Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMarriott Residence Inn Civil pemrit revision to approve plan - 689-449-80612/18/2017
Attendees
rnair (rnair@rentonwa.gov)
bmahn (bmahn@rentonwa.gov)
aaskren (aaskren@rentonwa.gov)
cthomas (cthomas@rentonrfa.org)
vdolbee (vdolbee@rentonwa.gov)
Documents
15564 CIVIL OPT-3_11-28-17.pdf
15564-LS SET 11-28-17.pdf
C5-GRADING-AND-STORM-DRAINAGE-PLAN-LEVEL-1-Rev.6.pdf
SV301-STRUCTURAL---DETENTION-VAULT-DETAILS-Rev.2.pdf
Record
Message Date Time Document Page Label
1 rnair: Joined Session 12/13/2017 5:16 PM
2 rnair: Added '15564 CIVIL OPT-3_11-28-17.pdf'12/13/2017 5:16 PM 15564 CIVIL
OPT-3_11-28-17.pdf
3 rnair: Added '15564-LS SET 11-28-17.pdf'12/13/2017 5:16 PM 15564-LS SET 11-28-17.pdf
4 rnair: Added
'C5-GRADING-AND-STORM-DRAINAGE-PLAN-LEVEL-1-Rev
.6.pdf'
12/13/2017 5:16 PM C5-GRADING-AND-STORM-
DRAINAGE-PLAN-LEVEL-1-R
ev.6.pdf
5 rnair: Added
'SV301-STRUCTURAL---DETENTION-VAULT-DETAILS-Rev.
2.pdf'
12/13/2017 5:16 PM SV301-STRUCTURAL---DET
ENTION-VAULT-DETAILS-Re
v.2.pdf
6 rnair: Set status to Reviewing 12/13/2017 5:21 PM
7 rnair: Left Session 12/13/2017 5:24 PM
8 bmahn: Joined Session 12/14/2017 9:25 AM
9 bmahn: Left Session 12/14/2017 9:28 AM
10 bmahn: Joined Session 12/14/2017 9:28 AM
11 bmahn: Left Session 12/14/2017 9:29 AM
Message Date Time Document Page Label
12 bmahn: Joined Session 12/14/2017 11:34 AM
13 bmahn: Left Session 12/14/2017 12:05 PM
14 bmahn: Joined Session 12/14/2017 1:18 PM
15 bmahn: Left Session 12/14/2017 2:12 PM
16 bmahn: Joined Session 12/14/2017 2:22 PM
17 bmahn: Add Callout 12/14/2017 2:29 PM 15564 CIVIL
OPT-3_11-28-17.pdf
8
18 bmahn: Delete Callout 12/14/2017 2:29 PM 15564 CIVIL
OPT-3_11-28-17.pdf
8
19 bmahn: Left Session 12/14/2017 2:32 PM
20 aaskren: Joined Session 12/14/2017 4:14 PM
21 aaskren: Set status to Finished 12/14/2017 4:17 PM
22 aaskren: Left Session 12/14/2017 4:17 PM
23 cthomas: Joined Session 12/15/2017 1:49 PM
24 cthomas: Set status to Reviewing 12/15/2017 1:53 PM
25 cthomas: Set status to Waiting 12/15/2017 1:53 PM
26 cthomas: Set status to Reviewing 12/15/2017 1:53 PM
27 cthomas: Set status to Finished 12/15/2017 1:54 PM
28 cthomas: Left Session 12/15/2017 1:54 PM
29 vdolbee: Joined Session 12/17/2017 6:58 AM
30 vdolbee: Add Cloud+12/17/2017 7:02 AM 15564-LS SET 11-28-17.pdf 2
31 vdolbee: Edit Cloud+ (Shurbs are required to be a minimum
size of 2 gallons. )
12/17/2017 7:03 AM 15564-LS SET 11-28-17.pdf 2
32 vdolbee: Add Callout 12/17/2017 7:06 AM 15564-LS SET 11-28-17.pdf 7
33 vdolbee: Edit Callout (Irrigation should extend into the
expanded planing area. Alternatively, a drought toleration
planing plan can be proposed and associated temporary
irrigation provided for a minimum of two years. )
12/17/2017 7:08 AM 15564-LS SET 11-28-17.pdf 7
34 vdolbee: Set status to Finished 12/17/2017 10:41 AM
35 vdolbee: Left Session 12/17/2017 10:41 AM
36 rnair: Joined Session 12/18/2017 10:00 AM
Message Date Time Document Page Label
37 rnair: Add Cloud+12/18/2017 10:38 AM 15564 CIVIL
OPT-3_11-28-17.pdf
11
38 rnair: Edit Cloud+ (delete truncated dome)12/18/2017 10:38 AM 15564 CIVIL
OPT-3_11-28-17.pdf
11
39 rnair: Edit Markups 12/18/2017 10:38 AM 15564 CIVIL
OPT-3_11-28-17.pdf
11
40 rnair: Edit Cloud+12/18/2017 10:38 AM 15564 CIVIL
OPT-3_11-28-17.pdf
11
41 rnair: Add Cloud+12/18/2017 10:38 AM 15564 CIVIL
OPT-3_11-28-17.pdf
11
42 rnair: Edit Cloud+ (label tthickness)12/18/2017 10:38 AM 15564 CIVIL
OPT-3_11-28-17.pdf
11
43 rnair: Add Cloud+12/18/2017 10:39 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
44 rnair: Edit Cloud+ (ROE dedication for portion of sidewalk
within private property.
