Loading...
HomeMy WebLinkAbout13207-Chevron Grading Ph1 Asbuilts 2017.08.28S75°4 1 ' 3 5 " E 196.52 'N1°22'54"E207.36'150.14'N14°18'24"E202.11'SCALE: 1" = 20' 1020 0 20 40 BUILDING C SE RE N T O N M A P L E V A L L E Y R O A D ( S R 1 6 9 ) PROPOSED RETAIL STORE (84'x43') FF = 112.50 FUTURE CAR WASH TREATMENT SYSTEM FUTURE CAR WASH TUNNEL CIVIL ENGINEERING | LAND SURVEYING | LAND PLANNINGPROJECT MANAGEMENT | PERMIT EXPEDITING | FEASIBILITYCONTACTphone: 253-301-4157fax: 253-336-3950landon@beylerconsulting.combeylerconsulting.comOFFICE10314 100th St. SWLakewood, WA 98498SHEET OF JOB NUMBERNO. DESCRIPTION INIT DATEDRAWN BY:CHECKED BY:SCALE:HORZ:VERT:DATE:BEYLERCONSULTINGPlan. Design. ManageA PORTION OF THE SW 1/4 OF SECTION 23, TOWNSHIP 23 N, RANGE 05 E., W.M.FUELING STATIONCEDAR RIVER STATIONCITY OF RENTON,WASHINGTON13-207 6 C1.0 1SITE PLANPARCEL NUMBER:232305-9211 SITE ADDRESS:15355 MAPLE VALLEY HWY RENTON, WA 98058 SITE AREA:35,031 SF (0.80 ACRES) ZONING:CA, (COMMERCIAL ARTERIAL) IMPERVIOUS AREA RETAIL:3,612 SF NEW ASPHALT/CONC:15,946 SF TOTAL 19,558 SF EXISTING ASPHALT:2,500 SF (CEDAR RIVER STATION PROJECT) TOTAL IMPERVIOUS:22,058 SF (63%) LANDSCAPING:12,973 SF SITE DATA THE EXISTING CULTURAL AND TOPOGRAPHICAL DATA SHOWN ON THESE DRAWINGS HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, BEYLER CONSULTING CANNOT ENSURE ACCURACY AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THAT INFORMATION OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO THESE DRAWINGS AS A RESULT. TOPOGRAPHIC NOTE VICINITY MAP N.T.S PROJECT INFO CLIENT: SUMMIT PETROLEUM GROUP 20207 105TH AVE SE KENT, WA 98031 ENGINEER: BEYLER CONSULTING 10314 100TH ST SW LAKEWOOD, WA 98498 TEL: 253-301-4157 CEDAR RIVER STATION FUELING STATION GRADING & UTILITY PLANS OIL/WATER SEPARATOR COVERED FUELING AREA CEDAR RIVER STATION PARCEL #2323059210 SEE DEVELOPMENT PLANS PREPARED BY ESM CONSULTING ENGINEERS 108.00 VERTICAL CURB (TYP) EXISTING SSMH TOP 106.50 12" IE 96.55 (W) 12" IE 96.65 (E)10'EXISTING 10' SEWER EASEMENT AFN #9007050803 5' EXISTING 5' STORM EASEMENT AFN #9412081041 EMERALD CREST CONDOMINIUM 15400 SE 155TH PL #232978-0000 VALLEY SPRINGS APARTMENTS 15300 SE 155TH PL #232305-9209 EARTHWORK CUT:0 CY FILL:2,400 CY (2,400 TONS) NET: 2,400 CY (FILL) (2,400 TONS) ORIGIN OF FILL TO BE DETERMINED SE RE N T O N M A P L E V A L L E Y H W Y 14 0 T H A V E S E 145TH PL SESITE CEDAR RIVER STATION PROPOSED CEDAR RIVER STATION FRONTAGE IMPROVEMENTS PER PLANS PREPARED BY ESM CONSULTING ENGINEERS EXISTI N G D I T C H EXISTI N G D I T C H 10 8 SEE CEDAR RIVER STATION DRAINAGE PLANS PREPARED BY ESM CONSULTING ENGINEERS FOR CONTINUATION OF PROPOSED STORM. STORMWATER CONTINUES TO UNDERGROUND WATER QUALITY AND DETENTION VAULT C E D A R R I V E R EDGE OF CEDAR RIVER STATION PAVING PER CIVIL DRAWINGS PREPARED BY ESM CONSULTING ENGINEERS (TYP) VACUUMS CITY OF RENTON APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ BASIS OF BEARINGS PLAT OF VISTA HILLS. THE MONUMENT LINE OF SE 186TH STREET FROM 107TH AVENUE SE TO 108TH AVENUE SE IS NORTH 89°38'54" EAST. ====================================== VERTICAL DATUM NAVD 88. THE ELEVATION OF THE BRASS DISK SET AS KING COUNTY F-8 NEAR RESIDENCE 18814 108TH AVENUE SOUTHEAST IS 486.860 ====================================== NOTE (PER CEDAR RIVER STATION PLANS PREPARED BY ESM): THE BOUNDARY SHOWN HERON