HomeMy WebLinkAboutREDLINES Returned to applicant_SummaryREDLINES Returned to applicant.pdf Markup Summary
Subject: Callout
Page Index: 2
Color:
apply to all pages to city of renton title block
2 (15)
Subject: Text Box
Page Index: 2
Color:
c:18-006619
Subject: Text Box
Page Index: 2
Color:
lua:18-000124
Subject: Text Box
Page Index: 2
Color:
pr:18-000081
Subject: Text Box
Page Index: 2
Color:
THE MAXIMUM AVAILABLE FIRE FLOW
CAPACITY FROM THE NEW 8-INCH WATER
LINE IN NE 27TH PLACE IS LIMITED TO 1,240
GALLONS PER MINUTE (GPM).
AN APPROVED RESIDENTIAL FIRE SPRINKLER
SYSTEM WILL BE REQUIRED FOR ALL NEW
SINGLE-FAMILY RESIDENCES THAT WILL
HAVE OVER 3,600 SQUARE-FEET OF GROSS
BUILDING AREA.
Subject: Markup Legend
Page Index: 2
Color:
Subject: Text Box
Page Index: 2
Color:
C18006619
Subject: Text Box
Page Index: 2
Color:
provide postmaster approval
Subject: Callout
Page Index: 2
Color:
FILL IN TITLE BLOCK WITH ALL NUMBERING
AND LABELS AS REDLINED IN THE
LOCATIONS ON THE TITLE BLOCK TEMPLATE.
NUMBERING CHANGES FROM SHEET TO
SHEET. (TYP)
apply to all pages tocity of renton titleblock
c:18-006619lua:18-000124pr:18-000081THE MAXIMUM AVAILABLE FIRE FLOW CAPACITY FROM THE NEW8-INCH WATER LINE IN NE 27TH PLACE IS LIMITED TO 1,240GALLONS PER MINUTE (GPM).
AN APPROVED RESIDENTIAL FIRE SPRINKLER SYSTEM WILL BEREQUIRED FOR ALL NEW SINGLE-FAMILY RESIDENCES THAT WILLHAVE OVER 3,600 SQUARE-FEET OF GROSS BUILDING AREA.
Markup Legend
REDRequired RevisionsBLUERecommended Revisions
PURPLE Advisory OnlyGREENItems to be Deleted
C18006619
provide postmaster approval
AAANN FOREST TERRACE PLATFILL IN TITLE BLOCK WITH ALLNUMBERING AND LABELS ASREDLINED IN THE LOCATIONS ONTHE TITLE BLOCK TEMPLATE.NUMBERING CHANGES FROMSHEET TO SHEET. (TYP)
Subject: Text Box
Page Index: 2
Color:
TED-40-4048
Subject: Text Box
Page Index: 2
Color:
R-404801
Subject: Callout
Page Index: 2
Color:
FILL IN TITLE BLOCK WITH ALL NUMBERING
AND LABELS AS REDLINED IN THE
LOCATIONS ON THE TITLE BLOCK TEMPLATE.
NUMBERING CHANGES FROM SHEET TO
SHEET. (TYP)
Subject: Callout
Page Index: 2
Color:
LOTS 10, 11, 12 AND 13 ARE REQUIRED TO BE
EQUIPPED WITH APPROVED FIRE SPRINKLER
SYSTEMS DUE TO LONG DEAD END ROAD.
THIS CONDITION SHALL BE CLEARLY STATED
ON THIS COVER SHEET.
Subject: Text Box
Page Index: 2
Color:
PER SEPA MITIGATION MEASURE #1,
CLEARING AND GRADING IS LIMITED TO MAY
1 THROUGH SEPTEMBER 30 AND SHALL BE
CLEARLY STATED ON THE COVER SHEET.
Subject: Text Box
Page Index: 2
Color:
per sepa mitigation measure #4, The applicant’s
geotechnical engineer shall identify those
construction activities where observation on site by
a licensed geotechnical engineer should occur.
Those identified activities shall be clearly stated on
the construction plans to be submitted for review
and approval by the Civil Plan Reviewer.
those benchmarks were identified in the DEC 14
geotechnical letter but not provided on the
corresponding construction sheets.
Subject: Cloud+
Page Index: 3
Color:
A safe walking route was not submitted with the
civil permit application.
3 (6)
Subject: Text Box
Page Index: 3
Color:
FIRE FLOW LIMITATION AND RESIDENTIAL
FIRE SPRINKLER REQUIREMENTSAAANNNNNNNTED-40-4048 COMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404801
IN COMPLIANCE
FOREST PULTE 3535 FACT BELLE
A-N
FILL IN TITLE BLOCK WITH ALL NUMBERINGAND LABELS AS REDLINED IN THELOCATIONS ON THE TITLE BLOCKTEMPLATE. NUMBERING CHANGES FROMSHEET TO SHEET. (TYP)
LOTS 10, 11, 12 AND 13 ARE REQUIREDTO BE EQUIPPED WITH APPROVED FIRESPRINKLER SYSTEMS DUE TO LONGDEAD END ROAD. THIS CONDITIONSHALL BE CLEARLY STATED ON THISCOVER SHEET.
PER SEPA MITIGATIONMEASURE #1, CLEARING ANDGRADING IS LIMITED TO MAY 1THROUGH SEPTEMBER 30AND SHALL BE CLEARLYSTATED ON THE COVERSHEET.
FORES
per sepa mitigation measure #4, The applicant’sgeotechnical engineer shall identify those constructionactivities where observation on site by a licensedgeotechnical engineer should occur. Those identifiedactivities shall be clearly stated on the constructionplans to be submitted for review and approval by the CivilPlan Reviewer.those benchmarks were identified in the DEC 14geotechnical letter but not provided on the correspondingconstruction sheets.
A safe walking routewas not submittedwith the civil permitapplication.
FIRE FLOW LIMITATION AND RESIDENTIAL FIRE SPRINKLER REQUIREMENTS
Subject: Text Box
Page Index: 3
Color:
THE MAXIMUM AVAILABLE FIRE FLOW
CAPACITY FROM THE NEW 8-INCH DEAD-END
WATER LINE IN NE 27TH PLACE IS LIMITED TO
1,240 GALLONS PER MINUTE (GPM).
AN APPROVED RESIDENTIAL FIRE SPRINKLER
SYSTEM WILL BE REQUIRED FOR ALL NEW
SINGLE-FAMILY RESIDENCES THAT WILL
HAVE OVER 3,600 SQUARE-FEET OF GROSS
BUILDING AREA.
Subject: Image
Page Index: 3
Color:
Subject: Text Box
Page Index: 3
Color:
R-404802
Subject: Text Box
Page Index: 3
Color:
TED-40-4048
Subject: Text Box
Page Index: 4
Color:
R-404803
4 (2)
Subject: Text Box
Page Index: 4
Color:
TED-40-4048
Subject: Callout
Page Index: 5
Color:
cul-de-sac island with bioretention to be added.
see comments on sheet 21.
5 (4)
Subject: Cloud+
Page Index: 5
Color:
Applicant has proposed to restrict the lots to 45%
of the lot for impervious surface. Keep in mind at
this point you will not receive BMP credit for a
reduced impervious surface credit. Individual lot
BMP credits are reviewed at building permit
review.
by restricting the lots more than zoning allows a
Reduced impervious surface covenant is required
to ensure the capacity of the vault is not exceeded.
THE MAXIMUM AVAILABLE FIRE FLOW CAPACITY FROM THE NEW 8-INCH DEAD-END WATER LINE IN NE 27THPLACE IS LIMITED TO 1,240 GALLONS PER MINUTE (GPM).
AN APPROVED RESIDENTIAL FIRE SPRINKLER SYSTEM WILL BE REQUIRED FOR ALL NEW SINGLE-FAMILYRESIDENCES THAT WILL HAVE OVER 3,600 SQUARE-FEET OF GROSS BUILDING AREA.
N COMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404802
AAANNNNNNNTED-40-4048COMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404803
AAANNNNNNNTED-40-4048cul-de-sac island withbioretention to beadded. see commentson sheet 21.
Applicant has proposed to restrict the lots to 45%of the lot for impervious surface. Keep in mind atthis point you will not receive BMP credit for areduced impervious surface credit. Individual lot BMPcredits are reviewed at building permit review. by restricting the lots more than zoning allows aReduced impervious surface covenant is required toensure the capacity of the vault is not exceeded.
Subject: Text Box
Page Index: 5
Color:
R-404804
Subject: Text Box
Page Index: 5
Color:
TED-40-4048
Subject: Cloud+
Page Index: 6
Color:
show private storm drainage easement
6 (13)
Subject: Callout
Page Index: 6
Color:
provide distance between intersection and pc.
Subject: Callout
Page Index: 6
Color:
provide distance between intersection and pt.
Subject: Callout
Page Index: 6
Color:
provide intersection stationing
Subject: Callout
Page Index: 6
Color:
label center of cul-de-sac bulb
Subject: Callout
Page Index: 6
Color:
label bearing and distance
Subject: Cloud+
Page Index: 6
Color:
match street name
Subject: Cloud+
Page Index: 6
Color:
match street name
COMPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404804
AAANNNNNNNTED-40-4048show private stormdrainage easement
provide distancebetween intersectionand pc.
provide distancebetween intersectionand pt.
provide intersectionstationing
label center ofcul-de-sac bulb
label bearingand distance
match street name
match street name
Subject: Callout
Page Index: 6
Color:
35' right of way radius per rmc 4-6-060
Subject: Text Box
Page Index: 6
Color:
Shelton Ave NE
Subject: Line
Page Index: 6
Color:
Subject: Text Box
Page Index: 6
Color:
R-404805
Subject: Text Box
Page Index: 6
Color:
TED-40-4048
Subject: Text Box
Page Index: 7
Color:
provide estimated grading volumes.
7 (12)
Subject: Cloud+
Page Index: 7
Color:
existing pole to be removed. all utilities to be
underground along project frontage.
Subject: Cloud+
Page Index: 7
Color:
existing pole to be removed. all utilities to be
underground along project frontage.
Subject: Cloud+
Page Index: 7
Color:
existing pole to be removed. all utilities to be
underground along project frontage.
Subject: Callout
Page Index: 7
Color:
overhead house service to be relocated
underground.
35' right of wayradius per rmc 4-6-060
Shelton Ave NEN COMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404805
AAANNNNNNNTED-40-4048provide estimated grading volumes.
P
existing pole to beremoved. allutilities to beunderground alongproject frontage.
existing pole tobe removed. all utilities tobeundergroundalong projectfrontage.
A-NNNNNNN
existing pole to beremoved. allutilities to beunderground alongproject frontage.
overhead houseservice to berelocatedunderground.
Subject: Callout
Page Index: 7
Color:
identify the minimum dimensions of sediment trap.
Subject: Cloud+
Page Index: 7
Color:
adjust text
Subject: Callout
Page Index: 7
Color:
contact OPL and PSE to notify them know
construction activity has begun.
Subject: Callout
Page Index: 7
Color:
provide delineation of existing septic system.
System must be protect during construction until
residence is connected to sewer.
Subject: Callout
Page Index: 7
Color:
notify inspector and current planning manager to
initialize tree protection walk through prior to any
on-site clearing
Subject: Text Box
Page Index: 7
Color:
R-404806
Subject: Text Box
Page Index: 7
Color:
TED-40-4048
Subject: Callout
Page Index: 8
Color:
use Erosion and Sediment control notes from STD
267.00, 267.10, and 268.00
8 (5)
Subject: Text Box
Page Index: 8
Color:
update all standard details to current standards.
Subject: Callout
Page Index: 8
Color:
identify where this will be used on-site
identify the minimumdimensions ofsediment trap.
adjust text
contact OPL and PSEto notify them knowconstruction activityhas begun.
IN COMPLIANCE WITH CITY OF RENTON STAND
A-NNNNNNN·
provide delineation of existingseptic system.System must be protect duringconstruction until residence isconnected to sewer.
notify inspector andcurrent planningmanager to initializetree protection walkthrough prior to anyon-site clearing
N COMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404806
AAANNNNNNNTED-40-4048FORES
use Erosion andSediment controlnotes from STD267.00, 267.10, and268.00
update all standard details to currentstandards.
identify where thiswill be used on-site
Subject: Text Box
Page Index: 8
Color:
R-404807
Subject: Text Box
Page Index: 8
Color:
TED-40-4048
Subject: Text Box
Page Index: 9
Color:
update standard details
9 (3)
Subject: Text Box
Page Index: 9
Color:
R-404808
Subject: Text Box
Page Index: 9
Color:
TED-40-4048
Subject: Text Box
Page Index: 10
Color:
show street light locations on this plan.
10 (22)
Subject: Callout
Page Index: 10
Color:
no parking to other side of street.
Subject: Cloud+
Page Index: 10
Color:
locate sign on adjacent street light.
Subject: Cloud+
Page Index: 10
Color:
locate sign on adjacent street light.
Subject: Callout
Page Index: 10
Color:
remove np sign
COMPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404807
AAANNNNNNNTED-40-4048update standard details
COMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404808
AAANNNNNNNTED-40-4048show street light locations onthis plan.
no parking to otherside of street.
locate sign onadjacentstreet light.
locate sign onadjacentstreet light.
remove
np sign
Subject: Callout
Page Index: 10
Color:
remove np sign
Subject: Cloud+
Page Index: 10
Color:
locate sign on adjacent street light.
Subject: Callout
Page Index: 10
Color:
remove np sign
Subject: Cloud+
Page Index: 10
Color:
change to a "future roadway extension" sign.
Subject: Callout
Page Index: 10
Color:
call out np signs.
Subject: Callout
Page Index: 10
Color:
and stop sign
Subject: Callout
Page Index: 10
Color:
relocate to street light if possible (dependent upon
street light revisions. see comments on sheet
IL-01.
Subject: Callout
Page Index: 10
Color:
remove np signs.
Subject: Callout
Page Index: 10
Color:
remove np sign
Subject: Callout
Page Index: 10
Color:
call out np signs within cul-de-sac island. see
comments on sheet 21.
removenp sign
locate sign onadjacentstreet light.
removenp sign
change to a "futureroadway extension"sign.
call outnp signs.
and stop sign
relocate to street light if possible(dependent upon street light revisions. see comments on sheet IL-01.
remove np signs.
removenp sign
call out np signs withincul-de-sac island. seecomments on sheet 21.
Subject: Text Box
Page Index: 10
Color:
Provide a note for compliance with condition #11:
Due to the close proximity of the proposed grading
within Tract E, the applicant shall retain a certified
arborist or licensed landscape architect to monitor
construction activities near the retained trees and
ensure they are protected and/or to prune
branches and roots, fertilize, and water as
appropriate. Monitoring and other required tree
protection measures during construction (RMC
4-4-130H.9) shall be incorporated into the civil
construction permit plans to be reviewed and
approved by the Current Planning Project Manager
prior to permit issuance.
Subject: Callout
Page Index: 10
Color:
Replace 3 barricades with 2 Type 4 end of road
OM4-3 red diamond object markers
Subject: Callout
Page Index: 10
Color:
Replace barricades with guard rail and 2 om4-3
red diamond object markers
Subject: Callout
Page Index: 10
Color:
Add stop bar
Subject: Cloud+
Page Index: 10
Color:
parking signs can be located every 200 feet
provided that a modified r8-3 (12"x18" with double
headed arrows below no parking symbol) sign is
utilized. no parking signs shall be installed 45
degrees to the roadway. where no parking signs
are located on street lights, the sign brackets shall
be black to match the street light.
Subject: Text Box
Page Index: 10
Color:
R-404809
Subject: Text Box
Page Index: 10
Color:
TED-40-4048
Subject: Text Box
Page Index: 11
Color:
R-404810
11 (2)
Provide a note for compliancewith condition #11: Due to theclose proximity of the proposedgrading within Tract E, theapplicant shall retain acertified arborist or licensedlandscape architect to monitorconstruction activities near theretained trees and ensure theyare protected and/or to prunebranches and roots, fertilize,and water as appropriate.Monitoring and other requiredtree protection measuresduring construction (RMC4-4-130H.9) shall beincorporated into the civilconstruction permit plans to bereviewed and approved by theCurrent Planning ProjectManager prior to permitissuance.FOR
Replace 3 barricadeswith 2 Type 4 end ofroad OM4-3 reddiamond objectmarkers
Replacebarricades withguard rail and 2om4-3 red diamondobject markers
Add stop bar
RACE PLAT
parking signs can be located every 200 feetprovided that a modified r8-3 (12"x18" with doubleheaded arrows below no parking symbol) sign isutilized. no parking signs shall be installed 45degrees to the roadway. where no parking signsare located on street lights, the sign bracketsshall be black to match the street light.
COMPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404809
AAANNNNNNNTED-40-4048COMPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404810
Subject: Text Box
Page Index: 11
Color:
TED-40-4048
Subject: Text Box
Page Index: 12
Color:
R-404811
12 (2)
Subject: Text Box
Page Index: 12
Color:
TED-40-4048
Subject: Text Box
Page Index: 13
Color:
existing power along the frontage of Union Ave NE
shall be relocated underground. please make sure
the location of new underground power is shown
on the composite utility plan.
13 (11)
Subject: Callout
Page Index: 13
Color:
drainage easement is required. within lot 10.
easement should have language that would allow
for a furure connection of the storwater system to
the north.