)
12/18/2017 10:40 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
45 rnair: Delete Cloud+12/18/2017 10:40 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
46 rnair: Add Callout 12/18/2017 10:40 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
47 rnair: Edit Callout (row dedication for portion of sidewalk
located within private property.)
12/18/2017 10:41 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
48 rnair: Edit Callout (row dedication for portion of public sidewalk
located within private property.)
12/18/2017 10:41 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
49 rnair: Add Callout 12/18/2017 10:41 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
Message Date Time Document Page Label
50 rnair: Edit Callout (stations for angle points in concrete
sidewalk)
12/18/2017 10:41 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
51 rnair: Add Arrow 12/18/2017 10:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
52 rnair: Add Arrow 12/18/2017 10:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
53 rnair: Edit Arrow 12/18/2017 10:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
54 rnair: Edit Arrow 12/18/2017 10:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
8
55 rnair: Add Highlight 12/18/2017 10:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
56 rnair: Add Highlight 12/18/2017 10:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
57 rnair: Add Highlight 12/18/2017 10:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
58 rnair: Add Highlight 12/18/2017 10:46 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
59 rnair: Add Cloud+12/18/2017 10:52 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
60 rnair: Edit Cloud+ (where is the legend for this symbol? )12/18/2017 10:53 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
61 rnair: Edit Cloud+12/18/2017 10:53 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
62 rnair: Edit Cloud+12/18/2017 10:53 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
63 rnair: Edit Cloud+12/18/2017 10:53 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
64 rnair: Add Highlight 12/18/2017 10:54 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
65 rnair: Add Highlight 12/18/2017 10:55 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
66 rnair: Edit Highlight 12/18/2017 10:56 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
67 rnair: Edit Highlight 12/18/2017 10:56 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
68 rnair: Left Session 12/18/2017 10:59 AM
69 rnair: Joined Session 12/18/2017 11:01 AM
70 rnair: Delete Cloud+12/18/2017 11:02 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
71 rnair: Add Highlight 12/18/2017 11:02 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
72 rnair: Edit Highlight 12/18/2017 11:02 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
73 rnair: Add Highlight 12/18/2017 11:02 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
74 rnair: Add Highlight 12/18/2017 11:03 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
75 rnair: Undo 12/18/2017 11:03 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
76 rnair: Undo 12/18/2017 11:03 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
77 rnair: Edit Highlight 12/18/2017 11:03 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
78 rnair: Add Popup 12/18/2017 11:03 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
79 rnair: Add Text Box 12/18/2017 11:04 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
80 rnair: Edit Text Box 12/18/2017 11:04 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
81 rnair: Add Text Box 12/18/2017 11:04 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
82 rnair: Edit Text Box 12/18/2017 11:04 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
83 rnair: Edit Text Box 12/18/2017 11:05 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
84 rnair: Add Popup 12/18/2017 11:05 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
85 rnair: Add Highlight 12/18/2017 11:05 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
86 rnair: Delete Highlight 12/18/2017 11:06 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
87 rnair: Delete Highlight 12/18/2017 11:06 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
88 rnair: Delete Highlight 12/18/2017 11:06 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
89 rnair: Delete Highlight 12/18/2017 11:06 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
90 rnair: Delete Highlight 12/18/2017 11:06 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
91 rnair: Add Highlight 12/18/2017 11:06 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
92 rnair: Add Cloud+12/18/2017 11:12 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
93 rnair: Edit Cloud+ (change to be reflected in sheet 15 also.
looks like the roof downspout is connected to storm vault. )
12/18/2017 11:13 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
94 rnair: Edit Cloud+12/18/2017 11:13 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
95 rnair: Edit Cloud+ (change to be reflected in sheet 15 also.
looks like the roof downspout is connected to storm vault.
calcs to show that the vault is sized to meet this capacity.)