IS PER BAIMA & HOLMBERG, INC. PROJECT NO. T.L. 232305-9210,9211 DATED 6-11-07. IMPROVEMENTS AND ELEVATIONS WITHIN THE RIGHT-OF-WAY OF SE RENTON MAPLE VALLEY ROAD (SR 169) WERE LOCATED DURING THE COURSE OF A SURVEY BY ESM CONSULTING ENGINEERS IN JANUARY OF 2008. IMPROVEMENTS SOUTH OF SAID RIGHT OF WAY WERE PROVIDED BY OTHERS. SURVEY DATUM 8 CONC. PAD 9' 9' 8' 9' 9' 9' 12.66' 9'23'42'23.33'8.56'8.15'5'4.5'8' 9.63'2'5.53'6'RAMP (TYP) 31'42'TRENCH DRAIN 15.39'15'15'2" WATER SERVICE 3/4" WATER SERVICE EXISTING SETTER FOR NEW 1.5" METER. COORDINATE WITH CEDAR RIVER WATER & SEWER DISTRICT IRRIGATION LINE WITH DEDUCT METER. SEE IRRIGATION PLANS FOR DETAILS R15' PROPOSED LIGHT. SEE ARCHITECTURAL PLANS FOR DETAILS10'8'8.58'3' 15.13' 6' RAMP TO EXISTING SIDEWALK COLORED STAMPED CONCRETE CROSSWALK 1' FILLET (TYP) 1' FILLET (TYP) R15' R15' SHEET INDEX SHEET 1 SITE PLANS SHEET 2 EROSION & SEDIMENT CONTROL PLAN SHEET 3 TESC NOTES & DETAILS SHEET 4 GRADING & UTILITY PLAN SHEET 5 NOTES & DETAILS SHEET 6 OIL WATER SEPARATOR DETAIL THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES THAT HAPPEN DUE TO THE CONTRACTOR'S FAILURE TO LOCATE EXACTLY AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. BEYLER CONSULTING ASSUMES NO LIABILITY FOR THE LOCATION OF UNDERGROUND UTILITIES. UTILITY NOTE 5' 5' EASEMENT (AFN 9412081041) VEHICULAR AND PEDESTRIAN INGRESS AND EGRESS, ROADWAY SIDEWALK, STORM DRAINAGE IMPROVEMENTS, UTILITIES AND LANDSCAPING IMPROVEMENTS (TO BE VACATED)10'10' SEWER EASEMENT (AFN 9007050803) EXISTING DITCH FLOW PATH UNDERGROUND FUELING TANKS (DESIGNED BY OTHERS) ADA PARKING SYMBOL 6" RAISED CONCRETE FUELING ISLANDS BOLLARDS (TYP) COLORED STAMPED CONCRETE CROSSWALK RAMP (TYP) SIGN ROOFTOP DS 1ADD PHASING TO SITE PLANBML 05/18/1515' NEW 2.5" GAS MAIN 2.5" GAS MAIN STUB INSTALLED WITH CEDAR RIVER STATION DEVELOPMENT 1-4" POWER CONDUIT AND 2-3" CENTURY LINK CONDUITS STUBS (APPROX LOCATION)ROOFTOP DRY WELL 2ADD FLOW CONTROL BMPBML 02/10/16AWNING DS AWNING DS AWNING DS AWNING DS ROOFTOP DS 3ADD DOWNSPOUT CLARIFICATIONBML 03/09/1612.5' 13.32' ± 11'1REVISED FUEL TANKS/SEWER PER SEWERBML 06/30/161000 GAL GREASE INTERCEPTOR 3AS-BUILTSKDA 08/28/17THESE PLANS ARE RECORD DRAWINGS AND THE INFORMATION SHOWN ACCURATELY REFLECTS THE AS-BUILT INFORMATION PROVIDED TO BEYLER CONSULTING AS OF THIS DATE: 08/22/2017 AS-BUILTS 109 110 111109108111110110109108107111 110 109 106110 109 108 107 106 105 111 110107112112 SCALE: 1" = 20' 1020 0 20 40 BUILDING C SE RE N T O N M A P L E V A L L E Y R O A D ( S R 1 6 9 ) PROPOSED RETAIL STORE (84'x43') FF = 112.50 CIVIL ENGINEERING | LAND SURVEYING | LAND PLANNINGPROJECT MANAGEMENT | PERMIT EXPEDITING | FEASIBILITYCONTACTphone: 253-301-4157fax: 253-336-3950landon@beylerconsulting.combeylerconsulting.comOFFICE10314 100th St. SWLakewood, WA 98498SHEET OF JOB NUMBERNO. DESCRIPTION INIT DATEDRAWN BY:CHECKED BY:SCALE:HORZ:VERT:DATE:BEYLERCONSULTINGPlan. Design. ManageA PORTION OF THE SW 1/4 OF SECTION 23, TOWNSHIP 23 N, RANGE 05 E., W.M.FUELING STATIONCEDAR RIVER STATIONCITY OF RENTON,WASHINGTON13-207 6 C2.0 2EROSION & SEDIMENT CONTROL PLANCEDAR RIVER STATION PARCEL #2323059210 SEE DEVELOPMENT PLANS PREPARED BY ESM CONSULTING ENGINEERS 108.00 EMERALD CREST CONDOMINIUM 15400 SE 155TH PL #232978-0000 VALLEY SPRINGS APARTMENTS 15300 SE 155TH PL #232305-9209 EXISTI N G D I T C H EXISTI N G D I T C H 10 8 LEGEND FILTER FABRIC FENCE CLEARING LIMITS PROPOSED CONTOUR EXISTING CONTOUR SEDIMENT FILTER/BARRIER INSTALL FILTER FABRIC FENCE AT TOE OF SLOPES TO PREVENT SILT LADEN RUNOFF FROM ENTERING ADJACENT PROPERTIES 100 SOURCE: CITY OF RENTON AMENDMENTS TO THE KING CO SWDM, REFERENCE 7-B 1.THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: 2.