Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bilti Short Plat - 853-084-138
1/9/2019 Attendees Justin Johnson (jtjohnson@rentonwa.gov) rstraka (rstraka@rentonwa.gov) cthomas (cthomas@rentonrfa.org) jcisneros (jcisneros@rentonwa.gov) aaskren (aaskren@rentonwa.gov) jding (jding@rentonwa.gov) KRevans (krevans@rentonwa.gov) rwmarshall (rwmarshall@rentonwa.gov) Documents Bilti Bond Quantity Worksheet.pdf P_Civil_Construction_Plans_Bilti_181128_v1.pdf RS_TIR_Bilti_181202_v1.pdf Record Message Date Time Document Page Label 1 Justin Johnson: Joined Session 12/3/2018 4:25 PM 2 Justin Johnson: Added 'Bilti Bond Quantity Worksheet.pdf'12/3/2018 4:25 PM Bilti Bond Quantity Worksheet.pdf 3 Justin Johnson: Added 'P_Civil_Construction_Plans_Bilti_181128_v1.pdf' 12/3/2018 4:26 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 Justin Johnson: Added 'RS_TIR_Bilti_181202_v1.pdf'12/3/2018 4:26 PM RS_TIR_Bilti_181202_v1.pdf 5 cthomas: Joined Session 12/4/2018 10:36 AM 6 cthomas: Set status to Reviewing 12/4/2018 12:35 PM 7 cthomas: Set status to Finished 12/4/2018 12:35 PM 8 cthomas: Left Session 12/4/2018 12:35 PM 9 jcisneros: Joined Session 12/4/2018 3:27 PM 10 jcisneros: Left Session 12/4/2018 3:30 PM 11 jcisneros: Joined Session 12/5/2018 7:33 AM Message Date Time Document Page Label 12 jcisneros: Add Callout 12/5/2018 7:36 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 13 jcisneros: Edit Callout (NOTE THESE NUMBERS TO BE INPUT ON THE COR TITLE BLOCK. SEE TITLE BLOCK EXAMPLE SHEET PROVIDED) 12/5/2018 7:36 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 14 jcisneros: Add Text Box 12/5/2018 7:36 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 15 jcisneros: Edit Text Box (TED-40-4040)12/5/2018 7:37 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 16 jcisneros: Move Text Box 12/5/2018 7:37 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 17 jcisneros: Apply Markups to All Pages 12/5/2018 7:37 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 18 jcisneros: Add Text Box 12/5/2018 7:37 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 19 jcisneros: Edit Text Box (R-397301)12/5/2018 7:37 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 20 jcisneros: Move Markups 12/5/2018 7:38 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 21 jcisneros: Add Callout 12/5/2018 7:38 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 22 jcisneros: Edit Callout (NOTE THESE NUMBERS TO BE INPUT ON THE COR TITLE BLOCK. SEE TITLE BLOCK EXAMPLE SHEET PROVIDED) 12/5/2018 7:38 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 23 jcisneros: Apply Markups to All Pages 12/5/2018 7:38 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 24 jcisneros: Edit Text Box (R-404001)12/5/2018 7:38 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 Message Date Time Document Page Label 25 jcisneros: Undo 12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 26 jcisneros: Undo 12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 27 jcisneros: Edit Text Box (R-404001)12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 28 jcisneros: Apply Markups to All Pages 12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 29 jcisneros: Edit Text Box (R-404002)12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 2 30 jcisneros: Edit Text Box (R-404003)12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 3 31 jcisneros: Edit Text Box (R-404004)12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 32 jcisneros: Edit Text Box (R-404005)12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 33 jcisneros: Edit Text Box (R-404006)12/5/2018 7:39 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 34 jcisneros: Edit Text Box (R-404007)12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 35 jcisneros: Edit Text Box (R-404008)12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 8 36 jcisneros: Edit Text Box (R-404009)12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 9 37 jcisneros: Edit Text Box (R-404010)12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 10 Message Date Time Document Page Label 38 jcisneros: Edit Text Box (R-404001)12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 11 39 jcisneros: Edit Text Box (R-404011)12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 11 40 jcisneros: Edit Text Box (R-404001)12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 41 jcisneros: Undo 12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 42 jcisneros: Move Text Box 12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 43 jcisneros: Move Text Box 12/5/2018 7:40 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 44 jcisneros: Move Text Box 12/5/2018 7:41 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 45 jcisneros: Edit Text Box (R-404001)12/5/2018 7:41 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 46 jcisneros: Move Text Box 12/5/2018 7:41 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 47 jcisneros: Move Markups 12/5/2018 7:41 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 48 jcisneros: Edit Text Box (R-404012)12/5/2018 7:41 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 12 49 jcisneros: Move Callout 12/5/2018 7:46 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 50 jcisneros: Set status to Finished 12/5/2018 7:47 AM 51 jcisneros: Left Session 12/5/2018 7:47 AM 