12/18/2017 11:14 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
96 rnair: Edit Cloud+12/18/2017 11:14 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
97 rnair: Add Highlight 12/18/2017 11:14 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
98 rnair: Undo 12/18/2017 11:14 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
99 rnair: Add Highlight 12/18/2017 11:15 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
100 rnair: Add Highlight 12/18/2017 11:15 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
101 rnair: Add Highlight 12/18/2017 11:15 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
102 rnair: Edit Highlight 12/18/2017 11:16 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
103 rnair: Move Highlight 12/18/2017 11:17 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
104 rnair: Add Highlight 12/18/2017 11:20 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
105 rnair: Add Highlight 12/18/2017 11:20 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
106 rnair: Add Line 12/18/2017 11:21 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
107 rnair: Edit Line 12/18/2017 11:21 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
108 rnair: Add Line 12/18/2017 11:21 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
109 rnair: Add Line 12/18/2017 11:21 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
110 rnair: Add Line 12/18/2017 11:21 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
111 rnair: Add Highlight 12/18/2017 11:23 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
112 rnair: Add Highlight 12/18/2017 11:23 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
113 rnair: Add Highlight 12/18/2017 11:23 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
114 rnair: Add Highlight 12/18/2017 11:23 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
115 rnair: Add Highlight 12/18/2017 11:23 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
116 rnair: Move Highlight 12/18/2017 11:23 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
117 rnair: Add Highlight 12/18/2017 11:24 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
118 rnair: Add Highlight 12/18/2017 11:24 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
119 rnair: Add Highlight 12/18/2017 11:24 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
120 rnair: Add Highlight 12/18/2017 11:24 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
121 rnair: Add Highlight 12/18/2017 11:24 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
122 rnair: Add Line 12/18/2017 11:24 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
123 rnair: Move Line 12/18/2017 11:24 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
124 rnair: Edit Cloud+ (change to be reflected in sheet 15 also.
looks like the roof downspout is connected to storm vault.
calcs to show that the vault is sized to meet this capacity.)
12/18/2017 11:33 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
125 rnair: Add Highlight 12/18/2017 11:33 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
126 rnair: Undo 12/18/2017 11:34 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
127 rnair: Add Highlight 12/18/2017 11:34 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
128 rnair: Undo 12/18/2017 11:34 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
129 rnair: Add Highlight 12/18/2017 11:34 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
130 rnair: Undo 12/18/2017 11:34 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
131 rnair: Add Highlight 12/18/2017 11:35 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
132 rnair: Undo 12/18/2017 11:35 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
133 rnair: Add Highlight 12/18/2017 11:35 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
134 rnair: Undo 12/18/2017 11:35 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
135 rnair: Add Highlight 12/18/2017 11:35 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
136 rnair: Add Highlight 12/18/2017 11:35 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
137 rnair: Undo 12/18/2017 11:35 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
138 rnair: Add Highlight 12/18/2017 11:36 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
139 rnair: Add Highlight 12/18/2017 11:36 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
140 rnair: Undo 12/18/2017 11:36 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
141 rnair: Add Highlight 12/18/2017 11:36 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
142 rnair: Add Highlight 12/18/2017 11:39 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
143 rnair: Edit Highlight 12/18/2017 11:41 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
144 rnair: Move Highlight 12/18/2017 11:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
145 rnair: Edit Line 12/18/2017 11:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
146 rnair: Add Popup 12/18/2017 11:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
147 rnair: Edit Highlight 12/18/2017 11:42 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
148 rnair: Edit Highlight 12/18/2017 11:43 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
149 rnair: Edit Highlight 12/18/2017 11:43 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
150 rnair: Edit Highlight 12/18/2017 11:43 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
151 rnair: Edit Highlight 12/18/2017 11:43 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
152 rnair: Edit Highlight 12/18/2017 11:43 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
153 rnair: Edit Highlight 12/18/2017 11:43 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
154 rnair: Edit Highlight 12/18/2017 11:44 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
155 rnair: Edit Highlight 12/18/2017 11:44 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
156 rnair: Edit Highlight 12/18/2017 11:44 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
157 rnair: Edit Highlight 12/18/2017 11:44 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
158 rnair: Edit Highlight 12/18/2017 11:44 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
159 rnair: Edit Line 12/18/2017 11:44 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
160 rnair: Edit Line 12/18/2017 11:44 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
161 rnair: Edit Line 12/18/2017 11:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