Subject: Callout
Page Index: 13
Color:
remove
Subject: Callout
Page Index: 13
Color:
relocate meter to planter strip
Subject: Callout
Page Index: 13
Color:
provide verification from the geotech that the
footing drain is sized adequately for surface and
subsurface flows. (TYP)
Subject: Text Box
Page Index: 13
Color:
R-404812
Subject: Text Box
Page Index: 13
Color:
W-404801AAANNNNNNNTED-40-4048OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404811
AAANNNNNNNTED-40-4048existing power along the frontage of UnionAve NE shall be relocated underground.please make sure the location of newunderground power is shown on thecomposite utility plan.
drainage easement isrequired. within lot10. easement shouldhave language thatwould allow for afurure connection ofthe storwater systemto the north.
remove
relocate meter toplanter strip
provide verification from the geotechthat the footing drainis sized adequatelyfor surface andsubsurface flows.(TYP)
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404812
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNN
W-404801
Subject: Text Box
Page Index: 13
Color:
S-404801
Subject: Text Box
Page Index: 13
Color:
TED-40-4048
Subject: Text Box
Page Index: 13
Color:
WWP-27-4048
Subject: Text Box
Page Index: 13
Color:
WTR-27-4048
Subject: Callout
Page Index: 14
Color:
minimum 6 inch hma
14 (5)
Subject: Callout
Page Index: 14
Color:
provide guardrail on north end of tract A
Subject: Callout
Page Index: 14
Color:
1.5% per std 102. (TYP)
Subject: Text Box
Page Index: 14
Color:
R-404813
Subject: Text Box
Page Index: 14
Color:
TED-40-4048
Subject: Cloud+
Page Index: 15
Color:
Per RMC 4-4-040C.2.d There shall be a minimum
three-foot (3') landscaped setback at the base of
retaining walls abutting public rights-of-way.
15 (4)
A-NNNNNNN
S-404801
AAANNNNNNNTED-40-4048F WWP-27-4048FOREST TERRACE PLATWTR-27-4048 minimum 6 inch hma
provide guardrail onnorth end of tract A
1.5% per std 102.(TYP)
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404813
AAANNNNNNNTED-40-4048Per RMC4-4-040C.2.d Thereshall be a minimumthree-foot (3')landscaped setbackat the base ofretaining wallsabutting publicrights-of-way.
Subject: Callout
Page Index: 15
Color:
provide temporary construction easement or adjust
walls accordingly in order to insure the wall can be
constructed within the project limits.
Subject: Text Box
Page Index: 15
Color:
R-404814
Subject: Text Box
Page Index: 15
Color:
TED-40-4048
Subject: Text Box
Page Index: 16
Color:
R-404815
16 (2)
Subject: Text Box
Page Index: 16
Color:
TED-40-4048
Subject: Text Box
Page Index: 17
Color:
R-404816
17 (2)
Subject: Text Box
Page Index: 17
Color:
TED-40-4048
Subject: Text Box
Page Index: 18
Color:
R-404817
18 (2)
Subject: Text Box
Page Index: 18
Color:
TED-40-4048
provide temporaryconstructioneasement or adjustwalls accordingly inorder to insure thewall can beconstructed withinthe project limits.
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404814
AAANNNNNNNTED-40-4048OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404815
AAANNNNNNNTED-40-4048OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404816
AAANNNNNNNTED-40-4048OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404817
AAANNNNNNNTED-40-4048
Subject: Cloud+
Page Index: 19
Color:
adjust label leaders and show cleanouts
19 (24)
Subject: Callout
Page Index: 19
Color:
and stop sign
Subject: Cloud+
Page Index: 19
Color:
revise np signs per comments on sheet 9 (typ)
Subject: Arrow
Page Index: 19
Color:
Subject: Arrow
Page Index: 19
Color:
Subject: Callout
Page Index: 19
Color:
location of existing on site swale. although the
majority of the water will be routed in the bypass
line along union, the existing property will still route
water to this location. Show how this water will be
captured and conveyed to the proposed storm
system as not to impact the future lot.
Subject: Line
Page Index: 19
Color:
Subject: Line
Page Index: 19
Color:
Subject: Callout
Page Index: 19
Color:
eliminate the west vertical bend and continue
water main.
Subject: Callout
Page Index: 19
Color:
cleanout required at 100' max spacing on straight
sections
adjust label leadersand show cleanouts
and stop sign
revise np signs percomments on sheet 9 (typ)
location of existing on site swale. although the majority of the water willbe routed in the bypass line along union,the existing property will still routewater to this location. Show how thiswater will be captured and conveyed tothe proposed storm system as not toimpact the future lot.
eliminate the west vertical bend andcontinue water main.
cleanout required at100' max spacing onstraight sections
Subject: Callout
Page Index: 19
Color:
cleanout required at 100' max spacing on straight
sections
Subject: Callout
Page Index: 19
Color:
Access Road required.
Subject: Callout
Page Index: 19
Color:
CB#20
Subject: Callout
Page Index: 19
Color:
Label connected pipes. If these are both 6", why
are this different line types?
Subject: PolyLine
Page Index: 19
Color:
Subject: PolyLine
Page Index: 19
Color:
Subject: Length Measurement
Page Index: 19
Color:
3.75 ft
Subject: Cloud
Page Index: 19
Color:
Subject: Callout
Page Index: 19
Color:
THERE IS ONLY ABOUT 4 FT OF HORIZONTAL
SEPARATION BETWEEN THE NEW 24" STORM
LINE AND THE EXISTING 36" SPU PIPELINE.
DEPT OF HEALTH DESIGN CRITERIA
REQUIRES 10 FEET OF SEPARATION. THE
DESIGN ENGINEER NEEDS TO PROVIDE
SPECIAL DESIGN CONSIDERATIONS FOR THE
PROTECTION AND FUTURE MAINTENANCE OF
SPU'S PIPELINE INCLUDING THE
ENCASEMENT OF THE NEW STORM LINE
WITH CONTROLLED DENSITY FILL (CDF). A
WRITTEN APPROVAL FROM SPU WILL BE
REQUIRED.
cleanout required at100' max spacing onstraight sections
Access Roadrequired.
CB#20
Label connectedpipes. If these areboth 6", why are thisdifferent line types?
3.75 ft
THERE IS ONLY ABOUT 4 FT OF HORIZONTAL SEPARATIONBETWEEN THE NEW 24" STORM LINE AND THE EXISTING 36"SPU PIPELINE. DEPT OF HEALTH DESIGN CRITERIA REQUIRES 10FEET OF SEPARATION. THE DESIGN ENGINEER NEEDS TOPROVIDE SPECIAL DESIGN CONSIDERATIONS FOR THEPROTECTION AND FUTURE MAINTENANCE OF SPU'S PIPELINEINCLUDING THE ENCASEMENT OF THE NEW STORM LINE WITHCONTROLLED DENSITY FILL (CDF). A WRITTEN APPROVAL FROMSPU WILL BE REQUIRED.
Subject: Text Box
Page Index: 19
Color:
THE CONTRACTOR SHALL CONTACT SPU
CREW CHIEF RICHARD COX AT 206-953-0184
(Richard.Cox@Seatle.gov) A MINIMUM OF 72
HOURS PRIOR TO ANY POTHLOLING AND ANY
EXCAVATION IN PROXIMITY OF SPU WATER
MAINS.
ALL WORK IN PROXIMITY OF AND ALL
CROSSINGS OF SPU WATER MAINS MUST BE
SUBMITTED SPU ENGINEERING DEPARTMENT
FOR APPROVAL
CONTACT: PAJ HWANG, P.E., SENIOR CIVIL
ENGINEER- SEATTLE PUBLIC UTILITIES
ENGINEERING AND TECHNICAL
SERVICES DIVISION
P.O. BOX 34108, SEATTLE, WA
98124-4018
TEL: (206) 386-4198 EMAIL:
Paj.Hwang@Seattle.gov
Subject: Cloud
Page Index: 19
Color:
Subject: Arrow
Page Index: 19
Color:
Subject: Text Box
Page Index: 19
Color:
R-404818
Subject: Text Box
Page Index: 19
Color:
TED-40-4048
Subject: Callout
Page Index: 20
Color:
shall be a yard drain or cb per std plan 225.0. label
structure.
20 (18)
Subject: Callout
Page Index: 20
Color:
shall be a yard drain or cb per std plan 225.0. label
structure.
Subject: Callout
Page Index: 20
Color:
shall be a yard drain or cb per std plan 225.0.
THE CONTRACTOR SHALL CONTACT SPU CREW CHIEF RICHARD COX AT206-953-0184 (Richard.Cox@Seatle.gov) A MINIMUM OF 72 HOURS PRIOR TO ANYPOTHLOLING AND ANY EXCAVATION IN PROXIMITY OF SPU WATER MAINS.ALL WORK IN PROXIMITY OF AND ALL CROSSINGS OF SPU WATER MAINS MUST BESUBMITTED SPU ENGINEERING DEPARTMENT FOR APPROVALCONTACT: PAJ HWANG, P.E., SENIOR CIVIL ENGINEER- SEATTLE PUBLIC UTILITIES ENGINEERING AND TECHNICAL SERVICES DIVISION P.O. BOX 34108, SEATTLE, WA 98124-4018 TEL: (206) 386-4198 EMAIL: Paj.Hwang@Seattle.gov
OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404818
AAANNNNNNNTED-40-4048shall be a yarddrain or cb perstd plan 225.0.label structure.
shall be a yarddrain or cb perstd plan 225.0.label structure.
shall be a yarddrain or cb perstd plan 225.0.
Subject: Callout
Page Index: 20
Color:
shall be a yard drain or cb per std plan 225.0.
Subject: Callout
Page Index: 20
Color:
shall be a yard drain or cb per std plan 225.0.
Subject: Callout
Page Index: 20
Color:
label 6" roof and footing drain.
Subject: Cloud+
Page Index: 20
Color:
provide slop elevations on curb line showing how
the curb line will be graded to slope to cb#6.
Subject: Callout
Page Index: 20
Color:
cleanout required at 100' max spacing on straight
sections
Subject: Callout
Page Index: 20
Color:
cleanout required at 100' max spacing on straight
sections
Subject: Callout
Page Index: 20
Color:
cleanout required at 100' max spacing on straight
sections
Subject: Callout
Page Index: 20
Color:
cleanout required at 100' max spacing on straight
sections
Subject: Callout
Page Index: 20
Color:
Make consistent with rational method table in TIR
that states 24".
Subject: Callout
Page Index: 20
Color:
label 6" roof and footing drain.
shall be a yarddrain or cb perstd plan 225.0.
shall be a yarddrain or cb perstd plan 225.0.
label 6" roof andfooting drain.
provide slop elevations on curbline showing how the curb line willbe graded to slope to cb#6.
cleanout required at100' max spacing onstraight sections
cleanout required at100' max spacing onstraight sections
cleanout required at100' max spacing onstraight sections
cleanout required at100' max spacing onstraight sections
Make consistent withrational method tablein TIR that states 24".
label 6" roof andfooting drain.
Subject: Callout
Page Index: 20
Color:
label 6" roof and footing drain.
Subject: Callout
Page Index: 20
Color:
label 6" roof and footing drain.
Subject: Cloud+
Page Index: 20
Color:
angle of pipe into type 1 cb may be a little too tight.
confirm this is constructible.
Subject: Text Box
Page Index: 20
Color:
R-404819
Subject: Text Box
Page Index: 20
Color:
TED-40-4048
Subject: PolyLine
Page Index: 21
Color:
21 (7)
Subject: Callout
Page Index: 21
Color:
add trench drain or other collection system
adjacent to sidewalk to capture sheet flow from
upstream flowing onto the sidewalk. sidewalk.
May be routed to the downstream dispersion
trench if grades work.
Subject: Callout
Page Index: 21
Color:
Label cleanouts.
Subject: Callout
Page Index: 21
Color:
label 6" roof and footing drain.
Subject: Callout
Page Index: 21
Color:
show the wall drain pipe connection
label 6" roof andfooting drain.
label 6" roof andfooting drain.
RACE PLAT angle of pipe into type1 cb may be a littletoo tight. confirmthis is constructible.
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404819
AAANNNNNNNTED-40-4048add trench drain orother collectionsystem adjacent tosidewalk to capturesheet flow fromupstream flowingonto the sidewalk.sidewalk. May berouted to thedownstreamdispersion trench ifgrades work.
Label cleanouts.
label 6" roof andfooting drain.
show the walldrain pipeconnection
Subject: Text Box
Page Index: 21
Color:
R-404820
Subject: Text Box
Page Index: 21
Color:
TED-40-4048
Subject: Cloud+
Page Index: 22
Color:
show private storm drainage easement.
22 (12)
Subject: Callout
Page Index: 22
Color:
shall be a yard drain or cb per std plan 225.0.
Subject: Callout
Page Index: 22
Color:
shall be a yard drain or cb per std plan 225.0.
Subject: Cloud+
Page Index: 22
Color:
update stationing and elevations to show the end
of the roadway reflected in plan view.
Subject: Cloud+
Page Index: 22
Color:
revise ie to match crowns. this may result in the
lowering of the 12" main.
Subject: Callout
Page Index: 22
Color:
driveway wings should ensure the they meet ada
requirements. provide spot elevations as needed.
Subject: Callout
Page Index: 22
Color:
bioretention to be added to cul-de-sac island (see
comment in tir)
Subject: Text Box
Page Index: 22
Color:
R-404821
OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404820
AAANNNNNNNTED-40-4048show private stormdrainage easement.
shall be a yarddrain or cb perstd plan 225.0.
shall be a yarddrain or cb perstd plan 225.0.
update stationingand elevations toshow the end of theroadway reflectedin plan view.
revise ie to match crowns.this may result in thelowering of the 12" main.
driveway wings should ensurethe they meet adarequirements. provide spotelevations as needed.
bioretention to be addedto cul-de-sac island (seecomment in tir)
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404821
Subject: Text Box
Page Index: 22
Color:
TED-40-4048
Subject: Diameter Measurement
Page Index: 22
Color:
40'-0"
Subject: Callout
Page Index: 22
Color:
PER RMC 4-6-060h.4: A landscaped center island
with a radius of twenty feet (20') delineated by
curbing shall be provided in the cul-de-sac. Low
impact development best management practices
shall be provided in the center island where
feasible and consistent with City standard details
and the Surface Water Design Manual.
Subject: Callout
Page Index: 22
Color:
PROVIDE NO PARKING SIGNS ALL AROUND
THE ISLAND.
Subject: Callout
Page Index: 23
Color:
DI
23 (10)
Subject: Callout
Page Index: 23
Color:
DI
Subject: Callout
Page Index: 23
Color:
Label cleanouts (TYP.).
Subject: Callout
Page Index: 23
Color:
label 6" roof and footing drain.
Subject: Callout
Page Index: 23
Color:
label pipe
Subject: Callout
Page Index: 23
Color:
ensure tie backs do not interfere with utilities.AAANNNNNNNTED-40-404840'-0"
PER RMC 4-6-060h.4:A landscaped centerisland with a radiusof twenty feet (20')delineated by curbingshall be provided inthe cul-de-sac. Lowimpact developmentbest managementpractices shall beprovided in the centerisland where feasibleand consistent withCity standard detailsand the SurfaceWater Design Manual.
PROVIDE NOPARKING
SIGNS ALLAROUND THEISLAND.
DI
DI
Label cleanouts (TYP.).
label 6" roof andfooting drain.
label pipe
PLAT
ensure tie backs donot interfere withutilities.
Subject: Text Box
Page Index: 23
Color:
R-404822
Subject: Text Box
Page Index: 23
Color:
TED-40-4048
Subject: Callout
Page Index: 23
Color:
NO PARKING SIGN SHALL BE LOCATED ON
OTHER SIDE OF STREET. PARKING LANE IS
LOCATED ON SIDE WITH BULB.
Subject: Callout
Page Index: 23
Color:
BOLLARDS ARE NOT ALLOWED BY THE FIRE
DEPARTMENT, REPLACE WITH LOCKING
SWING GATE AND FIRE DEPARTMENT
APPROVED LOCK BOX.
Subject: Callout
Page Index: 24
Color:
mailbox to be relocated to planter. mailbox to be
accessible during construction.
24 (29)
Subject: Callout
Page Index: 24
Color:
to be relocated planter.
Subject: Arrow
Page Index: 24
Color:
Subject: Arrow
Page Index: 24
Color:
Subject: Callout
Page Index: 24
Color:
cb#38
Subject: Cloud+
Page Index: 24
Color:
remove duplicate callout.
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404822
AAANNNNNNNTED-40-4048NO PARKING SIGNSHALL BE LOCATEDON OTHER SIDE OFSTREET. PARKINGLANE IS LOCATED ONSIDE WITH BULB.
BOLLARDS ARE NOT ALLOWEDBY THE FIRE DEPARTMENT,REPLACE WITH LOCKING SWINGGATE AND FIRE DEPARTMENTAPPROVED LOCK BOX.
FOREST TERRACE PL mailbox to berelocated to planter. mailbox to beaccessible duringconstruction.
to be relocatedplanter.
cb#38
remove duplicatecallout.
Subject: Callout
Page Index: 24
Color:
label pipe
Subject: Callout
Page Index: 24
Color:
label pipe between ex and proposed cbs.