52 jcisneros: Joined Session 12/5/2018 8:07 AM 53 jcisneros: Left Session 12/5/2018 9:36 AM Message Date Time Document Page Label 54 aaskren: Joined Session 12/5/2018 4:49 PM 55 aaskren: Left Session 12/5/2018 4:49 PM 56 aaskren: Joined Session 12/5/2018 4:51 PM 57 aaskren: Left Session 12/5/2018 5:10 PM 58 aaskren: Joined Session 12/5/2018 5:37 PM 59 aaskren: Add Cloud+12/5/2018 5:40 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 60 aaskren: Edit Cloud+ (unable to find the ties to the renton control monuments in this plan set) 12/5/2018 5:40 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 61 aaskren: Edit Cloud+12/5/2018 5:40 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 62 aaskren: Edit Cloud+ (unable to find the ties to the renton control monuments in the construction portion of the plan set. They are shown on the topographic survey from 2007.) 12/5/2018 5:42 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 63 aaskren: Edit Cloud+ (unable to find the ties to the renton control monuments in the construction portion of the plan set. They are shown on the topographic survey from 2007, but unable to confirm bearings and distances for construction set.) 12/5/2018 5:43 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 1 64 aaskren: Set status to Finished 12/5/2018 5:43 PM 65 aaskren: Left Session 12/5/2018 5:43 PM 66 jding: Joined Session 12/17/2018 1:21 PM 67 jding: Added Length Measurement (20'-3")12/17/2018 1:28 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 68 jding: Set status to Finished 12/17/2018 1:37 PM 69 jding: Left Session 12/17/2018 1:37 PM 70 jding: Joined Session 12/17/2018 1:38 PM 71 jding: Left Session 12/17/2018 1:41 PM 72 Justin Johnson: Reconnected 12/27/2018 3:42 PM 73 Justin Johnson: Left Session 12/27/2018 3:45 PM 74 Justin Johnson: Joined Session 12/31/2018 1:18 PM Message Date Time Document Page Label 75 Justin Johnson: Added Callout 12/31/2018 1:31 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 76 Justin Johnson: Edited Callout (update all details. )12/31/2018 1:31 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 77 Justin Johnson: Delete Callout 12/31/2018 1:31 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 78 Justin Johnson: Added Text Box 12/31/2018 1:31 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 79 Justin Johnson: Edited Text Box (update all details to current details. ) 12/31/2018 1:31 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 80 Justin Johnson: Added Callout 12/31/2018 1:42 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 81 Justin Johnson: Edited Callout 12/31/2018 1:42 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 82 Justin Johnson: Delete Callout 12/31/2018 1:42 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 83 Justin Johnson: Added Callout 12/31/2018 1:43 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 84 Justin Johnson: Edited Callout (replace surface water notes with standard details. ) 12/31/2018 1:43 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 85 Justin Johnson: Added Callout 12/31/2018 2:06 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 86 Justin Johnson: Edited Callout (Per section6.4.4.2 The Minimum sediment storage depth in the first cell shall average 1 foot. ) 12/31/2018 2:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 87 Justin Johnson: Move Callout 12/31/2018 2:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 Message Date Time Document Page Label 88 Justin Johnson: Edited Callout (Per section6.4.4.2 The Minimum sediment storage depth in the first cell shall average 1 foot. ) 12/31/2018 2:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 89 Justin Johnson: Move Callout 12/31/2018 2:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 90 Justin Johnson: Edited Callout (Per section6.4.4.2 The Minimum sediment storage depth in the first cell shall average 1 foot. ) 12/31/2018 2:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 91 Justin Johnson: Move Callout 12/31/2018 2:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 92 Justin Johnson: Added Callout 12/31/2018 2:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 93 Justin Johnson: Edited Callout (recommend adjusting elevations to allow for more than 0.5. field constructibility will make it this elevation difficult to achieve. ) 12/31/2018 2:10 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 94 Justin Johnson: Added Callout 12/31/2018 2:29 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 95 Justin Johnson: Edited Callout (elevations will place the riser below cell 4. ) 12/31/2018 2:30 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 96 Justin Johnson: Move Callout 12/31/2018 2:30 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 97 Justin Johnson: Edited Callout (elevations will place the riser below cell 4. ) 12/31/2018 2:30 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 98 Justin Johnson: Added Callout 12/31/2018 3:13 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 99 Justin Johnson: Edited Callout (Elevation difference is 5.56 feet) 12/31/2018 3:13 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 100 Justin Johnson: Added Callout 12/31/2018 3:18 PM RS_TIR_Bilti_181202_v1.pdf 7 Message Date Time Document Page Label 101 Justin Johnson: Edited Callout (based