HomeMy WebLinkAboutRenton RI Preliminary Schedule 2-13-18 CEID % CompleteTask NameDuration Baseline Start Baseline Finish Start Finish Actual Start Actual Finish Predecessors Successors19%Project Summary (Calendar Days; Remainder of Schedule in Working Days)590 daysWed 11/1/17Mon 7/1/19Mon 11/27/17Tue 7/9/19Mon 11/27/17NA299%NTP, Permit, & Contract 0 daysMon 11/27/17Mon 11/27/17Mon 11/27/17Mon 11/27/17Mon 11/27/17NA24,4SS+6 mons,9SS+13 mons30%Project Milestones260 daysMon 5/14/18Fri 4/26/19Mon 5/14/18Mon 5/13/19NANA40%1/3 Project Review Meeting1 dayMon 5/14/18Mon 5/14/18Mon 5/14/18Mon 5/14/18NANA2SS+6 mons50%Top Out0 daysWed 9/19/18Wed 9/19/18Mon 10/15/18Mon 10/15/18NANA14260%Dry-In Building0 daysWed 10/10/18Wed 10/10/18Mon 11/5/18Mon 11/5/18NANA144SS+10 days,14370%Model Rooms Approved0 daysWed 11/7/18Wed 11/7/18Thu 12/13/18Thu 12/13/18NANA48780%Complete Drywall 0 daysWed 1/2/19Wed 1/2/19Thu 2/21/19Thu 2/21/19NANA171,447,205,239,273,307,341,375,40990%2/3 Project Review Meeting1 dayMon 11/26/18Mon 11/26/18Mon 11/26/18Mon 11/26/18NANA2SS+13 mons100%Start Elevator Install0 daysThu 10/11/18Thu 10/11/18Tue 11/6/18Tue 11/6/18NANA489SS110%MEP Start-Up's0 daysWed 1/2/19Wed 1/2/19Mon 1/28/19Mon 1/28/19NANA488120%TCO0 daysFri 4/26/19Fri 4/26/19Mon 5/13/19Mon 5/13/19NANA491SS,490SS130%Key Procurement Items197 daysWed 6/6/18Tue 1/22/19Tue 6/12/18Thu 3/14/19NANA140%Procure Model Room Package6 wksThu 8/30/18Wed 10/10/18Thu 9/27/18Thu 11/8/18NANA469SF-1 day150%Shower Pans5 wksWed 6/6/18Wed 7/11/18Mon 7/2/18Mon 8/6/18NANA139SF-1 day160%Guestroom Cabinet/Granite/Surround Package10 wksTue 11/13/18Tue 1/22/19Thu 1/3/19Thu 3/14/19NANA177SF-1 day,211SF-1 day,245SF-1 day,279SF-1 day,313SF-1 day,347SF-1 170%Lumber package5 wksNANATue 6/12/18Tue 7/17/18NANA138SF180%TJIs4 wksNANATue 6/26/18Mon 7/23/18NANA138SF+5 days190%Simpson Package5 wksNANATue 6/12/18Tue 7/17/18NANA138SF200%Structural Steel3 wksNANAWed 6/20/18Wed 7/11/18NANA126SF210%Elevator Fabrication16 wksNANAMon 7/16/18Mon 11/5/18NANA489SF-1 day220%Shower Doors10 wksNANAWed 12/26/18Wed 3/6/19NANA180SF2342%Site Construction366 daysMon 11/27/17Wed 3/27/19Mon 11/27/17Mon 4/22/19Mon 11/27/17NA240%Mobilization, Layout & SWPPP Implementation5 daysMon 11/27/17Fri 12/1/17Mon 11/27/17Fri 12/1/17NANA225,2625100%Build PSE Road5 daysMon 12/4/17Wed 12/6/17Mon 12/4/17Fri 12/8/17Mon 12/4/17Fri 12/8/17242726100%Clear & Grub5 daysMon 12/4/17Fri 12/8/17Mon 12/11/17Fri 12/15/17Mon 12/11/17Fri 12/15/17242827100%Relocate Power Poles5 daysThu 12/7/17Wed 1/3/18Mon 12/11/17Fri 12/15/17Mon 12/11/17Fri 12/15/172528100%Grade for Shoring Acess264 daysMon 12/11/17Fri 1/26/18Mon 12/18/17Thu 12/20/18Mon 12/18/17Thu 12/20/18262929100%Shoring Mobilization/Setup/ Stocking4 daysNANATue 1/2/18Wed 12/26/18Tue 1/2/18Wed 12/26/18283130100%Install Shoring Level 1 15 daysWed 12/20/17Wed 12/27/17Mon 1/8/18Fri 1/26/18Mon 1/8/18Fri 1/26/1831100%Piles5 daysNANAMon 1/8/18Fri 1/12/18Mon 1/8/18Fri 1/12/182932,37,3832100%Legging2 daysNANAMon 1/15/18Tue 1/16/18Mon 1/15/18Tue 1/16/18313333100%Bulk Excavation1 dayNANAWed 1/17/18Wed 1/17/18Wed 1/17/18Wed 1/17/183234,35,3634100%Export soil as needed1 dayNANAThu 1/18/18Thu 1/18/18Thu 1/18/18Thu 1/18/1833,35SF35100%Neat Face1 dayNANAThu 1/18/18Thu 1/18/18Thu 1/18/18Thu 1/18/183334SF36100%Nail/Drill/Grout/Cure7 daysNANAThu 1/18/18Fri 1/26/18Thu 1/18/18Fri 1/26/183343SS+3 days,4637100%Crane Move1 dayNANAMon 1/15/18Mon 1/15/18Mon 1/15/18Mon 1/15/183138100%Build pad for grout pump1 dayNANAMon 1/15/18Mon 1/15/18Mon 1/15/18Mon 1/15/18313939100%Set grout pump1 dayNANATue 1/16/18Tue 1/16/18Tue 1/16/18Tue 1/16/1838404065%Install Shoring Level 212 daysThu 12/28/17Thu 1/4/18Mon 1/22/18Tue 2/6/18Mon 1/22/18NA3941100%Reaction Piles3 daysNANAMon 1/22/18Wed 1/24/18Mon 1/22/18Wed 1/24/184242100%Waling/ Rake Brace7 daysNANAThu 1/25/18Fri 2/2/18Thu 1/25/18Fri 2/2/184147,49FS-1 day43100%Bulk Excavation2 daysNANATue 1/23/18Wed 1/24/18Tue 1/23/18Wed 1/24/1836SS+3 days4444100%Export soil as needed1 dayNANAThu 1/25/18Thu 1/25/18Thu 1/25/18Thu 1/25/1843,45SF45100%Neat Face2 daysNANAFri 1/26/18Mon 1/29/18Fri 1/26/18Mon 1/29/1846SS-1 day44SF460%Nail/Drill/Grout/Cure7 daysNANAMon 1/29/18Tue 2/6/18NANA3645SS-1 day470%Crane Move1 dayNANAMon 2/5/18Mon 2/5/18NANA42480%Install Shoring Level 317 daysFri 1/5/18Fri 1/12/18Fri 2/2/18Mon 2/26/18Fri 2/2/18NA490%Rake Brace excavation from tier above2 daysNANAFri 2/2/18Mon 2/5/18NANA42FS-1 day50500%Bulk Excavation6 daysNANAFri 2/9/18Fri 2/16/18Fri 2/9/18NA4951,52FS-2 days510%Export soil as needed1 dayNANAMon 2/19/18Mon 2/19/18NANA50,53SF520%Soil Nails2 daysNANAThu 2/15/18Fri 2/16/18NANA50FS-2 days53530%Neat Face2 daysNANAMon 2/19/18Tue 2/20/18NANA5251SF,54540%shotcrete wall face/ cure/ lagging4 daysNANAWed 2/21/18Mon 2/26/18NANA5356FS-2 days550%Install Shoring Level 410 daysMon 1/15/18Mon 1/22/18Fri 2/23/18Thu 3/8/18NANA560%Bulk Excavation3 daysNANAFri 2/23/18Tue 2/27/18NANA54FS-2 days57SS570%Export soil as needed3 daysNANAFri 2/23/18Tue 2/27/18NANA56SS58FS-1 day580%Soil Nails2 daysNANATue 2/27/18Wed 2/28/18NANA57FS-1 day59590%Neat Face2 daysNANAThu 3/1/18Fri 3/2/18NANA5860600%Shotcrete wall face/ cure/ lagging4 daysNANAMon 3/5/18Thu 3/8/18NANA5963SS+2 days,67FS-1 day,62SS+2 days610%Install Shoring Level 512 daysTue 1/23/18Tue 1/30/18Tue 3/6/18Thu 3/22/18NANA620%Pothole for water0 daysNANATue 3/6/18Tue 3/6/18NANA60SS+2 days630%Lower Walers2 daysNANAWed 3/7/18Thu 3/8/18NANA60SS+2 days82,64SS+0.5 days640%Corner Bracing2 daysNANAWed 3/7/18Fri 3/9/18NANA63SS+0.5 days65SS650%Excavate for lower rakers1 dayNANAWed 3/7/18Thu 3/8/18NANA64SS66SS660%lower rakers6 daysNANAWed 3/7/18Thu 3/15/18NANA65SS670%bulk excavation3 daysNANAThu 3/8/18Mon 3/12/18NANA60FS-1 day68SS,69680%Export Soil3 daysNANAThu 3/8/18Mon 3/12/18NANA67SS690%Soil Nails3 daysNANATue 3/13/18Thu 3/15/18NANA6770700%Neat Face2 daysNANAFri 3/16/18Mon 3/19/18NANA6971FS-1 day710%shotcrete wall face/ cure/ lagging4 daysNANAMon 3/19/18Thu 3/22/18NANA70FS-1 day73FS-1 day720%Install Shoring Level 67 daysNANAThu 3/22/18Fri 3/30/18NANA730%Bulk Excavation2 daysNANAThu 3/22/18Fri 3/23/18NANA71FS-1 day74SS740%Export Soil2 daysNANAThu 3/22/18Fri 3/23/18NANA73SS75750%Neat Face2 daysNANAMon 3/26/18Tue 3/27/18NANA7476FS-1 day760%shotcrete wall face/ cure/ lagging4 daysNANATue 3/27/18Fri 3/30/18NANA75FS-1 day77FS+2 days770%Excavate for Storm Vault & Storm Sewer Mains2 daysTue 1/23/18Mon 2/5/18Wed 4/4/18Thu 4/5/18NANA76FS+2 days78780%Install Vault 3.5 wksTue 1/30/18Thu 2/22/18Fri 4/6/18Tue 5/1/18NANA77131FS+55 days790%Install Storm Sewer Mains5 daysTue 2/6/18Mon 2/12/18Wed 3/14/18Tue 3/20/18NANA82SS+3 days80800%Excavate, Install, & Backfill Site Utilities7 daysTue 2/6/18Wed 2/14/18Wed 3/21/18Thu 3/29/18NANA79810%Podium A/Parking Garage91 daysTue 2/13/18Tue 6/19/18Fri 3/9/18Fri 7/13/18NANA820%Excavate Footings/Elevator Pit5 daysTue 2/13/18Mon 2/19/18Fri 3/9/18Thu 3/15/18NANA63109,83,79SS+3 days830%FRP Footings PA-H.516 daysTue 2/20/18Tue 3/13/18Fri 3/16/18Fri 4/6/18NANA8288,85SS+6 days,86,84840%Install Drain Pipe w/ 1" Rock at Footings3 daysWed 