HomeMy WebLinkAboutStreet Lighting Inspection ChecklistCITY OF RENTON
STREET LIGHT-LUMINAIRE CHECKLIST
Last Modified: 2/20/2017
CONTACT: PHONE: EMAIL:
INSPECTOR NAMES: const/elect/maintenance
/ /
ELECTRICAL CONTRACTORS NAME:
PROJECT NAME(s): DATE OF INSPECTION COMPLETION:
LOCATION:
NOTE TO CONTRACTOR: Check to insure the following is installed as outlined in WSDOT Standard Specifications Section
8 & 9 or as amended by the Renton Standard details and is installed per the approved plans.
Construction Inspection Checklist
Lighting Contractor call 425-430-7203 for inspections 1-3
Date of
Inspection:
Initials of
Inspector
If Accepted
CONSTRUCTION PERMIT#
COMMENTS
1. Pole Foundations
2. Base Bolts
3. Cabinet foundation and Type
Electrical Construction Inspection Checklist
Lighting Contractor call 425-430-7202 for inspection 4
Date of
Inspection:
Initials of
Inspector
If Accepted
ELECTRICAL PERMIT#
COMMENTS
4. Underground/Rough-In Inspection:
Junction Box/Conduit Size, Type, Burial
Transportation Maintenance Inspection Checklist
Lighting Contractor call 425-430-7423 for inspection 5
Date of
Inspection:
Initials of
Inspector
If Accepted
CONSTRUCTION PERMIT#
COMMENTS
5. Street Lighting Inspection for Project By City
Maintenance confirming standard details and
plans have been met prior to energizing (see
list below for typical inspection items).
Electrical Construction Inspection Checklist
Lighting Contractor call 425-430-7202 for inspections 6-7
Date of
Inspection:
Initials of
Inspector
If Accepted
ELECTRICAL PERMIT#
COMMENTS
6. Service Inspection:
Confirm electrical system conforms with
Electrical Code prior to being energized.
(See contractor requirements for energizing
system.)
7. Final Inspection:
Final Street Lighting Inspection for Project By
Electrical Inspector once street lighting has
been energized.
Inspection 5: Typical inspection items reviewed during Maintenance Inspection: conductor size, insulation, type;
electrical service panel (including address); grounding and connections; wire/splices/fuses; fixture
and associated parts; poles and plumb/nut covers; decorative pad around vault; street lighting pole
locations; pole numbers; and check for damage. Meg reading may be required.
Inspection 6: Following inspection, electrical contractor is required to submit application to PSE to energize the
street lighting. PSE application (201E) may be found at the following website:
https://pse.com/accountsandservices/Construction/CCS%20Forms/1378_201E.pdf