on the elevations provided. (504.60-499.04) = 5.56 feet x 35ft x 11.25 ft = 987 /2038 sq ft = 46% > 35%) 12/31/2018 3:20 PM RS_TIR_Bilti_181202_v1.pdf 56 102 Justin Johnson: Move Callout 12/31/2018 3:20 PM RS_TIR_Bilti_181202_v1.pdf 56 103 Justin Johnson: Edited Callout (based on the elevations provided. (504.60-499.04) = 5.56 feet x 35ft x 11.25 ft = 938.25 /2038 sq ft = 46% > 35%) 12/31/2018 3:20 PM RS_TIR_Bilti_181202_v1.pdf 56 104 Justin Johnson: Edited Callout (based on the elevations provided. (504.60-499.04) = 5.56 feet x 35ft x 11.25 ft = 938.25 938.25/2038 sq ft = 46% > 35%. per section 6.4.1.2 the first cell must contain 25 to 35 percent of the total wetpool volume. ) 12/31/2018 3:21 PM RS_TIR_Bilti_181202_v1.pdf 56 105 Justin Johnson: Move Callout 12/31/2018 3:21 PM RS_TIR_Bilti_181202_v1.pdf 56 106 Justin Johnson: Reconnected 1/2/2019 7:47 AM 107 Justin Johnson: Edited Callout (Per section 6.4.4.2 The Minimum sediment storage depth in the first cell shall average 1 foot. ) 1/2/2019 7:48 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 108 Justin Johnson: Added Text Box 1/2/2019 7:50 AM RS_TIR_Bilti_181202_v1.pdf 53 109 Justin Johnson: Edited Text Box (elevations listed above differ from the elevations on the plan set. ) 1/2/2019 7:50 AM RS_TIR_Bilti_181202_v1.pdf 53 110 Justin Johnson: Added Callout 1/2/2019 7:53 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 111 Justin Johnson: Edited Callout (elevation does not match the model ran in KRCTS. ) 1/2/2019 7:54 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 112 Justin Johnson: Edited Callout (elevation does not match the model ran in KRCTS. please adjust accordingly ) 1/2/2019 7:54 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 113 Justin Johnson: Added Callout 1/2/2019 7:54 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 Message Date Time Document Page Label 114 Justin Johnson: Edited Callout (provide elevation. )1/2/2019 7:54 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 115 Justin Johnson: Move Callout 1/2/2019 7:54 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 116 Justin Johnson: Added Callout 1/2/2019 7:55 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 48 117 Justin Johnson: Edited Callout (specify pipe size)1/2/2019 7:55 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 118 Justin Johnson: Move Callout 1/2/2019 7:55 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 119 Justin Johnson: Added Callout 1/2/2019 8:37 AM RS_TIR_Bilti_181202_v1.pdf 56 120 Justin Johnson: Edited Callout (dimmensions for the )1/2/2019 8:38 AM RS_TIR_Bilti_181202_v1.pdf 56 121 Justin Johnson: Delete Callout 1/2/2019 8:38 AM RS_TIR_Bilti_181202_v1.pdf 56 122 Justin Johnson: Added Text Box 1/2/2019 8:38 AM RS_TIR_Bilti_181202_v1.pdf 56 123 Justin Johnson: Edited Text Box (dimmensions from the plan set give a west cross section of 3.21 sq ft and at the east end 2.81 sq ft) 1/2/2019 8:40 AM RS_TIR_Bilti_181202_v1.pdf 56 124 Justin Johnson: Added Callout 1/2/2019 8:43 AM RS_TIR_Bilti_181202_v1.pdf 56 125 Justin Johnson: Edited Callout (plans show sediment volume of 45.17 cubic feet.) 1/2/2019 8:43 AM RS_TIR_Bilti_181202_v1.pdf 56 126 Justin Johnson: Move Callout 1/2/2019 8:43 AM RS_TIR_Bilti_181202_v1.pdf 56 127 Justin Johnson: Edited Callout (plans show sediment volume of 45.17 cubic feet.) 1/2/2019 8:43 AM RS_TIR_Bilti_181202_v1.pdf 56 128 Justin Johnson: Edited Callout (plans show sediment volume of 94.09 cubic feet.) 1/2/2019 11:54 AM RS_TIR_Bilti_181202_v1.pdf 56 129 Justin Johnson: Edited Text Box (dimensions from the plan set give a west cross section of 1.575 sq ft and at the east end 1.18125 sq ft with a rectangular section of 3.2625 sq ft. ) 1/2/2019 11:57 AM RS_TIR_Bilti_181202_v1.pdf 56 130 Justin Johnson: Added Text Box 1/2/2019 11:57 AM RS_TIR_Bilti_181202_v1.pdf 56 Message Date Time Document Page Label 131 Justin Johnson: Edited Text Box (15' x [(1.575 sq ft + 1.18125 sq ft) / 2] = 48.9375 cubic feet) 1/2/2019 11:58 AM RS_TIR_Bilti_181202_v1.pdf 56 132 Justin Johnson: Move Text Box 1/2/2019 11:58 AM RS_TIR_Bilti_181202_v1.pdf 7 133 Justin Johnson: Edited Text Box (15' x [((1.575 sq ft + 1.18125 sq ft) / 2) + 3.2625 sq ft] = 48.9375 cubic feet) 1/2/2019 11:59 AM RS_TIR_Bilti_181202_v1.pdf 56 134 Justin Johnson: Move Text Box 1/2/2019 11:59 AM RS_TIR_Bilti_181202_v1.pdf 56 135 Justin Johnson: Added Text Box 1/2/2019 12:11 PM RS_TIR_Bilti_181202_v1.pdf 88 136 Justin Johnson: Edited Text Box (update to new form on city's website) 1/2/2019 12:11 PM RS_TIR_Bilti_181202_v1.pdf 88 137 Justin Johnson: Added Text Box 1/2/2019 1:34 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 2 138 Justin Johnson: Edited Text Box (provide horizontal control plan) 1/2/2019 1:35 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 2 139 Justin Johnson: Added Text Box 1/2/2019 1:41 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 140 Justin Johnson: Edited Text Box (provide composite utility plan showing location of all proposed utilities. ) 1/2/2019 1:42 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 141 Justin Johnson: Added Length Measurement (2 ft)1/2/2019 1:44 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 142 Justin Johnson: Delete Length Measurement 1/2/2019 1:44 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 143 Justin Johnson: Added Callout 1/2/2019 1:45 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 144 Justin Johnson: Edited Callout (1.5%)1/2/2019 1:45 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 145 Justin Johnson: Added Text Box 1/2/2019 2:25 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 9 Message Date Time Document Page Label 146 Justin Johnson: Edited Text Box (update all details)1/2/2019 2:25 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 9 147 Justin Johnson: Edited Text Box (update all details to current details.) 