HomeMy WebLinkAbout18Z
J
w.
Gal 2 Working Days Before You Dig
811
Utiites Underground(Lpocatiion Center
0D,e1 ,NDi0 ,WA)
CONSULTING ENGINEERS LLC
33400 8th Avenue South i C C
Suite 205
Federal Way, WA 98003
FEDEtiAL WAY (253) 83$-6113
www.esmcivii.com EMT (425) M-WW
Civil Engineering Land Surveying Land Planning
Public Works I Project Management Landscape Architecture
CCU inQ UOn A _nn I —n i =%
0 1 FIRST SUBMITTAL
4llb I NO
REVISION
1.
SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS
TRACT A
CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION
(LANDSCAPE)
MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS
v
CONSTRUCTED AS PART OF THIS SUBDIVISION.
COMPLIANCE WITH THIS REQUIREMENT WILL BE
ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR.
TRACT'
-s_.__.._A___..._.__ �.__.._
RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN
�
APPLICATION IS MADE FOR A SINGLE FAMILY
i (INGRESS/
RESIDENTIAL BUILDING PERMIT FOR EACH LOT.
_
s
OPENSPACE)
53,
RAW -4--
2.
FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS
wu
----- wM
SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD
REPAIR BY EACH LOT OWNER.
.
3
STORM ` DRAINAGE MAINS SHALL BE VlDEOED FOLLOWING
.
>E
♦....... _ _ . - -
... _
=
INSTALLATION PER THE FOLLOWING PROCEDURE:
- __... - - -
----
-
-----------
----------
............
-------------
...........
----
- - -
-
+„
A
THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY
--
------- --
----------
/
THE CCTV INSPECTION VIDEOS AND WRITTEN
REPORTS. THE CCTV INSPECTION SHALL INCLUDE
ALL PROJECT STORM DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES THAT
WILL BECOME CITY OWNED/MAINTAINED AND ALL
PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES
w
AND CONNECTING CATCH BASIN AND MANHOLE
8
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR
36
AND COMPATIBLE WITH THE CITY'S VIEWING AND
RECORDING SYSTEMS. THE CITY WILL ` ONLY
ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
s Q
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG
VIDEO FILE FORMAT) AND IS COMPATIBLE WITH
GRANITE XP. THE VIDEO SHALL REFERENCE EACH
PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM
AND DOWNSTREAM CONNECTING STRUCTURES AS
SOWN (AND IDENTIFIED) ON THE APPROVED
PROJECT CONSTRUCTION PLANS.
B)
THE COSTS INCURRED IN MAKING THE INITIAL CCTV
t
INSPECTION SHALL BE BORNE BY THE PROJECT
DEVELOPER. THE DEVELOPER SHALL BEAR ALL
COSTS INCURRED IN CORRECTING ANY DEFICIENCIES
FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION,
EXFILTRATION TESTING OR AIR TESTING THAT MAY
4,
BE REQURIED BY THE CITY TO VERIFY THE
CORRECTION OF SAID DEFICIENCY.
C)
THE DEVELOPER SHALL BE RESPONSIBLE- FOR ALL
COSTS INCURRED IN THE CCTV INSPECTION
PERFORMED SOLELY FOR THE BENEFIT OF THE
DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
8.
PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS
LESS THAN 1 FOOT.
CHECKED FOR COMPLIANCE TO CITY STANDARDS
SCALE
1 10maw
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
vornCAL: NAVD 19W
HORIZONTAL- MAD 1983/1991
DATUM
& CI TY OF
RENTON
Planning/Building/Public Works Dept.
DATE:
KINKADE CROSSING 04/01/2016
COMPOSITE UTILITY PLAN:
RECEIVE AI
DRAINING NO:
APR 0 4 2016 UT-01
UTILIW PERMIT # CITY OF RENT - 9 �19
PLAN ING VI 1