3/14/18Fri 3/16/18Mon 4/9/18Wed 4/11/18NANA83Project Summary (Calendar Days; Remainder of Schedule in Working Days)11/27 NTP, Permit, & Contract Project Milestones5/14 1/3 Project Review Meeting10/15 Top Out11/5 Dry-In Building12/13 Model Rooms Approved2/21 Complete Drywall 11/26 2/3 Project Review Meeting11/6 Start Elevator Install1/28 MEP Start-Up's5/13 TCOKey Procurement Items9/27 Procure Model Room Package7/2 Shower Pans1/3 Guestroom Cabinet/Granite/Surround Package6/12 Lumber package6/26 TJIs6/12 Simpson Package6/20 Structural Steel7/16 Elevator Fabrication12/26 Shower DoorsSite Construction11/27 Mobilization, Layout & SWPPP Implementation12/4 Build PSE Road12/11 Clear & Grub12/11 Relocate Power Poles12/18 Grade for Shoring Acess1/2 Shoring Mobilization/Setup/ StockingInstall Shoring Level 1 1/8 Piles1/15 Legging1/17 Bulk Excavation1/18 Export soil as needed1/18 Neat Face1/18 Nail/Drill/Grout/Cure1/15 Crane Move1/15 Build pad for grout pump1/16 Set grout pumpInstall Shoring Level 21/22 Reaction Piles1/25 Waling/ Rake Brace1/23 Bulk Excavation1/25 Export soil as needed1/26 Neat Face1/29 Nail/Drill/Grout/Cure2/5 Crane MoveInstall Shoring Level 32/2 Rake Brace excavation from tier above2/9 Bulk Excavation2/19 Export soil as needed2/15 Soil Nails2/19 Neat Face2/21 shotcrete wall face/ cure/ laggingInstall Shoring Level 42/23 Bulk Excavation2/23 Export soil as needed2/27 Soil Nails3/1 Neat Face3/5 Shotcrete wall face/ cure/ laggingInstall Shoring Level 53/6 Pothole for water3/7 Lower Walers3/7 Corner Bracing3/7 Excavate for lower rakers3/7 lower rakers3/8 bulk excavation3/8 Export Soil3/13 Soil Nails3/16 Neat Face3/19 shotcrete wall face/ cure/ laggingInstall Shoring Level 63/22 Bulk Excavation3/22 Export Soil3/26 Neat Face3/27 shotcrete wall face/ cure/ lagging4/4 Excavate for Storm Vault & Storm Sewer Mains4/6 Install Vault 3/14 Install Storm Sewer Mains3/21 Excavate, Install, & Backfill Site UtilitiesPodium A/Parking Garage3/9 Excavate Footings/Elevator Pit3/16 FRP Footings PA-H.54/9 Install Drain Pipe w/ 1" Rock at FootingsQ2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q12017201820192020202120222019Renton, WA Residence Inn Project Schedule EBCO GENERAL CONTRACTORTue 2/13/18 ID % CompleteTask NameDuration Baseline Start Baseline Finish Start Finish Actual Start Actual Finish Predecessors Successors850%FRP Walls/Columns PA-H.516 daysWed 2/28/18Wed 3/21/18Mon 3/26/18Mon 4/16/18NANA83SS+6 days91,111860%FRP Elevator Pit Walls4 daysWed 3/14/18Mon 3/19/18Mon 4/9/18Thu 4/12/18NANA8387870%Waterproof Elevator Pit Walls2 daysTue 3/20/18Wed 3/21/18Fri 4/13/18Mon 4/16/18NANA86880%Electrical Rough In's in Footings5 daysWed 3/14/18Tue 3/20/18Mon 4/9/18Fri 4/13/18NANA8389890%Storm Drain Rough Under Slab 2 daysWed 3/21/18Thu 3/22/18Mon 4/16/18Tue 4/17/18NANA8890900%Fire Line Rough Under Slab2 daysFri 3/23/18Mon 3/26/18Wed 4/18/18Thu 4/19/18NANA89910%Underground/Slab Prep8 daysThu 3/22/18Mon 4/2/18Tue 4/17/18Thu 4/26/18NANA8593FF,94,92SS920%MEP's Rough Under Slab5 daysThu 3/22/18Wed 3/28/18Tue 4/17/18Mon 4/23/18NANA91SS930%Final Grade Under Slab3 daysThu 3/29/18Mon 4/2/18Tue 4/24/18Thu 4/26/18NANA91FF940%Place All SOG Podium A & Parking1 dayTue 4/3/18Tue 4/3/18Fri 4/27/18Fri 4/27/18NANA9195950%Form PT Mezzanine Shoring/Sheeting5 daysWed 4/4/18Tue 4/10/18Mon 4/30/18Fri 5/4/18NANA9496960%Layout/MEP2 daysWed 4/11/18Thu 4/12/18Mon 5/7/18Tue 5/8/18NANA9597970%Place Rebar/PT Cables4 daysFri 4/13/18Wed 4/18/18Wed 5/9/18Mon 5/14/18NANA9698980%MEP / Inspections2 daysThu 4/19/18Fri 4/20/18Tue 5/15/18Wed 5/16/18NANA9799990%Place Mezanine PT Slab1 dayMon 4/23/18Mon 4/23/18Thu 5/17/18Thu 5/17/18NANA981001000%FRP Walls/Columns Level 29 daysTue 4/24/18Fri 5/4/18Fri 5/18/18Wed 5/30/18NANA991011010%Form Level 2 PT Slab8 daysMon 5/7/18Wed 5/16/18Thu 5/31/18Mon 6/11/18NANA1001021020%Layout/MEP2 daysThu 5/17/18Fri 5/18/18Tue 6/12/18Wed 6/13/18NANA1011031030%Place Rebar/PT Cables5 daysMon 5/21/18Fri 5/25/18Thu 6/14/18Wed 6/20/18NANA1021041040%MEP/Inspections3 daysMon 5/28/18Wed 5/30/18Thu 6/21/18Mon 6/25/18NANA1031051050%Place Level 2 PT Slab1 dayThu 5/31/18Thu 5/31/18Tue 6/26/18Tue 6/26/18NANA104106,107,138FS+3 days1060%CMU Stair Towers13 daysFri 6/1/18Tue 6/19/18Wed 6/27/18Fri 7/13/18NANA1051070%CMU Elevator Towers6 daysFri 6/1/18Fri 6/8/18Wed 6/27/18Wed 7/4/18NANA1051080%Podium B/Public Space96 daysTue 2/20/18Wed 7/11/18Fri 3/16/18Fri 7/27/18NANA1090%Excavate Footings/Elevator Pit5 daysTue 2/20/18Mon 2/26/18Fri 3/16/18Thu 3/22/18NANA82110,1111100%Drill and Install Jack Shaft3 daysTue 2/27/18Thu 3/1/18Fri 3/23/18Tue 3/27/18NANA1091110%FRP Footings H.5-A21 daysThu 3/22/18Thu 4/19/18Tue 4/17/18Tue 5/15/18NANA85,109113SS+10 days,1121120%Install Drain Pipe w/ 1" Rock at Footings4 daysFri 4/20/18Wed 4/25/18Wed 5/16/18Mon 5/21/18NANA111117,118,1191130%FRP Walls/Columns H.5-A #121 daysThu 4/5/18Thu 5/3/18Tue 5/1/18Tue 5/29/18NANA111SS+10 days114FF1140%FRP Elevator Pit Walls4 daysMon 4/30/18Thu 5/3/18Thu 5/24/18Tue 5/29/18NANA113FF115,1161150%Waterproof Elevator Pit Walls2 daysFri 5/4/18Mon 5/7/18Wed 5/30/18Thu 5/31/18NANA1141160%Underground/Slab Prep9 daysFri 5/4/18Wed 5/16/18Wed 5/30/18Mon 6/11/18NANA1141211170%Storm Drain Rough Under Slab 2 daysThu 4/26/18Fri 4/27/18Tue 5/22/18Wed 5/23/18NANA1121180%Fire Line Rough Under Slab1 dayThu 4/26/18Thu 4/26/18Tue 5/22/18Tue 5/22/18NANA1121190%MEP's Rough Under Slab10 daysThu 4/26/18Mon 4/30/18Tue 5/22/18Mon 6/4/18NANA1121201200%Final Grade Under Slab2 daysTue 5/1/18Wed 5/2/18Tue 6/5/18Wed 6/6/18NANA1191211210%Place SOG Public Area / BOH1 dayThu 5/17/18Thu 5/17/18Tue 6/12/18Tue 6/12/18NANA120,1161221220%Form Level 2 PT Slab11 daysFri 5/18/18Fri 6/1/18Wed 6/13/18Wed 6/27/18NANA1211231230%Layout/MEP2 daysMon 6/4/18Tue 6/5/18Thu 6/28/18Fri 6/29/18NANA1221241240%Place Rebar/PT Cables5 daysWed 6/6/18Tue 6/12/18Mon 7/2/18Fri 7/6/18NANA1231251250%MEP/Inspections2 daysWed 6/13/18Thu 6/14/18Mon 7/9/18Tue 7/10/18NANA1241261260%Place Level 2 PT Slab1 dayFri 6/15/18Fri 6/15/18Wed 7/11/18Wed 7/11/18NANA125127,128,433FS+8 days,138FS+3 days,20SF,1291270%CMU Stair Towers7 daysMon 6/18/18Tue 6/26/18Thu 7/12/18Fri 7/20/18NANA1261280%CMU Elevator Towers6 daysMon 6/18/18Mon 6/25/18Thu 7/12/18Thu 7/19/18NANA1261290%Misc Concrete Paving12 daysTue 6/26/18Wed 7/11/18Thu 7/12/18Fri 7/27/18NANA1261300%Misc ROW Improvements30 daysThu 5/10/18Thu 6/21/18Tue 7/17/18Tue 8/28/18NANA1310%ROW work10 daysThu 5/10/18Thu 5/24/18Tue 7/17/18Tue 7/31/18NANA78FS+55 days1321320%Construct Curb & Gutter15 daysThu 5/24/18Thu 6/14/18Tue 7/31/18Tue 8/21/18NANA131133SS+10 days1330%Asphalt Paving / Rework at Entry10 daysThu 6/7/18Thu 6/21/18Tue 8/14/18Tue 8/28/18NANA132SS+10 days1340%Concrete Flatwork(sidewalks, planters, handrails, etc)15 daysThu 2/14/19Wed 3/6/19Tue 3/12/19Mon 4/1/19NANA1471351350%Landscaping15 daysThu 3/7/19Wed 3/27/19Tue 4/2/19Mon 4/22/19NANA1341360%Guest Tower Construction204 daysThu 6/21/18Wed 3/6/19Tue 7/17/18Fri 4/26/19NANA1370%Wood Framing & Sheathing65 daysThu 6/21/18Wed 9/19/18Tue 7/17/18Mon 10/15/18NANA1380%2nd Floor Structural Wood