162 rnair: Add Line 12/18/2017 11:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
163 rnair: Move Highlight 12/18/2017 11:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
164 rnair: Add Line 12/18/2017 11:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
165 rnair: Add Line 12/18/2017 11:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
166 rnair: Add Line 12/18/2017 11:45 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
167 rnair: Delete Highlight 12/18/2017 11:46 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
168 rnair: Add Highlight 12/18/2017 11:47 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
169 rnair: Add Highlight 12/18/2017 11:47 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
170 rnair: Edit Highlight 12/18/2017 11:47 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
171 rnair: Move Highlight 12/18/2017 11:47 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
172 rnair: Edit Highlight 12/18/2017 11:47 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
173 rnair: Add Highlight 12/18/2017 11:48 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
174 rnair: Add Highlight 12/18/2017 11:48 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
175 rnair: Add Highlight 12/18/2017 11:48 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
176 rnair: Add Highlight 12/18/2017 11:49 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
177 rnair: Undo 12/18/2017 11:49 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
178 rnair: Add Highlight 12/18/2017 11:49 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
179 rnair: Undo 12/18/2017 11:49 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
180 rnair: Add Highlight 12/18/2017 11:49 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
181 rnair: Undo 12/18/2017 11:49 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
182 rnair: Paste 12/18/2017 11:50 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
183 rnair: Edit Highlight 12/18/2017 11:50 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
184 rnair: Move Highlight 12/18/2017 11:50 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
185 rnair: Paste 12/18/2017 11:51 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
186 rnair: Move Highlight 12/18/2017 11:51 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
187 rnair: Edit Highlight 12/18/2017 11:51 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
188 rnair: Move Highlight 12/18/2017 11:52 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
189 rnair: Add Line 12/18/2017 11:57 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
190 rnair: Edit Line 12/18/2017 11:57 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
191 rnair: Add Line 12/18/2017 11:57 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
192 rnair: Add Line 12/18/2017 11:58 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
193 rnair: Edit Line 12/18/2017 11:58 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
194 rnair: Edit Line 12/18/2017 11:58 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
195 rnair: Edit Line 12/18/2017 11:58 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
196 rnair: Move Cloud+12/18/2017 11:59 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
197 rnair: Move Highlight 12/18/2017 11:59 AM 15564 CIVIL
OPT-3_11-28-17.pdf
5
198 rnair: Edit Cloud+12/18/2017 12:00 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
199 rnair: Add Line 12/18/2017 12:00 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
200 rnair: Edit Line 12/18/2017 12:01 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
201 rnair: Add Line 12/18/2017 12:01 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
202 rnair: Add Line 12/18/2017 12:01 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
203 rnair: Add Line 12/18/2017 12:01 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
204 rnair: Add Line 12/18/2017 12:01 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
205 rnair: Add Highlight 12/18/2017 12:06 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
206 rnair: Edit Highlight 12/18/2017 12:06 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
207 rnair: Add Highlight 12/18/2017 12:07 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
208 rnair: Add Highlight 12/18/2017 12:07 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
209 rnair: Add Highlight 12/18/2017 12:07 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
210 rnair: Delete Text Box 12/18/2017 2:16 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
211 rnair: Add Cloud+12/18/2017 2:16 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
212 rnair: Edit Cloud+ (casing required fro pipe thru wall)12/18/2017 2:17 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
213 rnair: Add Text Box 12/18/2017 2:20 PM 15564 CIVIL
OPT-3_11-28-17.pdf
15
214 rnair: Edit Text Box (overhead)12/18/2017 2:21 PM 15564 CIVIL
OPT-3_11-28-17.pdf
15
215 rnair: Move Text Box 12/18/2017 2:21 PM 15564 CIVIL
OPT-3_11-28-17.pdf
15
216 rnair: Add Line 12/18/2017 2:27 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
217 rnair: Edit Callout (stations for angle points in concrete
sidewalk)
12/18/2017 2:29 PM 15564 CIVIL
OPT-3_11-28-17.pdf
8
218 rnair: Edit Highlight 12/18/2017 2:31 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
219 rnair: Add Highlight 12/18/2017 2:33 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
220 rnair: Add Highlight 12/18/2017 2:33 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
221 rnair: Add Highlight 12/18/2017 2:34 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
222 rnair: Edit Cloud+12/18/2017 2:35 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
223 rnair: Disconnected 12/18/2017 2:56 PM
224 rnair: Joined Session 12/18/2017 4:25 PM
225 rnair: Delete Cloud+12/18/2017 4:25 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
226 rnair: Move Highlight 12/18/2017 4:26 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
227 rnair: Undo 12/18/2017 4:26 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
228 rnair: Undo 12/18/2017 4:26 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
229 rnair: Edit Cloud+ (casing required for pipe thru wall)12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
230 rnair: Edit Cloud+ (casing required for pipe thru wall. mention
where the detail is provided.)