Subject: Text Box
Page Index: 24
Color:
provide channelization plan showing the
replacement of the roadway striping.
Subject: Callout
Page Index: 24
Color:
to planter strip.
show location of the relocated sign.
Subject: Cloud+
Page Index: 24
Color:
existing power pole to be removed. utilities shall
be relocated underground. revise accordingly.
Subject: Callout
Page Index: 24
Color:
to planter strip.
show location of the relocated sign.
Subject: Callout
Page Index: 24
Color:
and stop sign
Subject: Callout
Page Index: 24
Color:
Label CB#20
Subject: Callout
Page Index: 24
Color:
DI
Subject: Callout
Page Index: 24
Color:
At least 2' of cover is required for LCPE pipe. If 2'
of cover cannot be provided, use DI pipe and
provide at least 1' of cover.
label pipe
label pipe between exand proposed cbs.
provide channelizationplan showing thereplacement of theroadway striping.
FORE
to planter strip.
show location of therelocated sign.
TERRACE PL
existing power pole to beremoved. utilities shall berelocated underground.revise accordingly.
PLATto planter strip.
show location of therelocated sign.
and stop sign
Label CB#20
DI
At least 2' of cover isrequired for LCPEpipe. If 2' of covercannot be provided,use DI pipe and provideat least 1' of cover.
Subject: Callout
Page Index: 24
Color:
-48" Solid Lid (Public)
Subject: Callout
Page Index: 24
Color:
Solid Lid
Subject: Callout
Page Index: 24
Color:
Solid Lid
Subject: Callout
Page Index: 24
Color:
Label CB#21
Subject: Length Measurement
Page Index: 24
Color:
2.49 ft
Subject: Cloud
Page Index: 24
Color:
Subject: Callout
Page Index: 24
Color:
VERIFY CONFLICT BETWEEN STORM
STRUCTURES, PIPING WITH SPU'S 36"
PIPELINE
Subject: Callout
Page Index: 24
Color:
THERE IS ONLY ABOUT 2.5 FT OF
HORIZONTAL SEPARATION BETWEEN THE
NEW 24" STORM LINE AND THE EXISTING 36"
SPU PIPELINE. DEPT OF HEALTH DESIGN
CRITERIA REQUIRES 10 FEET OF
SEPARATION. THE DESIGN ENGINEER NEEDS
TO PROVIDE SPECIAL DESIGN
CONSIDERATIONS FOR THE PROTECTION
AND FUTURE MAINTENANCE OF SPU'S
PIPELINE INCLUDING THE ENCASEMENT OF
THE NEW STORM LINE WITH CONTROLLED
DENSITY FILL (CDF).
A WRITTEN APPROVAL FROM SPU WILL BE
REQUIRED.
THERE IS SUFFICIENT RIGHT-OF-WAY TO
MOVE THE NEW 24" STORM LINE TO THE
EAST.
-48" Solid Lid (Public)
Solid Lid
Solid Lid
Label CB#21
2.49 ftA FOREST TERRACE PLATVERIFY CONFLICT BETWEENSTORM STRUCTURES, PIPINGWITH SPU'S 36" PIPELINE
THERE IS ONLY ABOUT 2.5 FT OF HORIZONTAL SEPARATIONBETWEEN THE NEW 24" STORM LINE AND THE EXISTING 36"SPU PIPELINE. DEPT OF HEALTH DESIGN CRITERIA REQUIRES 10FEET OF SEPARATION. THE DESIGN ENGINEER NEEDS TOPROVIDE SPECIAL DESIGN CONSIDERATIONS FOR THEPROTECTION AND FUTURE MAINTENANCE OF SPU'S PIPELINEINCLUDING THE ENCASEMENT OF THE NEW STORM LINE WITHCONTROLLED DENSITY FILL (CDF). A WRITTEN APPROVAL FROM SPU WILL BE REQUIRED.THERE IS SUFFICIENT RIGHT-OF-WAY TO MOVE THE NEW 24"STORM LINE TO THE EAST.
Subject: Callout
Page Index: 24
Color:
Recommend looking into bypassing the flow
control facility and connecting into CB 37.
Applicant will need to follow the flow control
bypass requirements within section 1.2.3.2.E of the
2017 RSWDM. bypass will need to be addressed
in the TIR.
Subject: Callout
Page Index: 24
Color:
relocate private storm drain out of the frontage on
union.
Subject: Callout
Page Index: 24
Color:
existing overhead power to be installed
underground
Subject: Text Box
Page Index: 24
Color:
R-404823
Subject: Text Box
Page Index: 24
Color:
TED-40-4048
Subject: Cloud+
Page Index: 25
Color:
utilities along project frontage to be underground.
25 (8)
Subject: Callout
Page Index: 25
Color:
show relocated location.
mailboxes to be accessible during construction.
Subject: Text Box
Page Index: 25
Color:
existing driveways to remain accessible during
construction.
Subject: Callout
Page Index: 25
Color:
At least 2' of cover is required for LCPE pipe. If 2'
of cover cannot be provided, use DI pipe and
provide at least 1' of cover.
Subject: Callout
Page Index: 25
Color:
Solid Lid
Recommend looking intobypassing the flow controlfacility and connecting into CB37. Applicant will need tofollow the flow control bypassrequirements within section1.2.3.2.E of the 2017 RSWDM.bypass will need to be addressedin the TIR.
FO
relocate privatestorm drain out ofthe frontage onunion.AAA ERRACE PLATexisting overheadpower to be installedunderground
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404823
AAANNNNNNNTED-40-4048FO
utilities alongproject frontage tobe underground.
show relocated location. mailboxes to be accessibleduring construction.
existing driveways to remainaccessible during construction.
At least 2' of cover isrequired for LCPEpipe. If 2' of covercannot be provided,use DI pipe and provideat least 1' of cover.
Solid Lid
Subject: Callout
Page Index: 25
Color:
Solid Lid
Subject: Text Box
Page Index: 25
Color:
R-404824
Subject: Text Box
Page Index: 25
Color:
TED-40-4048
Subject: Callout
Page Index: 26
Color:
DI
26 (5)
Subject: Callout
Page Index: 26
Color:
At least 2' of cover is required for LCPE pipe. If 2'
of cover cannot be provided, use DI pipe and
provide at least 1' of cover where possible.
Subject: Text Box
Page Index: 26
Color:
permit required by king county for work within king
county right of way
Subject: Text Box
Page Index: 26
Color:
R-404825
Subject: Text Box
Page Index: 26
Color:
TED-40-4048
Subject: Callout
Page Index: 27
Color:
see comments on sheet 20.
27 (13)
Subject: Callout
Page Index: 27
Color:
add connection for trench drain or show other
collection system. see comments on sheet 20.
Solid Lid
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404824
AAANNNNNNNTED-40-4048DI
At least 2' of cover isrequired for LCPEpipe. If 2' of covercannot be provided,use DI pipe and provideat least 1' of coverwhere possible.
permit required by kingcounty for work withinking county right of way
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404825
AAANNNNNNNTED-40-4048see comments onsheet 20.
add connection fortrench drain or showother collection system.see comments on sheet 20.
Subject: Line
Page Index: 27
Color:
Subject: Callout
Page Index: 27
Color:
-48" Solid Lid (Public)
Subject: Callout
Page Index: 27
Color:
Solid Lid
Subject: Callout
Page Index: 27
Color:
Solid Lid
Subject: Callout
Page Index: 27
Color:
Label cleanouts (TYP.).
Subject: Callout
Page Index: 27
Color:
Label CB#41
Subject: Callout
Page Index: 27
Color:
Label pipe.
Subject: Callout
Page Index: 27
Color:
Label pipe.
Subject: Callout
Page Index: 27
Color:
remove
Subject: Text Box
Page Index: 27
Color:
R-404826
-48" Solid Lid (Public)
Solid Lid
Solid Lid
Label cleanouts (TYP.).
Label CB#41
Label pipe.
Label pipe.
remove
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404826
Subject: Text Box
Page Index: 27
Color:
TED-40-4048
Subject: Cloud+
Page Index: 28
Color:
see comments on the landscaping regarding
exposed face of wall
28 (9)
Subject: Callout
Page Index: 28
Color:
Add 12" ventilation pipe at corner created by
internal wall.
Subject: Callout
Page Index: 28
Color:
Add 12" ventilation pipe at corner created by
internal wall.
Subject: Callout
Page Index: 28
Color:
Add 12" ventilation pipe at corner created by
internal wall.
Subject: Callout
Page Index: 28
Color:
2'
Subject: Text Box
Page Index: 28
Color:
Access roads are required to be provided to each
access panel, the control structure, and at least
one access point per cell.
Subject: Text Box
Page Index: 28
Color:
R-404827
Subject: Text Box
Page Index: 28
Color:
TED-40-4048
Subject: Callout
Page Index: 28
Color:
BOLLARDS ARE NOT ALLOWED BY THE FIRE
DEPARTMENT, REPLACE WITH LOCKING
SWING GATE AND FIRE DEPARTMENT
APPROVED LOCK BOX.AAANNNNNNNTED-40-4048see comments on thelandscapingregarding exposedface of wall
Add 12" ventilationpipe at corner createdby internal wall.
Add 12" ventilationpipe at corner createdby internal wall.
Add 12" ventilationpipe at corner createdby internal wall.T TERRACE PLAT2'
Access roads are required to beprovided to each access panel,the control structure, and atleast one access point per cell.
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404827
AAANNNNNNNTED-40-4048BOLLARDS ARE NOT ALLOWEDBY THE FIRE DEPARTMENT,REPLACE WITH LOCKING SWINGGATE AND FIRE DEPARTMENTAPPROVED LOCK BOX.
Subject: Text Box
Page Index: 29
Color:
orifices may need to be revised based on
development basin revisions.
29 (14)
Subject: Cloud+
Page Index: 29
Color:
cb#29
Subject: Arrow
Page Index: 29
Color:
Subject: Arrow
Page Index: 29
Color:
Subject: Callout
Page Index: 29
Color:
show 36" pipe from tank
Subject: Callout
Page Index: 29
Color:
show 12" pipe from cb#28
Subject: Callout
Page Index: 29
Color:
shift access to other side of structure.
Subject: Callout
Page Index: 29
Color:
remove pipe
Subject: Cloud+
Page Index: 29
Color:
discharge pipe shown at different angle in plan
view. revise accordingly.
Subject: Callout
Page Index: 29
Color:
due to increased depth, vault shall be extended to
finished grade and a 4'x4' traffic rated access
hatch. both access location shall have a field
poured concrete collar is required. building permit
with structural analysis required for vault.
orifices may need to berevised based ondevelopment basin revisions.
cb#29
show 36"pipe fromtank
show 12" pipefrom cb#28
shift access to otherside of structure.
remove pipe
discharge pipe shownat different angle inplan view. reviseaccordingly.
due to increaseddepth, vault shall beextended to finishedgrade and a 4'x4'traffic rated accesshatch. both accesslocation shall have afield pouredconcrete collar isrequired. buildingpermit withstructural analysisrequired for vault.
Subject: Callout
Page Index: 29
Color:
WQ Flowrate appears to be different than in TIR.
Subject: Callout
Page Index: 29
Color:
Vault top must extend to finished grade. Also
install 5x5 hatch in place of round ring and lids.
Subject: Text Box
Page Index: 29
Color:
R-404828
Subject: Text Box
Page Index: 29
Color:
TED-40-4048
Subject: Cloud+
Page Index: 30
Color:
gate required per fire authority.
30 (18)
Subject: Cloud+
Page Index: 30
Color:
depth exceeds 5 feet. change to type 2.
Subject: Callout
Page Index: 30
Color:
adjust text for shifted profile (typ)
Subject: Callout
Page Index: 30
Color:
show location of vehicular barrier.
Subject: Callout
Page Index: 30
Color:
Show flow direction arrows.
Subject: Callout
Page Index: 30
Color:
DI
WQ Flowrate appears tobe different than in TIR.
Vault top must extendto finished grade.Also install 5x5hatch in place ofround ring and lids.
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404828
AAANNNNNNNTED-40-4048FO
gate required perfire authority.
depth exceeds 5 feet.change to type 2.
adjust text forshifted profile (typ)
show location ofvehicular barrier.
Show flow direction arrows.
DI
Subject: Callout
Page Index: 30
Color:
DI
Subject: Callout
Page Index: 30
Color:
At least 2' of cover is required for LCPE pipe. If 2'
of cover cannot be provided, use DI pipe and
provide at least 1' of cover.
Subject: Callout
Page Index: 30
Color:
Solid Lid
Subject: Callout
Page Index: 30
Color:
Label cleanouts (TYP.).
Subject: Callout
Page Index: 30
Color:
2'
Subject: Callout
Page Index: 30
Color:
2'
Subject: Callout
Page Index: 30
Color:
2'
Subject: Callout
Page Index: 30
Color:
Install through curb inlets with bi-directional grates
Subject: Callout
Page Index: 30
Color:
Label pipe
Subject: Callout
Page Index: 30
Color:
Label pipe
DI
At least 2' of cover isrequired for LCPEpipe. If 2' of covercannot be provided,use DI pipe and provideat least 1' of cover.
Solid Lid
Label cleanouts (TYP.).
2'
2'
2'
Install through curbinlets withbi-directional grates
FOREST Label pipe
Label pipe
Subject: Text Box
Page Index: 30
Color:
R-404829
Subject: Text Box
Page Index: 30
Color:
TED-40-4048
Subject: Callout
Page Index: 31
Color:
At least 2' of cover is required for LCPE pipe. If 2'
of cover cannot be provided, use DI pipe and
provide at least 1' of cover.
31 (6)
Subject: Callout
Page Index: 31
Color:
Solid Lid
Subject: Callout
Page Index: 31
Color:
Solid Lid
Subject: Callout
Page Index: 31
Color:
Install eccentric cone
Subject: Text Box
Page Index: 31
Color:
R-404830
Subject: Text Box
Page Index: 31
Color:
TED-40-4048
Subject: Callout
Page Index: 32
Color:
CB exceeds the allowed depth of the city approved
type 2 structure (15 feet max and the 25 feet
allows for a manhole). cb shall be structural
designed ensuring osha and wisha standards are
met which items such as fall protection and a wider
structure.
32 (8)
Subject: Callout
Page Index: 32
Color:
see comments regarding access and structure on
sheet 28.
MPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404829
AAANNNNNNNTED-40-4048At least 2' of cover isrequired for LCPEpipe. If 2' of covercannot be provided,use DI pipe and provideat least 1' of cover.
Solid Lid
Solid Lid
Install eccentriccone
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404830
AAANNNNNNNTED-40-4048CB exceeds the allowed depth of the cityapproved type 2 structure (15 feet max andthe 25 feet allows for a manhole). cb shall bestructural designed ensuring osha and wishastandards are met which items such as fallprotection and a wider structure.
see comments regardingaccess and structure onsheet 28.
Subject: Callout
Page Index: 32
Color:
Solid Lid
Subject: Callout
Page Index: 32
Color:
Solid Lid
Subject: Callout
Page Index: 32
Color:
Solid Lid
Subject: Callout
Page Index: 32
Color:
Vault top must extend to finished grade. Also
install 5x5 hatch in place of round ring and lids.
Subject: Text Box
Page Index: 32
Color:
R-404831
Subject: Text Box
Page Index: 32
Color:
TED-40-4048
Subject: Text Box
Page Index: 33
Color:
R-404832
33 (2)
Subject: Text Box
Page Index: 33
Color:
TED-40-4048
Subject: Text Box
Page Index: 34
Color:
Use current City of Renton Surface Water
Standard Plans.
34 (3)
Subject: Text Box
Page Index: 34
Color:
R-404833
Solid Lid
Solid Lid
Solid Lid
Vault top must extendto finished grade.Also install 5x5hatch in place ofround ring and lids.
MPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404831
AAANNNNNNNTED-40-4048OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404832
AAANNNNNNNTED-40-4048Use current City of RentonSurface Water Standard Plans.
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404833
Subject: Text Box
Page Index: 34
Color:
TED-40-4048
Subject: Callout
Page Index: 35
Color:
provide curb return information.
35 (28)
Subject: Callout
Page Index: 35
Color:
provide curb return information.
Subject: Callout
Page Index: 35
Color:
provide curb return information.
Subject: Callout
Page Index: 35
Color:
provide curb return information.
Subject: Callout
Page Index: 35
Color:
provide curb return information.
Subject: Arrow
Page Index: 35
Color:
Subject: Cloud+
Page Index: 35
Color:
cross slope exceeds 2 %. revise landing.
Subject: Arrow
Page Index: 35
Color:
Subject: Cloud+
Page Index: 35
Color:
cross slope exceeds 2 %. revise landing.AAANNNNNNNTED-40-4048provide curb returninformation.
provide curb returninformation.
provide curb returninformation.
provide curbreturninformation.
provide curbreturninformation.
cross slope exceeds2 %. revise landing.
cross slope exceeds2 %. revise landing.
Subject: Arrow
Page Index: 35
Color:
Subject: Cloud+
Page Index: 35
Color:
cross slope exceeds 2 %. revise landing.
Subject: Arrow
Page Index: 35
Color:
Subject: Cloud+
Page Index: 35
Color:
cross slope exceeds 2 %. revise landing.
Subject: Callout
Page Index: 35
Color:
show location of stop bar 9 feet west of the
midpoint of the bisected curb return.