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE-CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 3.THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5.ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 6.THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 7.APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 8.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9.WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10.COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 11.ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14.DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN-WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 15.ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16.PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. EROSION CONTROL NOTES CITY OF RENTON APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ FUTURE CAR WASH TUNNEL 1ADD PHASING TO SITE PLANBML 05/18/15HYDROSEED/SOD LANDSCAPING WITH IRRIGATION INLET PROTECTION TO REMAIN UNTIL PHASE 2 IS COMPLETE 1REVISED FUEL TANKS/SEWER PER SEWERASBUILTSBML 06/30/16 CIVIL ENGINEERING | LAND SURVEYING | LAND PLANNINGPROJECT MANAGEMENT | PERMIT EXPEDITING | FEASIBILITYCONTACTphone: 253-301-4157fax: 253-336-3950landon@beylerconsulting.combeylerconsulting.comOFFICE10314 100th St. SWLakewood, WA 98498SHEET OF JOB NUMBERNO. DESCRIPTION INIT DATEDRAWN BY:CHECKED BY:SCALE:HORZ:VERT:DATE:BEYLERCONSULTINGPlan. Design. ManageA PORTION OF THE SW 1/4 OF SECTION 23, TOWNSHIP 23 N, RANGE 05 E., W.M.FUELING STATIONCEDAR RIVER STATIONCITY OF RENTON,WASHINGTON13-207 6 C3.0 3EROSION & SEDIMENT CONTROL DETAILSCITY OF RENTON APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ SOURCE: CITY OF RENTON AMENDMENTS TO THE KING CO SWDM, REFERENCE 7-B 1.PRE-CONSTRUCTION MEETING. 2.POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 3.FLAG OR FENCE CLEARING LIMITS. 4.INSTALL CATCH BASIN PROTECTION IF REQUIRED. 5.GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6.INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7.CONSTRUCT SEDIMENT PONDS AND TRAPS. 8.GRADE AND STABILIZE CONSTRUCTION ROADS. 9.CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 10.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY’S EROSION AND SEDIMENT CONTROL STANDARDS. 12.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 13.STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14.SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15.UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. CONSTRUCTION SEQUENCE PREVENTATIVE MEASURES TO MINIMIZE WIND TRANSPORT OF SOIL SHALL BE IMPLEMENTED WHEN A TRAFFIC HAZARD MAY BE CREATED OR WHEN THERE IS THE POTENTIAL FOR SEDIMENT TO BE TRANSPORTED BY WIND. WATER IS THE MOST COMMON DUST CONTROL USED IN THE AREA. WHEN USING WATER FOR DUST CONTROL, THE EXPOSED SOILS SHALL BE SPRAYED UNTIL WET, BUT RUNOFF SHALL NOT BE GENERATED BY SPRAYING. EXPOSED AREAS SHALL BE RE-SPRAYED AS NEEDED. OIL SHALL NOT BE USED FOR DUST CONTROL. DUST CONTROL LIMIT HAUL HOURS BETWEEN 8:30 AM TO 3:30 PM, MONDAY THROUGH FRIDAY UNLESS OTHERWISE APPROVED BY THE DEVELOPMENT SERVICES DIVISION PER RMC SECTION4-4-030.C.2. CONSTRUCTION ACTIVITIES SHALL BE RESTRICTED TO THE HOURS BETWEEN 7 AM AND 8 PM, MONDAY THROUGH FRIDAY. WORK ON SATURDAYS SHALL BE RESTRICTED TO THE HOURS BETWEEN 9 AM AND 8 PM. NO WORK SHALL BE PERMITTED ON SUNDAYS. WORKING HOURS BML 06/30/16 109 110 1111091081111101101091081072:1 4:16 : 1 1.5% 1.2%3:11 . 