1/2/2019 2:36 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 9 148 Justin Johnson: Added Callout 1/2/2019 3:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 149 Justin Johnson: Edited Callout (provide prior to permit issuance) 1/2/2019 3:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 150 Justin Johnson: Added Callout 1/2/2019 3:09 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 11 151 Justin Johnson: Edited Callout (adjust sheet index)1/2/2019 3:09 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 11 152 Justin Johnson: Move Callout 1/2/2019 3:36 PM RS_TIR_Bilti_181202_v1.pdf 56 153 Justin Johnson: Added Text Box 1/2/2019 3:41 PM RS_TIR_Bilti_181202_v1.pdf 7 154 Justin Johnson: Edited Text Box (recommend lowering the bottom elevation in order to achieve required depth. ) 1/2/2019 3:41 PM RS_TIR_Bilti_181202_v1.pdf 56 155 Justin Johnson: Move Text Box 1/2/2019 3:42 PM RS_TIR_Bilti_181202_v1.pdf 7 156 Justin Johnson: Delete Callout 1/2/2019 3:50 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 157 Justin Johnson: Delete Callout 1/2/2019 3:50 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 158 Justin Johnson: Delete Callout 1/2/2019 3:50 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 159 Justin Johnson: Undo 1/2/2019 3:50 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 160 Justin Johnson: Undo 1/2/2019 3:50 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 Message Date Time Document Page Label 161 Justin Johnson: Delete Callout 1/2/2019 3:57 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 162 Justin Johnson: Edited Callout (please revise the elevations to match the plans) 1/2/2019 4:07 PM RS_TIR_Bilti_181202_v1.pdf 56 163 Justin Johnson: Added Callout 1/2/2019 4:10 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 164 Justin Johnson: Edited Callout (need to have a minimum of 12 inch ventilation pipes at all 4 corners of the vault. ) 1/2/2019 4:10 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 165 Justin Johnson: Move Text Box 1/2/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 61 166 Justin Johnson: Edited Text Box (provide composite utility plan showing location of all proposed utilities. ) 1/2/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 167 Justin Johnson: Move Text Box 1/2/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 168 Justin Johnson: Added Callout 1/2/2019 4:13 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 169 Justin Johnson: Edited Callout (provide triangular wings at driveway entrance. ) 1/2/2019 4:13 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 170 Justin Johnson: Added Callout 1/2/2019 4:14 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 171 Justin Johnson: Edited Callout (1.5%)1/2/2019 4:14 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 172 Justin Johnson: Add Leader 1/2/2019 4:14 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 173 Justin Johnson: Edited Callout (1.5%)1/2/2019 4:14 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 Message Date Time Document Page Label 174 Justin Johnson: Move Callout 1/2/2019 4:14 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 175 Justin Johnson: Edited Callout (1.5%)1/2/2019 4:14 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 176 Justin Johnson: Left Session 1/2/2019 4:28 PM 177 Justin Johnson: Joined Session 1/2/2019 4:30 PM 178 Justin Johnson: Reconnected 1/3/2019 7:16 AM 179 Justin Johnson: Left Session 1/3/2019 7:16 AM 180 rstraka: Joined Session 1/3/2019 7:42 AM 181 rstraka: Left Session 1/3/2019 7:48 AM 182 KRevans: Joined Session 1/3/2019 8:11 AM 183 KRevans: Add Cloud+1/3/2019 8:32 AM RS_TIR_Bilti_181202_v1.pdf 3 184 KRevans: Edit Cloud+ (2017 City of Renton Surface Water Design Manual) 1/3/2019 8:32 AM RS_TIR_Bilti_181202_v1.pdf 3 185 KRevans: Add Line 1/3/2019 8:32 AM RS_TIR_Bilti_181202_v1.pdf 3 186 KRevans: Edit Cloud+1/3/2019 8:32 AM RS_TIR_Bilti_181202_v1.pdf 3 187 KRevans: Edit Cloud+ (2017 City of Renton Surface Water Design Manual) 1/3/2019 8:32 AM RS_TIR_Bilti_181202_v1.pdf 3 188 KRevans: Edit Cloud+1/3/2019 8:33 AM RS_TIR_Bilti_181202_v1.pdf 3 189 KRevans: Add Cloud+1/3/2019 8:35 AM RS_TIR_Bilti_181202_v1.pdf 3 190 KRevans: Edit Cloud+ (parcel)1/3/2019 8:35 AM RS_TIR_Bilti_181202_v1.pdf 3 191 KRevans: Edit Cloud+1/3/2019 8:35 AM RS_TIR_Bilti_181202_v1.pdf 3 192 KRevans: Delete Cloud+1/3/2019 9:00 AM RS_TIR_Bilti_181202_v1.pdf 3 193 KRevans: Delete Line 1/3/2019 9:00 AM RS_TIR_Bilti_181202_v1.pdf 3 194 KRevans: Add Cloud+1/3/2019 10:08 AM RS_TIR_Bilti_181202_v1.pdf 16 195 KRevans: Edit Cloud+ (The stormwater vault will be owned, maintained, and operated by the homeowner's association.) 