unable to find the ties to the renton control
monuments in the construction portion of the plan
set. They are shown on the topographic survey
from 2007, but unable to confirm bearings and
distances for construction set.
1 (5)
Subject: Callout
Page Label: 1
Date: 12/5/2018 7:36:06 AM
Status:
Color:
Layer:
Space:
NOTE THESE NUMBERS TO BE INPUT ON THE
COR TITLE BLOCK. SEE TITLE BLOCK
EXAMPLE SHEET PROVIDED
Subject: Text Box
Page Label: 1
Date: 12/5/2018 7:37:33 AM
Status:
Color:
Layer:
Space:
TED-40-4040
Subject: Text Box
Page Label: 1
Date: 12/5/2018 7:39:10 AM
Status:
Color:
Layer:
Space:
R-404001
Subject: Callout
Page Label: 1
Date: 12/5/2018 7:46:44 AM
Status:
Color:
Layer:
Space:
NOTE THESE NUMBERS TO BE INPUT ON THE
COR TITLE BLOCK. SEE TITLE BLOCK
EXAMPLE SHEET PROVIDED
Subject: Text Box
Page Label: 2
Date: 1/2/2019 1:35:08 PM
Status:
Color:
Layer:
Space:
provide horizontal control plan
2 (3)
unable to find theties to the rentoncontrol monumentsin the constructionportion of the planset. They are shownon the topographicsurvey from 2007,but unable toconfirm bearingsand distances forconstruction set.
NOTE THESE NUMBERSTO BE INPUT ON THECOR TITLE BLOCK. SEETITLE BLOCK EXAMPLESHEET PROVIDED
TED-40-4040R-404001
NOTE THESE NUMBERSTO BE INPUT ON THECOR TITLE BLOCK. SEETITLE BLOCK EXAMPLESHEET PROVIDED
provide horizontal control plan
Subject: Text Box
Page Label: 2
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
Subject: Text Box
Page Label: 2
Date: 12/5/2018 7:39:26 AM
Status:
Color:
Layer:
Space:
R-404002
Subject: Callout
Page Label: 3
Date: 1/4/2019 10:21:30 AM
Status:
Color:
Layer:
Space:
Use CIty's updated erosion control notes found on
Surface Water Standard Plan 268.00.
3 (3)
Subject: Text Box
Page Label: 3
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
Subject: Text Box
Page Label: 3
Date: 12/5/2018 7:39:31 AM
Status:
Color:
Layer:
Space:
R-404003
Subject: Callout
Page Label: 4
Date: 1/4/2019 12:19:11 PM
Status:
Color:
Layer:
Space:
Must be removed by developer after construction
is complete
4 (4)
Subject: Text Box
Page Label: 4
Date: 12/31/2018 1:31:42 PM
Status:
Color:
Layer:
Space:
update all details to current details.TED-40-4040R-404002
Use CIty's updated erosion control notes foundon Surface Water Standard Plan 268.00.TED-40-4040R-404003
Must be removed bydeveloper afterconstruction iscomplete
update all details to currentdetails.
Subject: Text Box
Page Label: 4
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
Subject: Text Box
Page Label: 4
Date: 12/5/2018 7:39:42 AM
Status:
Color:
Layer:
Space:
R-404004
Subject: Text Box
Page Label: 5
Date: 1/2/2019 4:11:20 PM
Status:
Color:
Layer:
Space:
provide composite utility plan showing location of
all proposed utilities.
5 (21)
Subject: Callout
Page Label: 5
Date: 1/2/2019 4:13:42 PM
Status:
Color:
Layer:
Space:
provide triangular wings at driveway entrance.
Subject: Callout
Page Label: 5
Date: 1/2/2019 4:14:26 PM
Status:
Color:
Layer:
Space:
1.5%
Subject: Callout
Page Label: 5
Date: 1/3/2019 10:13:14 AM
Status:
Color:
Layer:
Space:
Private
Subject: Callout
Page Label: 5
Date: 1/3/2019 10:19:46 AM
Status:
Color:
Layer:
Space:
PrivateTED-40-4040R-404004
provide composite utility plan showinglocation of all proposed utilities.
provide triangularwings at drivewayentrance.