5% 3. 2% 1.0% 1.2% 111 111.67 111.67 111.67 112.17 112.17 112.33 112.33 112.33 112.33 111.75 111.90 112.15 111.80 111.90 111.90 111.90 111.71 111.75 111.40 111.15 111.65 111.40 111.40 111.14 111.25 111.67 111.67 111.73 112.17 111.90 112.25 111.75 111.80 111.20 111.80 111.93 112.22 111.75 111.10 111.75 111.67 111.67TOP 112.17 TOP 112.17 111.67 111.67 111.67 110.81 111.85 108.5± 108.5± 111.09 109.85 109.75 8.3%8.3%110 109 111.55 111.70 111.67 111.67 111.37 111.19 106110 109 108 107 106 105 111 111.27 1101072:1 TOP 112.17 111.75 TOP 112.17 111.78 112112 SCALE: 1" = 20' 1020 0 20 40 BUILDING C SE RE N T O N M A P L E V A L L E Y R O A D ( S R 1 6 9 ) PROPOSED RETAIL STORE (84'x43') FF = 112.50 CB, TYPE 1 TOP 110.86 12" IE 107.16 (IN-NE) 12" IE 107.16 (OUT-W)CIVIL ENGINEERING | LAND SURVEYING | LAND PLANNINGPROJECT MANAGEMENT | PERMIT EXPEDITING | FEASIBILITYCONTACTphone: 253-301-4157fax: 253-336-3950landon@beylerconsulting.combeylerconsulting.comOFFICE10314 100th St. SWLakewood, WA 98498SHEET OF JOB NUMBERNO. DESCRIPTION INIT DATEDRAWN BY:CHECKED BY:SCALE:HORZ:VERT:DATE:BEYLERCONSULTINGPlan. Design. ManageA PORTION OF THE SW 1/4 OF SECTION 23, TOWNSHIP 23 N, RANGE 05 E., W.M.FUELING STATIONCEDAR RIVER STATIONCITY OF RENTON,WASHINGTON13-207 6 C4.0 4GRADING & UTILITY PLANCOVERED FUELING AREA CEDAR RIVER STATION PARCEL #2323059210 SEE DEVELOPMENT PLANS PREPARED BY ESM CONSULTING ENGINEERS CB, TYPE 1 TOP 110.51 6" IE 108.27 (IN-W) 12" IE 107.77 (IN-N) 12" IE 107.77 (OUT-W) CB, TYPE 1 TOP 111.16 12" IE 107.40 (IN-N) 12" IE 107.40 (IN-E) 12" IE 107.40 (OUT-SW) CB, TYPE 1 TOP 110.86 12" IE 108.02 (IN-E) 12" IE 108.02 (OUT-W) 108.00 110.00 VERTICAL CURB (TYP) EXISTING SSMH TOP 106.50 12" IE 96.55 (W) 12" IE 96.65 (E) EXISTING SSMH TOP 110.61 12" IE 97.0 (E,W) 8" IE 97.10 (S)10'EXISTING 10' SEWER EASEMENT AFN #9007050803 5' EXISTING 5' STORM EASEMENT AFN #9412081041 EMERALD CREST CONDOMINIUM 15400 SE 155TH PL #232978-0000 VALLEY SPRINGS APARTMENTS 15300 SE 155TH PL #232305-9209 PROPOSED CEDAR RIVER STATION FRONTAGE IMPROVEMENTS PER PLANS PREPARED BY ESM CONSULTING ENGINEERS EXISTI N G D I T C H EXISTI N G D I T C H 110 1 0 9 1 0 8 SEE CEDAR RIVER STATION DRAINAGE PLANS PREPARED BY ESM CONSULTING ENGINEERS FOR CONTINUATION OF PROPOSED STORM. STORMWATER CONTINUES TO UNDERGROUND WATER QUALITY AND DETENTION VAULT EDGE OF CEDAR RIVER STATION PAVING PER CIVIL DRAWINGS PREPARED BY ESM CONSULTING ENGINEERS (TYP) 1 110.59 5' LANDING. 