1/3/2019 10:08 AM RS_TIR_Bilti_181202_v1.pdf 16 196 KRevans: Edit Cloud+1/3/2019 10:09 AM RS_TIR_Bilti_181202_v1.pdf 16 197 KRevans: Add Callout 1/3/2019 10:13 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 Message Date Time Document Page Label 198 KRevans: Edit Callout (Private)1/3/2019 10:13 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 199 KRevans: Move Callout 1/3/2019 10:13 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 200 KRevans: Edit Callout (Private)1/3/2019 10:13 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 201 KRevans: Move Callout 1/3/2019 10:13 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 202 KRevans: Add Callout 1/3/2019 10:19 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 203 KRevans: Move Callout 1/3/2019 10:19 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 204 KRevans: Edit Callout (Private)1/3/2019 10:19 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 205 KRevans: Paste 1/3/2019 10:19 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 206 KRevans: Edit Callout (Private)1/3/2019 10:19 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 207 KRevans: Move Callout 1/3/2019 10:20 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 208 KRevans: Paste 1/3/2019 10:20 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 209 KRevans: Edit Callout (Private)1/3/2019 10:20 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 210 KRevans: Move Callout 1/3/2019 10:20 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 Message Date Time Document Page Label 211 KRevans: Edit Callout (Private)1/3/2019 10:20 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 212 KRevans: Add Callout 1/3/2019 10:25 AM RS_TIR_Bilti_181202_v1.pdf 16 213 KRevans: Edit Callout (The private storm systems located within the private drainage easement or Tract A will be maintained by the homeowner's association.) 1/3/2019 10:26 AM RS_TIR_Bilti_181202_v1.pdf 16 214 KRevans: Move Callout 1/3/2019 10:26 AM RS_TIR_Bilti_181202_v1.pdf 16 215 KRevans: Edit Callout (The private storm systems located within the private drainage easement or Tract A will be maintained by the homeowner's association.) 1/3/2019 10:26 AM RS_TIR_Bilti_181202_v1.pdf 16 216 KRevans: Add Cloud+1/3/2019 10:27 AM RS_TIR_Bilti_181202_v1.pdf 16 217 KRevans: Edit Cloud+ (within private lots)1/3/2019 10:27 AM RS_TIR_Bilti_181202_v1.pdf 16 218 KRevans: Edit Cloud+1/3/2019 10:27 AM RS_TIR_Bilti_181202_v1.pdf 16 219 KRevans: Edit Callout (The private storm systems located within the private drainage easement or Tract A will be maintained by the homeowner's association.) 1/3/2019 10:27 AM RS_TIR_Bilti_181202_v1.pdf 16 220 KRevans: Move Callout 1/3/2019 10:27 AM RS_TIR_Bilti_181202_v1.pdf 16 221 KRevans: Left Session 1/3/2019 1:36 PM 222 KRevans: Joined Session 1/3/2019 1:37 PM 223 KRevans: Left Session 1/3/2019 2:51 PM 224 KRevans: Joined Session 1/3/2019 2:53 PM 225 KRevans: Add Callout 1/3/2019 3:24 PM RS_TIR_Bilti_181202_v1.pdf 57 226 KRevans: Edit Callout (Where do these values come from? Does not seem to match tables or figures in TIR.) 1/3/2019 3:24 PM RS_TIR_Bilti_181202_v1.pdf 57 227 KRevans: Add Leader 1/3/2019 3:24 PM RS_TIR_Bilti_181202_v1.pdf 57 228 KRevans: Edit Callout (Where do these values come from? Does not seem to match tables or figures in TIR.) 1/3/2019 3:24 PM RS_TIR_Bilti_181202_v1.pdf 57 229 KRevans: Move Callout 1/3/2019 3:24 PM RS_TIR_Bilti_181202_v1.pdf 57 230 KRevans: Edit Callout (Where do these values come from? Does not seem to match tables or figures in TIR.) 1/3/2019 3:24 PM RS_TIR_Bilti_181202_v1.pdf 57 Message Date Time Document Page Label 231 KRevans: Move Callout 1/3/2019 3:24 PM RS_TIR_Bilti_181202_v1.pdf 57 232 KRevans: Add Callout 1/3/2019 4:02 PM RS_TIR_Bilti_181202_v1.pdf 56 233 KRevans: Move Callout 1/3/2019 4:02 PM RS_TIR_Bilti_181202_v1.pdf 56 234 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*.28 (triangle) = 4.8375 SF) 1/3/2019 4:05 PM RS_TIR_Bilti_181202_v1.pdf 56 235 KRevans: Move Callout 1/3/2019 4:05 PM RS_TIR_Bilti_181202_v1.pdf 56 236 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*.28 (triangle) = 4.8375 SF) 1/3/2019 4:05 PM RS_TIR_Bilti_181202_v1.pdf 56 237 KRevans: Move Callout 1/3/2019 4:05 PM RS_TIR_Bilti_181202_v1.pdf 56 238 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 = 4.8375 SF) 1/3/2019 4:06 PM RS_TIR_Bilti_181202_v1.pdf 56 239 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 = 4.8375 SF EAst x-section = Rectangle + Triangle = 11.25*(499.04-498.82) + 0.5*11.25*(498.82-498.54) = 2.475 + 1.575 = 4.05 SF) 1/3/2019 4:08 PM RS_TIR_Bilti_181202_v1.pdf 56 240 KRevans: Move Callout 1/3/2019 4:08 PM RS_TIR_Bilti_181202_v1.pdf 56 241 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 = 4.8375 SF EAst x-section = Rectangle + Triangle = 11.25*(499.04-498.82) + 0.5*11.25*(498.82-498.54) = 2.475 + 1.575 = 4.05 SF) 1/3/2019 4:08 PM RS_TIR_Bilti_181202_v1.pdf 56 242 KRevans: Move Callout 1/3/2019 4:08 PM RS_TIR_Bilti_181202_v1.pdf 56 Message Date Time Document Page Label 243 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 = 4.8375 SF EAst x-section = Rectangle + Triangle = 11.25*(499.04-498.82) + 0.5*11.25*(498.82-498.54) = 2.475 + 1.575 = 4.05 SF Average x-section = 0.5 * (4.8375+4.05) = 4.44375 SF) 1/3/2019 4:09 PM RS_TIR_Bilti_181202_v1.pdf 56 244 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 = 4.8375 SF EAst x-section = Rectangle + Triangle = 11.25*(499.04-498.82) + 0.5*11.25*(498.82-498.54) = 2.475 + 1.575 = 4.05 SF Average x-section = 0.5 * (4.8375+4.05) = 4.44375 SF First Cell Volume = 15' * 4.44375 SF = 66.66 CF) 1/3/2019 4:10 PM RS_TIR_Bilti_181202_v1.pdf 56 245 KRevans: Move Callout 1/3/2019 4:10 PM RS_TIR_Bilti_181202_v1.pdf 56 246 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 = 4.8375 SF EAst x-section = Rectangle + Triangle = 11.25*(499.04-498.82) + 0.5*11.25*(498.82-498.54) = 2.475 + 1.575 = 4.05 SF Average x-section = 0.5 * (4.8375+4.05) = 4.44375 SF First Cell Volume = 15' * 4.44375 SF = 66.66 CF) 1/3/2019 4:10 PM RS_TIR_Bilti_181202_v1.pdf 56 247 KRevans: Add Leader 1/3/2019 4:13 PM RS_TIR_Bilti_181202_v1.pdf 56 248 KRevans: Left Session 1/3/2019 4:15 PM 249 KRevans: Joined Session 1/4/2019 8:24 AM 250 KRevans: Add Cloud+1/4/2019 9:20 AM RS_TIR_Bilti_181202_v1.pdf 53 251 KRevans: Edit Cloud+ (Basic)1/4/2019 9:20 AM RS_TIR_Bilti_181202_v1.pdf 53 Message Date Time Document Page Label 252 KRevans: Edit Cloud+1/4/2019 9:20 AM RS_TIR_Bilti_181202_v1.pdf 53 253 KRevans: Add Callout 1/4/2019 9:23 AM RS_TIR_Bilti_181202_v1.pdf 53 254 KRevans: Edit Callout (Assess feasibility of Rain gardens, permeable pavement, rainwater harvesting, vegetated roofs, reduced impervious surface credit, native growth retention credit, and soil amendment.) 1/4/2019 9:27 AM RS_TIR_Bilti_181202_v1.pdf 53 255 KRevans: Edit Callout (Assess feasibility of rain gardens, permeable pavement, rainwater harvesting, vegetated roofs, reduced impervious surface credit, native growth retention credit, and soil amendment.) 1/4/2019 9:28 AM RS_TIR_Bilti_181202_v1.pdf 53 256 KRevans: Move Callout 1/4/2019 9:28 AM RS_TIR_Bilti_181202_v1.pdf 53 257 KRevans: Disconnected 1/4/2019 9:43 AM 258 rwmarshall: Joined Session 1/4/2019 11:55 AM 259 rwmarshall: Left Session 1/4/2019 11:57 AM 260 rwmarshall: Joined Session 1/4/2019 11:59 AM 261 rwmarshall: Add Callout 1/4/2019 12:16 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 262 rwmarshall: Delete Callout 1/4/2019 12:16 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 263 rwmarshall: Add Callout 1/4/2019 12:17 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 264 rwmarshall: Edit Callout (Must be removed by developer after construction is complete) 1/4/2019 12:19 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 265 rwmarshall: Add Arrow 1/4/2019 12:20 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 266 rwmarshall: Delete Arrow 1/4/2019 12:20 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 267 rwmarshall: Add Arrow 1/4/2019 12:20 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 Message Date Time Document Page Label 268 rwmarshall: Delete Arrow 1/4/2019 12:20 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 269 rwmarshall: Set status to Reviewing 1/4/2019 12:22 PM 270 rwmarshall: Add Callout 1/4/2019 12:23 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 271 rwmarshall: Edit Callout (eliminate this cb)1/4/2019 12:23 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 272 rwmarshall: Add Callout 1/4/2019 12:25 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 273 rwmarshall: Edit Callout (Solid Locking Lid If Not Collecting Water) 1/4/2019 12:25 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 274 rwmarshall: Add Callout 1/4/2019 12:28 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 8 275 rwmarshall: Edit Callout (no city of renton logo in private syatem) 1/4/2019 12:29 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 8 276 rwmarshall: Set status to Finished with comments 1/4/2019 12:34 PM 277 rwmarshall: Left Session 1/4/2019 12:35 PM 278 rwmarshall: Joined Session 1/4/2019 12:54 PM 279 rwmarshall: Left Session 1/4/2019 2:49 PM 280 KRevans: Joined Session 1/4/2019 4:11 PM 281 KRevans: Delete Callout 1/4/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 282 KRevans: Add Callout 1/4/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 3 283 KRevans: Delete Text Box 1/4/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 4 284 KRevans: Add Callout 1/4/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 Message Date Time Document Page Label 285 KRevans: Delete Callout 1/4/2019 4:11 PM RS_TIR_Bilti_181202_v1.pdf 53 286 KRevans: Add Callout 1/4/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 287 KRevans: Paste 1/4/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 8 288 KRevans: Add Text Box 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 6 289 KRevans: Paste 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 290 KRevans: Add Callout 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 291 KRevans: Paste 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 6 292 KRevans: Add Callout 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 16 293 KRevans: Add Callout 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 294 KRevans: Add Callout 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 295 KRevans: Edit Callout (Assess feasibility of soil amendment.)1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 53 296 KRevans: Edit Callout (The public storm systems identified by the utility permit plans within the Tukwila The private storm systems located within the private drainage easement or Tract A will be maintained by the homeowner's association.) 