame of 3-4 weeks. Shoreline Exemptions are not subject to any application fees. All fees are
subject to change. Detailed information regarding the land use application submittal can be
found on the City’s website by clicking “Land Use Applications” on the Community & Economic
Development page, then “All Forms (A to Z).” The City now requires electronic plan submittal for
all applications.
Rowing Center Dock Replacement, Phase II
Page 6 of 6
May 25, 2023
Next Steps: When the formal application materials are complete, the applicant is required to
have the application materials pre-screened prior to submitting the complete application
package. Please contact Jill Ding, Senior Planner at jding@rentonwa.gov.
Expiration: The shoreline exemption is valid for two (2) years of the date of approval.