2% MAX CITY OF RENTON APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ 2 STORMWATER NOTES 1 CB #1, TYPE I W/SOLID LOCKING LID TOP 111.50 6" IE 108.00 (IN-E) 8" IE 107.83 (IN-N,S) 12" IE 107.50 (OUT-SW)(EXISTING) 2 36± LF, 8" PVC, @ S=0.50% 3 CB #2, TYPE I TOP 111.59 8" IE 108.01 (IN-E) 8" IE 108.01 (OUT-N) 4 65± LF, 8" PVC, @ S=0.50% 5 CB #3, TYPE I TOP 111.35 8" IE 108.01 (IN-E) 8" IE 108.01 (OUT-W) 6 73± LF, 8" PVC, @ S=0.50% 7 CB #4, TYPE I TOP 111.20 6" IE 108.55 (IN-N,W) (ROOF) 8" IE 108.38 (OUT-W) 8 48± LF, 8" PVC, @ S=0.50% 9 CB #5, TYPE I W/SOLID LOCKING LID TOP 111.00 8" IE 108.07 (IN-E) 8" IE 108.07 (OUT-S) 10 66± LF, 8" PVC, @ S=0.50% 11 CB #6, TYPE I TOP 111.17 6" IE 108.57 (IN-S) 8" IE 108.40 (OUT-W) 12 114± LF, 8" PVC, @ S=0.50% 13 CB #7, TYPE I TOP 111.50 6" IE 108.76 (IN-SE)(ROOF) 8" IE 108.59 (IN-S) 8" IE 108.59 (OUT-W) 14 36± LF, 8" PVC, @ S=0.50% 15 CB #8, TYPE I W/SOLID LOCKING LID TOP 112.05 6" IE 108.94 (IN-E, W) 8" IE 108.77 (OUT-N) 16 CB #9, TYPE I W/SOLID LOCKING LID W/DOWN TURNED ELBOW & FINE MESH SCREEN ON OUTLET PIPE TOP 111.64 6" IE 108.14 (IN-N, W) (ROOF) 6" IE 108.14 (OUT-E) 17 12' DIAMETER DRY WELL FILLED WITH 1.5"-3" WASHED DRAIN ROCK 7.5' DEEP TOP OF WELL APPROX 107.50 INSTALL CEANOUT DOWN TO TOP OF GRAVEL IN CENTER OF DRY WELL. SEE DETAIL BELOW. 3 4 5 6 7 8 9 11 10 12 13 15 14 SEWER NOTES 1 10± LF, 6" PVC, @ S=2.0% CONNECT TO EXISTING SEWER MAIN 6" IE 102.00± 2 SSCO #1 (STRAIGHT "T" RISER) TOP 111.16 6" IE 102.20± 3 OMITTED 4 20± LF, 6" PVC, @ S=5.45% 5 SSCO #2 (STRAIGHT "T" RISER) TOP 111.38 6" IE 103.29 6 2 LF, 6" PVC, @ S=2.0% 7 OIL WATER SEPARATOR W/5.5' OF RISER OLD CASTLE 660-SA TOP 111.35 (CENTER) 6" IE 103.81 (IN-E) 6" IE 103.31 (OUT-W) SEE DETAIL ON SHEET C6.0 8 2 LF, 6" PVC, @ s=2.0% 9 SSCO #3 (STRAIGHT "T" RISER) TOP 111.31 6" IE 103.85 10 48± LF, 6" PVC, @ S=2.0% 11 SSCO #4 TOP 111.48 6" IE 104.81 12 75± LF, 6" PVC, @ S=2.0% 13 SSCO #5 TOP 111.65 6" IE 106.31 14 27± LF, 6" PVC, @ S=2.0% 15 SSCO #6 TOP 111.38 6" IE 106.85 STUB FOR FUTURE CAR WASH TREATMENT 16 60± LF, 4" PVC, @ S=2.0% 17 50 LF ACO DRAIN SLABDRAIN H100 NEUTRAL CHANNEL TRENCH DRAIN WITH ADA DUCTILE IRON GRATE TOP: VARIES SLOPE: 1.0% SEE DETAIL SHEET C5 18 OMITED 19 OMITED 20 EX SSCO ADJUST TOP AS NEEDED TOP 111.75± 6" IE 101.50± 21 10± LF, 6" PVC, @ S=55% 22 SSCO #5 (DOUBLE SWEEP) TOP 112.29 6" IE 107.00 23 SSCO #6 TOP 111.95 6" IE 108.45 24 2 ± LF, 6" PVC, @ S=XX% 25 1000 GAL GREASE INTERCEPTOR TOP 111.59 6" IE 107.59± (E-IN) 6" IE 107.43± (N-OUT) SEE DETAIL ON SHEET C6.0 26 3 ± LF, 6" PVC, @ S=19% 27 SSCO #7 STRAIGHT "T" RISER SAMPLING POINT) TOP 111.50 6" IE 106.85 28 28 ± LF, 6" PVC, @ S=19% 2 4 10 11 5' LANDING. 2% MAX 20 LF PVC CULVERT UNDER SIDEWALK @ S=0.5%. CONNECT TO EXISTING CULVERT 12" IE 103.76 EX 12" IE 103.66 5 6 7 8 9 16 17 21 22 20 PROPOSED CONCRETE RAMP TO EXISTING SIDEWALK COLORED STAMPED CONCRETE CROSSWALK C526"-8" RAISED CONCRETE FUELING ISLANDS BOLLARDS (TYP) 1.CONTRACTOR TO VERIFY DOWNSPOUT LOCATIONS AND CONNECTIONS TO PROPOSED ROOF DRAIN LINE. COORDINATE DOWNSPOUT LOCATIONS WITH ARCHITECT AND OR OWNER. 2.DOWNSPOUTS SHALL BE TIED INTO A NON-PERFORATED, RIGID, PIPE WHICH DRAINS TO AN APPROVED STORM SYSTEM. 3.PROVIDE CLEANOUTS AT THE UPPER END OF THE SYSTEM AND AT EACH CUMULATIVE CHANGE OF DIRECTION IN EXCESS OF 135 DEGREES. 