Framing & Sheathing15 daysThu 6/21/18Wed 7/11/18Tue 7/17/18Mon 8/6/18NANA105FS+3 days,126FS+3 days139,17SF,18SF+5 days,19SF1390%3rd Floor Wood Framing & Sheathing15 daysThu 7/12/18Wed 8/1/18Tue 8/7/18Mon 8/27/18NANA138140,153,15SF-1 day1400%4th Floor Wood Framing & Sheathing15 daysThu 8/2/18Wed 8/22/18Tue 8/28/18Mon 9/17/18NANA139141,1421410%5th Floor Wood Framing & Sheathing10 daysThu 8/23/18Wed 9/5/18Tue 9/18/18Mon 10/1/18NANA1401421420%Parapet Framing/Roof Trusses 10 daysThu 9/6/18Wed 9/19/18Tue 10/2/18Mon 10/15/18NANA141,140144,5,145,1431430%Install Exterior Windows15 daysThu 9/20/18Wed 10/10/18Tue 10/16/18Mon 11/5/18NANA14261440%Install Shingle Roofing15 daysThu 9/20/18Wed 10/10/18Tue 10/16/18Mon 11/5/18NANA1426SS+10 days,150,148SS,146SS+10 days,468,489,4881450%Install TPO Roofing (Patios)5 daysThu 9/20/18Wed 9/26/18Tue 10/16/18Mon 10/22/18NANA1421460%Temporary Dry-In0 daysWed 10/3/18Wed 10/3/18Mon 10/29/18Mon 10/29/18NANA144SS+10 days1601470%Exterior Cladding105 daysThu 9/20/18Wed 2/13/19Tue 10/16/18Mon 3/11/19NANA1341480%Exterior Waterproofing15 daysThu 9/20/18Wed 10/10/18Tue 10/16/18Mon 11/5/18NANA144SS1491490%Masonry45 daysThu 10/11/18Wed 12/12/18Tue 11/6/18Mon 1/7/19NANA1481500%EIFS90 daysThu 10/11/18Wed 2/13/19Tue 11/6/18Mon 3/11/19NANA144151FF1510%Metallic EIFS or ACM Panels45 daysThu 12/13/18Wed 2/13/19Tue 1/8/19Mon 3/11/19NANA150FF1520%MEP Rough-In's40 daysThu 8/2/18Wed 9/26/18Tue 8/28/18Mon 10/22/18NANA1530%Second Floor - MEP/Sprinkler/FA Rough-In's10 daysThu 8/2/18Wed 8/15/18Tue 8/28/18Mon 9/10/18NANA1391541540%Third Floor - MEP/Sprinkler/FA Rough-In's10 daysThu 8/16/18Wed 8/29/18Tue 9/11/18Mon 9/24/18NANA1531551550%Fourth Floor - MEP/Sprinkler/FA Rough-In's10 daysThu 8/30/18Wed 9/12/18Tue 9/25/18Mon 10/8/18NANA1541561560%Fifth Floor - MEP/Sprinkler/FA Rough-In's10 daysThu 9/13/18Wed 9/26/18Tue 10/9/18Mon 10/22/18NANA1551571570%Cover Up Inspections10 daysThu 9/27/18Wed 10/10/18Tue 10/23/18Mon 11/5/18NANA1561611580%Fifth Floor Finishes Area A (20 rooms/areas)93 daysThu 10/4/18Wed 1/16/19Tue 10/30/18Thu 3/7/19NANA1590%Wall & Ceiling Finishes44 daysThu 10/4/18Tue 11/27/18Tue 10/30/18Fri 12/28/18NANA1600%Electrical - Pull Wire & Inspect7 daysThu 10/4/18Wed 10/10/18Tue 10/30/18Wed 11/7/18NANA146161,1941610%Insulation3 daysThu 10/11/18Mon 10/15/18Thu 11/8/18Mon 11/12/18NANA157,160162,1951620%Drywall 1st Layer4 daysTue 10/16/18Fri 10/19/18Tue 11/13/18Fri 11/16/18NANA1611631630%Inspection on 1st Layer1 dayMon 10/22/18Mon 10/22/18Mon 11/19/18Mon 11/19/18NANA1621641640%Drywall 2nd Layer4 daysTue 10/23/18Fri 10/26/18Tue 11/20/18Fri 11/23/18NANA163165SS+1 day1650%Fire Tape4 daysWed 10/24/18Mon 10/29/18Wed 11/21/18Mon 11/26/18NANA164SS+1 day166SS+1 day1660%HVAC Rough In 4 daysThu 10/25/18Tue 10/30/18Thu 11/22/18Tue 11/27/18NANA165SS+1 day167SS+1 day,168SS+1 day1670%Metal Framing at Furdowns4 daysFri 10/26/18Wed 10/31/18Fri 11/23/18Wed 11/28/18NANA166SS+1 day1680%Electrical/ Sprinkler Rough In4 daysFri 10/26/18Wed 10/31/18Fri 11/23/18Wed 11/28/18NANA166SS+1 day1691690%Above Ceiling Inspections1 dayThu 11/1/18Thu 11/1/18Thu 11/29/18Thu 11/29/18NANA1681701700%Drywall Furdowns2 daysFri 11/2/18Mon 11/5/18Fri 11/30/18Mon 12/3/18NANA169171SS+1 day1710%Tape/Float/Texture10 daysWed 10/31/18Tue 11/13/18Mon 12/3/18Fri 12/14/18NANA170SS+1 day172,83/26 FRP Walls/Columns PA-H.54/9 FRP Elevator Pit Walls4/13 Waterproof Elevator Pit Walls4/9 Electrical Rough In's in Footings4/16 Storm Drain Rough Under Slab 4/18 Fire Line Rough Under Slab4/17 Underground/Slab Prep4/17 MEP's Rough Under Slab4/24 Final Grade Under Slab4/27 Place All SOG Podium A & Parking4/30 Form PT Mezzanine Shoring/Sheeting5/7 Layout/MEP5/9 Place Rebar/PT Cables5/15 MEP / Inspections5/17 Place Mezanine PT Slab5/18 FRP Walls/Columns Level 25/31 Form Level 2 PT Slab6/12 Layout/MEP6/14 Place Rebar/PT Cables6/21 MEP/Inspections6/26 Place Level 2 PT Slab6/27 CMU Stair Towers6/27 CMU Elevator TowersPodium B/Public Space3/16 Excavate Footings/Elevator Pit3/23 Drill and Install Jack Shaft4/17 FRP Footings H.5-A5/16 Install Drain Pipe w/ 1" Rock at Footings5/1 FRP Walls/Columns H.5-A #15/24 FRP Elevator Pit Walls5/30 Waterproof Elevator Pit Walls5/30 Underground/Slab Prep5/22 Storm Drain Rough Under Slab 5/22 Fire Line Rough Under Slab5/22 MEP's Rough Under Slab6/5 Final Grade Under Slab6/12 Place SOG Public Area / BOH6/13 Form Level 2 PT Slab6/28 Layout/MEP7/2 Place Rebar/PT Cables7/9 MEP/Inspections7/11 Place Level 2 PT Slab7/12 CMU Stair Towers7/12 CMU Elevator Towers7/12 Misc Concrete PavingMisc ROW Improvements7/17 ROW work7/31 Construct Curb & Gutter8/14 Asphalt Paving / Rework at Entry3/12 Concrete Flatwork(sidewalks, planters, handrails, etc)4/2 LandscapingGuest Tower ConstructionWood Framing & Sheathing7/17 2nd Floor Structural Wood Framing & Sheathing8/7 3rd Floor Wood Framing & Sheathing8/28 4th Floor Wood Framing & Sheathing9/18 5th Floor Wood Framing & Sheathing10/2 Parapet Framing/Roof Trusses 10/16 Install Exterior Windows10/16 Install Shingle Roofing10/16 Install TPO Roofing (Patios)10/29 Temporary Dry-InExterior Cladding10/16 Exterior Waterproofing11/6 Masonry11/6 EIFS1/8 Metallic EIFS or ACM PanelsMEP Rough-In's8/28 Second Floor - MEP/Sprinkler/FA Rough-In's9/11 Third Floor - MEP/Sprinkler/FA Rough-In's9/25 Fourth Floor - MEP/Sprinkler/FA Rough-In's10/9 Fifth Floor - MEP/Sprinkler/FA Rough-In's10/23 Cover Up InspectionsFifth Floor Finishes Area A (20 rooms/areas)Wall & Ceiling Finishes10/30 Electrical - Pull Wire & Inspect11/8 Insulation11/13 Drywall 1st Layer11/19 Inspection on 1st Layer11/20 Drywall 2nd Layer11/21 Fire Tape11/22 HVAC Rough In 11/23 Metal Framing at Furdowns11/23 Electrical/ Sprinkler Rough In11/29 Above Ceiling Inspections11/30 Drywall Furdowns12/3 Tape/Float/TextureQ2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q12017201820192020202120222019Renton, WA Residence Inn Project Schedule EBCO GENERAL CONTRACTORTue 2/13/18 ID % CompleteTask NameDuration Baseline Start Baseline Finish Start Finish Actual Start Actual Finish Predecessors Successors1720%Prime & Paint5 daysWed 11/14/18Tue 11/20/18Mon 12/17/18Fri 12/21/18NANA171173,1741730%Gypcrete5 daysWed 11/21/18Tue 11/27/18Mon 12/24/18Fri 12/28/18NANA1721740%Doors, Frames, & Hardware5 daysWed 11/21/18Tue 11/27/18Mon 12/24/18Fri 12/28/18NANA1721761750%Flooring, Millwork, & Trim49 daysWed 11/28/18Tue 1/1/19Mon 12/31/18Thu 3/7/19NANA1760%Ceramic Tile4 daysWed 11/28/18Mon 12/3/18Mon 12/31/18Thu 1/3/19NANA174177SS+5 days1770%Cabinets & Granite4 daysWed 12/5/18Mon 12/10/18Mon 1/7/19Thu 1/10/19NANA176SS+5 days16SF-1 day,178,1791780%Toilet/ Bath Access4 daysTue 12/11/18Fri 12/14/18Fri 1/11/19Wed 1/16/19NANA1771790%MEP Trim4 daysTue 12/11/18Fri 12/14/18Fri 1/11/19Wed 1/16/19NANA177185,1811800%Shower Doors2 daysNANAWed 3/6/19Thu 3/7/19NANA417FS-3 wks214,22SF1810%Carpet- Guestroom4 daysMon 12/17/18Thu 12/20/18Thu 1/17/19Tue 1/22/19NANA1791821820%Final Paint4 daysFri 12/21/18Wed 12/26/18Wed 1/23/19Mon 1/28/19NANA1811831830%Closet Shelving4 daysThu 12/27/18Tue 1/1/19Tue 1/29/19Fri 2/1/19NANA1821840%Corridors8 