Loading...
HomeMy WebLinkAboutChange Order - 31            CAG-20-065, CO #31-23 Approved by Cheryl Beyer via 4/28/2023                   Change Order No. 031 Restake Monument Contract Title: Duvall Avenue NE Contract No. CAG -20-065 Page 1 of 1 Change Order No. 31 Backup Documentation Contract Title: Duvall Avenue NE Contractor: Reed Trucking & Excavating, Inc. Contract No. : CAG -20-065 Federal Aid No. : N/A Attachments: Backup Documentation ܈Field Directive ܈Equitable Adjustment Determination ܈Determination of Additional Working Days ܈Engineer’s Estimate of Change Order Cost ܈Engineer’s Calculation of Additional Working Days ܆Contractor’s Quote ܆Project Labor List ܆Contractor’s Equipment list including rates per AGC-WSDOT Equipment Agreement ܆Summary of invoices for rented equipment ܆Summary of invoices for materials                   Bid Item No.Description Quantity Change Unit Unit Price Cost 31-A119 Restake Monument 1LS $1,185.41 $1,185.41 $1,185.41 $1,185.41 Construction Manager: Tani Stafford, PE Contract Item Changes Contract Item Cost CHANGE ORDER COST By: Tani Stafford Date: 04/21/23 Equitable Adjustment Determination - CO No 31 Project Name: Duvall Avenue NE Contractor: Reed Trucking & Excavating Inc. Contract No: CAG 20-065 Narrative: FWD No 34 was issued on 03/29/23 directing the Contractor stake the monument at NE 10th Street and Duvall Avenue NE at a new location. The Contractor's surveyor had already staked the monument per the plans. There will be another trip required by the surveyor to restake the monument in the new location. The Engineer's estimate was prepared on 3/21/23 for a total estimated cost of $1,720. The Contractor quoted $1,185.41, which was reviewed and accepted for an equitable adjustment of $1,185.41          Determination of Additional Working Days A determination of zero additional working days was made.          City of Renton - Duvall Ave NE, CAG 20-065 Field Directive No 34 Engineer's Estimate Date: 3/21/23 Item No.Description Unit LS Price Total A119 Restake Monument LS 1,720.00$ 1,720.00$ Total (rounded)1,720.00$ Description: Date TBD Prime contractor Labor: (Reed Trucking)Hours Rate Total Foreman 4 $86.42 $345.68 Labor Cost $345.68 Markup (31%)$107.16 Subtotal Labor Cost $452.84 Hours Reg Rate Total Service Truck 4.0 $40.00 $160.00 Equipment Cost $160.00 Markup (21%)$33.60 Subtotal Equipment Cost $193.60 Subcontractor Labor: (W.E. Coates)Hours Rate Total Two Man Crew 4 $139.00 $556.00 Labor Cost $556.00 Markup (31%)$172.36 Subtotal Labor Cost $728.36 Hours Reg Rate Total Service Truck 4.0 $40.00 $160.00 Equipment Cost $160.00 Markup (21%)$33.60 Subtotal Equipment Cost $193.60 Subcontractor Material:Qty Invoice Total Nails 3 $10.00 $30.00 Material Cost $30.00 Markup (21%)$6.30 Subtotal Subcontractor Material Cost $36.30 Total Subcontractor Cost $958.26 Markup (12%)$114.99 Total Cost:$1,719.69 Restake the Monument Control for the Monument at NE 10th Street and Duvall Ave NE Subcontractor Equipment: Prime contractor Equipment: Engineer's Estimate         Engineer's Calculation of Additional Working Days See CO No 28, this work falls within the critical path work for the additional days in that change order.          Change Order Proposal #41 2207 Inter Ave., Ste. A Puyallup, WA 98372 Office: (253) 841-4837 Fax: (253) 841-4816 GC/Owner:JSS #: Reed Job No:156 Project: Date: Description: Subcontractor: Hours Rate Hrs Rate * Regular Overtime -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ * Including Fringe Benef Labor Subtotal Labor Subtotal -$ -$ Labor Total Labor Total -$ Equip. # Hrs Rate Hrs Rate * Regular Standby -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Equipment Subtotals -$ -$ Equipment Total $0.00 Quantity Price Amount $0.00 $0.00 $0.00 $0.00 Materials Total $0.00 Quantity Price Amount 1 $1,058.40 $1,058.40 $0.00 $0.00 $0.00 Subcontractor Total $1,058.40 Cost Summary Total Labor -$ 31% Labor Mark-up -$ Total Equipment $0.00 Date: ______________21% Equipment Mark-up $0.00 Total Materials $0.00 21% Material Mark-up $0.00 Total Subcontractors $1,058.40 12% Sub Markup up to $25K $127.01 10% Sub Markup $25K-$100K $0.00 Date: ______________7% Sub Mark-up Over $100K $0.00 Grand Total 1,185.41$ Pay Estimate Date Bid Item Number WE Coates City of Renton 41 Duvall Ave NE 4/20/2023 Re-Stake Revised monument location Equipment Costs Labor Costs Craft Employee Name Regular Overtime Amount Regular Standby Amount Equipment Material Costs Supplier Material Invoice(s) Subcontractor Costs Subcontractor Scope Invoice(s) WE Coates Re-Stake Revised monument location 2188 Contractor Foreman / Superintendent Engineer Contractor Quote         4/20/2023INVOICE #: 2188 BILL TO: Reed Trucking & Excavation Inc. 2207 Inter Ave Suite A Puyallup, WA 98372 JOB NUMBER:21-16 DUE DATE:5/20/2023 PROJECT NAME: Duvall Avenue NE FOR SURVEYING SERVICES:EWO DATE DESCRIPTION & PERCENTAGE COMPLETED AMOUNT 4/6/2023 Extra Work Order 4-6-23 1,058.40 $1,058.40