4.ALL PIPE FITTINGS SHALL BE MADE OF THE SAME MATERIAL AS THE STRAIGHT PIPE. GLUED JOINTS MUST USE A BONDING AGENT RECOMMENDED BY THE PIPE MANUFACTURER. ROOF DOWNSPOUT NOTE CONTRACTOR TO FIELD VERIFY GRADES AND SHALL NOTIFY ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. DESIGN GRADES NOTE ·STORM PIPE (SD) SHALL BE PVC SDR-35 PER ASTM D3034 ·SEWER PIPE (SS) SHALL BE PVC SDR-35 PER ASTM D3034 PIPE MATERIAL DS DS 6" STUB FOR DOWNSPOUT 6" ROOF DRAIN @ S=2% MIN DS CONCRETE WALKWAY EXISTING STUB TO BE REMOVED DOWN TO NEW CB 1 12 15 14 13 1ADD PHASING TO SITE PLANBML 05/18/156" STUB FOR DOWNSPOUT @ 2% MIN 6" STUB FOR DOWNSPOUT @ 2% MIN WATER STUB FOR FUTURE CAR WASH 6" STUB FOR DOWNSPOUT @ 2% MIN APPROX LOCATION OF NEW 2.5" GAS LINE FOR RETAIL STORE AND FUTURE CAR WASH GAS LINE STUB FOR FUTURE CAR WASH. 2.5" GAS MAIN STUB INSTALLED WITH CEDAR RIVER STATION DEVELOPMENT 1-4" POWER CONDUIT AND 2-3" CENTURY LINK CONDUITS STUBS (APPROX LOCATION)2ADD FLOW CONTROL BMPBML 02/10/1616 17 DRY WELL DETAIL1 C4 SCALE: NTS 6"Ø CAP FLUSH WITH GRADE 6"Ø PVC TO SURFACE LENGTH AS REQUIRED ALL SIDES LINED WITH FILTER FABRIC 12' DIA 7.5' DFROM CB #9 DRY WELL FILLED WITH 1.5"-3" WASHED DRAIN ROCK FINISH GRADE SOURCE: 2009 KCSWDM FIGURE C.2.2.C APPROX ELEV=111.5± ELEV=107.5± EXISTING SSMH TOP 111.00 8" IE 101.00 (N) 1 1REVISED FUEL TANKS/SEWER PER SEWERASBUILTSBML 06/30/16TOP 111.90 TOP 112.05 TOP 112.20 TOP 112.35 TOP 112.25 TOP 111.95 2ADDED FUELING ISLAND ELEVATIONSBML 10/24/1623 24 26 28 25 27 111.99 108.29 107.38 107.47 0.86% 111.42 107.57 107.69 1.26% 111.49 108.28 108.39 1.23% 111.09 NO PIPE 109.18 0.81% 110.82 107.76 107.77 0.61% 110.93 109.25 108.16 0.11% 111.03 109.00 108.21 108.14 1.89% 111.63 109.33 109.28 111.54 108.91 108.59 THESE PLANS ARE RECORD DRAWINGS AND THE INFORMATION SHOWN ACCURATELY REFLECTS THE AS-BUILT INFORMATION PROVIDED TO BEYLER CONSULTING AS OF THIS DATE: 08/22/2017 AS-BUILTS 3AS-BUILTSKDA 08/28/17 CIVIL ENGINEERING | LAND SURVEYING | LAND PLANNINGPROJECT MANAGEMENT | PERMIT EXPEDITING | FEASIBILITYCONTACTphone: 253-301-4157fax: 253-336-3950landon@beylerconsulting.combeylerconsulting.comOFFICE10314 100th St. SWLakewood, WA 98498SHEET OF JOB NUMBERNO. DESCRIPTION INIT DATEDRAWN BY:CHECKED BY:SCALE:HORZ:VERT:DATE:BEYLERCONSULTINGPlan. Design. ManageA PORTION OF THE SW 1/4 OF SECTION 23, TOWNSHIP 23 N, RANGE 05 E., W.M.FUELING STATIONCEDAR RIVER STATIONCITY OF RENTON,WASHINGTON13-207 6 C5.0 5NOTES & DETAILSCITY OF RENTON APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ SOURCE: CITY OF RENTON AMENDMENTS TO THE KING CO SWDM, REFERENCE 7-B 1.THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SURFACE WATER UTILITY. 2.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE-CONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF RENTON PLAN REVIEW SECTION AND THE APPLICANT. 3.ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RENTON MUNICIPAL CODE (RMC), THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THIS PLANS, ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY. 4.APPROVAL OF THIS ROAD, GRADING, PARKING AND DRAINAGE PLAN DOES NOT CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (E.G. DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICAL. ETC.)THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILE IN WITH THE CITY. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. 5.A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6.GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7 A.M. TO 7 P.M. MONDAY THROUGH SATURDAY AND NO WORK ON SUNDAY IS ALLOWED, UNLESS OTHERWISE APPROVED WITH A WRITTEN DECISION BY THE CITY OF RENTON. 7.IT SHALL BE THE APPLICANT’S/CONTRACTOR’S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF-SITE WORK. EASEMENTS REQUIRE CITY REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. 