12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
231 rnair: Edit Cloud+12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
232 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
233 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
234 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
235 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
236 rnair: Delete Line 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
237 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
238 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
239 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
240 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
241 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
242 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
243 rnair: Delete Line 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
244 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
245 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
246 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
247 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
248 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
249 rnair: Delete Highlight 12/18/2017 5:13 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
250 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
251 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
252 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
253 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
254 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
255 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
256 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
257 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
258 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
259 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
260 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
261 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
262 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
263 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
264 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
265 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
266 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
267 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
268 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
269 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
270 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
271 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
272 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
273 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
274 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
275 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
276 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
277 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
278 rnair: Delete Line 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
279 rnair: Delete Text Box 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
280 rnair: Delete Highlight 12/18/2017 5:14 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
281 rnair: Delete Highlight 12/18/2017 5:15 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
282 rnair: Delete Highlight 12/18/2017 5:15 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
283 rnair: Delete Highlight 12/18/2017 5:15 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
284 rnair: Delete Cloud+12/18/2017 5:15 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
285 rnair: Add Text Box 12/18/2017 5:15 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
286 rnair: Edit Text Box (add note:
flow control bmp provided is _______ sq. feet of pervious
(porous) concrete )
12/18/2017 5:16 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
287 rnair: Add Cloud+12/18/2017 5:19 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
Message Date Time Document Page Label
288 rnair: Edit Cloud+ (provide the standard city of renton surface
water notes in the 2009 amendments to )
12/18/2017 5:19 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
289 rnair: Edit Cloud+ (provide the standard surface water notes
available in the 2009 city of renton amendments to the king
county surface water design manual)
12/18/2017 5:20 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
290 rnair: Edit Cloud+12/18/2017 5:21 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
291 rnair: Edit Cloud+ (provide the standard surface water notes,
erosion control notes, and construction sequence notes
available in the 2009 city of renton amendments to the king
county surface water design manual)
12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
292 rnair: Edit Cloud+12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
293 rnair: Edit Cloud+ (provide the standard surface water notes,
erosion control notes, and construction sequence notes
available in the 2009 city of renton amendments to the king
county surface water design manual)
12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
294 rnair: Edit Cloud+12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
295 rnair: Edit Cloud+12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
296 rnair: Edit Cloud+12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
297 rnair: Edit Cloud+12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
298 rnair: Edit Cloud+ (provide the standard surface water notes,
erosion control notes, and construction sequence notes
available in the 2009 city of renton amendments to the king
county surface water design manual)
12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
Message Date Time Document Page Label
299 rnair: Edit Cloud+12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
300 rnair: Edit Cloud+ (provide the standard surface water notes,
erosion control notes, and construction sequence notes
available in the 2009 city of renton amendments to the king
county surface water design manual)
12/18/2017 5:22 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
301 rnair: Edit Cloud+12/18/2017 5:23 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
302 rnair: Edit Cloud+ (provide the standard surface water notes,
erosion control notes, and construction sequence notes
available in the 2009 city of renton amendments to the king
county surface water design manual)
12/18/2017 5:23 PM 15564 CIVIL
OPT-3_11-28-17.pdf
9
303 rnair: Add Callout 12/18/2017 5:24 PM 15564 CIVIL
OPT-3_11-28-17.pdf
8
304 rnair: Delete Callout 12/18/2017 5:25 PM 15564 CIVIL
OPT-3_11-28-17.pdf
8
305 rnair: Add Callout 12/18/2017 5:30 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
306 rnair: Edit Callout (casing to be provided for pipe thru wall.
previde reference to detail of casing.)
