Loading...
HomeMy WebLinkAbout16-0922 Weston Heights North Utility II Comments DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M   DATE: September 22, 2016     TO: Scott Mesic, SDA     FROM: Ian Fitz-James, Civil Plan Reviewer     SUBJECT: Utility Permit Review II Comments Weston Heights North Short Plat - 702 Nile Avenue NE City of Renton Permit #U16-003996      I have reviewed the second utility permit plan submittal for Weston Heights North Short Plat located at 702 Nile Avenue NE and my comments are listed below. Please make the minor plan and TIR corrections listed in the general comments. Please submit a digital set of plans and TIR for me to review after making the corrections. If all the corrections are made, mylars will be requested. The preconstruction items need to be completed prior to the preconstruction meeting. Please contact me if you have any questions. GENERAL COMMENTS Please have approved water plans from King County Water District 90 routed to the City for final review prior to permit issuance. A Construction Stormwater General Permit from the Washington Department of Ecology is required as clearing and grading of the site exceeds one acre. A Utility Permit cannot be issued until the NPDES permit is obtained. Add NPDES permit number to Sheet C2.0. Clean up plans where redlined. Look at image quality of inserted PDFs. PDF quality in the plans appears worse than in the Weston Heights plan set. Clean up concrete hatch for driveways. Concrete hatch extends outside of limit of driveways. WSDOT has updated their perpendicular curb ramp detail. Use WSDOT Perpendicular Curb Ramp F-40.15-03 dated June 29, 2016. Show curb ramp wing slopes on Sheet C3.1. Wings shall have slopes less than 10% to be ADA compliant. The storm drain that drains the existing French drain is in conflict with the existing sewer line. Adjust slope so that the line is not in conflict. Label storm drain clearance from sewer and water lines. Update callouts for yard drain and storm drain cleanout on Sheet C4.0 as redlined. Label top of trench at northern end. Provide rim and invert elevations at CO #3 and CO #4. Move CB #3 out of the driveway path. Clean up linetypes on Sheet C4.0. Update profile as redlined based on new CB #3 location. The 6” storm drain from the yard drains flows into CB #2 and not CB #1. Update profile. Label storm drain clearance from sewer and water lines between CB #1 and CB #7. Call for ethafoam pads in areas with less than 1.0’ of vertical clearance between pipes. Add COR Std. Plan 204.00 – Rectangular Frame to Sheet C4.2. Updated landscape plans as redlined. Update conveyance section of TIR as redlined. Insert your TESC site plan in your TIR on the page that says “Insert Site Plan Here”. Revise SWPPP summary section as redlined. Update bond quantity worksheet as redlined. PRECONSTRUCTION ITEMS In addition to the above corrections and items needed, the following preconstruction items are required prior to issuance of a utility permit. One set of plan mylars. Mylar plans shall include all civil plans, street lighting plans, and landscape plans. Mylars will be signed by me and other staff at the City. Signed mylars will be requested to be picked up by the applicant. The applicant shall make three paper copies and return them to the City with the original signed mylars at least two days prior to the pre-construction meeting. The applicant is also responsible for making as many copies of the mylars needed for the contractor. A copy of the approved plans is required on site at all times. Surety Device The surety device amount is calculated using the completed bond quantity worksheet. An amount for the surety device can be determined after updating the bond quantity worksheet per the redlines. The surety device can be a Bond, Letter of Credit, or an Assignment of Funds. The form for each is attached. Complete the desired form and return it prior to the pre-construction meeting. Authorization of Special Billing Form is attached and is to be completed and provided at the pre-construction meeting. Contractor Information Name Contact Information Current City of Renton Business License Final permit fees can be calculated using the updated bond quantity worksheet or using construction costs from contractor bids. Please follow up with the preferred method for determining the final permit fees. Once, the fee determination method is chosen, a follow up email will be sent with the final permit fees. Fees are payable at the time of permit issuance. Two hard copies of the approved SWPPP. One hard copy of the TIR. Digital files of the scanned mylar plans, CAD, TIR, and bond quantity worksheet. Right of way permit for King County Water District 90 water infrastructure. Approved KCWD 90 plans are required prior to issuance of a right of way permit. The cost for the right of way permit is $154.50. Demolition permit for the shop that is being removed. Abandonment of any on-site septic systems shall be in accordance with King County Department of Health regulations and Renton Municipal Code. The applicant / contractor shall contact King County Department of Health for more information on the abandonment of the existing septic systems.