Subject: Length Measurement
Page Index: 35
Color:
9 ft
Subject: Line
Page Index: 35
Color:
Subject: Callout
Page Index: 35
Color:
relocate ramps to be east of stop bar.
Subject: Length Measurement
Page Index: 35
Color:
20 ft
Subject: Callout
Page Index: 35
Color:
shift ramp to south.
cross slope exceeds2 %. revise landing.
cross slope exceeds2 %. revise landing.
show location ofstop bar 9 feet westof the midpoint of thebisected curb return.
9 ft
relocate rampsto be east ofstop bar.20 ft shiftramp to south.
Subject: Callout
Page Index: 35
Color:
provide curb return information.
Subject: Cloud+
Page Index: 35
Color:
Recommend combining ADA ramps. in order to
meet the requirements for the stop bar.
Subject: Cloud+
Page Index: 35
Color:
Recommend combining ADA ramps. in order to
meet the requirements for the stop bar.
Subject: Cloud+
Page Index: 35
Color:
provide a maximum extent feasible analysis for this
ramp.
Subject: Cloud+
Page Index: 35
Color:
provide a maximum extent feasible analysis for this
ramp.
Subject: Text Box
Page Index: 35
Color:
R-404834
Subject: Text Box
Page Index: 35
Color:
T-404801
Subject: Text Box
Page Index: 35
Color:
TED-40-4048
Subject: Text Box
Page Index: 35
Color:
TRO-41-4048
Subject: Callout
Page Index: 36
Color:
add spot elevations for the added cul-de-sac
planter island
36 (5)
provide curbreturninformation.
Recommend combiningADA ramps. in orderto meet therequirements for thestop bar.
Recommend combiningADA ramps. in orderto meet therequirements for thestop bar.
provide a maximumextent feasibleanalysis for this ramp.
provide a maximumextent feasibleanalysis for this ramp.
OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404834
OMPLIANCE WITH CITY OF RENTON
A-NNNNNNN
T-404801
AAANNNNNNNTED-40-4048FO TRO-41-4048''
'
'
add spot elevations forthe added cul-de-sacplanter island
Subject: Text Box
Page Index: 36
Color:
T-404802
Subject: Text Box
Page Index: 36
Color:
R-404835
Subject: Text Box
Page Index: 36
Color:
TED-40-4048
Subject: Text Box
Page Index: 36
Color:
TRO-41-4048
Subject: Text Box
Page Index: 37
Color:
replace note with standard plans 267.00 and
267.10
37 (3)
Subject: Text Box
Page Index: 37
Color:
R-404836
Subject: Text Box
Page Index: 37
Color:
TED-40-4048
Subject: Text Box
Page Index: 38
Color:
update city of renton std plans
38 (4)
Subject: Text Box
Page Index: 38
Color:
R-404837
Subject: Text Box
Page Index: 38
Color:
TED-40-4048
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNN
T-404802
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404835
AAANNNNNNNTED-40-4048TRO-41-4048replace note with standard plans267.00 and 267.10
MPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404836
AAANNNNNNNTED-40-4048update city of renton std plans
COMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404837
AAANNNNNNNTED-40-4048
Subject: Callout
Page Index: 38
Color:
BOLLARDS ARE NOT ALLOWED BY THE FIRE
DEPARTMENT, REPLACE WITH LOCKING
SWING GATE AND FIRE DEPARTMENT
APPROVED LOCK BOX. REMOVE THIS DETAIL
AS IT IS NOT ALLOWED.
Subject: Text Box
Page Index: 39
Color:
update city of renton std plans
39 (3)
Subject: Text Box
Page Index: 39
Color:
R-404838
Subject: Text Box
Page Index: 39
Color:
TED-40-4048
Subject: Text Box
Page Index: 40
Color:
update city of renton std plans
40 (4)
Subject: Text Box
Page Index: 40
Color:
remove reference to snohomish county and only
show detail of the yard drain. private lot
connections to be per city of renton std plan
225.00.
Subject: Text Box
Page Index: 40
Color:
R-404839
Subject: Text Box
Page Index: 40
Color:
TED-40-4048
Subject: Text Box
Page Index: 41
Color:
R-404840
41 (2)
Subject: Text Box
Page Index: 41
Color:
TED-40-4048
BOLLARDS ARE NOT ALLOWEDBY THE FIRE DEPARTMENT,REPLACE WITH LOCKING SWINGGATE AND FIRE DEPARTMENTAPPROVED LOCK BOX. REMOVETHIS DETAIL AS IT IS NOTALLOWED.
update city of renton std plans
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404838
AAANNNNNNNTED-40-4048update city of renton std plans
remove reference to snohomishcounty and only show detail of theyard drain. private lot connections tobe per city of renton std plan 225.00.
MPLIANCE WITH CITY OF RENTON ST
A-NNNNNNNR-404839
AAANNNNNNNTED-40-4048OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404840
AAANNNNNNNTED-40-4048
Subject: Text Box
Page Index: 42
Color:
R-404841
42 (2)
Subject: Text Box
Page Index: 42
Color:
TED-40-4048
Subject: Text Box
Page Index: 43
Color:
replace with updated std plans 261.40 and 264.00
43 (3)
Subject: Text Box
Page Index: 43
Color:
R-404842
Subject: Text Box
Page Index: 43
Color:
TED-40-4048
Subject: Line
Page Index: 44
Color:
44 (42)
Subject: Line
Page Index: 44
Color:
Subject: Cloud+
Page Index: 44
Color:
shift sewer stub or street light to provide a
minimum 5' of separation.
Subject: Callout
Page Index: 44
Color:
add 8" gate valve at station 12+00
Subject: Text Box
Page Index: 44
Color:
show and label irrigation meter(s) confirm sizing is
adequate for irrigation needs.
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404841
AAANNNNNNNTED-40-4048replace with updated stdplans 261.40 and 264.00
OMPLIANCE WITH CITY OF RENTON S
A-NNNNNNNR-404842
AAANNNNNNNTED-40-4048shift sewer stub orstreet light toprovide a minimum 5'of separation.
add 8" gate valve atstation 12+00
show and label irrigation meter(s)confirm sizing is adequate forirrigation needs.
Subject: Callout
Page Index: 44
Color:
eliminate the west vertical bend and continue
water main.
Subject: Typewritten Text
Page Index: 44
Color:
8"
Subject: Line
Page Index: 44
Color:
Subject: Callout
Page Index: 44
Color:
EX 12" W
Subject: Typewritten Text
Page Index: 44
Color:
EX 12" W
Subject: Typewritten Text
Page Index: 44
Color:
EX 8" W
Subject: Group
Page Index: 44
Color:
Subject: Polygon
Page Index: 44
Color:
Subject: Callout
Page Index: 44
Color:
SHOW EXISTING 8" GV NORTH OF TEE
(fyi there is a 12"x8" reducer north of the 12"x8"
tee)
Subject: Typewritten Text
Page Index: 44
Color:
EX 8" W
eliminate the west vertical bend andcontinue water main.
8"
EX 12" W
EX 12" WEX 8" W
SHOW EXISTING 8" GVNORTH OF TEE(fyi there is a 12"x8" reducernorth of the 12"x8" tee)EX 8" W
Subject: Callout
Page Index: 44
Color:
Subject: Line
Page Index: 44
Color:
Subject: Line
Page Index: 44
Color:
Subject: Group
Page Index: 44
Color:
Subject: Line
Page Index: 44
Color:
Subject: Group
Page Index: 44
Color:
Subject: Line
Page Index: 44
Color:
Subject: Callout
Page Index: 44
Color:
INSTALL WATER METER IN PLANTER AND 5 FT
FROM PROPERTY LINE
SHOW TAILPIECE 1 FT PAST PROPERTY LINE
PER STD PLAN NO. 320.1
TYPICAL FOR ALL METERS
Subject: Cloud
Page Index: 44
Color:
Subject: Callout
Page Index: 44
Color:
PVC SLEEVE NOT REQUIRED
INSTALL COPPER TAILPIECE 1 FT PAST
PROPERTY LINE PER STD PLAN NO. 320.1
INSTALL WATER METER IN PLANTER AND 5 FTFROM PROPERTY LINE SHOW TAILPIECE 1 FT PAST PROPERTY LINE PERSTD PLAN NO. 320.1TYPICAL FOR ALL METERS
A-NNNNNNN
IN COM
PVC SLEEVE NOT REQUIRED INSTALL COPPER TAILPIECE 1 FTPAST PROPERTY LINE PER STDPLAN NO. 320.1
Subject: Text Box
Page Index: 44
Color:
ALL MECHANICAL FITTINGS SHALL HAVE
RESTRAINED-RETAINER GLANDS EQUAL TO
MEGALUG SERIES 1100 OR ROMAC
ROMAGRIP AND CONCRETE BLOCKING
Subject: PolyLine
Page Index: 44
Color:
Subject: PolyLine
Page Index: 44
Color:
Subject: Line
Page Index: 44
Color:
Subject: Callout
Page Index: 44
Color:
CUT-IN: (BY CIYT FORCES)
8" X 8" TEE (MJxFL)
8" GATE VALVE (FLxMJ)
2-8"SLEEVES (MJxMJ)
SEE CONNECTION DETAIL PER STD PLAN NO.
300.2
Subject: Group
Page Index: 44
Color:
Subject: Callout
Page Index: 44
Color:
SHOW NEW VALVE
Subject: Hydrant (P)
Page Index: 44
Color:
Subject: Group
Page Index: 44
Color:
Subject: Callout
Page Index: 44
Color:
INSTALL FIRST HYDRANT AT NEW STREET
INTERSECTION
ALL MECHANICAL FITTINGS SHALL HAVE RESTRAINED-RETAINERGLANDS EQUAL TO MEGALUG SERIES 1100 OR ROMACROMAGRIP AND CONCRETE BLOCKING
ACE PLAT
CUT-IN: (BY CIYT FORCES)8" X 8" TEE (MJxFL)8" GATE VALVE (FLxMJ)2-8"SLEEVES (MJxMJ)SEE CONNECTION DETAIL PERSTD PLAN NO. 300.2
SHOW NEW VALVE
E PLAT INSTALL FIRST HYDRANT ATNEW STREET INTERSECTION
Subject: Text Box
Page Index: 44
Color:
THE CONTRACTOR SHALL CONTACT SPU
CREW CHIEF RICHARD COX AT 206-953-0184
(Richard.Cox@Seatle.gov) A MINIMUM OF 72
HOURS PRIOR TO ANY POTHLOLING AND ANY
EXCAVATION IN PROXIMITY OF SPU WATER
MAINS.
ALL WORK IN PROXIMITY OF AND ALL
CROSSINGS OF SPU WATER MAINS MUST BE
SUBMITTED SPU ENGINEERING DEPARTMENT
FOR APPROVAL
CONTACT: PAJ HWANG, P.E., SENIOR CIVIL
ENGINEER- SEATTLE PUBLIC UTILITIES
ENGINEERING AND TECHNICAL
SERVICES DIVISION
P.O. BOX 34108, SEATTLE, WA
98124-4018
TEL: (206) 386-4198 EMAIL:
Paj.Hwang@Seattle.gov
Subject: Callout
Page Index: 44
Color:
existing drain field shall be delineated prior to
construction.
Subject: Callout
Page Index: 44
Color:
restrain joints and blocking per detail 330.3
Subject: Text Box
Page Index: 44
Color:
W-404802
Subject: Text Box
Page Index: 44
Color:
S-404802
Subject: Text Box
Page Index: 44
Color:
WTR-27-4048
Subject: Text Box
Page Index: 44
Color:
WWP-27-4048
Subject: Callout
Page Index: 45
Color:
relocate hydrant to the intersection. shift water
services as needed.
45 (7)
THE CONTRACTOR SHALL CONTACT SPU CREW CHIEF RICHARD COX AT206-953-0184 (Richard.Cox@Seatle.gov) A MINIMUM OF 72 HOURS PRIOR TO ANYPOTHLOLING AND ANY EXCAVATION IN PROXIMITY OF SPU WATER MAINS.ALL WORK IN PROXIMITY OF AND ALL CROSSINGS OF SPU WATER MAINS MUST BESUBMITTED SPU ENGINEERING DEPARTMENT FOR APPROVALCONTACT: PAJ HWANG, P.E., SENIOR CIVIL ENGINEER- SEATTLE PUBLIC UTILITIES ENGINEERING AND TECHNICAL SERVICES DIVISION P.O. BOX 34108, SEATTLE, WA 98124-4018 TEL: (206) 386-4198 EMAIL: Paj.Hwang@Seattle.gov
existing drain field shall bedelineated prior toconstruction.
restrain joints andblocking per detail 330.3
CE WITH CITY OF RENTON STANDA
NNNNNNNW-404802
IN COMPLIANCE WITH
A-NNN S-404802
AAANNNNNNNWTR-27-4048F WWP-27-4048relocate hydrant tothe intersection.shift water servicesas needed.
Subject: Callout
Page Index: 45
Color:
remove valve symbols on main line
Subject: Cloud+
Page Index: 45
Color:
confirm minimum separation between water main
and side sewer stub is met at this location.
Subject: Text Box
Page Index: 45
Color:
W-404803
Subject: Text Box
Page Index: 45
Color:
S-404803
Subject: Text Box
Page Index: 45
Color:
WTR-27-4048
Subject: Text Box
Page Index: 45
Color:
WWP-27-4048
Subject: Callout
Page Index: 46
Color:
1-8" gate valve
46 (22)
Subject: Callout
Page Index: 46
Color:
relocate fire hydrant. remove gate valve east of
hydrant.
Subject: Callout
Page Index: 46
Color:
16" PETROLEUM PIPELINE
Subject: Callout
Page Index: 46
Color:
20" PETROLEUM PIPELINE
remove valve symbolson main line
confirm minimumseparation betweenwater main and sidesewer stub is met atthis location.
NCE WITH CITY OF RENTON STAND
A-NNNNNNNW-404803
IN COMPLIANCE WIT
A-NNN S-404803
AAANNNNNNNWTR-27-4048WWP-27-40481-8" gate valve
ST TERRACE PLAT
relocate firehydrant. remove gatevalve east of hydrant.
16" PETROLEUM PIPELINE
20" PETROLEUM PIPELINE
Subject: Callout
Page Index: 46
Color:
CAUTION
16" AND 20" PETROLEUM PIPELINES
Subject: Typewritten Text
Page Index: 46
Color:
ADD NOTE:
Subject: Image
Page Index: 46
Color:
Subject: Cloud
Page Index: 46
Color:
Subject: Text Box
Page Index: 46
Color:
PVC
Subject: Line
Page Index: 46
Color:
Subject: Callout
Page Index: 46
Color:
USE 14" OR 18" PVC C-900 PIPE FOR CASING
AROUND 8" D.I. PIPE TO PROVIDE INSULATION
FROM OPL CO. IMPRESSED CURRENT
CATHODIC PROTECTION SYSTEM
Subject: Length Measurement
Page Index: 46
Color:
15.00 ft
Subject: Length Measurement
Page Index: 46
Color:
15.00 ft
Subject: PolyLine
Page Index: 46
Color:
CAUTION16" AND 20" PETROLEUM PIPELINES
ADD NOTE:
PVC
USE 14" OR 18" PVC C-900 PIPE FOR CASINGAROUND 8" D.I. PIPE TO PROVIDE INSULATIONFROM OPL CO. IMPRESSED CURRENTCATHODIC PROTECTION SYSTEM
15.00 ft
15.00 ft
Subject: Line
Page Index: 46
Color:
Subject: Line
Page Index: 46
Color:
Subject: Line
Page Index: 46
Color:
Subject: Line
Page Index: 46
Color:
Subject: Text Box
Page Index: 46
Color:
S-404804
Subject: Text Box
Page Index: 46
Color:
W-404804
Subject: Text Box
Page Index: 46
Color:
WTR-27-4048
Subject: Text Box
Page Index: 46
Color:
WWP-27-4048
Subject: Cloud+
Page Index: 47
Color:
remove blow-off. hydrant to be relocated to the end
of the main.
add hydrant assembly label and 8" gate valve east
of the hydrant.
47 (19)
Subject: Callout
Page Index: 47
Color:
remove gate valve symbol west of the hydrant
once relocated.
IN COMPLIANC
A-
S-404804
MPLIANCE WITH CITY OF RENTON
A-NNNNNNNW-404804
AAANNNNNNNWTR-27-4048WWP-27-4048remove blow-off. hydrant to berelocated to the end of the main.
add hydrant assembly label and 8" gatevalve east of the hydrant.
remove gate valvesymbol west of thehydrant oncerelocated.
Subject: Callout
Page Index: 47
Color:
fire hydrant to be relocated to the end of the water
main and add callout
Subject: Line
Page Index: 47
Color:
Subject: Group
Page Index: 47
Color:
Subject: Group
Page Index: 47
Color:
Subject: PolyLine
Page Index: 47
Color:
Subject: Callout
Page Index: 47
Color:
INSTALL VERTICAL CROSS PER STD PLAN
300.6 (FOR REMOVAL OF POLYPIG)
AND 2-INCH TEMP BLOW-OFF ASSEMBLY PER
STD PLAN NO. 340.2
Subject: Group
Page Index: 47
Color:
Subject: Callout
Page Index: 47
Color:
INSTALL 8" GATE VALVE (MJ)
AFTER LAST WATER SERVICE FOR ISOLATION
FOR FUTURE EXTENSION
Subject: Hydrant (P)
Page Index: 47
Color:
Subject: Group
Page Index: 47
Color: FOREST TERRACE PLATfire hydrant to berelocated to the endof the water main andadd callout
INSTALL VERTICAL CROSS PER STDPLAN 300.6 (FOR REMOVAL OFPOLYPIG)AND 2-INCH TEMP BLOW-OFFASSEMBLY PER STD PLAN NO. 340.2
INSTALL 8" GATE VALVE (MJ)AFTER LAST WATER SERVICEFOR ISOLATION FOR FUTUREEXTENSION
Subject: Callout
Page Index: 47
Color:
extend sewer man hole to the west so it is outside
of the paving area.