daysMon 12/17/18Wed 12/26/18Thu 1/17/19Mon 1/28/19NANA1850%VWC- Corridor3 daysMon 12/17/18Wed 12/19/18Thu 1/17/19Mon 1/21/19NANA1791861860%MEP Trim & Ceilings- Corridor3 daysThu 12/20/18Mon 12/24/18Tue 1/22/19Thu 1/24/19NANA185187SS1870%Carpet- Corridor5 daysThu 12/20/18Wed 12/26/18Tue 1/22/19Mon 1/28/19NANA186SS1891880%Cleaning/Punch/Inspections15 daysThu 12/27/18Wed 1/16/19Tue 1/29/19Mon 2/18/19NANA1890%Final Clean5 daysThu 12/27/18Wed 1/2/19Tue 1/29/19Mon 2/4/19NANA1871901900%Punch5 daysThu 1/3/19Wed 1/9/19Tue 2/5/19Mon 2/11/19NANA1891911910%Final Inspections5 daysThu 1/10/19Wed 1/16/19Tue 2/12/19Mon 2/18/19NANA1901920%Fifth Floor Finishes Area B (20 rooms/areas)88 daysThu 10/11/18Wed 1/23/19Thu 11/8/18Mon 3/11/19NANA1930%Wall & Ceiling Finishes44 daysThu 10/11/18Tue 12/4/18Thu 11/8/18Tue 1/8/19NANA1940%Electrical - Pull Wire & Inspect7 daysThu 10/11/18Wed 10/17/18Thu 11/8/18Fri 11/16/18NANA160195,2281950%Insulation3 daysThu 10/18/18Mon 10/22/18Mon 11/19/18Wed 11/21/18NANA194,161229,1961960%Drywall 1st Layer4 daysTue 10/23/18Fri 10/26/18Thu 11/22/18Tue 11/27/18NANA1951971970%Inspection on 1st Layer1 dayMon 10/29/18Mon 10/29/18Wed 11/28/18Wed 11/28/18NANA1961981980%Drywall 2nd Layer4 daysTue 10/30/18Fri 11/2/18Thu 11/29/18Tue 12/4/18NANA197199SS+1 day1990%Fire Tape4 daysWed 10/31/18Mon 11/5/18Fri 11/30/18Wed 12/5/18NANA198SS+1 day200SS+1 day2000%HVAC Rough In 4 daysThu 11/1/18Tue 11/6/18Mon 12/3/18Thu 12/6/18NANA199SS+1 day201SS+1 day,202SS+1 day2010%Metal Framing at Furdowns4 daysFri 11/2/18Wed 11/7/18Tue 12/4/18Fri 12/7/18NANA200SS+1 day2020%Electrical/ Sprinkler Rough In4 daysFri 11/2/18Wed 11/7/18Tue 12/4/18Fri 12/7/18NANA200SS+1 day2032030%Above Ceiling Inspections1 dayThu 11/8/18Thu 11/8/18Mon 12/10/18Mon 12/10/18NANA2022042040%Drywall Furdowns2 daysFri 11/9/18Mon 11/12/18Tue 12/11/18Wed 12/12/18NANA203205SS+1 day2050%Tape/Float/Texture10 daysWed 11/7/18Tue 11/20/18Wed 12/12/18Tue 12/25/18NANA204SS+1 day206,82060%Prime & Paint5 daysWed 11/21/18Tue 11/27/18Wed 12/26/18Tue 1/1/19NANA205207,2082070%Gypcrete5 daysWed 11/28/18Tue 12/4/18Wed 1/2/19Tue 1/8/19NANA2062080%Doors, Frames, & Hardware5 daysWed 11/28/18Tue 12/4/18Wed 1/2/19Tue 1/8/19NANA2062102090%Flooring, Millwork, & Trim44 daysWed 12/5/18Tue 1/8/19Wed 1/9/19Mon 3/11/19NANA2100%Ceramic Tile4 daysWed 12/5/18Mon 12/10/18Wed 1/9/19Mon 1/14/19NANA208211SS+5 days2110%Cabinets & Granite4 daysWed 12/12/18Mon 12/17/18Wed 1/16/19Mon 1/21/19NANA210SS+5 days16SF-1 day,212,2132120%Toilet/ Bath Access4 daysTue 12/18/18Fri 12/21/18Tue 1/22/19Fri 1/25/19NANA2112130%MEP Trim4 daysTue 12/18/18Fri 12/21/18Tue 1/22/19Fri 1/25/19NANA211219,2152140%Shower Doors2 daysNANAFri 3/8/19Mon 3/11/19NANA1802482150%Carpet- Guestroom4 daysMon 12/24/18Thu 12/27/18Mon 1/28/19Thu 1/31/19NANA2132162160%Final Paint4 daysFri 12/28/18Wed 1/2/19Fri 2/1/19Wed 2/6/19NANA2152172170%Closet Shelving4 daysThu 1/3/19Tue 1/8/19Thu 2/7/19Tue 2/12/19NANA2162180%Corridors8 daysMon 12/24/18Wed 1/2/19Mon 1/28/19Wed 2/6/19NANA2190%VWC- Corridor3 daysMon 12/24/18Wed 12/26/18Mon 1/28/19Wed 1/30/19NANA2132202200%MEP Trim & Ceilings- Corridor3 daysThu 12/27/18Mon 12/31/18Thu 1/31/19Mon 2/4/19NANA219221SS2210%Carpet- Corridor5 daysThu 12/27/18Wed 1/2/19Thu 1/31/19Wed 2/6/19NANA220SS2232220%Cleaning/Punch/Inspections15 daysThu 1/3/19Wed 1/23/19Thu 2/7/19Wed 2/27/19NANA2230%Final Clean5 daysThu 1/3/19Wed 1/9/19Thu 2/7/19Wed 2/13/19NANA2212242240%Punch5 daysThu 1/10/19Wed 1/16/19Thu 2/14/19Wed 2/20/19NANA2232252250%Final Inspections5 daysThu 1/17/19Wed 1/23/19Thu 2/21/19Wed 2/27/19NANA2242260%Fourth Floor Finishes Area A (20 rooms/areas)83 daysThu 10/18/18Wed 1/30/19Mon 11/19/18Wed 3/13/19NANA2270%Wall & Ceiling Finishes44 daysThu 10/18/18Tue 12/11/18Mon 11/19/18Thu 1/17/19NANA2280%Electrical - Pull Wire & Inspect7 daysThu 10/18/18Wed 10/24/18Mon 11/19/18Tue 11/27/18NANA194229,2622290%Insulation3 daysThu 10/25/18Mon 10/29/18Wed 11/28/18Fri 11/30/18NANA228,195263,2302300%Drywall 1st Layer4 daysTue 10/30/18Fri 11/2/18Mon 12/3/18Thu 12/6/18NANA2292312310%Inspection on 1st Layer1 dayMon 11/5/18Mon 11/5/18Fri 12/7/18Fri 12/7/18NANA2302322320%Drywall 2nd Layer4 daysTue 11/6/18Fri 11/9/18Mon 12/10/18Thu 12/13/18NANA231233SS+1 day2330%Fire Tape4 daysWed 11/7/18Mon 11/12/18Tue 12/11/18Fri 12/14/18NANA232SS+1 day234SS+1 day2340%HVAC Rough In 4 daysThu 11/8/18Tue 11/13/18Wed 12/12/18Mon 12/17/18NANA233SS+1 day235SS+1 day,236SS+1 day2350%Metal Framing at Furdowns4 daysFri 11/9/18Wed 11/14/18Thu 12/13/18Tue 12/18/18NANA234SS+1 day2360%Electrical/ Sprinkler Rough In4 daysFri 11/9/18Wed 11/14/18Thu 12/13/18Tue 12/18/18NANA234SS+1 day2372370%Above Ceiling Inspections1 dayThu 11/15/18Thu 11/15/18Wed 12/19/18Wed 12/19/18NANA2362382380%Drywall Furdowns2 daysFri 11/16/18Mon 11/19/18Thu 12/20/18Fri 12/21/18NANA237239SS+1 day2390%Tape/Float/Texture10 daysWed 11/14/18Tue 11/27/18Fri 12/21/18Thu 1/3/19NANA238SS+1 day240,82400%Prime & Paint5 daysWed 11/28/18Tue 12/4/18Fri 1/4/19Thu 1/10/19NANA239241,2422410%Gypcrete5 daysWed 12/5/18Tue 12/11/18Fri 1/11/19Thu 1/17/19NANA2402420%Doors, Frames, & Hardware5 daysWed 12/5/18Tue 12/11/18Fri 1/11/19Thu 1/17/19NANA2402442430%Flooring, Millwork, & Trim39 daysWed 12/12/18Tue 1/15/19Fri 1/18/19Wed 3/13/19NANA2440%Ceramic Tile4 daysWed 12/12/18Mon 12/17/18Fri 1/18/19Wed 1/23/19NANA242245SS+5 days2450%Cabinets & Granite4 daysWed 12/19/18Mon 12/24/18Fri 1/25/19Wed 1/30/19NANA244SS+5 days16SF-1 day,246,2472460%Toilet/ Bath Access4 daysTue 12/25/18Fri 12/28/18Thu 1/31/19Tue 2/5/19NANA2452470%MEP Trim4 daysTue 12/25/18Fri 12/28/18Thu 1/31/19Tue 2/5/19NANA245253,2492480%Shower Doors2 daysNANATue 3/12/19Wed 3/13/19NANA2142822490%Carpet- Guestroom4 daysMon 12/31/18Thu 1/3/19Wed 2/6/19Mon 2/11/19NANA2472502500%Final Paint4 daysFri 1/4/19Wed 1/9/19Tue 2/12/19Fri 2/15/19NANA2492512510%Closet Shelving4 daysThu 1/10/19Tue 1/15/19Mon 2/18/19Thu 2/21/19NANA2502520%Corridors8 daysMon 12/31/18Wed 1/9/19Wed 2/6/19Fri 2/15/19NANA2530%VWC- Corridor3 daysMon 12/31/18Wed 1/2/19Wed 2/6/19Fri 2/8/19NANA2472542540%MEP Trim & Ceilings- Corridor3 daysThu 1/3/19Mon 1/7/19Mon 2/11/19Wed 2/13/19NANA253255SS2550%Carpet- Corridor5 daysThu 1/3/19Wed 1/9/19Mon 2/11/19Fri 2/15/19NANA254SS2572560%Cleaning/Punch/Inspections15 daysThu 1/10/19Wed 1/30/19Mon 2/18/19Fri 3/8/19NANA2570%Final Clean5 daysThu 1/10/19Wed 1/16/19Mon 2/18/19Fri 2/22/19NANA2552582580%Punch5 daysThu 1/17/19Wed 1/23/19Mon 2/25/19Fri 3/1/19NANA2572592590%Final Inspections5 daysThu 1/24/19Wed 1/30/19Mon 3/4/19Fri 3/8/19NANA25812/17 Prime & Paint12/24 Gypcrete12/24 Doors, Frames, & HardwareFlooring, Millwork, & Trim12/31 Ceramic Tile1/7 Cabinets & Granite1/11 Toilet/ Bath Access1/11 MEP Trim3/6 Shower Doors1/17 Carpet- Guestroom1/23 Final Paint1/29 Closet ShelvingCorridors1/17 VWC- Corridor1/22 MEP Trim & Ceilings- Corridor1/22 Carpet- CorridorCleaning/Punch/Inspections1/29 Final Clean2/5 Punch2/12 Final InspectionsFifth Floor Finishes Area B (20 rooms/areas)Wall & Ceiling Finishes11/8 Electrical - Pull Wire & Inspect11/19 Insulation11/22 Drywall 1st Layer11/28 