8.FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL REQUIREMENTS OF CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL ARE SUBMITTED TO THE CITY OF RENTON. 9.DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS. 10.ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 11.ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 PERCENT DENSITY, STANDARD PROCTOR. 12.OPEN CUTTING OF EXISTING ROADWAYS FOR NON-FRANCHISED UTILITY OR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY OF RENTON TRENCH RESTORATION STANDARDS. 13.ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON-SITE EROSION HAS PASSED. 14.ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. 15.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS “C”, WITH THE EXCEPTION OF PVC PIPE. 16.STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE. 17.ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES SHALL HAVE SOLID LOCKING LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY SHALL HAVE SOLID LOCKING LIDS. 18.BUILDING AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES. 19.ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL. 20.ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY OF RENTON RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 70% PASSING; 2 - 4 INCH ROCK / 30 - 40% PASSING; AND LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 21.ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED AS-BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY UPON COMPLETION. 22.DRAINAGE OUTLETS (STUB-OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT, EXCEPT FOR THOSE LOTS APPROVED FOR INFILTRATION BY THE CITY. STUB-OUTS SHALL CONFORM TO THE FOLLOWING: A.EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS, DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUBSURFACE DRAINS NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED USE. EACH OUTLET SHALL HAVE FREE-FLOWING, POSITIVE DRAINAGE TO AN APPROVED STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL LOCATION. B.OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE-FOOT-HIGH, 2" X 4" STAKE MARKED "STORM" OR "DRAIN". THE STUB-OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE VISIBLE, AND BE SECURED TO THE STAKE. C.PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL AND, IF NON-METALLIC, THE PIPE SHALL BE PLACED IN A TRENCH WITH A TRACING WIRE ABOVE OR OTHER ACCEPTABLE DETECTION. D.PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED TO CONVEY FLOWS THROUGH INDIVIDUAL LOTS. E.THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE LOCATIONS OF ALL STUBOUT CONVEYANCE LINES WITH RESPECT TO OTHER UTILITIES (E.G. POWER, GAS, TELEPHONE, TELEVISION). F.ALL INDIVIDUAL STUB-OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE LOT HOME OWNER. G.STORM DRAINAGE PIPE SYSTEMS SHALL NOT PENETRATE BUILDING FOUNDATIONS, EXCEPT FOR SUMP PUMP DISCHARGE LINES USED TO DRAIN CRAWL SPACES, PROVIDED THE SUMP PUMP SYSTEM INCLUDES BACKFLOW PREVENTION OR A CHECK VALVE. 23.ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE MUST DEMONSTRATE ONE OF THE FOLLOWING: THE EXISTING DUFF LAYER SHALL BE STAGED AND REDISTRIBUTED TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL, OR; AMENDED SOIL SHALL BE ADDED TO MAINTAIN THE MOISTURE CAPACITY. 24.PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO CONSTRUCTION PERMIT ISSUANCE. 25.