12/18/2017 5:30 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
307 rnair: Add Text Box 12/18/2017 5:42 PM 15564 CIVIL
OPT-3_11-28-17.pdf
4
308 rnair: Edit Text Box (add note:
Wet SEASON EROSION CONTROL MEASURES ARE IN )
12/18/2017 5:43 PM 15564 CIVIL
OPT-3_11-28-17.pdf
4
309 rnair: Edit Text Box (add note:
Wet SEASON EROSION CONTROL REQUIREMENTS ARE
APPLICABLE TO PROJECT FROM OCTOBER 1ST TO
APRIL 30TH.)
12/18/2017 5:45 PM 15564 CIVIL
OPT-3_11-28-17.pdf
4
Message Date Time Document Page Label
310 rnair: Delete Text Box 12/18/2017 5:49 PM 15564 CIVIL
OPT-3_11-28-17.pdf
4
311 rnair: Undo 12/18/2017 5:50 PM 15564 CIVIL
OPT-3_11-28-17.pdf
4
312 rnair: Add Text Box 12/18/2017 5:51 PM 15564 CIVIL
OPT-3_11-28-17.pdf
13
313 rnair: Edit Text Box (1.The allowed time that a disturbed area
can remain unworked without cover measures is reduced to
two (2) days, rather than seven (7)
days.
2.Stockpiles, steep cut, and fill slopes are to be covered or
protected with mulch, sod, plastic covering, jute mat etc. if left
unworked for more than 12 hours.
3.Cover materials (plastic, matting, etc.) sufficient to cover all
disturbed areas, shall be stockpiled and available on site.
4.All areas that are to be unworked during the wet
12/18/2017 5:51 PM 15564 CIVIL
OPT-3_11-28-17.pdf
13
314 rnair: Edit Text Box (WET SEASON
1.The allowed time that a disturbed area can remain unworked
without cover measures is reduced to two (2) days, rather than
seven (7)
days.
2.Stockpiles, steep cut, and fill slopes are to be covered or
protected with mulch, sod, plastic covering, jute mat etc. if left
unworked for more than 12 hours.
3.Cover materials (plastic, matting, etc.) sufficient to cover all
disturbed areas, shall be stockpiled and available on site.
4.All areas that are to be unworked du
12/18/2017 5:51 PM 15564 CIVIL
OPT-3_11-28-17.pdf
13
Message Date Time Document Page Label
315 rnair: Edit Text Box (WET SEASON EROSION CONTROL
REQUIREMENTS
1.The allowed time that a disturbed area can remain unworked
without cover measures is reduced to two (2) days, rather than
seven (7)
days.
2.Stockpiles, steep cut, and fill slopes are to be covered or
protected with mulch, sod, plastic covering, jute mat etc. if left
unworked for more than 12 hours.
3.Cover materials (plastic, matting, etc.) sufficient to cover all
disturbed areas, shall be stockpiled and available on site.
4.All are
12/18/2017 5:51 PM 15564 CIVIL
OPT-3_11-28-17.pdf
13
316 rnair: Edit Text Box (WET SEASON EROSION CONTROL
REQUIREMENTS (APPLICBALE FROM OCTOBER 1ST TO
APRIL 30TH)
1.The allowed time that a disturbed area can remain unworked
without cover measures is reduced to two (2) days, rather than
seven (7)
days.
2.Stockpiles, steep cut, and fill slopes are to be covered or
protected with mulch, sod, plastic covering, jute mat etc. if left
unworked for more than 12 hours.
3.Cover materials (plastic, matting, etc.) sufficient to cover all
disturbed areas, shall be
12/18/2017 5:52 PM 15564 CIVIL
OPT-3_11-28-17.pdf
13
317 rnair: Delete Line 12/18/2017 5:54 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
318 rnair: Delete Highlight 12/18/2017 5:54 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
319 rnair: Delete Line 12/18/2017 5:54 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
Message Date Time Document Page Label
320 rnair: Delete Line 12/18/2017 5:54 PM 15564 CIVIL
OPT-3_11-28-17.pdf
5
321 rnair: Set status to Finished 12/18/2017 6:53 PM
322 rnair: Add Approved - Planning 12/18/2017 6:54 PM 15564 CIVIL
OPT-3_11-28-17.pdf
1
323 rnair: Group Markups 12/18/2017 6:54 PM 15564 CIVIL
OPT-3_11-28-17.pdf
1
324 rnair: Add Approved - Planning 12/18/2017 6:54 PM 15564-LS SET 11-28-17.pdf 7
325 rnair: Group Markups 12/18/2017 6:54 PM 15564-LS SET 11-28-17.pdf 7