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 16 297 KRevans: Add Callout 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 298 KRevans: Delete Callout 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 57 299 KRevans: Add Text Box 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 45 300 KRevans: Delete Callout 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 301 KRevans: Add Callout 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 53 Message Date Time Document Page Label 302 KRevans: Add Callout 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 53 303 KRevans: Edit 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 53 304 KRevans: Add Callout 1/4/2019 4:12 PM RS_TIR_Bilti_181202_v1.pdf 53 305 KRevans: Delete Callout 1/4/2019 4:12 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 306 KRevans: Delete Callout 1/4/2019 4:13 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 307 KRevans: Left Session 1/4/2019 4:23 PM 308 KRevans: Joined Session 1/7/2019 9:09 AM 309 KRevans: Add Text Box 1/7/2019 9:59 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 310 KRevans: Edit Text Box (Access openings shall be placed so no location within the vault is more than 50' away from an access opening.) 1/7/2019 10:00 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 311 KRevans: Add Callout 1/7/2019 10:01 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 312 KRevans: Edit Callout (Also install ventilation pipes at these two "corners" created by the wall.) 1/7/2019 10:02 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 313 KRevans: Add Leader 1/7/2019 10:02 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 314 KRevans: Edit Callout (Also install ventilation pipes at these two "corners" created by the wall.) 1/7/2019 10:02 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 315 KRevans: Move Callout 1/7/2019 10:02 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 316 KRevans: Edit Callout (Also install ventilation pipes at these two "corners" created by the wall.) 1/7/2019 10:02 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 317 KRevans: Move Callout 1/7/2019 10:02 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 Message Date Time Document Page Label 318 KRevans: Delete Callout 1/7/2019 10:18 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 319 KRevans: Reconnected 1/7/2019 10:48 AM 320 KRevans: Add Callout 1/7/2019 10:48 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 321 KRevans: Add Callout 1/7/2019 10:48 AM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 322 KRevans: Set status to Finished 1/7/2019 10:49 AM 323 KRevans: Disconnected 1/7/2019 12:48 PM 324 KRevans: Joined Session 1/7/2019 1:07 PM 325 KRevans: Add Callout 1/7/2019 1:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 326 KRevans: Edit Callout (Removable locking solid panel)1/7/2019 1:07 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 327 KRevans: Edit Cloud+ (The stormwater vault will be owned and maintained by the homeowner's association.) 1/7/2019 1:12 PM RS_TIR_Bilti_181202_v1.pdf 16 328 KRevans: Edit Callout (West x-section = Rectangle + Triangle = 11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 = 4.8375 SF EAst x-section = Rectangle + Triangle = 11.25*(499.04-498.82) + 0.5*11.25*(498.82-498.54) = 2.475 + 1.575 = 4.05 SF Average x-section = 0.5 * (4.8375+4.05) = 4.44375 SF First Cell Volume = 15' * 4.44375 SF = 66.66 CF First cell sediment storage volume is deficient.) 1/7/2019 1:14 PM RS_TIR_Bilti_181202_v1.pdf 56 329 KRevans: Left Session 1/7/2019 1:20 PM 330 rstraka: Joined Session 1/7/2019 1:31 PM Message Date Time Document Page Label 331 rstraka: Add Cloud+1/7/2019 1:33 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 332 rstraka: Edited Cloud+ (The City of Kent approval is requred for the storm improvments in SE 192nd Street, prior to City approval of construction plans) 1/7/2019 1:33 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 333 rstraka: Edit Cloud+1/7/2019 1:34 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 334 rstraka: Edited Cloud+ (The City of Kent approval is required for the storm improvements in SE 192nd Street, prior to City approval of construction plans) 1/7/2019 1:34 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 335 rstraka: Edit Cloud+1/7/2019 1:37 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 336 rstraka: Edited Cloud+ (The City of Kent approval is required for the storm improvements in SE 192nd Street, prior to City approval of construction plans - There is an existing storm system in SE 192nd Street) 1/7/2019 1:38 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 337 rstraka: Add Cloud+1/7/2019 1:45 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 338 rstraka: Edited Cloud+ (Check elevation should be 503.41?)1/7/2019 1:46 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 339 rstraka: Added Callout 1/7/2019 1:48 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 340 rstraka: Edited Callout (Notch connecting cell #3 to Cell #4 invert elevation needs to match wetpool elevation of 504.60) 1/7/2019 1:49 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 341 rstraka: Move Callout 1/7/2019 1:49 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 342 rstraka: Edit Cloud+1/7/2019 1:49 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 