Subject: Callout
Page Index: 47
Color:
if fire flow of the water main is increase applicant
may not need to sprinkler all homes.
Subject: Cloud+
Page Index: 47
Color:
extend water main and sewer main past pavement.
Subject: Text Box
Page Index: 47
Color:
W-404805
Subject: Text Box
Page Index: 47
Color:
S-404805
Subject: Text Box
Page Index: 47
Color:
WTR-27-4048
Subject: Text Box
Page Index: 47
Color:
WWP-27-4048
Subject: Line
Page Index: 48
Color:
48 (12)
Subject: Ellipse
Page Index: 48
Color:
Subject: Line
Page Index: 48
Color:
extend sewer manhole to the west so itis outside of thepaving area.
IN COMPLIANCE WIT
A-NN if fire flow of thewater main is increaseapplicant may notneed to sprinkler allhomes.FOREST TERR
extend water mainand sewer main pastpavement.
PLIANCE WITH CITY OF RENTON S
A-NNNNNNNW-404805
IN COMPLIANCE
A-N S-404805
AAANNNNNNNWTR-27-4048WWP-27-4048
Subject: Callout
Page Index: 48
Color:
shift storm drainage to provide a minimum of 7 feet
of separation between storm and fire hydrant
assemply.
Subject: Gate Valve
Page Index: 48
Color:
Subject: Callout
Page Index: 48
Color:
INSTALL VERTICAL CROSS PER STD PLAN
300.6 (FOR REMOVAL OF POLYPIG)
AND 2-INCH TEMP BLOW-OFF ASSEMBLY PER
STD PLAN NO. 340.2
Subject: Callout
Page Index: 48
Color:
hydrant to be installed per city of renton water
requirements
Subject: Cloud+
Page Index: 48
Color:
hydrant assembly to be installed in addition of a
blowoff in accordance with city of renton water
standards.
Subject: Text Box
Page Index: 48
Color:
W-404806
Subject: Text Box
Page Index: 48
Color:
S-404806
Subject: Text Box
Page Index: 48
Color:
WTR-27-4048
Subject: Text Box
Page Index: 48
Color:
WWP-27-4048
Subject: Text Box
Page Index: 49
Color:
ex
49 (20)
shift storm drainageto provide a minimumof 7 feet ofseparation betweenstorm and firehydrant assemply.
PLAT INSTALL VERTICAL CROSS PER STDPLAN 300.6 (FOR REMOVAL OFPOLYPIG)AND 2-INCH TEMP BLOW-OFFASSEMBLY PER STD PLAN NO. 340.2
hydrant to beinstalled per city ofrenton waterrequirements
hydrant assembly to be installed inaddition of a blowoff in accordancewith city of renton water standards.
PLIANCE WITH CITY OF RENTON S
A-NNNNNNNW-404806
IN COMPLIANCE
A-N
S-404806
AAANNNNNNNWTR-27-4048WWP-27-4048ex
Subject: Text Box
Page Index: 49
Color:
ex
Subject: Text Box
Page Index: 49
Color:
ex
Subject: Text Box
Page Index: 49
Color:
contractor to revise channel of existing sewer
manhole for the added sewer connection.
Subject: Callout
Page Index: 49
Color:
provide pipe call out.
Subject: Callout
Page Index: 49
Color:
provide pipe call out.
Subject: Group
Page Index: 49
Color:
Subject: Line
Page Index: 49
Color:
Subject: Callout
Page Index: 49
Color:
INSTALL NEW 1" WATER SERVICE AND METER
IN PLANTER
Subject: Callout
Page Index: 49
Color:
CUT AND CAP EXISTING WATER SERVICE
AND ABANDON IN PLACE
REMOVE EXIST 3/4" METER
(BY CITY FORCES) - WATER PERMIT
REQUIRED
Subject: PolyLine
Page Index: 49
Color:
ex
ex
contractor to revisechannel of existingsewer manhole for theadded sewer connection.
provide pipe call out.
provide pipe call out.
INSTALL NEW 1" WATER SERVICE ANDMETER IN PLANTER
AAANNNNNNNFOREST TERRACE PLATCUT AND CAP EXISTING WATERSERVICE AND ABANDON IN PLACEREMOVE EXIST 3/4" METER(BY CITY FORCES) - WATER PERMITREQUIRED
Subject: Typewritten Text
Page Index: 49
Color:
8"
Subject: Line
Page Index: 49
Color:
Subject: PolyLine
Page Index: 49
Color:
Subject: Line
Page Index: 49
Color:
Subject: Callout
Page Index: 49
Color:
see the water detail 43
Subject: Text Box
Page Index: 49
Color:
W-404807
Subject: Text Box
Page Index: 49
Color:
S-404807
Subject: Text Box
Page Index: 49
Color:
WWP-27-4048
Subject: Text Box
Page Index: 49
Color:
WTR-27-4048
Subject: Text Box
Page Index: 50
Color:
S-404808
50 (2)
8"
see the water detail43
E WITH CITY OF RENTON STANDA
NNNNNNNW-404807
IN COMPLIANCE WITH C
A-NNN
S-404807
F WWP-27-4048AAANNNNNNNWTR-27-4048MPLIANCE WITH CITY OF RENTON
A-NNNNNNNS-404808
Subject: Text Box
Page Index: 50
Color:
WWP-27-4048
Subject: Text Box
Page Index: 51
Color:
S-404809
51 (4)
Subject: Text Box
Page Index: 51
Color:
W-404808
Subject: Text Box
Page Index: 51
Color:
WWP-27-4048
Subject: Text Box
Page Index: 51
Color:
WTR-27-4048
Subject: Text Box
Page Index: 52
Color:
W-404809
52 (4)
Subject: Text Box
Page Index: 52
Color:
S-404810
Subject: Text Box
Page Index: 52
Color:
WWP-27-4048
Subject: Text Box
Page Index: 52
Color:
WTR-27-4048
Subject: Text Box
Page Index: 53
Color:
W-404810
53 (2)AAANNNNNNNWWP-27-4048IN COMPLIAN
A-
S-404809
MPLIANCE WITH CITY OF RENTON
A-NNNNNNNW-404808
F WWP-27-4048AAANNNNNNNWTR-27-4048MPLIANCE WITH CITY OF RENTON
A-NNNNNNNW-404809
IN COMPLIANC
A-N
S-404810
WWP-27-4048AAANNNNNNNWTR-27-4048MPLIANCE WITH CITY OF RENTON
A-NNNNNNNW-404810
Subject: Text Box
Page Index: 53
Color:
WTR-27-4048
Subject: Text Box
Page Index: 54
Color:
R-404843
54 (2)
Subject: Text Box
Page Index: 54
Color:
TED-40-4048
Subject: Text Box
Page Index: 55
Color:
revise street tree location revised utility (i.e. street
lights, fire hydrant, etc.) and sign placements
(Typ)
55 (13)
Subject: Text Box
Page Index: 55
Color:
R-404844
Subject: Text Box
Page Index: 55
Color:
TED-40-4048
Subject: Cloud+
Page Index: 55
Color:
Move tree north within planter strip alignment
Subject: Cloud+
Page Index: 55
Color:
Move tree north within planter strip alignment
Subject: Cloud+
Page Index: 55
Color:
Provide groundcover planting on all terrace levels
and shrubs on terraces that are shown without
trees
Subject: Text Box
Page Index: 55
Color:
Provide split rail fencing around tree tracts with
signage identifying the area is a tree protection
tract. See sample detail on sheet L4. Fencing shall
not block access from NE 27th to the power
easement.AAANNNNNNNWTR-27-4048OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404843
AAANNNNNNNTED-40-4048T
revise street tree location revised utility (i.e. streetlights, fire hydrant, etc.) and sign placements (Typ)
OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404844
AAANNNNNNNTED-40-4048VVV
VVV
PPPP
P
PPPPPPPMMMMFO
Move tree northwithin planter stripalignment
VVV
VV
PPPPPMMMMFOREST T
Move tree northwithin planter stripalignment
VVVRRRVVRPPPPPPPMMMMMMPPPPPMMMMPPPMMMMMMMMPAAANNNNNNNFOREST TERRACE PLATNOTES:1.SEE L3 FOR PLANT SCHEDULE.2.STREET TREE LAYOUT IS BASED ON PHYSICALCONSTRAINTS OF DRIVEWAYS AND UTILITYCLEARANCES. DRIVEWAY LOCATIONS ARE SUBJECT TOMODIFICATION.3.STREET TREE SPECIES ARE SELECTED FROM THE CITYOF RENTON APPROVED STREET TREE LIST.4.CALIPER IS MEASURED AS DIAMETER AT BREASTHEIGHT.
Provide groundcoverplanting on all terracelevels and shrubs onterraces that areshown without trees
FO
JECT TO
HE CITY
T
Provide split rail fencing aroundtree tracts with signage identifyingthe area is a tree protection tract.See sample detail on sheet L4.Fencing shall not block access fromNE 27th to the power easement.
Subject: Arrow
Page Index: 55
Color:
Subject: Cloud+
Page Index: 55
Color:
Relocate driveway to east side in order to provide
space for street tree along frontage. No parking
signs are spaced at every 200-ft and is likely not
needed here.
Subject: Diameter Measurement
Page Index: 55
Color:
40'-0"
Subject: Text Box
Page Index: 55
Color:
Landscape Center Island
per cul-de-sac standard
Subject: Cloud+
Page Index: 55
Color:
Pedestrian access shall be maintained along the
easement
Subject: Cloud+
Page Index: 55
Color:
pedestrian access shall be maintained along
easement
Subject: Cloud+
Page Index: 56
Color:
street trees shall be placed as not to block street
signs.
56 (14)
Subject: Cloud+
Page Index: 56
Color:
clean up.
Subject: Cloud+
Page Index: 56
Color:
Explore relocating this light standard in order to
plant street tree similar to street tree location of
west side of bulb
Subject: Cloud+
Page Index: 56
Color:
Replace street tree type with large species from
approved tree list as spacing is increased.
P
PC MMMMM MMMMM MMMMM
PPPPPP
C
C
PP
PP
MMMMM
PPC PPCMMMMMMMMMMMMMMM
Relocate drivewayto east side in orderto provide space forstreet tree alongfrontage. Noparking signs arespaced at every200-ft and is likelynot needed here.
40'-0"
V PPPPCC
Landscape Center Island
per cul-de-sac standard
VVV RRRVVV RRR VVVMMMP PPPPPPPPPPPPPPPP
Pedestrian accessshall be maintainedalong the easement
RRR RRR RRR
VVVVVV
VV
VV V
pedestrian accessshall be maintainedalong easement
PPC PP
P
PCC
PP PPC PP
PPCC
MMMMM
MMMMM
RRR P
MMMM
MMMMM
street trees shall beplaced as not toblock street signs.
Dial 811Callbefore you dig.below.Know what's
clean up.
MMMMM MMMMM MMMMM
MMMMMMMMMMPPPPCC PP PPCC
PP PPCC PPC
Explore relocating this light standard inorder to plant street tree similar to streettree location of west side of bulb
MMMMMMMMMMPPPPCVRRRVMMM
MMM
MMM
VVVVV
VVVVV
PP PPCC PP PPCC PPCMMMMMAAANNNNNNNFOREST TERRACE PLATFO
Replace street treetype with largespecies fromapproved tree list asspacing is increased.
Subject: Cloud+
Page Index: 56
Color:
Per Condition #6: The revised landscape plan shall
also provide specifications for aesthetic treatment
of the exposed vault wall along the northern
perimeter of the vault in lieu of providing a
substantive landscape screen. The treatment shall
be a veneer surface attached to the vault that
consists of brick detailing such as a garden wall
bond with diagonal patterns or a comparable
surface approved by the Current Planning Project
Manager.
Subject: Cloud+
Page Index: 56
Color:
Provide shrubs interspersed with trees along lot 3
eastern front yard.
Subject: Cloud+
Page Index: 56
Color:
Per RMC 4-4-070H.6 perimeter landscaping
surrounding storm drainage facilities shall be a
minimum of 15-feet in width. The staff
recommendation reduced that width along the
northern border in exchange for a high quality
decorative wall on the exposed vault face. The
remaining west, south, and east perimeters shall
provide the 15-foot width of trees, shrubs, and
ground cover.
Subject: Cloud+
Page Index: 56
Color:
Provide trees, shrubs, and groundcover within lock
and load terraces to comply with condition #12.
Subject: Text Box
Page Index: 56
Color:
R-404844
Subject: Text Box
Page Index: 56
Color:
TED-40-4048
Subject: Callout
Page Index: 56
Color:
Continue landscape planter
Subject: Cloud+
Page Index: 56
Color:
Move these two trees further north to provide
consistent spacing along street. No parking sign to
be relocated.
Subject: Arrow
Page Index: 56
Color:
PP PPCCMMMMM
MMMMM RRR
RRRPPPPP
FOREST TERRACE PLAT
NOTES:1.SEE L3 FOR PL 2.STREET TREE
Per Condition #6: The revised landscape plan shall alsoprovide specifications for aesthetic treatment of theexposed vault wall along the northern perimeter of thevault in lieu of providing a substantive landscapescreen. The treatment shall be a veneer surfaceattached to the vault that consists of brick detailingsuch as a garden wall bond with diagonal patterns or acomparable surface approved by the Current PlanningProject Manager.
MMMMMMMMMMPPC
VRRRVMMM
MMM
MMM
VVVVV
VVVVV
PP PPCC PP PPCC PPCMMMMM
FO
Provide shrubsinterspersed withtrees along lot 3eastern front yard.
P
PPC PP PPCC
PP PPCC PP PPCC
PPPC
MMMMM MMMMM RRR RRRPPPPP
PPPPPPPPPPPPPPPPPPPPPPPPPPVV
MMMMMMMMMM
FOREST TERRACE PLAT
NOTES:1.SEE L3 FOR PLANT SC 2.STREET TREE LAYOU CONSTRAINTS OF DR CLEARANCES. DRIVEW MODIFICATION.3.STREET TREE SPECIE OF RENTON APPROVE 4.CALIPER IS MEASURE HEIGHT.
Per RMC 4-4-070H.6 perimeterlandscaping surrounding stormdrainage facilities shall be aminimum of 15-feet in width. Thestaff recommendation reducedthat width along the northernborder in exchange for a highquality decorative wall on theexposed vault face. Theremaining west, south, and eastperimeters shall provide the15-foot width of trees, shrubs,and ground cover.
PMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMVRRRVMMM
MMM
MMM
VVVVV
VVVVV
PPPPCC PP PPCC PPPPCC
PPC PPPPPPPPCCCC PP PPCC PP PPCC PPPPCC
PPPC
MMMMM MMMMMRRR RRRPPPPP
PPPPPPPPPPPPPPPPPPPPPPPPPPVVMMMMMMMMMM
FOREST TERRACE PLAT K
NOTES:1.SEE L3 FOR PLANT SCHEDULE.2.STREET TREE LAYOUT IS BASED ON CONSTRAINTS OF DRIVEWAYS AND CLEARANCES. DRIVEWAY LOCATION MODIFICATION.3.STREET TREE SPECIES ARE SELECT OF RENTON APPROVED STREET TRE 4.CALIPER IS MEASURED AS DIAMETE HEIGHT.
Provide trees,shrubs, andgroundcover withinlock and loadterraces to complywith condition #12.
OMPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404844
AAANNNNNNNTED-40-4048VVVVV
Continue landscapeplanter
MMMMM
VRRRVMMM
MMM
VVVVV
PP PPCC
Move these twotrees further northto provideconsistent spacingalong street. Noparking sign to berelocated.
MMMMM MMMMM MMMMM
MMMMM
VRRRVMMM
M
MM PPC
PPC PPPP
PPPP
CCCC PPC
Subject: Text Box
Page Index: 56
Color:
Minimum tree density for this lot is eight (8) trees
Subject: Cloud+
Page Index: 57
Color:
Tree retention worksheet indicates 540 trees at
3-inch caliper to meet replacement requirements.
57 (5)
Subject: Cloud+
Page Index: 57
Color:
Trees that contain 3-inches DBH do not need to be
staked.
Subject: Text Box
Page Index: 57
Color:
Plan does not comply with Condition #7. Identify
the number of trees that are already required by
the landscape code regardless of replacement
requirements (e.g. street trees, street frontage
landscaping, storm drainage landscaping). Those
required trees receive 50-percent replacement
credit.
Subject: Text Box
Page Index: 57
Color:
R-404845
Subject: Text Box
Page Index: 57
Color:
TED-40-4048
Subject: Text Box
Page Index: 58
Color:
Provide detail of lock and load wall per condition
#12. See note in Terra wall design package.