1.5%
Private
Private
Subject: Callout
Page Label: 5
Date: 1/3/2019 10:20:00 AM
Status:
Color:
Layer:
Space:
Private
Subject: Callout
Page Label: 5
Date: 1/3/2019 10:20:25 AM
Status:
Color:
Layer:
Space:
Private
Subject: Callout
Page Label: 5
Date: 1/4/2019 1:04:36 PM
Status:
Color:
Layer:
Space:
Label these structures. (TYP.)
Subject: Callout
Page Label: 5
Date: 1/4/2019 11:35:56 AM
Status:
Color:
Layer:
Space:
Label roof drain collector pipes. Ensure pipes are
6" dia min, and have 0.5% min slope, and have 2'
min cover. (TYP.)
Subject: Callout
Page Label: 5
Date: 1/4/2019 11:54:44 AM
Status:
Color:
Layer:
Space:
Provide minimum 5' setback between cleanout and
lot line. (TYP.)
Subject: Callout
Page Label: 5
Date: 1/4/2019 11:56:39 AM
Status:
Color:
Layer:
Space:
Add arrows on all storm pipes to show flow
direction. (TYP.)
Subject: Callout
Page Label: 5
Date: 1/4/2019 12:23:38 PM
Status:
Color:
Layer:
Space:
eliminate this cb
Private
Private
Label these structures. (TYP.)
Label roof drain collector pipes.Ensure pipes are 6" dia min, and have 0.5%min slope, and have 2' min cover. (TYP.)
Provide minimum 5' setbackbetween cleanout and lotline. (TYP.)
Add arrows on allstorm pipes to showflow direction. (TYP.)
eliminate this cb
Subject: Callout
Page Label: 5
Date: 1/4/2019 12:25:45 PM
Status:
Color:
Layer:
Space:
Solid Locking Lid If Not Collecting Water
Subject: Cloud+
Page Label: 5
Date: 1/7/2019 1:38:22 PM
Status:
Color:
Layer:
Space:
The City of Kent approval is required for the storm
improvements in SE 192nd Street, prior to City
approval of construction plans - There is an
existing storm system in SE 192nd Street
Subject: Text Box
Page Label: 5
Date: 1/7/2019 2:41:54 PM
Status:
Color:
Layer:
Space:
Access openings shall be placed so no location
within the vault is more than 50' away from an
access opening.
Subject: Callout
Page Label: 5
Date: 1/7/2019 3:49:57 PM
Status:
Color:
Layer:
Space:
Provide a minimum 5'x5' vented grate over cell #2
outside of curb line.
Subject: Callout
Page Label: 5
Date: 1/7/2019 3:50:56 PM
Status:
Color:
Layer:
Space:
Provide a minimum 5'x5' vented grate over cell #3
outside of roadway.
Subject: Callout
Page Label: 5
Date: 1/7/2019 3:59:46 PM
Status:
Color:
Layer:
Space:
Ensure access road provides access to at least
one access point in each cell.
Subject: Length Measurement
Page Label: 5
Date: 12/17/2018 1:28:57 PM
Status:
Color:
Layer:
Space:
20'-3"
Solid Locking Lid IfNot CollectingWater
The City of Kentapproval is requiredfor the stormimprovements in SE192nd Street, priorto City approval ofconstruction plans -There is an existingstorm system in SE192nd Street
Access openings shall be placed so nolocation within the vault is more than50' away from an access opening.
Provide a minimum 5'x5' vented grateover cell #2 outside of curb line.
Provide a minimum 5'x5' vented grateover cell #3 outside of roadway.
Ensure access roadprovides access to atleast one accesspoint in each cell.
20'-3"
Subject: Text Box
Page Label: 5
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
Subject: Text Box
Page Label: 5
Date: 12/5/2018 7:39:48 AM
Status:
Color:
Layer:
Space:
R-404005
Subject: Callout
Page Label: 6
Date: 1/2/2019 1:45:39 PM
Status:
Color:
Layer:
Space:
1.5%
6 (6)
Subject: Callout
Page Label: 6
Date: 1/2/2019 3:07:16 PM
Status:
Color:
Layer:
Space:
provide prior to permit issuance
Subject: Callout
Page Label: 6
Date: 1/4/2019 10:24:21 AM
Status:
Color:
Layer:
Space:
Use City's updated Surface Water Standard notes
found on Surface Water Standard Plans 267.00
and 267.10.