343 KRevans: Joined Session 1/7/2019 2:32 PM Message Date Time Document Page Label 344 KRevans: Edit Callout (Provide a 5'x10' vented grate with over the second cell outside of curb line.) 1/7/2019 2:33 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 345 KRevans: Edit Callout (Provide a 5'x10' vented grate over the second cell outside of curb line.) 1/7/2019 2:36 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 346 KRevans: Paste 1/7/2019 2:36 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 347 KRevans: Edit Callout (Provide a 5'x10' vented grate over the second cell outside of curb line.) 1/7/2019 2:36 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 348 KRevans: Move Callout 1/7/2019 2:36 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 349 KRevans: Edit Callout (Provide a 5'x10' vented grate over the second cell outside of curb line.) 1/7/2019 2:37 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 350 KRevans: Move Callout 1/7/2019 2:37 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 351 KRevans: Edit Callout (Provide a 5'x10' vented grate over the second cell outside of curb line.) 1/7/2019 2:37 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 352 KRevans: Paste 1/7/2019 2:41 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 353 KRevans: Move Text Box 1/7/2019 2:41 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 354 KRevans: Add Callout 1/7/2019 2:49 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 355 KRevans: Edit Callout 1/7/2019 2:49 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 356 KRevans: Edit Callout (Call out a provide )1/7/2019 2:49 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 Message Date Time Document Page Label 357 KRevans: Move Callout 1/7/2019 2:49 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 358 KRevans: Edit Callout (Provide and call out an average sediment storage of 1 foot.) 1/7/2019 2:50 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 359 KRevans: Move Callout 1/7/2019 2:50 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 360 KRevans: Reconnected 1/7/2019 4:11 PM 361 KRevans: Delete Callout 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 362 KRevans: Edit Callout (Provide a 5'x10' vented grate over the second cell outside of curb line.) 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 363 KRevans: Edit Callout (Provide and call out an average sediment storage of 1 foot.) 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 364 KRevans: Paste 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 365 KRevans: Paste 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 366 KRevans: Delete Callout 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 367 KRevans: Add Callout 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 56 368 KRevans: Paste 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 369 KRevans: Delete Callout 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 370 KRevans: Paste 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 7 Message Date Time Document Page Label 371 KRevans: Paste 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 372 KRevans: Delete Callout 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 373 KRevans: Edit Callout (Ensure access road provides access to at least one access point in each cell.) 1/7/2019 4:11 PM P_Civil_Construction_Plans_B ilti_181128_v1.pdf 5 374 KRevans: Add Callout 1/7/2019 4:14 PM RS_TIR_Bilti_181202_v1.pdf 40 375 KRevans: Edit Callout (Ensure assumptions comply with requirements within section C.2.9 of the manual.) 1/7/2019 4:14 PM RS_TIR_Bilti_181202_v1.pdf 40 376 KRevans: Move Callout 1/7/2019 4:14 PM RS_TIR_Bilti_181202_v1.pdf 40 377 KRevans: Disconnected 1/8/2019 5:47 AM 378 KRevans: Joined Session 1/8/2019 7:46 AM 379 KRevans: Edit Text Box (State that lot development will utilize reduced impervious surface credit. Ensure assumptions and calculations comply with requirements within section C.2.9 of the manual. Must provide covenant that states restricted impervious area amount for each lot.) 1/8/2019 7:46 AM RS_TIR_Bilti_181202_v1.pdf 53 380 KRevans: Edit Callout (Ensure assumptions and calculations comply with requirements within section C.2.9 of the manual.) 1/8/2019 7:46 AM RS_TIR_Bilti_181202_v1.pdf 40 381 KRevans: Edit Text Box (State that lot development will utilize reduced impervious surface credit. Ensure assumptions and calculations comply with requirements within section C.2.9 of the manual. Must provide covenant that states restricted impervious area amount for each lot.) 1/8/2019 8:28 AM RS_TIR_Bilti_181202_v1.pdf 53 Message Date Time Document Page Label 382 KRevans: Edit Text Box (State that lot development will utilize reduced impervious surface credit. Ensure assumptions and calculations comply with requirements within section C.2.9 of the manual. For the lots, any recorded limit on total impervious surface less than a norm of 4,000 sf or the maximum allowed by the lot's zoning, whichever is smaller, qualifies for a restricted footprint credit equal to the difference in sf. Must provide covenant that states restricted impervious area amount for each lot.) 1/8/2019 8:30 AM RS_TIR_Bilti_181202_v1.pdf 53 383 KRevans: Left Session 1/8/2019 8:31 AM 384 Justin Johnson: Joined Session 1/9/2019 7:51 AM