Provide detail of rockery on Perkins property to
comply with condition #13.
58 (7)
Subject: Text Box
Page Index: 58
Color:
R-404846
Subject: Text Box
Page Index: 58
Color:
TED-40-4048
1"
Minimum tree density for thislot is eight (8) trees
TOTAL PROPOSED TREE COUNT: 540
B & B 3" DBH LOW NATIVE EVERGREEN 83
B & B 3" DBH MEDIUM NATIVE EVERGREEN 92
CONT.SIZE WATER USE ORIGIN FOLIAGE QTY
AM B & B 2" DBH MEDIUM N. AM. NATIVE DECIDUOUS 17
E B & B 2" DBH MEDIUM EXOTIC DECIDUOUS 45
CONT.WATER USE ORIGIN FOLIAGE SPACING QTY
GWOOD #2 MEDIUM NATIVE DECIDUOUS 72" o.c.40
#2 LOW NATIVE EVERGREEN 48" o.c.157
Tree retention worksheet indicates540 trees at 3-inch caliper to meetreplacement requirements.FOREST TERRACE PLATTREES
STREET T
SHRUBS
C
PLAN
Trees that contain3-inches DBH do notneed to be staked.
Plan does not comply with Condition #7.Identify the number of trees that are alreadyrequired by the landscape code regardlessof replacement requirements (e.g. streettrees, street frontage landscaping, stormdrainage landscaping). Those required treesreceive 50-percent replacement credit.
MPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404845
AAANNNNNNNTED-40-4048Provide detail of lock and load wall percondition #12. See note in Terra walldesign package.
Provide detail of rockery on Perkinsproperty to comply with condition #13.
MPLIANCE WITH CITY OF RENTON
A-NNNNNNNR-404846
AAANNNNNNNTED-40-4048
Subject: Snapshot
Page Index: 58
Color:
Subject: Snapshot
Page Index: 58
Color:
Subject: Snapshot
Page Index: 58
Color:
Subject: Text Box
Page Index: 58
Color:
Provide details of root barrier system within planter
strip for street trees to comply with condition of
approval #5
Subject: Text Box
Page Index: 59
Color:
W-404811
59 (2)
Subject: Text Box
Page Index: 59
Color:
TED-40-4048
Subject: Text Box
Page Index: 60
Color:
show the following:
1. point of connection with dcva
2. confirm irrigation meter(s) is sized to
accommodate the irrigation needs.
3. show irrigation street crossings (all crossing
shall be made via a schedule 80 conduit). Ensure
utilities separations are met.
60 (6)
Subject: Callout
Page Index: 60
Color:
adjust text
Subject: Callout
Page Index: 60
Color:
what does this refer too?
Subject: Callout
Page Index: 60
Color:
adjust per plat conditions
EVERGREEN TREE PLANTING/STAKING DETAILNOT TO SCALE
D BEFORE MULCH )TAINER and LARGER
1/21/19
DETAIL
LAT
LODGEPOLE STAKES; TIE AT APPROX. 1/3 TO 1/2GHT OF TREE WITH FLEXIBLE RUBBER TIE IN FIGURE
Provide details of root barriersystem within planter strip forstreet trees to comply withcondition of approval #5
MPLIANCE WITH CITY OF RENTON
A-NNNNNNNW-404811
AAANNNNNNNTED-40-4048show the following:1. point of connection with dcva2. confirm irrigation meter(s) is sized to accommodatethe irrigation needs.3. show irrigation street crossings (all crossingshall be made via a schedule 80 conduit). Ensureutilities separations are met.AAANNNNNNNFOREST TERRACE PLATadjust text
what does this refertoo?
CE PLAT adjust per platconditions
Subject: Text Box
Page Index: 60
Color:
W-404812
Subject: Text Box
Page Index: 60
Color:
WTR-27-4048
Subject: Text Box
Page Index: 61
Color:
W-404813
61 (2)
Subject: Text Box
Page Index: 61
Color:
WTR-27-4048
Subject: Text Box
Page Index: 62
Color:
W-404814
62 (2)
Subject: Text Box
Page Index: 62
Color:
WTR-27-4048
Subject: Text Box
Page Index: 63
Color:
R-404847
63 (2)
Subject: Text Box
Page Index: 63
Color:
TED-40-4048
Subject: Text Box
Page Index: 64
Color:
R-404848
64 (2)
MPLIANCE WITH CITY OF RENTON
A-NNNNNNNW-404812
AAANNNNNNNWTR-27-4048MPLIANCE WITH CITY OF RENTON
A-NNNNNNNW-404813
AAANNNNNNNWTR-27-4048OMPLIANCE WITH CITY OF RENTO
A-NNNNNNNW-404814
AAANNNNNNNWTR-27-4048R-404847
TED-40-4048R-404848
Subject: Text Box
Page Index: 64
Color:
TED-40-4048
Subject: Text Box
Page Index: 65
Color:
R-404849
65 (2)
Subject: Text Box
Page Index: 65
Color:
TED-40-4048
Subject: Text Box
Page Index: 66
Color:
R-404850
66 (2)
Subject: Text Box
Page Index: 66
Color:
TED-40-4048
Subject: Text Box
Page Index: 67
Color:
R-404851
67 (2)
Subject: Text Box
Page Index: 67
Color:
TED-40-4048
Subject: Text Box
Page Index: 68
Color:
R-404852
68 (2)
Subject: Text Box
Page Index: 68
Color:
TED-40-4048TED-40-4048R-404849
TED-40-4048R-404850
TED-40-4048R-404851
TED-40-4048R-404852
TED-40-4048
Subject: Text Box
Page Index: 69
Color:
R-404853
69 (2)
Subject: Text Box
Page Index: 69
Color:
TED-40-4048
Subject: Text Box
Page Index: 70
Color:
R-404854
70 (2)
Subject: Text Box
Page Index: 70
Color:
TED-40-4048
Subject: Text Box
Page Index: 71
Color:
revise street lighting to provide a minimum of 0.3 fc
with the sidewalk and minimum 0.8 fc within the
intersections.
generally street lights can be placed every 55 to 60
feet on alternating sides in order to achieve 0.3 fc
on sidewalks.
see landscape plan for additional notes regarding
placement of street lights and street trees.
71 (9)
Subject: Callout
Page Index: 71
Color:
add columns for latitude and longitude
Subject: Callout
Page Index: 71
Color:
Add column for pole ID numbers
Subject: Callout
Page Index: 71
Color:
Fixture type is wrong if using STD. detail 116.1
Subject: Text Box
Page Index: 71
Color:
internal residential roadways shall install street
lights as shown on standard plan 116 with 44 W
LED
2
R-404853
420'
430'
440'TED-40-4048R-404854
NOTE:ALL LO FOUND ACCO (FIGUR DEPEN
390'
385'TED-40-4048revise street lighting to provide a minimum of 0.3 fc with thesidewalk and minimum 0.8 fc within the intersections.
generally street lights can be placed every 55 to 60 feet onalternating sides in order to achieve 0.3 fc on sidewalks.
see landscape plan for additional notes regardingplacement of street lights and street trees.
add columns for latitude and longitude
Add column forpole ID numbers
Fixture type is
wrong if usingSTD. detail 116.1
internal residentialroadways shallinstall street lightsas shown onstandard plan 116with 44 W LED
Subject: Callout
Page Index: 71
Color:
arterial 117.1
Subject: Callout
Page Index: 71
Color:
existing overhead power to be installed
underground
Subject: Text Box
Page Index: 71
Color:
T-404803
Subject: Text Box
Page Index: 71
Color:
TRO-41-4048
Subject: Cloud+
Page Index: 72
Color:
minimum maintained (not an average)
72 (4)
Subject: Text Box
Page Index: 72
Color:
8. Contact Eric Cutshall Transportation Manager
for asset ID number at 425-430-7423
Subject: Text Box
Page Index: 72
Color:
TRO-41-4048
Subject: Text Box
Page Index: 72
Color:
T-404804
Subject: Text Box
Page Index: 73
Color:
update to current std details
73 (4)
Subject: Cloud+
Page Index: 73
Color:
see notes on previous sheet. provide standard
detail 116
arterial 117.1
existing overheadpower to be installedunderground
T-404803
TRO-41-4048minimum maintained(not an average)
8. Contact Eric Cutshall Transportation Manager for asset ID number at 425-430-7423
TRO-41-4048T-404804
update to current std details
see notes onprevious sheet.provide standarddetail 116
Subject: Text Box
Page Index: 73
Color:
R-404855
Subject: Text Box
Page Index: 73
Color:
TED-40-4048
Subject: Cloud+
Page Index: 80
Color:
geotechnical report and sepa anticipates export of
material. please reconcile.
80 (1)
Subject: Cloud+
Page Index: 86
Color:
update property boundary
86 (1)
Subject: Callout
Page Index: 88
Color:
aerial topo shows this area as upstream tributary
to the site. include the analysis or provide
documentation that this area is not tributary.
88 (3)
Subject: Polygon
Page Index: 88
Color:
Subject: Cloud+
Page Index: 88
Color:
add the area graded for the roadway
Subject: Cloud+
Page Index: 90
Color:
udpate project boundary
90 (1)
Subject: Cloud+
Page Index: 92
Color:
adjust project boundary
92 (1)
R-404855
TED-40-4048nk. The outfall from the detention tank and the detention vault discharg or basic water quality treatment. The discharge from the StormFilter continue nion Ave NE which routes to a drainage swale along Union Ave NE, wh an existing catch basin at the intersection of Union Ave NE and SE 95th ontinues within the existing drainage system outlets onto a hillside on the no ay, which will eventually flow to May Creek.
will be mass graded to balance cut and fills so that all lots will be level flat p lding. Site drainage designs are based on the 2017 Renton Surface Wa WDM). Please refer to Section 4.0 of this TIR for further details regarding th n.
geotechnical report and sepa anticipatesexport of material. please reconcile.
update propertyboundary
aerial topo shows this area as upstreamtributary to the site. include the analysisor provide documentation that this areais not tributary.
FOREST TERR
add the area gradedfor the roadway
udpate projectboundary
adjust projectboundary
Subject: Cloud+
Page Index: 94
Color:
adjust site boundary
94 (1)
Subject: Cloud+
Page Index: 96
Color:
adjust site boundary
96 (1)
Subject: Cloud+
Page Index: 101
Color:
on-site
101 (5)
Subject: Cloud+
Page Index: 101
Color:
flow control facilities shall be designed to flow
control duration standard matching forested site
conditions (Level 2 is king county standards)
requiring the developed site conditions to match
50% of the 2-year flow up to the full 50-year peak
flow. the developed peak discharge rates shall not
exceed predeveloped peak discharge rates for the
2- and the 10-year return periods.
Subject: Cloud+
Page Index: 101
Color:
provide o&m manual
Subject: Callout
Page Index: 101
Color:
provide backwater analysis.
Subject: Text Box
Page Index: 101
Color:
Applicant has proposed to restrict the lots to 45%
of the lot for impervious surface. Keep in mind at
this point you will not receive BMP credit for a
reduced impervious surface credit. Individual lot
BMP credits are reviewed at building permit
review.
by restricting the lots more than zoning allows a
Reduced impervious surface covenant is required
to ensure the capacity of the vault is not exceeded.
Subject: Text Box
Page Index: 102
Color:
address special requirement #6
102 (1)
adjust site boundary
adjust site boundary
No. 8: Water Quality T a
No. 9: Flow Control BMPs T m r i T d c A
on-site
2.1 Analysis of the Core Requirements and Special Requirements
CORE REQUIREMENTS HOW PROJECT HAS ADDRESSED REQUIREMENT No. 1: Discharge at Natural Location Stormwater from the site will be detained within one of two drainage facilities and treated within a single drainage facility prior to being discharged May Creek, its natural location. No. 2: Off-Site Analysis The off-site analysis has been included within Section 3.0 of this Technical Information Report. No. 3: Flow Control The Detention Vault and Detention Tank have been designed for Level 2 flow control and released matching predeveloped conditions for 50% of the 2 year to the 50-year flow. No. 4: Conveyance System The conveyance and backwater analysis will be designed per the 2017 RSWDM for the proposed storm drainage system, and will be included in Section 5.0 of this Technical Information Report at final engineering. No. 5: Erosion and Sediment Control Temporary erosion control measures for this project will include: stabilized construction entrances, perimeter runoff control, cover practices, sedimentation facilities, and construction sequencing. No. 6: Maintenance and Operations The City will own and maintain the public drainage facility for this project. An Operations and Maintenance Manual, if required, will be provided in Section 10.0 of this Technical Information Report.
flow control facilities shall be designed to flow control duration standardmatching forested site conditions (Level 2 is king county standards) requiring thedeveloped site conditions to match 50% of the 2-year flow up to the full 50-yearpeak flow. the developed peak discharge rates shall not exceed predevelopedpeak discharge rates for the 2- and the 10-year return periods.
imeter runoff control, cover construction sequencing.
ublic drainage facility for this e Manual, if required, will be al Information Report.
by the City of Renton using
er for basic water quality in
mpervious Surface credit to uirements (specifically the ired reducing the Allowable
provideo&mmanual
sis has been included within Section 3.0 of this ion Report.
ult and Detention Tank have been designed for l and released matching predeveloped conditions ar to the 50-year flow.
and backwater analysis will be designed per the the proposed storm drainage system, and will be n 5.0 of this Technical Information Report at final
n control measures for this project will include: ction entrances, perimeter runoff control, cover tation facilities, and construction sequencing.
and maintain the public drainage facility for this ions and Maintenance Manual, if required, will be n 10.0 of this Technical Information Report.
mpleted as required by the City of Renton using antity Worksheet.
provide backwateranalysis.
18396.003.TIR.doc
drainage facility has been sized for 45% max impervious coverage per lot. All lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system. All disturbed pervious surfaces shall be to the Soil Amendment standards. See section 4.0 of this Technical Information Report for further details. All disturbed onsite soils will be amended per 2017 RSWDM requirements.
Applicant has proposed to restrict the lots to 45%of the lot for impervious surface. Keep in mind atthis point you will not receive BMP credit for areduced impervious surface credit. Individual lot BMP credits arereviewed at building permit review.
by restricting the lots more than zoning allows a Reducedimpervious surface covenant is required to ensure the capacity ofthe vault is not exceeded.
No. 4: Source Controls Source controls project as applic
No. 5: Oil Control This site is not in the 2017 RS necessary.
address special requirement #6
Subject: Cloud+
Page Index: 105
Color:
geotechnical report and sepa anticipates export of
material. please reconcile.
105 (5)
Subject: Cloud+
Page Index: 105
Color:
revise to "flow control duration standard matching
forested condition"
Subject: Cloud+
Page Index: 105
Color:
east
Subject: Cloud+
Page Index: 105
Color:
west
Subject: Cloud+
Page Index: 105
Color:
east
Subject: Cloud+
Page Index: 117
Color:
revise per comments on the upstream drainage
basin map (page 48 of Pdf)
117 (4)
Subject: Cloud+
Page Index: 117
Color:
North
Subject: Cloud+
Page Index: 117
Color:
northern
Subject: Cloud+
Page Index: 117
Color:
north
second tax parcel 042305-9114. The site is located at 2611 Union Ave NE Renton, 98059 in a portion of Section 4, Township 23 North, Range 5 East, Willamette he City of Renton, Washington.
d portion of the site consists of two single-family homes with driveways and a PSE evelopment will take place outside of the PSE Easement and the portion of the site eded to the Perkins property.
rdered by single family homes to the North and West, Union Ave NE to the East and s Elementary School to the South. Onsite soils were found to be a majority classified ry gravelly sandy loam and Alderwood gravelly sandy loam filling in the edges. o the soils map in Section 1, Figure 1.0.4. All drainage calculations were modeled
hy on site is a very steep hillside with slopes of up to 50 percent in some areas. The slopes to the North with elevations ranging from 342 to 442 across the site. The e mass graded with cuts and fill balanced on site. A 100-foot wide PSE easement the eastern portion of the site. Portions of the site will be undisturbed in an attempt any existing trees as possible.
d drainage facilities are required to meet the requirements of the 2017 Renton r Design Manual (RSWDM). The drainage design shall meet at a minimum the Flow Control (previously known as Level 2) and Basic Water Quality Treatment. n vault is proposed to address a majority of the stormwater needs of the site while a k is proposed to address the stormwater that flows off Road B and Tract B. detention facilities, the controlled stormwater will be conveyed to a StormFilter for uality treatment before discharging to an existing drainage system which drains to n existing condition there is an offsite basin that flows through the site. This area is routed through the developed site before being released through a dispersal trench
geotechnical report and sepa anticipatesexport of material. please reconcile.
as till soils.
The topography on site is a very steep hillside with slopes of up to 50 percen site generally slopes to the North with elevations ranging from 342 to 442 project will be mass graded with cuts and fill balanced on site. A 100-foot runs through the eastern portion of the site. Portions of the site will be undis to retain as many existing trees as possible.