Subject: Callout
Page Label: 6
Date: 12/31/2018 1:43:56 PM
Status:
Color:
Layer:
Space:
replace surface water notes with standard details.
Subject: Text Box
Page Label: 6
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040TED-40-4040R-404005
1.5%
provide prior topermit issuance
Use City's updated Surface WaterStandard notes found on Surface WaterStandard Plans 267.00 and 267.10.
replace surfacewater notes withstandard details.TED-40-4040
Subject: Text Box
Page Label: 6
Date: 12/5/2018 7:39:54 AM
Status:
Color:
Layer:
Space:
R-404006
Subject: Callout
Page Label: 7
Date: 1/2/2019 4:10:31 PM
Status:
Color:
Layer:
Space:
need to have a minimum of 12 inch ventilation
pipes at all 4 corners of the vault.
7 (21)
Subject: Callout
Page Label: 7
Date: 1/2/2019 7:48:02 AM
Status:
Color:
Layer:
Space:
Per section 6.4.4.2 The Minimum sediment storage
depth in the first cell shall average 1 foot.
Subject: Callout
Page Label: 7
Date: 1/2/2019 7:54:29 AM
Status:
Color:
Layer:
Space:
provide elevation.
Subject: Callout
Page Label: 7
Date: 1/2/2019 7:55:37 AM
Status:
Color:
Layer:
Space:
specify pipe size
Subject: Text Box
Page Label: 7
Date: 1/4/2019 10:51:34 AM
Status:
Color:
Layer:
Space:
Update to current City of Renton Surface Water
Standard Plans.
Subject: Callout
Page Label: 7
Date: 1/7/2019 1:49:18 PM
Status:
Color:
Layer:
Space:
Notch connecting cell #3 to Cell #4 invert elevation
needs to match wetpool elevation of 504.60
R-404006
need to have a minimumof 12 inch ventilationpipes at all 4 cornersof the vault.
Per section 6.4.4.2The Minimum sedimentstorage depth in thefirst cell shallaverage 1 foot.
provide elevation.
specify pipe size
Update to current City of RentonSurface Water Standard Plans.
Notch connectingcell #3 to Cell #4invert elevationneeds to matchwetpool elevation of504.60
Subject: Cloud+
Page Label: 7
Date: 1/7/2019 1:50:32 PM
Status:
Color:
Layer:
Space:
Check elevation should be 503.41?
Subject: Text Box
Page Label: 7
Date: 1/7/2019 10:00:22 AM
Status:
Color:
Layer:
Space:
Access openings shall be placed so no location
within the vault is more than 50' away from an
access opening.
Subject: Callout
Page Label: 7
Date: 1/7/2019 10:02:48 AM
Status:
Color:
Layer:
Space:
Also install ventilation pipes at these two "corners"
created by the wall.
Subject: Callout
Page Label: 7
Date: 1/7/2019 12:56:57 PM
Status:
Color:
Layer:
Space:
5'x10' Removable locking solid panel with traffic
bearing lid
Subject: Callout
Page Label: 7
Date: 1/7/2019 3:35:37 PM
Status:
Color:
Layer:
Space:
Provide and call out an average sediment storage
of 1 foot for cell #1.
Subject: Callout
Page Label: 7
Date: 1/7/2019 3:36:24 PM
Status:
Color:
Layer:
Space:
Provide and call out an average sediment storage
of 6 inches for cell #2.
Subject: Callout
Page Label: 7
Date: 1/7/2019 3:37:01 PM
Status:
Color:
Layer:
Space:
Provide and call out an average sediment storage
of 6 inches for cell #3.
Check elevation should be 503.41?
Access openings shall be placed so nolocation within the vault is more than50' away from an access opening.
Also install ventilation pipes at thesetwo "corners" created by the wall.
5'x10' Removable locking solidpanel with traffic bearing lid
Provide and call outan average sedimentstorage of 1 foot forcell #1.
Provide and call outan average sedimentstorage of 6 inchesfor cell #2.