Inspection on 1st Layer11/29 Drywall 2nd Layer11/30 Fire Tape12/3 HVAC Rough In 12/4 Metal Framing at Furdowns12/4 Electrical/ Sprinkler Rough In12/10 Above Ceiling Inspections12/11 Drywall Furdowns12/12 Tape/Float/Texture12/26 Prime & Paint1/2 Gypcrete1/2 Doors, Frames, & HardwareFlooring, Millwork, & Trim1/9 Ceramic Tile1/16 Cabinets & Granite1/22 Toilet/ Bath Access1/22 MEP Trim3/8 Shower Doors1/28 Carpet- Guestroom2/1 Final Paint2/7 Closet ShelvingCorridors1/28 VWC- Corridor1/31 MEP Trim & Ceilings- Corridor1/31 Carpet- CorridorCleaning/Punch/Inspections2/7 Final Clean2/14 Punch2/21 Final InspectionsFourth Floor Finishes Area A (20 rooms/areas)Wall & Ceiling Finishes11/19 Electrical - Pull Wire & Inspect11/28 Insulation12/3 Drywall 1st Layer12/7 Inspection on 1st Layer12/10 Drywall 2nd Layer12/11 Fire Tape12/12 HVAC Rough In 12/13 Metal Framing at Furdowns12/13 Electrical/ Sprinkler Rough In12/19 Above Ceiling Inspections12/20 Drywall Furdowns12/21 Tape/Float/Texture1/4 Prime & Paint1/11 Gypcrete1/11 Doors, Frames, & HardwareFlooring, Millwork, & Trim1/18 Ceramic Tile1/25 Cabinets & Granite1/31 Toilet/ Bath Access1/31 MEP Trim3/12 Shower Doors2/6 Carpet- Guestroom2/12 Final Paint2/18 Closet ShelvingCorridors2/6 VWC- Corridor2/11 MEP Trim & Ceilings- Corridor2/11 Carpet- CorridorCleaning/Punch/Inspections2/18 Final Clean2/25 Punch3/4 Final InspectionsQ2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q12017201820192020202120222019Renton, WA Residence Inn Project Schedule EBCO GENERAL CONTRACTORTue 2/13/18 ID % CompleteTask NameDuration Baseline Start Baseline Finish Start Finish Actual Start Actual Finish Predecessors Successors2600%Fourth Floor Finishes Area B (20 rooms/areas)80 daysThu 10/25/18Wed 2/6/19Wed 11/28/18Tue 3/19/19NANA2610%Wall & Ceiling Finishes44 daysThu 10/25/18Tue 12/18/18Wed 11/28/18Mon 1/28/19NANA2620%Electrical - Pull Wire & Inspect7 daysThu 10/25/18Wed 10/31/18Wed 11/28/18Thu 12/6/18NANA228263,2962630%Insulation3 daysThu 11/1/18Mon 11/5/18Fri 12/7/18Tue 12/11/18NANA262,229264,2972640%Drywall 1st Layer4 daysTue 11/6/18Fri 11/9/18Wed 12/12/18Mon 12/17/18NANA2632652650%Inspection on 1st Layer1 dayMon 11/12/18Mon 11/12/18Tue 12/18/18Tue 12/18/18NANA2642662660%Drwyall 2nd Layer4 daysTue 11/13/18Fri 11/16/18Wed 12/19/18Mon 12/24/18NANA265267SS+1 day2670%Fire Tape4 daysWed 11/14/18Mon 11/19/18Thu 12/20/18Tue 12/25/18NANA266SS+1 day268SS+1 day2680%HVAC Rough In 4 daysThu 11/15/18Tue 11/20/18Fri 12/21/18Wed 12/26/18NANA267SS+1 day269SS+1 day,270SS+1 day2690%Metal Framing at Furdowns4 daysFri 11/16/18Wed 11/21/18Mon 12/24/18Thu 12/27/18NANA268SS+1 day2700%Electrical/ Sprinkler Rough In4 daysFri 11/16/18Wed 11/21/18Mon 12/24/18Thu 12/27/18NANA268SS+1 day2712710%Above Ceiling Inspections1 dayThu 11/22/18Thu 11/22/18Fri 12/28/18Fri 12/28/18NANA2702722720%Drywall Furdowns2 daysFri 11/23/18Mon 11/26/18Mon 12/31/18Tue 1/1/19NANA271273SS+1 day2730%Tape/Float/Texture10 daysWed 11/21/18Tue 12/4/18Tue 1/1/19Mon 1/14/19NANA272SS+1 day274,82740%Prime & Paint5 daysWed 12/5/18Tue 12/11/18Tue 1/15/19Mon 1/21/19NANA273275,2762750%Gypcrete5 daysWed 12/12/18Tue 12/18/18Tue 1/22/19Mon 1/28/19NANA2742760%Doors, Frames, & Hardware5 daysWed 12/12/18Tue 12/18/18Tue 1/22/19Mon 1/28/19NANA2742782770%Flooring, Millwork, & Trim34 daysWed 12/19/18Tue 1/22/19Tue 1/29/19Fri 3/15/19NANA2780%Ceramic Tile4 daysWed 12/19/18Mon 12/24/18Tue 1/29/19Fri 2/1/19NANA276279SS+5 days2790%Cabinets & Granite4 daysWed 12/26/18Mon 12/31/18Tue 2/5/19Fri 2/8/19NANA278SS+5 days16SF-1 day,280,2812800%Toilet/ Bath Access4 daysTue 1/1/19Fri 1/4/19Mon 2/11/19Thu 2/14/19NANA2792810%MEP Trim4 daysTue 1/1/19Fri 1/4/19Mon 2/11/19Thu 2/14/19NANA279287,2832820%Shower Doors2 daysNANAThu 3/14/19Fri 3/15/19NANA2483162830%Carpet- Guestroom4 daysMon 1/7/19Thu 1/10/19Fri 2/15/19Wed 2/20/19NANA2812842840%Final Paint4 daysFri 1/11/19Wed 1/16/19Thu 2/21/19Tue 2/26/19NANA2832852850%Closet Shelving4 daysThu 1/17/19Tue 1/22/19Wed 2/27/19Mon 3/4/19NANA2842860%Corridors8 daysMon 1/7/19Wed 1/16/19Fri 2/15/19Tue 2/26/19NANA2870%VWC- Corridor3 daysMon 1/7/19Wed 1/9/19Fri 2/15/19Tue 2/19/19NANA2812882880%MEP Trim & Ceilings- Corridor3 daysThu 1/10/19Mon 1/14/19Wed 2/20/19Fri 2/22/19NANA287289SS2890%Carpet- Corridor5 daysThu 1/10/19Wed 1/16/19Wed 2/20/19Tue 2/26/19NANA288SS2912900%Cleaning/Punch/Inspections15 daysThu 1/17/19Wed 2/6/19Wed 2/27/19Tue 3/19/19NANA2910%Final Clean5 daysThu 1/17/19Wed 1/23/19Wed 2/27/19Tue 3/5/19NANA2892922920%Punch5 daysThu 1/24/19Wed 1/30/19Wed 3/6/19Tue 3/12/19NANA2912932930%Final Inspections5 daysThu 1/31/19Wed 2/6/19Wed 3/13/19Tue 3/19/19NANA2922940%Third Floor Finishes Area A (20 rooms/areas)80 daysThu 11/1/18Wed 2/13/19Fri 12/7/18Thu 3/28/19NANA2950%Wall & Ceiling Finishes44 daysThu 11/1/18Tue 12/25/18Fri 12/7/18Wed 2/6/19NANA2960%Electrical - Pull Wire & Inspect7 daysThu 11/1/18Wed 11/7/18Fri 12/7/18Mon 12/17/18NANA262297,3302970%Insulation3 daysThu 11/8/18Mon 11/12/18Tue 12/18/18Thu 12/20/18NANA296,263298,3312980%Drywall 1st Layer4 daysTue 11/13/18Fri 11/16/18Fri 12/21/18Wed 12/26/18NANA2972992990%Inspection on 1st Layer1 dayMon 11/19/18Mon 11/19/18Thu 12/27/18Thu 12/27/18NANA2983003000%Drywall 2nd Layer4 daysTue 11/20/18Fri 11/23/18Fri 12/28/18Wed 1/2/19NANA299301SS+1 day3010%Fire Tape4 daysWed 11/21/18Mon 11/26/18Mon 12/31/18Thu 1/3/19NANA300SS+1 day302SS+1 day3020%HVAC Rough In 4 daysThu 11/22/18Tue 11/27/18Tue 1/1/19Fri 1/4/19NANA301SS+1 day303SS+1 day,304SS+1 day3030%Metal Framing at Furdowns4 daysFri 11/23/18Wed 11/28/18Wed 1/2/19Mon 1/7/19NANA302SS+1 day3040%Electrical/ Sprinkler Rough In4 daysFri 11/23/18Wed 11/28/18Wed 1/2/19Mon 1/7/19NANA302SS+1 day3053050%Above Ceiling Inspections1 dayThu 11/29/18Thu 11/29/18Tue 1/8/19Tue 1/8/19NANA3043063060%Drywall Furdowns2 daysFri 11/30/18Mon 12/3/18Wed 1/9/19Thu 1/10/19NANA305307SS+1 day3070%Tape/Float/Texture10 daysWed 11/28/18Tue 12/11/18Thu 1/10/19Wed 1/23/19NANA306SS+1 day308,83080%Prime & Paint5 daysWed 12/12/18Tue 12/18/18Thu 1/24/19Wed 1/30/19NANA307309,3103090%Gypcrete5 daysWed 12/19/18Tue 12/25/18Thu 1/31/19Wed 2/6/19NANA3083100%Doors, Frames, & Hardware5 daysWed 12/19/18Tue 12/25/18Thu 1/31/19Wed 2/6/19NANA3083123110%Flooring, Millwork, & Trim29 daysWed 12/26/18Tue 1/29/19Thu 2/7/19Tue 3/19/19NANA3120%Ceramic Tile4 daysWed 12/26/18Mon 12/31/18Thu 2/7/19Tue 2/12/19NANA310313SS+5 days3130%Cabinets & Granite4 daysWed 1/2/19Mon 1/7/19Thu 2/14/19Tue 2/19/19NANA312SS+5 days16SF-1 day,314,3153140%Toilet/ Bath Access4 daysTue 1/8/19Fri 1/11/19Wed 2/20/19Mon 2/25/19NANA3133150%MEP Trim4 daysTue 1/8/19Fri 1/11/19Wed 2/20/19Mon 2/25/19NANA313321,3173160%Shower Doors2 daysNANAMon 3/18/19Tue 3/19/19NANA2823503170%Carpet- Guestroom4 daysMon 1/14/19Thu 1/17/19Tue 2/26/19Fri 3/1/19NANA3153183180%Final Paint4 daysFri 1/18/19Wed 1/23/19Mon 3/4/19Thu 3/7/19NANA3173193190%Closet Shelving4 daysThu 1/24/19Tue 1/29/19Fri 3/8/19Wed 3/13/19NANA3183200%Corridors8 daysMon 1/14/19Wed 1/23/19Tue 2/26/19Thu 3/7/19NANA3210%VWC- Corridor3 daysMon 1/14/19Wed 1/16/19Tue 2/26/19Thu 2/28/19NANA3153223220%MEP Trim & Ceilings- Corridor3 