The proposed drainage facilities are required to meet the requirements Surface Water Design Manual (RSWDM). The drainage design shall mee Conservation Flow Control (previously known as Level 2) and Basic Wate One detention vault is proposed to address a majority of the stormwater nee detention tank is proposed to address the stormwater that flows off Ro Following the detention facilities, the controlled stormwater will be conveyed basic water quality treatment before discharging to an existing drainage sys May Creek. In existing condition there is an offsite basin that flows through t collected and routed through the developed site before being released throug into the PSE easement. Please refer to Section 4.0 for detailed drainage calc
UPSTREAM DRAINAGE ANALYSIS
The property is located on a hillside and bordered by Union Ave NE to the Elementary School to the South, two large lots to the east and north. Since t hillside that falls south to north the only possible contributing basins co property and some undeveloped portion to the west of the school. The schoo the main school building, a large parking lot, several out buildings and a playfield. The contributing area west of the school property is a forested area to the Puget Sound Energy power easement.
revise to "flow control duration standardmatching forested condition"
E to the west, Sierra Heigh
Since the property is on th asins come from the scho e school property consists
east
d bordered by Union Ave NE t ge lots to the east and north. S nly possible contributing basinto the west of the school. The s ng lot, several out buildings
west
nce the property is on the s come from the school chool property consists of nd a large baseball and
area that continues west
perty as it flows down the yfield flows to one of the as shown in the following
east
4.1 Existing Site Hydrology The project site is located on the forested hillside West of Union Ave NE and South of Sierra Heights Elementary School. A 100' PSE Easement bisects the property on the western portion of the site. Stormwater generally lands on the site and flows from the South to the North down the hillside and onto the abutting southern properties. There is a catch basin along Union Ave NE in the Southeast corner of the site that drains stormwater from the School to the south onto the site. This forms a small creek that flows down the hill and disperses across the site. The proposed detention systems will be used to mitigate all the stormwater on site and discharge it downstream on Union Ave NE. For the purposes of modeling, the existing basin area will be modeled as till forest with moderate slope totaling 13.25 acres.
Predeveloped Tank Basin Impervious Pervious Total Area 0.00 Ac 0.54 Ac(1) 0.54 Ac Notes: 1. Modeled as Forested Moderate slope Predeveloped Vault Basin
Impervious Pervious Total Area 0.00 Ac 12.71 Ac(1) 12.71 Ac Notes: 2. Modeled as Forested Moderate slope
revise per commentson the upstreamdrainage basin map(page 48 of Pdf)
E and South of Sierra the western portion of
to the North down the ng Union Ave NE in the
North
ite Hydrology
site is located on the forested hillside We mentary School. A 100' PSE Easement bise mwater generally lands on the site and flo nto the abutting southern properties. There rner of the site that drains stormwater from l creek that flows down the hill and dispers be used to mitigate all the stormwater on s
northern
ed hillside West of Union Ave NE and South of Easement bisects the property on the western po he site and flows from the South to the North do perties. There is a catch basin along Union Ave NE ormwater from the School to the south onto the sit ll and disperses across the site. The proposed de ormwater on site and discharge it downstream on he existing basin area will be modeled as till fore
north
Subject: Text Box
Page Index: 118
Color:
Applicant has proposed to restrict the lots to 45%
of the lot for impervious surface. Keep in mind at
this point you will not receive BMP credit for a
reduced impervious surface credit. Individual lot
BMP credits are reviewed at building permit
review.
118 (5)
Subject: Cloud+
Page Index: 118
Color:
west
Subject: Cloud+
Page Index: 118
Color:
the Flow Control Duration Standard Matching
Forest Conditions
Subject: Callout
Page Index: 118
Color:
Verify with geotech that bioretention is feasible.
Subject: Callout
Page Index: 118
Color:
did you apply reduced impervious surface for BMP
credits on the facilities?
Subject: Cloud+
Page Index: 119
Color:
revise as necessary per comments on upstream
drainage map
119 (4)
Subject: Cloud+
Page Index: 119
Color:
bioretention can be placed in the cul-de-sac island
as there is are no proposed utilities in this area.
see comments on sheet 21 of the civil construction
plans.
Subject: Cloud+
Page Index: 119
Color:
revise as necessary per comments on upstream
drainage map and developed basin map
Subject: Callout
Page Index: 119
Color:
Revise as necessary based on restricted footprint
bmp comments.
18396.003.TIR.doc
structure BMP's will address runoff from roads and sidewalks within the Right-of-he size of the proposed roads and sidewalk system, the relative elevation difference e lack of viable undeveloped land, full dispersion was deemed not feasible for this ted and full infiltration methods were also deemed infeasible per the results of the eport, which is included in Section 6.1 of this TIR. Therefore, Bioretention facilities sed wherever possible in the planters along onsite road systems. Road B slopes rcent in order to meet existing grade and therefore cannot support any Bioretention requires slopes at 8 percent or less. NE 27TH PL has maximum road slopes of 6 me areas and can thus support the gentle slopes required for Bioretention swales. ion swales will be proposed for wherever they can fit between driveways, street hts, and fire hydrants proposed within the planter. Due to limitation caused by Applicant has proposed to restrict the lots to 45%of the lot for impervious surface. Keep in mind atthis point you will not receive BMP credit for areduced impervious surface credit. Individual lot BMPcredits are reviewed at building permit review.
will flow to a control structure he 2-year peak flow and up
h and east of the project. T portion of the site. A catchb asin area and route it to the
dispersal trench to continu
west
ormwater that drains onto the site will be routed around the site down Union Ave NE and will nnect back with the outfall catch basin. Due to the relative onsite elevations the stormwater will sent to one of two detention systems located on site.
ormwater generated by Road B in the center of the site will be routed to a detention tank in act B. A conveyance system consisting of catch basins and storm pipes will be constructed to llect drainage from the NE 27TH PL and route it to the detention tank.
e remaining stormwater generated by the lots and remaining roads will be routed to a detention ult located in Tract A. A conveyance system consisting of catch basins and storm pipes will be nstructed on the roadways to collect drainage from impervious areas and lots. All rooftop areas e to be routed to the front of the lots and tight lined to the stormwater conveyance system. The oposed detention vault has been sized for Conservation Flow Control Areas to mitigate tential downstream erosion hazards. The detention vault will flow to a control structure that will atch the predeveloped discharge rates from 50 percent of the 2-year peak flow and up to the full -year peak flow.
ere is an upstream contributing basin located offsite south and east of the project. This area w onsite and generally collects into a drain in the eastern portion of the site. A catchbasin with birdcage grate is positioned to collect the runoff from this basin area and route it to the northern rder of the site. There the runoff is dispersed through a dispersal trench to continue flowing wn the hill minimizing the existing condition.
ater quality will be provided for the entire site though a single StormFilter located downstream the detention tank and detention vault. Please refer to section 4.5 for further detail regarding ater quality treatment details and sizing information.
is project will be implementing BMP's for individual lots and plat infrastructure improvements in
the Flow Control Duration StandardMatching Forest Conditions
18396.003.TIR
assuming no treatment credit from these BMP's. As there is no treatment credit assigned to Individual lot BMP's, further discussion of the type of BMP and their implementation will addressed with the acquisition of the Building Permits.
The plat infrastructure BMP's will address runoff from roads and sidewalks within the RightWay. Due to the size of the proposed roads and sidewalk system, the relative elevation differe onsite and the lack of viable undeveloped land, full dispersion was deemed not feasible for site. Both limited and full infiltration methods were also deemed infeasible per the results of geotechnical report, which is included in Section 6.1 of this TIR. Therefore, Bioretention facili will be proposed wherever possible in the planters along onsite road systems. Road B slop down at 15 percent in order to meet existing grade and therefore cannot support any Bioretent facility which requires slopes at 8 percent or less. NE 27TH PL has maximum road slopes o percent in some areas and can thus support the gentle slopes required for Bioretention swa The Bioretention swales will be proposed for wherever they can fit between driveways, str tree, streetlights, and fire hydrants proposed within the planter. Due to limitation caused
Verify with geotechthat bioretention isfeasible.
order to satisfy Core Requirement #9. The r the individual lot Bmp requirements (speci reducing the Allowable impervious coverage allows 55% max impervious coverage per lo impervious coverage per lot.
Due to the poor infiltration capacity of onsi assuming no treatment credit from these BM Individual lot BMP's, further discussion of addressed with the acquisition of the Building
The plat infrastructure BMP's will address r Way. Due to the size of the proposed roads a onsite and the lack of viable undeveloped la site. Both limited and full infiltration methods geotechnical report, which is included in Sec will be proposed wherever possible in the down at 15 percent in order to meet existing facility which requires slopes at 8 percent o percent in some areas and can thus suppor The Bioretention swales will be proposed f tree, streetlights, and fire hydrants propos did you apply reducedimpervious surfacefor BMP credits onthe facilities?
landscape, requirements and utility placement bioretention swales were not utilized for this project. In addition to these Bioretention BMP's, all lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system and all disturbed soil will be amended to City of Renton standards. The upstream basin bypassing the site was modeled as follows: Ustream Bypass
Impervious Pervious Total Area 0.50 Ac(1) 6.37 Ac(2) (3) 6.87 Ac Notes: 1. Existing buildings and structures = 0.50 Ac 2. Modeled as till grass = 1.14 Ac 3. Modeled as Forested = 5.23 Ac The basin areas that are tributary to the detention tank and detention vault are as follows:
Detention Vault Impervious Pervious Total Area 5.07 Ac(1) 7.64 Ac(2) 12.71 Ac Notes: 1. Roads and Sidewalks = 2.15 Ac Lot Area @ 45% impervious = 2.63 Ac 2. Modeled as till grass = 7.64 Ac Mod = 3.67
revise asnecessary percomments onupstreamdrainage map
landscape, requirements and utility placement bioretention swales were not utilized for this project. In addition to these Bioretention BMP's, all lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system and all disturbed soil will be amended to City of Renton standards. The upstream basin bypassing the site was modeled as follows: Ustream Bypass
Impervious Pervious Total Area 0.50 Ac(1) 6.37 Ac(2) (3) 6.87 Ac Notes: 1. Existing buildings and structures = 0.50 Ac 2. Modeled as till grass = 1.14 Ac 3. Modeled as Forested = 5.23 Ac
bioretention can be placed in the cul-de-sac island as there is are no proposedutilities in this area. see comments on sheet 21 of the civil construction plans.
The basin areas that are tributary to the detention tank and detention vault are as follows:
Detention Vault
Impervious Pervious Total Area 5.07 Ac(1) 7.64 Ac(2) 12.71 Ac Notes: 1. Roads and Sidewalks = 2.15 Ac Lot Area @ 45% impervious = 2.63 Ac 2. Modeled as till grass = 7.64 Ac Mod = 3.67 Flat = 3.97 Detention Tank
Impervious Pervious Total Area 0.54 Ac(1) 0.00 Ac(2) 0.54 Ac Notes: 1. Roads and Sidewalks = 0.54 Ac 2. There is no contributing pervious area
For detention tank and detention pond WWHM2012 design calculations please refer to section 4.4. For Water Quality facility sizing information, please see section 4.5.
revise as necessaryper comments onupstream drainagemap and developedbasin map
the detention tank and detention vault are as follows:
Detention Vault
Pervious Total Area 7.64 Ac(2) 12.71 Ac
5 Ac s = 2.63 Ac Ac
Detention Tank
s Pervious Total Area
0.00 Ac(2) 0.54 Ac
4 Ac
Revise as necessarybased on restrictedfootprint bmp comments.
Subject: Area Measurement
Page Index: 120
Color:
614.281 sf
120 (14)
Subject: Area Measurement
Page Index: 120
Color:
1,288.344 sf
Subject: Area Measurement
Page Index: 120
Color:
24,127.75 sf
Subject: Callout
Page Index: 120
Color:
see comments on sheet 20 of civil construction
plans. may include this area as within upstream
bypass area.
Subject: Polygon
Page Index: 120
Color:
Subject: Area Measurement
Page Index: 120
Color:
11,204.05 sf
Subject: Area Measurement
Page Index: 120
Color:
5,995.688 sf
Subject: Callout
Page Index: 120
Color:
area highlighted will be captured by wall drains and
routed to the detention tank. revise detention
system modeling to account for this area storm
routing.
Subject: Area Measurement
Page Index: 120
Color:
6,204.191 sf
Subject: Callout
Page Index: 120
Color:
area to be routed to bypass line via wall drains.
revise vault calculations accordingly.
614.281 sf
1,288.346 sf
P
24,127.75 sf
see comments onsheet 20 of civilconstruction plans. may include this areaas within upstreambypass area.
11,204.1 sf
5,995.693 sf
P
FOREST TERRACE PLAT area highlighted will be captured by wall drains androuted to the detention tank. revise detention systemmodeling to account for this area storm routing.
6,204.193 sf
area to be routed to bypass linevia wall drains. revise vaultcalculations accordingly.
Subject: Polygon
Page Index: 120
Color:
Subject: Area Measurement
Page Index: 120
Color:
4,577.672 sf
Subject: Callout
Page Index: 120
Color:
area allowed to bypass vault. revise vault
calculations accordingly.
Subject: Text Box
Page Index: 120
Color:
see comments on upstream drainage basin map.
Subject: Cloud+
Page Index: 121
Color:
add area graded for the roadway or describe any
proposed basin swaps occurring onsite.
121 (4)
Subject: Cloud+
Page Index: 121
Color:
add area graded for the lots or describe any
proposed basin swaps occurring onsite.
Subject: Cloud+
Page Index: 121
Color:
add area graded for secondary and storm access
or describe any proposed basin swaps occurring
onsite.
Subject: Cloud+
Page Index: 121
Color:
area captured by the trench drain noted in city
comment on sheet 20 of the civil construction
plans.
Subject: Text Box
Page Index: 122
Color:
Applicant has proposed to restrict the lots to 45%
of the lot for impervious surface. Keep in mind at
this point you will not receive BMP credit for a
reduced impervious surface credit. Individual lot
BMP credits are reviewed at building permit
review.
122 (7)
Subject: Cloud+
Page Index: 122
Color:
update to reflect city of renton flow control
requirements.
4,577.697 sf
area allowed tobypass vault. revisevault calculationsaccordingly.
see comments on upstreamdrainage basin map.
FOREST TERRA
add area graded forthe roadway ordescribe anyproposed basinswaps occurringonsite.
add area graded for thelots or describe anyproposed basin swapsoccurring onsite.
P
E PLAT
add area graded forsecondary andstorm access ordescribe anyproposed basinswaps occurringonsite.
area captured by thetrench drain notedin city comment onsheet 20 of the civilconstruction plans.
18396.003.TIR.doc
Rainwater Harvesting Feasible but impractical, evaluated on an individual lot basis at developer’s discretion. Reduced Impervious Surface Credit This project is using the reduced impervious Surface credit to meet the individual lot Bmp requirements (specifically the restricted Footprint bmp), which required reducing the Allowable impervious coverage by 10 percent. This project is zoned r-4. The zone allows 55% max impervious coverage per lot. The drainage facility has been sized for 45% max impervious coverage per lot. The allowable impervious areas listed in this table are computed as 45 percent of the lot area. Native Growth Retention Credit Not feasible due to site constrains Perforated Pipe Connection All lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system. Rain Gardens Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR Soil Amendment All disturbed pervious surfaces shall be to the Soil Amendment standards. Tree Retention Credit The project will be mass graded during construction clearing all trees within the construction footprint. After clearing the site will contain approximately 119 of the existing trees. Vegetated Roofs All roofs are pitch roofs and are unsuitable for this BMP implication.
Applicant has proposed to restrict the lots to 45% of the lot for impervious surface.Keep in mind at this point you will not receive BMP credit for a reduced impervioussurface credit. Individual lot BMP credits are reviewed at building permit review.
ntirely till soils. A geotechnical analysis revealed that the ration. Please refer to the Geotechnical Report for ed July 19, 2017. The WWHM2012 program was used tion facilities were sized for Conservation Flow Control 7 RSWDM. Please see the WWHM2012 calculations m) of this report.
be providing BMP’s for individual lots and on-site roads. any sizing or treatment credits for the detention or water detention and water quality facilities have been sized for
update to reflect city of rentonflow control requirements.
Subject: Cloud+
Page Index: 122
Color:
lots of similar size and setbacks have been able to
accomplish elements of basic dispersion. bmps on
the lots will be reviewed on the building permit
application and will be determined at that time
whether they are feasible.
Subject: Callout
Page Index: 122
Color:
Conflicts with section 4.2 of this TIR.
Subject: Callout
Page Index: 122
Color:
The comparison impervious coverage is 4,000
square feet or the maximum allowed by the lot's
zoning, WHICHEVER IS LESS. Verify that 55% of
each lot is less than 4,000 sf, or else compare to
4,000 sf.
Subject: Callout
Page Index: 122
Color:
Provide restricted footprint bmp covenant limiting
impervious area for each lot.
Subject: Callout
Page Index: 122
Color:
Clearly designated restricted impervious areas for
each lot on recorded plat.
Subject: Text Box
Page Index: 123
Color:
update per previous comments.
123 (2)
Subject: Cloud+
Page Index: 123
Color:
0.01
Subject: Text Box
Page Index: 127
Color:
update basin areas per comments on upstream
basin map and developed basin map.
127 (1)
Subject: Cloud+
Page Index: 135
Color:
revise highlights so the values are visible.
135 (1)
quality facilities proposed. The proposed detention and water quality facilities have been sized for the full site.
This project is required to provide Basic Water Quality and will do so via a StormFilter designed following the 2017 RSWDM. See Section 4.5 (Water Quality System) for more detail. Core Requirement #9 – Onsite BMP Evaluation Full Dispersion Not feasible for this site due to lot constrains Full infiltration Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Limited Infiltration Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Basic Dispersion Not feasible for this site due to lot constrains. Farmland Dispersion Not applicable.