Provide and call outan average sedimentstorage of 6 inchesfor cell #3.
Subject: Callout
Page Label: 7
Date: 1/7/2019 3:42:27 PM
Status:
Color:
Layer:
Space:
removable
Subject: Callout
Page Label: 7
Date: 1/7/2019 3:42:34 PM
Status:
Color:
Layer:
Space:
removable
Subject: Callout
Page Label: 7
Date: 1/7/2019 3:47:36 PM
Status:
Color:
Layer:
Space:
Provide a minimum 5'x5' vented grate over cell #2
outside of curb line.
Subject: Callout
Page Label: 7
Date: 1/7/2019 3:48:08 PM
Status:
Color:
Layer:
Space:
Provide a minimum 5'x5' vented grate over cell #3
outside of curb line.
Subject: Callout
Page Label: 7
Date: 12/31/2018 2:10:15 PM
Status:
Color:
Layer:
Space:
recommend adjusting elevations to allow for more
than 0.5. field constructibility will make it this
elevation difficult to achieve.
Subject: Callout
Page Label: 7
Date: 12/31/2018 3:13:39 PM
Status:
Color:
Layer:
Space:
Elevation difference is 5.56 feet
Subject: Text Box
Page Label: 7
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
removable
removable
Provide a minimum 5'x5' vented grateover cell #2 outside of curb line.
Provide a minimum 5'x5' vented grateover cell #3 outside of curb line.
recommend adjustingelevations to allowfor more than 0.5.field constructibilitywill make it thiselevation difficult toachieve.
Elevation differenceis 5.56 feet
TED-40-4040
Subject: Text Box
Page Label: 7
Date: 12/5/2018 7:40:02 AM
Status:
Color:
Layer:
Space:
R-404007
Subject: Text Box
Page Label: 8
Date: 1/4/2019 10:51:43 AM
Status:
Color:
Layer:
Space:
Update to current City of Renton Surface Water
Standard Plans.
8 (4)
Subject: Callout
Page Label: 8
Date: 1/4/2019 12:29:03 PM
Status:
Color:
Layer:
Space:
no city of renton logo in private syatem
Subject: Text Box
Page Label: 8
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
Subject: Text Box
Page Label: 8
Date: 12/5/2018 7:40:12 AM
Status:
Color:
Layer:
Space:
R-404008
Subject: Text Box
Page Label: 9
Date: 1/2/2019 2:36:40 PM
Status:
Color:
Layer:
Space:
update all details to current details.
9 (3)
Subject: Text Box
Page Label: 9
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
R-404007
Update to current City of RentonSurface Water Standard Plans.
no city of rentonlogo in private syatem
TED-40-4040R-404008
update all details to current details.TED-40-4040
Subject: Text Box
Page Label: 9
Date: 12/5/2018 7:40:21 AM
Status:
Color:
Layer:
Space:
R-404009
Subject: Text Box
Page Label: 10
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
10 (2)
Subject: Text Box
Page Label: 10
Date: 12/5/2018 7:40:26 AM
Status:
Color:
Layer:
Space:
R-404010
Subject: Callout
Page Label: 11
Date: 1/2/2019 3:09:16 PM
Status:
Color:
Layer:
Space:
adjust sheet index
11 (3)
Subject: Text Box
Page Label: 11
Date: 12/5/2018 7:37:36 AM
Status:
Color:
Layer:
Space:
TED-40-4040
Subject: Text Box
Page Label: 11
Date: 12/5/2018 7:40:35 AM
Status:
Color:
Layer:
Space:
R-404011
Subject: Text Box
Page Label: 12
Date: 12/5/2018 7:40:58 AM
Status:
Color:
Layer:
Space:
TED-40-4040
12 (2)
R-404009
TED-40-4040R-404010
SHORT PLAT
adjust sheet index
7ÄTED-40-4040ENTON STANDARDS
R-404011
TED-40-4040
Subject: Text Box
Page Label: 12
Date: 12/5/2018 7:41:28 AM
Status:
Color:
Layer:
Space:
R-404012
Subject: Cloud+
Page Label: 15
Date: 1/3/2019 8:35:59 AM
Status:
Color:
Layer:
Space:
parcel
15 (1)
Subject: Callout
Page Label: 28
Date: 1/4/2019 10:47:59 AM
Status:
Color:
Layer:
Space:
The public storm systems identified by the utility
permit plans within the Kent city limits will be
maintained by the City of Kent. The private storm
systems located within the private drainage
easement or Tract A will be maintained by the
homeowner's association.
