HomeMy WebLinkAboutPunchlist Cedar River StationCedarRiverstationpunchlist1)Cleanentirestormsystem2)C.B.#16Mudframeandgrate3)CE.#14Mudframeandgrate4)C.B.#11rotatelidandmoveladder.5)C.B.#9grout6)C.B.#10centerframeandgrateandgrout7)ExistingC.B.concretecollararoundringandlid8)Completeon-sitecurb9)Bluereflectorsoncenterlineforallhydrants10)Adjustutilitycoversperstandarddetail#400.411)Removetemporarypowerpole12)Removeplasticfromtruncateddomes13)Removespoilspilesandhydroseed14)Placetopsoilandsodnexttosidewalks.w.cornetofproject15)Reseedorsodn.w.cornerofproject16)Movebusstopoutofwalkway17)SeedorsodeastofentranceoffS.R.16918)Removesoilandplacequarryspallsatpipeoutlet-inlet19)Completeon-sitepaving20)LetterfromCedarRiverwaterandsewerindicatingtheyhaveacceptedwaterandsewerinitsentirety
SURFACEWATERSECTIONWALKTHRU.INSPECTIONSHEETDUE:02/29/16PROJECTNAMECEDARRIVERSTATIONWO#618230ADDRESSS.R.169&152NDAVESEDATE02/16/16INSP.BY:N.Nelson,C.KrysiakINSPECTORTOMMAIN@206999-1833PAGESTATIONSTRUCTUREDEFECT10CB#EXTheringandlidneedtogrouteddownperSTD.Plan201.00TheframeandrisersneedtogrouteddownperSTD.Plan202.00.10CB14TheDummyjointsand2’offsetexpansionjointwerenotinstalledperStd.Plan101.1TheframeandrisersneedtogrouteddownperSTD.Plan202.00.10CB15TheDummyjointsand2’offsetexpansionjointwerenotinstalledperStd.Plan101.1J:\ADMIN\WALKTHRU\SURFACEWATER.DOC
TheframeandrisersneedtogrouteddownperSTD.Plan202.00.11CB16TheDummyjointsand2’offsetexpansionjointwerenotinstalledperStd.Plan101.111WestofCB16ThereisstandingwaterinthecurblinethatisnotgettingintoCB16.Wecouldnotverifyiftheswalewas10/11Drainageswalebuiltperplanduetoaninsufficientsetofplans.i:\ADMIN\WALKTHRU\SURFACEWATER.DOC
STREETSSECTIONWALKTHRU.INSPECTIONSHEETDUE:02/29/16PROJECTNAMECEDARRIVERSTATIONWO#618229ADDRESSS.R.169&152NDAVESEDATE02/16/16INSP.BY:JAYSONGRANT@2238INSPECTORTOMMAIN@206999-1833PAGESTATIONSTRUCTUREDEFECTRemoveplasticoffofADAramp.Pictureattached.J:\ADMIN\WALKTHRU\STREET.DCC