Bioretention Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Permeable Pavement Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Rainwater Harvesting Feasible but impractical, evaluated on an individual lot basis at developer’s discretion. Reduced Impervious Surface Credit This project is using the reduced impervious Surface credit to meet the individual lot Bmp requirements (specifically the restricted Footprint bmp), which required reducing the Allowable impervious coverage by 10 percent. This project is zoned r-4. The zone allows 55% max impervious coverage per lot. The drainage facility has been sized for 45% max impervious coverage per lot. The allowable impervious areas listed in this table are computed as 45 percent of the lot area. Native Growth Retention Credit Not feasible due to site constrains
Perforated Pipe Connection All lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system. Rain Gardens Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR Soil Amendment All disturbed pervious surfaces shall be to the Soil Amendment standards. Tree Retention Credit The project will be mass graded during construction clearing all trees within the construction footprint. After clearing the site will contain approximately 119 of the existing trees. Vegetated Roofs All roofs are pitch roofs and are unsuitable for this BMP implication.
lots ofsimilar sizeandsetbackshave beenable toaccomplish elementsof basicdispersion. bmps onthe lotswill bereviewedon thebuildingpermitapplicationand will bedeterminedat thattimewhetherthey arefeasible.
Limited Infiltration Not fea the res this TIRBasic Dispersion Not fea Farmland Dispersion Not app
Bioretention Not fea the res this TIRPermeable Pavement Not fea the res this TIRRainwater Harvesting Feasib discreti Reduced Impervious Surface Credit
This pr individu Footpri
Conflictswith section4.2 of this TIR.
18396.003.TIR.doc
this TIR. Limited Infiltration Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Basic Dispersion Not feasible for this site due to lot constrains. Farmland Dispersion Not applicable. Bioretention Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Permeable Pavement Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Rainwater Harvesting Feasible but impractical, evaluated on an individual lot basis at developer’s discretion. Reduced Impervious Surface Credit
This project is using the reduced impervious Surface credit to meet the individual lot Bmp requirements (specifically the restricted Footprint bmp), which required reducing the Allowable impervious coverage by 10 percent. This project is zoned r-4. The zone allows 55% max impervious coverage per lot. The drainage facility has been sized for 45% max impervious coverage per lot. The allowable impervious areas listed in this table are computed as 45 percent of the lot area. Native Growth Retention Credit Not feasible due to site constrains Perforated Pipe Connection All lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system. Rain Gardens Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR Soil Amendment All disturbed pervious surfaces shall be to the Soil Amendment standards. Tree Retention Credit The project will be mass graded during construction clearing all trees within the construction footprint. After clearing the site will contain approximately 119 of the existing trees. Vegetated Roofs All roofs are pitch roofs and are unsuitable for this BMP implication.
The comparisonimperviouscoverage is4,000 squarefeet or themaximumallowed by thelot's zoning,WHICHEVER ISLESS. Verifythat 55% ofeach lot is lessthan 4,000 sf,or else compareto 4,000 sf.
Dispersion Bioretention Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Permeable Pavement Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR. Rainwater Harvesting Feasible but impractical, evaluated on an individual lot basis at developer’s discretion. Reduced mpervious Surface Credit
This project is using the reduced impervious Surface credit to meet the individual lot Bmp requirements (specifically the restricted Footprint bmp), which required reducing the Allowable impervious coverage by 10 percent. This project is zoned r-4. The zone allows 55% max impervious coverage per lot. The drainage facility has been sized for 45% max impervious coverage per lot. The allowable impervious areas listed in this table are computed as 45 percent of the lot area. Native Growth Retention Credit Not feasible due to site constrains
Perforated Pipe Connection All lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system. Rain Gardens Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR Soil Amendment All disturbed pervious surfaces shall be to the Soil Amendment standards. ree Retention Credit The project will be mass graded during construction clearing all trees within the construction footprint. After clearing the site will contain approximately 119 of the existing trees. Vegetated Roofs All roofs are pitch roofs and are unsuitable for this BMP implication.
Provide restricted footprint bmp covenantlimiting impervious area for each lot.
18396.003.TIR.doc
Pavement the results of the geotechnical report, which is included in Section 6.1 of this TIR. Rainwater Harvesting Feasible but impractical, evaluated on an individual lot basis at developer’s discretion. Reduced Impervious Surface Credit
This project is using the reduced impervious Surface credit to meet the individual lot Bmp requirements (specifically the restricted Footprint bmp), which required reducing the Allowable impervious coverage by 10 percent. This project is zoned r-4. The zone allows 55% max impervious coverage per lot. The drainage facility has been sized for 45% max impervious coverage per lot. The allowable impervious areas listed in this table are computed as 45 percent of the lot area. Native Growth Retention Credit Not feasible due to site constrains Perforated Pipe Connection All lots will provide perforated stub out connections when tight lined to the proposed stormwater conveyance system. Rain Gardens Not feasible for this site due to soil condition unsuitable for infiltration per the results of the geotechnical report, which is included in Section 6.1 of this TIR Soil Amendment All disturbed pervious surfaces shall be to the Soil Amendment standards. Tree Retention Credit The project will be mass graded during construction clearing all trees within the construction footprint. After clearing the site will contain approximately 119 of the existing trees. Vegetated Roofs All roofs are pitch roofs and are unsuitable for this BMP implication. Clearly designated restricted imperviousareas for each lot on recorded plat.
zed to take in the storm water from all the onsite lots, all of acts A and F. provide flow control. The Detention Tanks wa ff from Road B and the access road in Tract A. WWHM ilities. Please refer to the WWHM2012 computations inclu The required and provided volumes for the Detention ws:
update per previous comments.
CFS)
Mitigated Developed
0.1
0.03
0.06
0.01
update basin areas percomments on upstreambasin map and developedbasin map.
revise highlights sothe values are visible.
Subject: Text Box
Page Index: 138
Color:
see comments related to basin area revisions.
water quality may be revised.
138 (1)
Subject: Text Box
Page Index: 158
Color:
revise based on comments on the developed basin
map.
158 (1)
Subject: Cloud+
Page Index: 166
Color:
adjust highlight so that text can be viewed.
166 (1)
Subject: Text Box
Page Index: 188
Color:
revise based on comments on the upstream basin
map.
188 (1)
Subject: Text Box
Page Index: 215
Color:
update plans as per comments. (typ)
215 (1)
Subject: Text Box
Page Index: 223
Color:
update areas and design (if needed) per previous
comments.
223 (10)
Subject: Callout
Page Index: 223
Color:
Revise the report accordingly
Subject: Cloud+
Page Index: 223
Color:
1.
Subject: Cloud+
Page Index: 223
Color:
0.54 AC
see comments related tobasin area revisions. waterquality may be revised.
revise based on commentson the developed basin map.
adjust highlight so thattext can be viewed.
revise based on commentson the upstream basin map.
update plans as percomments. (typ)
update areas anddesign (if needed) perprevious comments.
ous area
ormFilter has been included within this section. Detailed with in this section. Alternative methods of providing water l engineering if accepted by the City.
Revise the reportaccordingly
Notes: 3. Roads 4. There
1.
rvious Pervious Total
Ac(1) 0.00 Ac(2) 0.54
ewalks = 0.19 Ac
ntributing pervious area
mation for StormFilter has been include er is provide with in this section. Alternat
0.54 AC
Subject: Cloud+
Page Index: 223
Color:
1.
Subject: Cloud+
Page Index: 223
Color:
2.
Subject: Cloud+
Page Index: 223
Color:
2.
Subject: Callout
Page Index: 223
Color:
Revise as necessary based on restricted footprint
bmp comments.
Subject: Callout
Page Index: 223
Color:
Provide this information/calculations as part of TIR.
Subject: Callout
Page Index: 223
Color:
WQ Flowrate appears to be different than that in
the drainage facility details of the drainage plan.
(28 of 53)
Subject: Text Box
Page Index: 227
Color:
update basin areas based on previous comments.
227 (6)
Subject: Polygon
Page Index: 227
Color:
Subject: Callout
Page Index: 227
Color:
include are in subbasin analysis.
Subject: Callout
Page Index: 227
Color:
area continues to flow onto lot 24. basin analysis
will need to account for this area/lot.
Notes: 3. Roads Lot Ar
4. Mode
1.
Notes: 3. Road Lot A 4. Mode
2.
Notes:
3. Roads
4. There
The GULD s
sizing of the
2.
of 9.06 CFS. The basin breakdown is as follows:
Detention Vault
Pervious Total Area
7.64 Ac(2) 12.71 Ac
Ac = 2.63 Ac
c
Detention Tank
Revise as necessarybased on restrictedfootprint bmp comments.
Detention Tank
Impervious Pervious Total Area
0.54 Ac(1) 0.00 Ac(2) 0.54 Ac
d Sidewalks = 0.19 Ac
o contributing pervious area
information for StormFilter has been included within this section. D mFilter is provide with in this section. Alternative methods of providing e utilized during final engineering if accepted by the City.
Provide thisinformation/calculationsas part of TIR.
ect will be sized in accordance with the 2017 eatment. A single water quality facility is being water quality will be provided with a StormFilter. Quality through Washington State Department of directly downstream of the Detention Vault and er has been sized to treat the combined 2-year S) and Detention Tank (0.06 CFS) of 0.61 CFS. ass the flows higher than the 2-year flows up to S. The basin breakdown is as follows:
WQ Flowrate appears to be differentthan that in the drainage facilitydetails of the drainage plan. (28 of 53)
PLAT
update basin areas based onprevious comments.
IN COMPLIANCE WITH CITY OF REN
A-NNNNNNN
include are insubbasin analysis.
area continues toflow onto lot 24.basin analysis willneed to account forthis area/lot.
Subject: Callout
Page Index: 227
Color:
revise basin areas (typ).
example: highlighted area flows to cb#24 basin.
(see comments made on upstream basin map and
development basin map.)
Subject: Callout
Page Index: 227
Color:
What about offsite runoff from northern edge of
school onto property?
Subject: Callout
Page Index: 228
Color:
Make consistent with sheet 19 of plans that states
18".
228 (3)
Subject: Text Box
Page Index: 228
Color:
Provide conveyance calculations for proposed
bypass pipe.
Subject: Text Box
Page Index: 228
Color:
Update to satisfy comments on previous page.
Subject: Text Box
Page Index: 298
Color:
bond quantity worksheet to be reviewed following
revisions to civil construction plans.
update at necessary.
298 (1)
Subject: Callout
Page Index: 312
Color:
provide operations and Maintenance Manual.
312 (1)
Subject: Callout
Page Index: 313
Color:
per section 4-6-060 section I the Foot-Candles
shall be a MINIMUM of 0.3 along residential street
sidewalks and a minimum of 0.8 on residential
streets and intersections.
313 (1)
Subject: Text Box
Page Index: 318
Color:
revise street lighting to provide a minimum of 0.3 fc
with the sidewalk and minimum 0.8 fc within the
intersections.
generally street lights can be placed every 55 to 60
feet on alternating sides in order to achieve 0.3 fc
on sidewalks.
318 (1)
FOREST TERRACE PLAT
revise basin areas (typ).
example: highlighted area flows to cb#24 basin.(see comments made on upstream basin map anddevelopment basin map.)
What about offsite runofffrom northern edge ofschool onto property?BARGHAUSEN CONSULT using the Rational Method KING COUNTY DESIGN F NOTE: E 96 DEFAUL Qd= Design Flow (cfs)Qf= Full Capacity Flow (cfs)(min)Vd= Velocity at Design Flow (fps)Vf= Velocity at Full Flow (fps)s= Slope of pipe (%)n= Manning Roughness CoefficientTt= Travel Time at Vd (min)A s Ld Tc n C====== ====== ================== ====== ======1.39 1.00 8512 6.3 0.014 0.60.05 1.00 5612 6.6 0.014 0.720.03 0.80 2512 6.8 0.014 0.720.52 8.90 7912 6.9 0.014 0.720.30 0.50 8418 7.0 0.014 0.720.05 0.50 14118 7.3 0.014 0.720.66 0.50 14918 7.9 0.014 0.720.66 0.50 8524 8.5 0.014 0.720.05 0.60 3712 6.3 0.014 0.720.83 0.60 2512 6.7 0.014 0.72erraceMake consistent withsheet 19 of plansthat states 18".Provide conveyancecalculations forproposed bypass pipe.D/d D Vf VdTt====== ====== ====== ====== ===== 0.680 8.16 4.21 4.680.300.686 8.23 4.21 4.690.200.748 8.98 3.77 4.260.100.431 5.17 12.57 11.770.110.588 10.58 3.90 4.150.34Update to satisfycomments onprevious page.5 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200
VEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
Engine
10/24/2018Prepared by:Project Phase 1
bond quantity worksheet to be reviewedfollowing revisions to civil construction plans.
update at necessary.
detention vault or detention tan discharging to an existing catch and Maintenance Manual will be
provide operationsand MaintenanceManual.
TARGET CRITERA
Calculation Area Avg. Foot-candles (fc) Max. Uniformity (Avg. fc fc) Road A & Road B (Residential Streets Intersection) 0.80 6.00:1
Road A & Road B (Residential Streets Sidewalk) 0.30 6.00:1 Union Ave NE & NE 27th Pl (Minor Arterial-Intersection) 1.50 4.00:1
Union Ave NE (Minor Arterial) 1.20 4.00:1
per section 4-6-060section I theFoot-Candles shallbe a MINIMUM of 0.3along residentialstreet sidewalks anda minimum of 0.8 onresidential streetsand intersections.
0.70.70.70.70.60.60.60.60.60.60.60.50.50.50.50.50.50.5
2.12.
1.71.
1.41.
revise street lighting to providea minimum of 0.3 fc with thesidewalk and minimum 0.8 fcwithin the intersections.
generally street lights can beplaced every 55 to 60 feet onalternating sides in order toachieve 0.3 fc on sidewalks.
Subject: Text Box
Page Index: 324
Color:
Per SEPA mitigation measure #5 The applicant’s
geotechnical engineer shall seal and certify all
rockeries and retaining walls regardless of height
on the construction plans and provide long term
maintenance recommendations for future
homeowners.
The first part of this mitigation measure has been
met however the maintenance recommendations
are not included. this portion of the mitigation
measure shall be incorporated into the hoa
documents to be reviewed and approved prior to
plat recording.
324 (1)
Subject: Cloud+
Page Index: 327
Color:
provide wall details that include dimensions and
exterior finish of stones along with a detail of the
wall face. Stones shall be smaller scale similar to
reflect the scale of single-family residential
development.
327 (1)
Per SEPA mitigation measure #5 The applicant’s geotechnicalengineer shall seal and certify all rockeries and retainingwalls regardless of height on the construction plans andprovide long term maintenance recommendations for futurehomeowners.
The first part of this mitigation measure has been methowever the maintenance recommendations are not included.this portion of the mitigation measure shall be incorporatedinto the hoa documents to be reviewed and approved prior toplat recording.
7)GEOGRID SHALL BE PULLED TIGHT BEHIND WALL. STAKE END OF GEOGRID AS REQUIRED TO MAINTAIN TENSIONBEFORE COVERING WITH STRUCTURAL FILL.8)PROTECT GEOGRID FROM CONSTRUCTION DAMAGE PER MANUFACTURERS SPECIFICATIONS. CONSTRUCTIONEQUIPMENT SHALL NOT TRAVEL DIRECTLY ON GEOGRID. ANY GEOGRID THAT IS DAMAGED SHALL BE REPLACEDWITH NEW GEOGRID AT CONTRACTORS EXPENSE.9)LOCK+LOAD ® WALL ASSEMBLY TO BE COMPLETED PER MANUFACTURERS SPECIFICATIONS.10)STRUCTURAL FILL SHALL BE PLACED AND COMPACTED ACCORDING TO RECOMMENDATIONS PROVIDED IN THEGEOTECHNICAL REPORT, VANDERMAY, RENTON, WASHINGTON, PROJECT NO. T-7677, PREPARED BY TERRAASSOCIATES, INC., DATED JULY 19, 2017 STRUCTURAL FILL IN REINFORCED ZONE SHALL BE GRANULAR MATERIALWITH A MAXIMUM AGGREGATE SIZE OF 3-INCHES AND A MAXIMUM SOIL FINES (LESS THAN # 200 SIEVE) CONTENT OF30 PERCENT.
11)HEAVY CONSTRUCTION EQUIPMENT SUCH AS VIBRATORY DRUM ROLLERS, LOADED DUMP TRUCKS, FRONT-ENDLOADERS, ETC., SHALL NOT OPERATE WITHIN FIVE FEET OF BACK OF WALLS. STRUCTURAL FILL PLACED IN THISZONE SHALL HAVE MAXIMUM LOOSE LIFT THICKNESS OF 12 INCHES AND SHALL BE COMPACTED USING HANDOPERATED COMPACTION EQUIPMENT.
LOCK+LOAD WALL DETAILS 2NOT TO SCALE
9/6/2018
SHEET 2.0
Approved by:Date:
Designed by:Prepared by:SE CS CS SEPTEMBER 2 LOCK + L FO RENT
PROJECT No. T-76
provide wall details that includedimensions and exterior finish ofstones along with a detail of thewall face. Stones shall besmaller scale similar to reflectthe scale of single-familyresidential development.