28 (4)
Subject: Cloud+
Page Label: 28
Date: 1/4/2019 10:48:15 AM
Status:
Color:
Layer:
Space:
within private lots
Subject: Callout
Page Label: 28
Date: 1/4/2019 10:48:37 AM
Status:
Color:
Layer:
Space:
within the Renton city limits
Subject: Cloud+
Page Label: 28
Date: 1/7/2019 1:12:23 PM
Status:
Color:
Layer:
Space:
The stormwater vault will be owned and
maintained by the homeowner's association.
Subject: Callout
Page Label: 52
Date: 1/7/2019 4:18:08 PM
Status:
Color:
Layer:
Space:
Ensure assumptions and calculations comply with
requirements within section C.2.9 of the manual.
52 (1)
R-404012
ill be retained after
on of the project to
ll be reviewed for
he City of Renton
orner to provide storm
cross a particle to the
tch on SE 192nd Street.
nd sewer services. oject tom the west.
d to be Alderwood
parcel
Core Requirement #6: Maintenance and Operations The utility permit plans have identified the public and private storm systems on the project. The stormwater vault will be owned by the homeowner’s association. The maintenance and operation of the internal portion of the stormwater vault will be provide by the City of Renton. The public storm systems identified by the utility permit plans will be maintained by the City of Renton. The private storm systems located on private property will be maintained by the individual home owner. TIR Section 10 of this Report provides routine maintenance requirements for the new facilities on this project. Core Requirement # 7: Financial Guarantees and Liability Financial Guarantees and Liabilities will be provided to the City of Renton as part of the issuance of the utility construction permit to construct the flow control facilities, storm conveyance systems, erosion control measures, and road improvements. A Bond Quantity worksheet has been provided within TIR Section 9 to provide support information to the City of Renton to determine financial requirements for bonds, fees, and sureties. Core Requirement No. 8 – Water Quality The subject project is required to provide water quality treatment. The water quality sizing is provided within TIR Section 4 of this Report. The water quality (dead storage) and sedimentation will be provided in the lower portion of the proposed stormwater vault. Section 1.3 Special Requirements Special Requirement #1: Other Adopted Area-Specific Requirements This project is not in a designated area included in an adopted master drainage plan, basin plan, salmon conservation plan, stormwater compliance plan, flood hazard reduction plan, or shared facilities drainage plan as identified under the City of Renton amendments to the King County Surface Water Design Manual dated February 2010.
The public storm systems identified by the utility permit plans within the Kent city limitswill be maintained by the City of Kent. The private storm systems located within theprivate drainage easement or Tract A will be maintained by the homeowner's association.
uirement #6: Maintenance and Operations utility permit plans have identified the public and private storm systems on the project stormwater vault will be owned by the homeowner’s association. The maintenance operation of the internal portion of the stormwater vault will be provide by the City of ton. The public storm systems identified by the utility permit plans will be maintained he City of Renton. The private storm systems located on private property will be ntained by the individual home owner. TIR Section 10 of this Report provides routine ntenance requirements for the new facilities on this project.
uirement # 7: Financial Guarantees and Liability ancial Guarantees and Liabilities will be provided to the City of Renton as part of the ance of the utility construction permit to construct the flow control facilities, storm veyance systems, erosion control measures, and road improvements. ond Quantity worksheet has been provided within TIR Section 9 to provide support
within private lots
ons
c and private storm systems on the project. eowner’s association. The maintenance mwater vault will be provide by the City of the utility permit plans will be maintained
ms located on private property will be Section 10 of this Report provides routine on this project.
d Liability ded to the City of Renton as part of the nstruct the flow control facilities, storm
and road improvements.