daysThu 1/17/19Mon 1/21/19Fri 3/1/19Tue 3/5/19NANA321323SS3230%Carpet- Corridor5 daysThu 1/17/19Wed 1/23/19Fri 3/1/19Thu 3/7/19NANA322SS3253240%Cleaning/Punch/Inspections15 daysThu 1/24/19Wed 2/13/19Fri 3/8/19Thu 3/28/19NANA3250%Final Clean5 daysThu 1/24/19Wed 1/30/19Fri 3/8/19Thu 3/14/19NANA3233263260%Punch5 daysThu 1/31/19Wed 2/6/19Fri 3/15/19Thu 3/21/19NANA3253273270%Final Inspections5 daysThu 2/7/19Wed 2/13/19Fri 3/22/19Thu 3/28/19NANA3263280%Third Floor Finishes Area B (20 rooms/areas)80 daysThu 11/8/18Wed 2/20/19Tue 12/18/18Mon 4/8/19NANA3290%Wall & Ceiling Finishes44 daysThu 11/8/18Tue 1/1/19Tue 12/18/18Fri 2/15/19NANA3300%Electrical - Pull Wire & Inspect7 daysThu 11/8/18Wed 11/14/18Tue 12/18/18Wed 12/26/18NANA296331,3643310%Insulation3 daysThu 11/15/18Mon 11/19/18Thu 12/27/18Mon 12/31/18NANA330,297332,3653320%Drywall 1st Layer4 daysTue 11/20/18Fri 11/23/18Tue 1/1/19Fri 1/4/19NANA3313333330%Inspection on 1st Layer1 dayMon 11/26/18Mon 11/26/18Mon 1/7/19Mon 1/7/19NANA3323343340%Drywall 2nd Layer4 daysTue 11/27/18Fri 11/30/18Tue 1/8/19Fri 1/11/19NANA333335SS+1 day3350%Fire Tape4 daysWed 11/28/18Mon 12/3/18Wed 1/9/19Mon 1/14/19NANA334SS+1 day336SS+1 day3360%HVAC Rough In 4 daysThu 11/29/18Tue 12/4/18Thu 1/10/19Tue 1/15/19NANA335SS+1 day337SS+1 day,338SS+1 day3370%Metal Framing at Furdowns4 daysFri 11/30/18Wed 12/5/18Fri 1/11/19Wed 1/16/19NANA336SS+1 day3380%Electrical/ Sprinkler Rough In4 daysFri 11/30/18Wed 12/5/18Fri 1/11/19Wed 1/16/19NANA336SS+1 day3393390%Above Ceiling Inspections1 dayThu 12/6/18Thu 12/6/18Thu 1/17/19Thu 1/17/19NANA3383403400%Drywall Furdowns2 daysFri 12/7/18Mon 12/10/18Fri 1/18/19Mon 1/21/19NANA339341SS+1 day3410%Tape/Float/Texture10 daysWed 12/5/18Tue 12/18/18Mon 1/21/19Fri 2/1/19NANA340SS+1 day342,83420%Prime & Paint5 daysWed 12/19/18Tue 12/25/18Mon 2/4/19Fri 2/8/19NANA341343,3443430%Gypcrete5 daysWed 12/26/18Tue 1/1/19Mon 2/11/19Fri 2/15/19NANA3423440%Doors, Frames, & Hardware5 daysWed 12/26/18Tue 1/1/19Mon 2/11/19Fri 2/15/19NANA3423463450%Flooring, Millwork, & Trim25 daysWed 1/2/19Tue 2/5/19Mon 2/18/19Fri 3/22/19NANA3460%Ceramic Tile4 daysWed 1/2/19Mon 1/7/19Mon 2/18/19Thu 2/21/19NANA344347SS+5 days3470%Cabinets & Granite4 daysWed 1/9/19Mon 1/14/19Mon 2/25/19Thu 2/28/19NANA346SS+5 days16SF-1 day,348,3493480%Toilet/ Bath Access4 daysTue 1/15/19Fri 1/18/19Fri 3/1/19Wed 3/6/19NANA347Fourth Floor Finishes Area B (20 rooms/areas)Wall & Ceiling Finishes11/28 Electrical - Pull Wire & Inspect12/7 Insulation12/12 Drywall 1st Layer12/18 Inspection on 1st Layer12/19 Drwyall 2nd Layer12/20 Fire Tape12/21 HVAC Rough In 12/24 Metal Framing at Furdowns12/24 Electrical/ Sprinkler Rough In12/28 Above Ceiling Inspections12/31 Drywall Furdowns1/1 Tape/Float/Texture1/15 Prime & Paint1/22 Gypcrete1/22 Doors, Frames, & HardwareFlooring, Millwork, & Trim1/29 Ceramic Tile2/5 Cabinets & Granite2/11 Toilet/ Bath Access2/11 MEP Trim3/14 Shower Doors2/15 Carpet- Guestroom2/21 Final Paint2/27 Closet ShelvingCorridors2/15 VWC- Corridor2/20 MEP Trim & Ceilings- Corridor2/20 Carpet- CorridorCleaning/Punch/Inspections2/27 Final Clean3/6 Punch3/13 Final InspectionsThird Floor Finishes Area A (20 rooms/areas)Wall & Ceiling Finishes12/7 Electrical - Pull Wire & Inspect12/18 Insulation12/21 Drywall 1st Layer12/27 Inspection on 1st Layer12/28 Drywall 2nd Layer12/31 Fire Tape1/1 HVAC Rough In 1/2 Metal Framing at Furdowns1/2 Electrical/ Sprinkler Rough In1/8 Above Ceiling Inspections1/9 Drywall Furdowns1/10 Tape/Float/Texture1/24 Prime & Paint1/31 Gypcrete1/31 Doors, Frames, & HardwareFlooring, Millwork, & Trim2/7 Ceramic Tile2/14 Cabinets & Granite2/20 Toilet/ Bath Access2/20 MEP Trim3/18 Shower Doors2/26 Carpet- Guestroom3/4 Final Paint3/8 Closet ShelvingCorridors2/26 VWC- Corridor3/1 MEP Trim & Ceilings- Corridor3/1 Carpet- CorridorCleaning/Punch/Inspections3/8 Final Clean3/15 Punch3/22 Final InspectionsThird Floor Finishes Area B (20 rooms/areas)Wall & Ceiling Finishes12/18 Electrical - Pull Wire & Inspect12/27 Insulation1/1 Drywall 1st Layer1/7 Inspection on 1st Layer1/8 Drywall 2nd Layer1/9 Fire Tape1/10 HVAC Rough In 1/11 Metal Framing at Furdowns1/11 Electrical/ Sprinkler Rough In1/17 Above Ceiling Inspections1/18 Drywall Furdowns1/21 Tape/Float/Texture2/4 Prime & Paint2/11 Gypcrete2/11 Doors, Frames, & HardwareFlooring, Millwork, & Trim2/18 Ceramic Tile2/25 Cabinets & Granite3/1 Toilet/ Bath AccessQ2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q12017201820192020202120222019Renton, WA Residence Inn Project Schedule EBCO GENERAL CONTRACTORTue 2/13/18 ID % CompleteTask NameDuration Baseline Start Baseline Finish Start Finish Actual Start Actual Finish Predecessors Successors3490%MEP Trim4 daysTue 1/15/19Fri 1/18/19Fri 3/1/19Wed 3/6/19NANA347355,3513500%Shower Doors2 daysNANAWed 3/20/19Thu 3/21/19NANA3163843510%Carpet- Guestroom4 daysMon 1/21/19Thu 1/24/19Thu 3/7/19Tue 3/12/19NANA3493523520%Final Paint4 daysFri 1/25/19Wed 1/30/19Wed 3/13/19Mon 3/18/19NANA3513533530%Closet Shelving4 daysThu 1/31/19Tue 2/5/19Tue 3/19/19Fri 3/22/19NANA3523540%Corridors8 daysMon 1/21/19Wed 1/30/19Thu 3/7/19Mon 3/18/19NANA3550%VWC- Corridor3 daysMon 1/21/19Wed 1/23/19Thu 3/7/19Mon 3/11/19NANA3493563560%MEP Trim & Ceilings- Corridor3 daysThu 1/24/19Mon 1/28/19Tue 3/12/19Thu 3/14/19NANA355357SS3570%Carpet- Corridor5 daysThu 1/24/19Wed 1/30/19Tue 3/12/19Mon 3/18/19NANA356SS3593580%Cleaning/Punch/Inspections15 daysThu 1/31/19Wed 2/20/19Tue 3/19/19Mon 4/8/19NANA3590%Final Clean5 daysThu 1/31/19Wed 2/6/19Tue 3/19/19Mon 3/25/19NANA3573603600%Punch5 daysThu 2/7/19Wed 2/13/19Tue 3/26/19Mon 4/1/19NANA3593613610%Final Inspections5 daysThu 2/14/19Wed 2/20/19Tue 4/2/19Mon 4/8/19NANA3603620%Second Floor Finishes Area A (20 rooms/areas)80 daysThu 11/15/18Wed 2/27/19Thu 12/27/18Wed 4/17/19NANA3630%Wall & Ceiling Finishes44 daysThu 11/15/18Tue 1/8/19Thu 12/27/18Tue 2/26/19NANA3640%Electrical - Pull Wire & Inspect7 daysThu 11/15/18Wed 11/21/18Thu 12/27/18Fri 1/4/19NANA330365,3983650%Insulation3 daysThu 11/22/18Mon 11/26/18Mon 1/7/19Wed 1/9/19NANA364,331366,3993660%Drywall 1st Layer4 daysTue 11/27/18Fri 11/30/18Thu 1/10/19Tue 1/15/19NANA3653673670%Inspection on 1st Layer1 dayMon 12/3/18Mon 12/3/18Wed 1/16/19Wed 1/16/19NANA3663683680%Drwyall 2nd Layer4 daysTue 12/4/18Fri 12/7/18Thu 1/17/19Tue 1/22/19NANA367369SS+1 day3690%Fire Tape4 daysWed 12/5/18Mon 12/10/18Fri 1/18/19Wed 1/23/19NANA368SS+1 day370SS+1 day3700%HVAC Rough In 4 daysThu 12/6/18Tue 12/11/18Mon 1/21/19Thu 1/24/19NANA369SS+1 day371SS+1 day,372SS+1 day3710%Metal Framing at Furdowns4 daysFri 12/7/18Wed 12/12/18Tue 1/22/19Fri 1/25/19NANA370SS+1 day3720%Electrical/ Sprinkler Rough In4 daysFri 12/7/18Wed 12/12/18Tue 1/22/19Fri 1/25/19NANA370SS+1 day3733730%Above Ceiling Inspections1 dayThu 12/13/18Thu 12/13/18Mon 1/28/19Mon 1/28/19NANA3723743740%Drywall Furdowns2 daysFri 12/14/18Mon 12/17/18Tue 1/29/19Wed 1/30/19NANA373375SS+1 day3750%Tape/Float/Texture10 daysWed 12/12/18Tue 12/25/18Wed 1/30/19Tue 2/12/19NANA374SS+1 day376,83760%Prime & Paint5 daysWed 12/26/18Tue 1/1/19Wed 2/13/19Tue 