HomeMy WebLinkAboutRE Renton Marriott signal revision drawingsWe added comments to the attached pdf files for your use. When you come in tomorrow, you can help me with the “approval with comments”. Thanks,
Chris M. Barnes, Sr.
Transportation Operations Manager
City of Renton, WA
Ph. No. 425-430-7220
cbarnes@rentonwa.gov <mailto:cbarnes@rentonwa.gov>
From: Rohini Nair
Sent: Tuesday, February 12, 2019 8:18 AM
To: Chris Barnes
Cc: Brianne Bannwarth
Subject: FW: Renton Marriott, signal revision drawings
Hi Chris,
Please let me know if you have any comments other than the ones that are marked up by Eric? If you do not have additional comments are you okay to give ‘approval with the comments’
for the comments given by Eric. I am out of office today due to snow driving concerns but will check my emails periodically.
Thanks
Rohini
From: Eric Cutshall
Sent: Monday, February 11, 2019 2:22 PM
To: Rohini Nair <RNair@Rentonwa.gov>; Chris Barnes <CBarnes@Rentonwa.gov>
Subject: RE: Renton Marriott, signal revision drawings dated: Revised 11-12-18
Attached are my comments.
Thank you,
Eric Cutshall
Transportation Maintenance Manager
City Of Renton, WA
(425)-430-7423
Ecutshall@rentonwa.gov <mailto:Ecutshall@rentonwa.gov>
Renton-Home of the XLVIII Super Bowl Champion Seahawks
From: Rohini Nair
Sent: Monday, February 04, 2019 6:54 AM
To: Eric Cutshall <ECutshall@Rentonwa.gov>; Chris Barnes <CBarnes@Rentonwa.gov>
Subject: FW: Renton Marriott, signal revision drawings dated: Revised 11-12-18
Hi,
Please review the attached revised Renton Marriott revision drawings by TENW to reflect the Lake Washington Blvd widening effects. The same engineer had worked on both projects.
They want stamp approval of the revision drawings.
Thanks
Rohini
MQD,LLC
425-419-6700