within the Renton city limits
Core Requirement #6: Maintenance and Operations The utility permit plans have identified the public and private storm systems on the project. The stormwater vault will be owned by the homeowner’s association. The maintenance and operation of the internal portion of the stormwater vault will be provide by the City of Renton. The public storm systems identified by the utility permit plans will be maintained by the City of Renton. The private storm systems located on private property will be maintained by the individual home owner. TIR Section 10 of this Report provides routine maintenance requirements for the new facilities on this project. Core Requirement # 7: Financial Guarantees and Liability Financial Guarantees and Liabilities will be provided to the City of Renton as part of the issuance of the utility construction permit to construct the flow control facilities, storm conveyance systems, erosion control measures, and road improvements. A Bond Quantity worksheet has been provided within TIR Section 9 to provide support information to the City of Renton to determine financial requirements for bonds, fees, and sureties. Core Requirement No. 8 – Water Quality The subject project is required to provide water quality treatment. The water quality sizing
The stormwater vault will beowned and maintained by thehomeowner's association.
1022 acres) acres) es)
ed impervious surface BMP: feet feet feet
feet .2388 acres) 034 acres)
es) )
Ensure assumptionsand calculationscomply withrequirements withinsection C.2.9 of themanual.
Subject: Text Box
Page Label: 57
Date: 1/4/2019 2:35:11 PM
Status:
Color:
Layer:
Space:
Include full model report in appendix.
57 (1)
Subject: Text Box
Page Label: 65
Date: 1/2/2019 7:50:00 AM
Status:
Color:
Layer:
Space:
elevations listed above differ from the elevations
on the plan set.
65 (7)
Subject: Callout
Page Label: 65
Date: 1/4/2019 10:03:30 AM
Status:
Color:
Layer:
Space:
Infiltration/permeability rate is not provided in
geotech reports.
Subject: Callout
Page Label: 65
Date: 1/4/2019 10:04:24 AM
Status:
Color:
Layer:
Space:
This soil description does not match geotech
reports, which define soil as silty sands with gravel,
not fine loamy sands or alderwood soils.
Subject: Callout
Page Label: 65
Date: 1/4/2019 10:05:46 AM
Status:
Color:
Layer:
Space:
No groundwater was present in attached geotech
reports.
Subject: Callout
Page Label: 65
Date: 1/4/2019 10:17:18 AM
Status:
Color:
Layer:
Space:
Assess feasibility of soil amendment.
Subject: Cloud+
Page Label: 65
Date: 1/4/2019 9:20:39 AM
Status:
Color:
Layer:
Space:
Basic
Include full model report in appendix.
gations have been account for and shown.
oject area breakdown, the KCRTS model was used to compute the existing from the project. To meet the performance standard and allow for the ge, the storm water detention volume was calculated at 10,692 cubic feet.
ithin the active (detention) portion) is 509.30’ overflow – 504.90’ outlet The detention portion of the vault would be 108’ x 22.50’ (wide) x 4.40’ 0,692 cubic feet. The proposed vault is adequately sized for flow control fo ment. elevations listed above differ from theelevations on the plan set.
n Drainage Manual, the following steps are required to determine the off of the developed project:
G (no good) – The property does not have adequate flow path l dispersion; G – The soils have been classified by the Geotechnical Engineer as h a low permeability rate; Alderwood Series soils w/ high ground soils are not adequate for full infiltration per the Drainage Manual. neer does not recommend infiltration or retention of onsite runoff d water table and poor draining soils. – N/G- With the presents of a high ground water table, the use of t recommended by the geotechnical Engineer or allowed by the City
– N/G – The soils, the high ground water table and the lack of
Infiltration/permeability rate isnot provided in geotech reports.
Flow Control System (Part D):
Based upon the City of Renton Drainage Manual, the following steps are required to determine the mitigation of storm water runoff of the developed project:
Full Dispersion – N/G (no good) – The property does not have adequate flow path lengths to allow for full dispersion; Full Infiltration – N/G – The soils have been classified by the Geotechnical Engineer as “fine loamy sands” with a low permeability rate; Alderwood Series soils w/ high ground water present. These soils are not adequate for full infiltration per the Drainage Manual. The Geotechnical Engineer does not recommend infiltration or retention of onsite runoff due to the high ground water table and poor draining soils. Limited Infiltration – N/G- With the presents of a high ground water table, the use of infiltration BMP’s is not recommended by the geotechnical Engineer or allowed by the City manual. Limited Dispersion – N/G – The soils, the high ground water table and the lack of available flow path do not allow for these types of BMP’s. Perforated Pipe Connection – This BMP will be used on the lots as each house connects to the onsite stormwater facility.