2/19/19NANA375377,3783770%Gypcrete5 daysWed 1/2/19Tue 1/8/19Wed 2/20/19Tue 2/26/19NANA3763780%Doors, Frames, & Hardware5 daysWed 1/2/19Tue 1/8/19Wed 2/20/19Tue 2/26/19NANA3763803790%Flooring, Millwork, & Trim25 daysWed 1/9/19Tue 2/12/19Wed 2/27/19Tue 4/2/19NANA3800%Ceramic Tile4 daysWed 1/9/19Mon 1/14/19Wed 2/27/19Mon 3/4/19NANA378381SS+5 days3810%Cabinets & Granite4 daysWed 1/16/19Mon 1/21/19Wed 3/6/19Mon 3/11/19NANA380SS+5 days16SF-1 day,382,3833820%Toilet/ Bath Access4 daysTue 1/22/19Fri 1/25/19Tue 3/12/19Fri 3/15/19NANA3813830%MEP Trim4 daysTue 1/22/19Fri 1/25/19Tue 3/12/19Fri 3/15/19NANA381389,3853840%Shower Doors2 daysNANAFri 3/22/19Mon 3/25/19NANA3504183850%Carpet- Guestroom4 daysMon 1/28/19Thu 1/31/19Mon 3/18/19Thu 3/21/19NANA3833863860%Final Paint4 daysFri 2/1/19Wed 2/6/19Fri 3/22/19Wed 3/27/19NANA3853873870%Closet Shelving4 daysThu 2/7/19Tue 2/12/19Thu 3/28/19Tue 4/2/19NANA3863880%Corridors8 daysMon 1/28/19Wed 2/6/19Mon 3/18/19Wed 3/27/19NANA3890%VWC- Corridor3 daysMon 1/28/19Wed 1/30/19Mon 3/18/19Wed 3/20/19NANA3833903900%MEP Trim & Ceilings- Corridor3 daysThu 1/31/19Mon 2/4/19Thu 3/21/19Mon 3/25/19NANA389391SS3910%Carpet- Corridor5 daysThu 1/31/19Wed 2/6/19Thu 3/21/19Wed 3/27/19NANA390SS3933920%Cleaning/Punch/Inspections15 daysThu 2/7/19Wed 2/27/19Thu 3/28/19Wed 4/17/19NANA3930%Final Clean5 daysThu 2/7/19Wed 2/13/19Thu 3/28/19Wed 4/3/19NANA3913943940%Punch5 daysThu 2/14/19Wed 2/20/19Thu 4/4/19Wed 4/10/19NANA3933953950%Final Inspections5 daysThu 2/21/19Wed 2/27/19Thu 4/11/19Wed 4/17/19NANA3943960%Second Floor Finishes Area B (20 rooms/areas)80 daysThu 11/22/18Wed 3/6/19Mon 1/7/19Fri 4/26/19NANA3970%Wall & Ceiling Finishes44 daysThu 11/22/18Tue 1/15/19Mon 1/7/19Thu 3/7/19NANA3980%Electrical - Pull Wire & Inspect7 daysThu 11/22/18Wed 11/28/18Mon 1/7/19Tue 1/15/19NANA3643993990%Insulation3 daysThu 11/29/18Mon 12/3/18Wed 1/16/19Fri 1/18/19NANA398,3654004000%Drywall 1st Layer4 daysTue 12/4/18Fri 12/7/18Mon 1/21/19Thu 1/24/19NANA3994014010%Inspection on 1st Layer1 dayMon 12/10/18Mon 12/10/18Fri 1/25/19Fri 1/25/19NANA4004024020%Drywall 2nd Layer4 daysTue 12/11/18Fri 12/14/18Mon 1/28/19Thu 1/31/19NANA401403SS+1 day4030%Fire Tape4 daysWed 12/12/18Mon 12/17/18Tue 1/29/19Fri 2/1/19NANA402SS+1 day404SS+1 day4040%HVAC Rough In 4 daysThu 12/13/18Tue 12/18/18Wed 1/30/19Mon 2/4/19NANA403SS+1 day405SS+1 day,406SS+1 day4050%Metal Framing at Furdowns4 daysFri 12/14/18Wed 12/19/18Thu 1/31/19Tue 2/5/19NANA404SS+1 day4060%Electrical/ Sprinkler Rough In4 daysFri 12/14/18Wed 12/19/18Thu 1/31/19Tue 2/5/19NANA404SS+1 day4074070%Above Ceiling Inspections1 dayThu 12/20/18Thu 12/20/18Wed 2/6/19Wed 2/6/19NANA4064084080%Drywall Furdowns2 daysFri 12/21/18Mon 12/24/18Thu 2/7/19Fri 2/8/19NANA407409SS+1 day4090%Tape/Float/Texture10 daysWed 12/19/18Tue 1/1/19Fri 2/8/19Thu 2/21/19NANA408SS+1 day410,84100%Prime & Paint5 daysWed 1/2/19Tue 1/8/19Fri 2/22/19Thu 2/28/19NANA409411,4124110%Gypcrete5 daysWed 1/9/19Tue 1/15/19Fri 3/1/19Thu 3/7/19NANA4104120%Doors, Frames, & Hardware5 daysWed 1/9/19Tue 1/15/19Fri 3/1/19Thu 3/7/19NANA4104144130%Flooring, Millwork, & Trim25 daysWed 1/16/19Tue 2/19/19Fri 3/8/19Thu 4/11/19NANA4140%Ceramic Tile4 daysWed 1/16/19Mon 1/21/19Fri 3/8/19Wed 3/13/19NANA412415SS+5 days4150%Cabinets & Granite4 daysWed 1/23/19Mon 1/28/19Fri 3/15/19Wed 3/20/19NANA414SS+5 days16SF-1 day,416,4174160%Toilet/ Bath Access4 daysTue 1/29/19Fri 2/1/19Thu 3/21/19Tue 3/26/19NANA4154170%MEP Trim4 daysTue 1/29/19Fri 2/1/19Thu 3/21/19Tue 3/26/19NANA415423,419,180FS-3 wks4180%Shower Doors area 2B and punch all floors5 daysNANATue 3/26/19Mon 4/1/19NANA3844190%Carpet- Guestroom4 daysMon 2/4/19Thu 2/7/19Wed 3/27/19Mon 4/1/19NANA4174204200%Final Paint4 daysFri 2/8/19Wed 2/13/19Tue 4/2/19Fri 4/5/19NANA4194214210%Closet Shelving4 daysThu 2/14/19Tue 2/19/19Mon 4/8/19Thu 4/11/19NANA4204220%Corridors8 daysMon 2/4/19Wed 2/13/19Wed 3/27/19Fri 4/5/19NANA4230%VWC- Corridor3 daysMon 2/4/19Wed 2/6/19Wed 3/27/19Fri 3/29/19NANA4174244240%MEP Trim & Ceilings- Corridor3 daysThu 2/7/19Mon 2/11/19Mon 4/1/19Wed 4/3/19NANA423425SS4250%Carpet- Corridor5 daysThu 2/7/19Wed 2/13/19Mon 4/1/19Fri 4/5/19NANA424SS4274260%Cleaning/Punch/Inspections15 daysThu 2/14/19Wed 3/6/19Mon 4/8/19Fri 4/26/19NANA4270%Final Clean5 daysThu 2/14/19Wed 2/20/19Mon 4/8/19Fri 4/12/19NANA4254284280%Punch5 daysThu 2/21/19Wed 2/27/19Mon 4/15/19Fri 4/19/19NANA4274294290%Final Inspections5 daysThu 2/28/19Wed 3/6/19Mon 4/22/19Fri 4/26/19NANA4284304300%Complete Guest Tower Construction0 daysWed 11/1/17Wed 11/1/17Fri 4/26/19Fri 4/26/19NANA429493,4904310%Public Areas & BOH Construction152 daysThu 6/28/18Wed 3/27/19Tue 7/24/18Wed 2/20/19NANA4320%Framing & Rough Ins50 daysThu 6/28/18Wed 11/7/18Tue 7/24/18Mon 10/1/18NANA4330%Metal Framing 15 daysThu 6/28/18Wed 7/11/18Tue 7/24/18Mon 8/13/18NANA126FS+8 days436,4344340%Prerock5 daysNANATue 8/14/18Mon 8/20/18NANA4334353/1 MEP Trim3/20 Shower Doors3/7 Carpet- Guestroom3/13 Final Paint3/19 Closet ShelvingCorridors3/7 VWC- Corridor3/12 MEP Trim & Ceilings- Corridor3/12 Carpet- CorridorCleaning/Punch/Inspections3/19 Final Clean3/26 Punch4/2 Final InspectionsSecond Floor Finishes Area A (20 rooms/areas)Wall & Ceiling Finishes12/27 Electrical - Pull Wire & Inspect1/7 Insulation1/10 Drywall 1st Layer1/16 Inspection on 1st Layer1/17 Drwyall 2nd Layer1/18 Fire Tape1/21 HVAC Rough In 1/22 Metal Framing at Furdowns1/22 Electrical/ Sprinkler Rough In1/28 Above Ceiling Inspections1/29 Drywall Furdowns1/30 Tape/Float/Texture2/13 Prime & Paint2/20 Gypcrete2/20 Doors, Frames, & HardwareFlooring, Millwork, & Trim2/27 Ceramic Tile3/6 Cabinets & Granite3/12 Toilet/ Bath Access3/12 MEP Trim3/22 Shower Doors3/18 Carpet- Guestroom3/22 Final Paint3/28 Closet ShelvingCorridors3/18 VWC- Corridor3/21 MEP Trim & Ceilings- Corridor3/21 Carpet- CorridorCleaning/Punch/Inspections3/28 Final Clean4/4 Punch4/11 Final InspectionsSecond Floor Finishes Area B (20 rooms/areas)Wall & Ceiling Finishes1/7 Electrical - Pull Wire & Inspect1/16 Insulation1/21 Drywall 1st Layer1/25 Inspection on 1st Layer1/28 Drywall 2nd Layer1/29 Fire Tape1/30 HVAC Rough In 1/31 Metal Framing at Furdowns1/31 Electrical/ Sprinkler Rough In2/6 Above Ceiling Inspections2/7 Drywall Furdowns2/8 Tape/Float/Texture2/22 Prime & Paint3/1 Gypcrete3/1 Doors, Frames, & HardwareFlooring, Millwork, & Trim3/8 Ceramic Tile3/15 Cabinets & Granite3/21 Toilet/ Bath Access3/21 MEP Trim3/26 Shower Doors area 2B and punch all floors3/27 Carpet- Guestroom4/2 Final Paint4/8 Closet ShelvingCorridors3/27 VWC- Corridor4/1 MEP Trim & Ceilings- Corridor4/1 Carpet- CorridorCleaning/Punch/Inspections4/8 Final Clean4/15 Punch4/22 Final Inspections4/26 Complete Guest Tower ConstructionPublic Areas & BOH ConstructionFraming & Rough Ins7/24 Metal Framing 8/14 PrerockQ2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q12017201820192020202120222019Renton, WA Residence Inn Project Schedule EBCO GENERAL CONTRACTORTue 2/13/18 ID % CompleteTask NameDuration Baseline Start Baseline Finish Start Finish Actual Start Actual Finish Predecessors Successors4350%Storefront Windows & Doors5 daysThu 10/11/18Wed 10/17/18Tue 8/21/18Mon 8/27/18NANA4344360%MEP Rough-In's15 daysThu 10/11/18Wed 10/31/18Tue 8/14/18Mon 9/3/18NANA4334374370%Temporary Dry-In around all penetrations5 daysNANATue 9/4/18Mon 9/10/18NANA4364384380%Rough in Electrical, Finish MP Rough Ins10 daysNANATue 9/11/18Mon 9/24/18NANA4374394390%Cover Up Inspections5 daysThu 11/1/18Wed 11/7/18Tue 9/25/18Mon 10/1/18NANA4384424400%Finishes102 daysThu 11/8/18Wed 3/27/19Tue 10/2/18Wed 2/20/19NANA4410%Wall & Ceiling Finishes47 daysThu 11/8/18Wed 1/9/19Tue 10/2/18Wed 12/5/18NANA4420%Insulation5 daysThu 11/8/18Wed 11/14/18Tue 10/2/18Mon 10/8/18NANA4394434430%Drywall10 daysThu 11/15/18Wed 11/28/18Tue 10/9/18Mon 10/22/18NANA442449,450,4444440%Metal Framing Furdowns6 daysThu 11/29/18Thu 12/6/18Tue 10/23/18Tue 10/30/18NANA4434454450%MEP Rough Ins Above Furdowns8 daysFri 12/7/18Tue 12/18/18Wed 10/31/18Fri 11/9/18NANA4444464460%Drywall Furdowns5 daysWed 12/19/18Tue 12/25/18Mon 11/12/18Fri 11/16/18NANA445447SS+3 days4470%Tape/Float/Texture10 daysThu 12/20/18Wed 1/2/19Thu 11/15/18Wed 11/28/18NANA446SS+3 days448,84480%Prime & Paint5 daysThu 1/3/19Wed 1/9/19Thu 11/29/18Wed 12/5/18NANA4474524490%Cornice & Crown10 daysThu 11/29/18Wed 12/12/18Tue 10/23/18Mon 11/5/18NANA4434500%Doors, Frames, & Hardware5 daysThu 11/29/18Wed 12/5/18Tue 10/23/18Mon 10/29/18NANA4434510%Flooring, Millwork, & Trim30 daysThu 1/10/19Wed 2/20/19Thu 12/6/18Wed 1/16/19NANA4520%Ceramic Tile5 daysThu 1/10/19Wed 1/16/19Thu 12/6/18Wed 12/12/18NANA448453,4544530%Cabinets & Granite10 daysThu 1/17/19Wed 1/30/19Thu 12/13/18Wed 12/26/18NANA4524554540%Toilet/ Bath Access5 daysThu 1/17/19Wed 1/23/19Thu 12/13/18Wed 12/19/18NANA4524550%MEP Trim5 daysThu 1/31/19Wed 2/6/19Thu 12/27/18Wed 1/2/19NANA453456,4594560%Carpet5 daysThu 2/7/19Wed 2/13/19Thu 1/3/19Wed 1/9/19NANA4554574570%Final Paint5 daysThu 2/14/19Wed 2/20/19Thu 1/10/19Wed 1/16/19NANA4564580%Corridors15 daysThu 2/7/19Wed 2/27/19Thu 1/3/19Wed 1/23/19NANA4590%VWC- Corridor5 daysThu 2/7/19Wed 2/13/19Thu 1/3/19Wed 1/9/19NANA4554604600%MEP Trim & Ceilings- Corridor5 daysThu 2/14/19Wed 2/20/19Thu 1/10/19Wed 1/16/19NANA4594614610%Carpet- Corridor5 daysThu 2/21/19Wed 2/27/19Thu 1/17/19Wed 1/23/19NANA4604634620%Cleaning/Punch/Inspections20 daysThu 2/28/19Wed 3/27/19Thu 1/24/19Wed 2/20/19NANA4630%Final Clean5 daysThu 2/28/19Wed 3/6/19Thu 1/24/19Wed 1/30/19NANA4614644640%Punch5 daysThu 3/7/19Wed 3/13/19Thu 1/31/19Wed 2/6/19NANA4634654650%Final Inspections10 daysThu 3/14/19Wed 3/27/19Thu 2/7/19Wed 2/20/19NANA464466,4904660%Complete Public Areas & BOH Construction0 daysWed 3/27/19Wed 3/27/19Wed 2/20/19Wed 2/20/19NANA4654670%Model Rooms28 daysThu 10/11/18Thu 11/8/18Tue 11/6/18Thu 12/13/18NANA4680%Finish wall MEP rough ins and cover up inspections3 daysNANATue 11/6/18Thu 11/8/18NANA1444694690%Insulation1 dayThu 10/11/18Fri 10/12/18Fri 11/9/18Fri 11/9/18NANA468470,14SF-1 day4700%Drywall 1st Layer2 daysMon 10/15/18Wed 10/17/18Mon 11/12/18Tue 11/13/18NANA4694714710%Inspection on 1st Layer1 dayNANAWed 11/14/18Wed 11/14/18NANA4704724720%Drywall 2nd Layer2 daysNANAThu 11/15/18Fri 11/16/18NANA4714734730%Fire Tape1 dayNANAMon 11/19/18Mon 11/19/18NANA4724744740%HVAC Rough In 1 dayNANATue 11/20/18Tue 11/20/18NANA4734754750%Metal Framing at Furdowns1 dayNANAWed 11/21/18Wed 11/21/18NANA4744764760%Electrical/ Sprinkler Rough In1 dayNANAThu 11/22/18Thu 11/22/18NANA4754774770%Above Ceiling Inspections1 dayNANAFri 11/23/18Fri 11/23/18NANA4764784780%Drywall Fur Downs1 dayNANAMon 11/26/18Mon 11/26/18NANA4774794790%Tape/Float/Texture5 daysThu 10/18/18Wed 10/24/18Tue 11/27/18Mon 12/3/18NANA4784804800%Paint3 daysThu 10/25/18Mon 10/29/18Tue 12/4/18Thu 12/6/18NANA4794814810%Doors & Trim2 daysTue 10/30/18Mon 11/5/18Fri 12/7/18Mon 12/10/18NANA4804824820%Ceramic Tile3 daysTue 11/6/18Thu 11/8/18Tue 12/11/18Thu 12/13/18NANA481483SS4830%Cabinets/Granite2 daysTue 11/6/18Wed 11/7/18Tue 12/11/18Wed 12/12/18NANA482SS484SS4840%Set Plumbing Fixtures3 daysTue 11/6/18Wed 11/7/18Tue 12/11/18Thu 12/13/18NANA483SS485SS4850%MEP Trim3 daysTue 11/6/18Thu 11/8/18Tue 12/11/18Thu 12/13/18NANA484SS486SS4860%Punch Out2 daysTue 11/6/18Wed 11/7/18Tue 12/11/18Wed 12/12/18NANA485SS4874870%Owner Review1 dayThu 11/8/18Thu 11/8/18Thu 12/13/18Thu 12/13/18NANA48674880%MEP Equipment Installation60 daysThu 10/11/18Wed 1/2/19Tue 11/6/18Mon 1/28/19NANA144114890%Elevator Install15 wksThu 10/11/18Wed 1/23/19Tue 11/6/18Mon 2/18/19NANA14410SS,21SF-1 day4900%Building Turnover & Commissioning10 daysThu 3/28/19Thu 4/25/19Mon 4/29/19Fri 5/10/19NANA465,43012SS,4914910%TCO1 dayFri 4/26/19Fri 4/26/19Mon 5/13/19Mon 5/13/19NANA49012SS,497,493,4984920%Furniture Install/ Training40 daysMon 4/29/19Fri 5/24/19Tue 5/14/19Mon 7/8/19NANA4984930%Guestroom Furniture Install4 wksNANATue 5/14/19Mon 6/10/19NANA430,491494,4954940%Ryan M. Operations through guestrooms3 wksNANATue 6/11/19Mon 7/1/19NANA4934964950%Public Area Furniture Install2 wksNANATue 6/11/19Mon 6/24/19NANA4934964960%Staff Training1 wkNANATue 7/2/19Mon 7/8/19NANA494,4954970%CO1 monMon 5/27/19Fri 5/31/19Tue 5/14/19Mon 6/10/19NANA4914984980%Hotel Opening1 dayNANATue 7/9/19Tue 7/9/19NANA491,492,4974995000%Contract 17 Month to TCO/ Furniture Start370 daysMon 11/27/17Fri 4/26/19Mon 11/27/17Fri 4/26/19NANA5010%Building Permit Expires 7/1/19416 daysMon 11/27/17Mon 7/1/19Mon 11/27/17Mon 7/1/19NANA8/21 Storefront Windows & Doors8/14 MEP Rough-In's9/4 Temporary Dry-In around all penetrations9/11 Rough in Electrical, Finish MP Rough Ins9/25 Cover Up InspectionsFinishesWall & Ceiling Finishes10/2 Insulation10/9 Drywall10/23 Metal Framing Furdowns10/31 MEP Rough Ins Above Furdowns11/12 Drywall Furdowns11/15 Tape/Float/Texture11/29 Prime & Paint10/23 Cornice & Crown10/23 Doors, Frames, & HardwareFlooring, Millwork, & Trim12/6 Ceramic Tile12/13 Cabinets & Granite12/13 Toilet/ Bath Access12/27 MEP Trim1/3 Carpet1/10 Final PaintCorridors1/3 VWC- Corridor1/10 MEP Trim & Ceilings- Corridor1/17 Carpet- CorridorCleaning/Punch/Inspections1/24 Final Clean1/31 Punch2/7 Final Inspections2/20 Complete Public Areas & BOH ConstructionModel Rooms11/6 Finish wall MEP rough ins and cover up inspections11/9 Insulation11/12 Drywall 1st Layer11/14 Inspection on 1st Layer11/15 Drywall 2nd Layer11/19 Fire Tape11/20 HVAC Rough In 11/21 Metal Framing at Furdowns11/22 Electrical/ Sprinkler Rough In11/23 Above Ceiling Inspections11/26 Drywall Fur Downs11/27 Tape/Float/Texture12/4 Paint12/7 Doors & Trim12/11 Ceramic Tile12/11 Cabinets/Granite12/11 Set Plumbing Fixtures12/11 MEP Trim12/11 Punch Out12/13 Owner Review11/6 MEP Equipment Installation11/6 Elevator Install4/29 Building Turnover & Commissioning5/13 TCOFurniture Install/ Training5/14 Guestroom Furniture Install6/11 Ryan M. Operations through guestrooms6/11 Public Area Furniture Install7/2 Staff Training5/14 CO7/9 Hotel Opening11/27Contract 17 Month to TCO/ Furniture Start11/27Building Permit Expires 7/1/19Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q12017201820192020202120222019Renton, WA Residence Inn Project Schedule EBCO GENERAL CONTRACTORTue 2/13/18