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION. 26.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVE BY THE PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY. 27.PROJECT LOCATED WITHIN THE AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL AND AQUIFER PROTECTION REGULATIONS (RMC 4-3-050). SURFACE WATER STANDARD PLAN NOTES PAVEMENT SECTION N.T.S 4 C5 SEE PLAN 4" 6"2500 PSI FIBER MESH CONCRETE 1-1/2 POUNDS FIBER MESH PER CUBIC YARD. 14" TOOLED JOINT 1-2% COMPACTED SUBGRADE PER PLAN 4"2500 PSI FIBER MESH CONCRETE 1-1/2 POUNDS FIBER MESH PER CUBIC YARD.1/2" R (TYP) MONOLITHIC CURB & SIDEWALK2 C5 SCALE: NTS SLOPE AWAY FROM BUILDING DETACHED SIDEWALK ON-SITE3 C5 SCALE: NTS 1-2% SLOPE AWAY FROM BUILDING (IF NECESSARY) CONCRETE SECTION N.T.S 5 C5 PORTLAND CEMENT CONCRETE (3000 PSI COMPRESSIVE STRENGTH PER WSDOT STD SECTION 5.05) W/REINFORCEMENT2" CRUSHED TOP COURSE OVER 4" CRUSHED BASE COURSE (WSDOT STD SPEC 9-03.9(3)) COMPACTED SUITABLE NATIVE MATERIAL OR STRUCTURAL FILL. UNSUITABLE NATIVE MATERIAL SHALL BE OVEREXVACATED AND REPLACED. COMPACT TO ACHIEVE 95% DENSITY PER ASTM D-1557 2" ASPHALT CONCRETE (AC) 1.5" CRUSHED TOP COARSE OVER 2.5 CRUSHED BASE COURSE (WSDOT STD SPEC 9-03.9(3)) COMPACTED SUITABLE NATIVE MATERIAL OR STRUCTURAL FILL. UNSUITABLE NATIVE MATERIAL SHALL BE OVEREXVACATED AND REPLACED. COMPACT TO ACHIEVE 95% DENSITY PER ASTM D-1557 COMPACTED SUBGRADE VERTICAL BARRIER CURB1 C5 SCALE: NTS 16"7.75" 5.5"6"PAVEMENT 1"R0.5"R FINISHED FLOOR 2"6"6"Ø CAP FLUSH WITH GRADE 6"Ø PVC TO SURFACE LENGTH AS REQUIRED 6"Ø 45° ELBOW 6"Ø PVC TO SURFACE LENGTH AS REQUIRED END PLUG 6"Ø 45° WYE 6"Ø PVC STORM CLEANOUT DETAIL N.T.S 6 C5 EXISTING OR PROPOSED GRADE A SECTION AA A PLAN VIEW opauburn.com Delivering Reliability 119.1 SCALE: 1/2"=1'-0" 660-SA CIVIL ENGINEERING | LAND SURVEYING | LAND PLANNINGPROJECT MANAGEMENT | PERMIT EXPEDITING | FEASIBILITYCONTACTphone: 253-301-4157fax: 253-336-3950landon@beylerconsulting.combeylerconsulting.comOFFICE10314 100th St. SWLakewood, WA 98498SHEET OF JOB NUMBERNO. DESCRIPTION INIT DATEDRAWN BY:CHECKED BY:SCALE:HORZ:VERT:DATE:BEYLERCONSULTINGPlan. Design. ManageA PORTION OF THE SW 1/4 OF SECTION 23, TOWNSHIP 23 N, RANGE 05 E., W.M.FUELING STATIONCEDAR RIVER STATIONCITY OF RENTON,WASHINGTON13-207 6 C6.0 6NOTES & DETAILS (CONT.)CITY OF RENTON APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ APPROVED BY:______________________________DATE:__________ OIL WATER SEPARATOR (450 GAL)1 C6 1"=2'1ADD PHASING TO SITE PLANBML 05/18/151000 GALLON GREASE INTERCEPTOR DETAIL2 C6 OLDCASTLE, 4484-GA, H20 RATED GREASE TRAP 24" LOCKING FRAME AND COVER, AIR & GAS TIGHT, 3 PLACES HS20 LOAD CAPACITY & LABELED "PRIVATE SEWER" GREASE INTERCEPTOR GENERAL NOTES: 1.CONCRETE: 28 DAY COMPRESSIVE STRENGTH, F'C = 7,000 PSI 2.REBAR: ASTM A-615 GRADE 60 3.MESH: ASTM A-185 GRADE 65 4.DESIGN: ACI-318-02 BUILDING CODE ASTM C-857 "MINIMUM STRUCTURAL DESIGN LOADING FOR UNDERGROUND PRECAST CONCRETE UTILITY STRUCTURES" 5.LOADS: H-20 TRUCK WHEEL W/30% IMPACT PER AASHTO 6.FILL W/CLEAN WATER PRIOR TO START-UP OF SYSTEM 7.CONTRACTOR TO SUPPLY & INSTALL ALL PIPING & SAMPLING TEES 8.GRAY WATER ONLY, BLACK WATER SHALL BE CARRIED BY SEPARATE SIDE SEWER 2.5"Ø VENT PIPE REQUIRED 107.43107.59 COAT W/COAL TAR EPOXY, SEE GENERAL NOTE #4 BELOW INLET A PLAN VIEW OUTLET A DETAIL 1 KOR-N-SEAL & BOOT (TYP)KOR-N-SEAL & BOOT (TYP)