The project will be sized for a storm water facility (vault) to provide runoff control. The facility izing calculations can be found attached to this section.
The existing historic conditions of the site are required to be analyzed as “Forested Site Conditions”
Developed Project Area breakdown has been attached to indicate the developed conditions of the project after BMP mitigations have been account for and shown.
From the developed project area breakdown, the KCRTS model was used to compute the existing and developed runoffs from the project. To meet the performance standard and allow for the
This soil description does not match geotech reports, which define soilas silty sands with gravel, not fine loamy sands or alderwood soils.
s not have adequate flow path
d by the Geotechnical Engineer as
wood Series soils w/ high ground
filtration per the Drainage Manual.
ation or retention of onsite runoff soils. gh ground water table, the use of ical Engineer or allowed by the City
nd water table and the lack of P’s. d on the lots as each house connects
ovide runoff control. The facility
No groundwaterwas present inattached geotechreports.
Limited Infiltration – N/G- With the presents of a high g infiltration BMP’s is not recommended by the geotechnical manual. Limited Dispersion – N/G – The soils, the high ground w available flow path do not allow for these types of BMP’s. Perforated Pipe Connection – This BMP will be used on to the onsite stormwater facility. The project will be sized for a storm water facility (vault) to provid sizing calculations can be found attached to this section. The existing historic conditions of the site are required to be analy Conditions” Developed Project Area breakdown has been attached to indicate project after BMP mitigations have been account for and shown. From the developed project area breakdown, the KCRTS model wa
Assess feasibility of soil amendment.
The Geotechnica
due to the high
Limited Infiltr
infiltration BMP’ manual.
Limited Dispe
available flow p Perforated Pip
to the onsite sto
The project will be size
Basic
Subject: Text Box
Page Label: 65
Date: 1/8/2019 8:31:03 AM
Status:
Color:
Layer:
Space:
State that lot development will utilize reduced
impervious surface credit. Ensure assumptions
and calculations comply with requirements within
section C.2.9 of the manual. For the lots, any
recorded limit on total impervious surface less than
a norm of 4,000 sf or the maximum allowed by the
lot's zoning, whichever is smaller, qualifies for a
restricted footprint credit equal to the difference in
sf. Must provide covenant that states restricted
impervious area amount for each lot.
Subject: Callout
Page Label: 68
Date: 1/2/2019 11:54:57 AM
Status:
Color:
Layer:
Space:
plans show sediment volume of 94.09 cubic feet.
68 (6)
Subject: Text Box
Page Label: 68
Date: 1/2/2019 11:57:21 AM
Status:
Color:
Layer:
Space:
dimensions from the plan set give a west cross
section of 1.575 sq ft and at the east end 1.18125
sq ft with a rectangular section of 3.2625 sq ft.
Subject: Text Box
Page Label: 68
Date: 1/2/2019 11:59:21 AM
Status:
Color:
Layer:
Space:
15' x [((1.575 sq ft + 1.18125 sq ft) / 2) + 3.2625 sq
ft] = 48.9375 cubic feet
Subject: Text Box
Page Label: 68
Date: 1/2/2019 3:42:05 PM
Status:
Color:
Layer:
Space:
recommend lowering the bottom elevation in order
to achieve required depth.
Subject: Callout
Page Label: 68
Date: 1/2/2019 4:07:41 PM
Status:
Color:
Layer:
Space:
please revise the elevations to match the plans
and developed runoffs from the project. To meet the performance standard and allow for the bypass area to discharge, the storm water detention volume was calculated at 10,692 cubic feet. The proposed vault (within the active (detention) portion) is 509.30’ overflow – 504.90’ outlet (4.40’ active storage). The detention portion of the vault would be 108’ x 22.50’ (wide) x 4.40’ deep (detention) OR 10,692 cubic feet. The proposed vault is adequately sized for flow control for the proposed development.
State that lot development will utilize reduced impervious surfacecredit. Ensure assumptions and calculations comply with requirementswithin section C.2.9 of the manual. For the lots, any recorded limit ontotal impervious surface less than a norm of 4,000 sf or the maximumallowed by the lot's zoning, whichever is smaller, qualifies for arestricted footprint credit equal to the difference in sf. Must providecovenant that states restricted impervious area amount for each lot.
Calculation o 15’*(13.725+
Cell #1 contains an
Remainder of vault (Cell #2
plans show sedimentvolume of 94.09 cubicfeet.
5’ * 15’ = 168.75 cubic feet of
q. feet feet
OKAY
ev. 500.90
ment storage
dimensions fromthe plan set give awest cross sectionof 1.575 sq ft andat the east end1.18125 sq ft witha rectangularsection of 3.2625sq ft.
lculate average sediment volume for 12”: 12” (1’) * 11.25’ * 15’ = 168.75 cubic feet of orage to obtain 12” average sediment storage
ovided sediment volume within Cell #1: Cross sectional area at west end of Cell #1: 13.725 sq. feet Cross sectional area at east end of Cell #1: 12.82 sq. feet Calculation of provided sediment volume in Cell #1: 15’*(13.725+12.82)/2 = 199.09 cubic feet > 168.75 OKAY
ll #1 contains an average of 12” of sediment storage @ elev. 500.90
r of vault (Cell #2 and Cell #3) will have 6” (0.5’) of sediment storage
15' x [((1.575 sq ft + 1.18125 sq ft) / 2) + 3.2625 sq ft] =48.9375 cubic feet
Cross sectional area at west end of Cell #1: 13.725 sq. feet Cross sectional area at east end of Cell #1: 12.82 sq. feet Calculation of provided sediment volume in Cell #1: 15’*(13.725+12.82)/2 = 199.09 cubic feet > 168.75 OKAY Cell #1 contains an average of 12” of sediment storage @ elev. 500.90 Remainder of vault (Cell #2 and Cell #3) will have 6” (0.5’) of sediment storage
recommend lowering the bottom elevation in order to achieve requireddepth.
sq. feet
eet
s: quare feet of new PGIS (6,250 sq. feet proposed ed driveways. Therefore, water quality treatment is
ater quality volume are attached to this section. The et of dead storage. The northerly half of the vault will he first portion of this area will be Cell #1. Cell #1 water quality.
5’ wide x 15’ long x (504.90-500.90) – volume 33.12%<35% OKAY
please revise the elevations tomatch the plans
Subject: Callout
Page Label: 68
Date: 1/7/2019 1:14:56 PM
Status:
Color:
Layer:
Space:
West x-section = Rectangle + Triangle =
11.25*(499.04-498.75) +
0.5*11.25*(498.75-498.47) = 3.2625 + 1.575 =
4.8375 SF
EAst x-section = Rectangle + Triangle =
11.25*(499.04-498.82) +
0.5*11.25*(498.82-498.54) = 2.475 + 1.575 = 4.05
SF
Average x-section = 0.5 * (4.8375+4.05) = 4.44375
SF
First Cell Volume = 15' * 4.44375 SF = 66.66 CF
First cell sediment storage volume is deficient.
Subject: Text Box
Page Label: 100
Date: 1/2/2019 12:11:23 PM
Status:
Color:
Layer:
Space:
update to new form on city's website
100 (1)
y half of the vault will be Cell #1. Cell #1
0.90) – volume
75 cu. feet
= 168.75 cubic feet of
90
age
West x-section = Rectangle + Triangle =11.25*(499.04-498.75) + 0.5*11.25*(498.75-498.47) =3.2625 + 1.575 = 4.8375 SFEAst x-section = Rectangle + Triangle =11.25*(499.04-498.82) + 0.5*11.25*(498.82-498.54) =2.475 + 1.575 = 4.05 SF
Average x-section = 0.5 * (4.8375+4.05) = 4.44375 SFFirst Cell Volume = 15' * 4.44375 SF = 66.66 CF
First cell sediment storage volume is deficient.
7
ON OF COVENANT AND EASEMENT FOR INSPECTION
update to new form on city's website