Loading...
HomeMy WebLinkAbout18Z J w. Gal 2 Working Days Before You Dig 811 Utiites Underground(Lpocatiion Center 0D,e1 ,NDi0 ,WA) CONSULTING ENGINEERS LLC 33400 8th Avenue South i C C Suite 205 Federal Way, WA 98003 FEDEtiAL WAY (253) 83$-6113 www.esmcivii.com EMT (425) M-WW Civil Engineering Land Surveying Land Planning Public Works I Project Management Landscape Architecture CCU inQ UOn A _nn I —n i =% 0 1 FIRST SUBMITTAL 4llb I NO REVISION 1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS TRACT A CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION (LANDSCAPE) MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS v CONSTRUCTED AS PART OF THIS SUBDIVISION. COMPLIANCE WITH THIS REQUIREMENT WILL BE ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR. TRACT' -s_.__.._A___..._.__ �.__.._ RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN � APPLICATION IS MADE FOR A SINGLE FAMILY i (INGRESS/ RESIDENTIAL BUILDING PERMIT FOR EACH LOT. _ s OPENSPACE) 53, RAW -4-- 2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS wu ----- wM SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD REPAIR BY EACH LOT OWNER. . 3 STORM ` DRAINAGE MAINS SHALL BE VlDEOED FOLLOWING . >E ♦....... _ _ . - - ... _ = INSTALLATION PER THE FOLLOWING PROCEDURE: - __... - - - ---- - ----------- ---------- ............ ------------- ........... ---- - - - - +„ A THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY -- ------- -- ---------- / THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES w AND CONNECTING CATCH BASIN AND MANHOLE 8 STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR 36 AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ` ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS s Q VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION PLANS. B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV t INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY 4, BE REQURIED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. C) THE DEVELOPER SHALL BE RESPONSIBLE- FOR ALL COSTS INCURRED IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. VIDEO TO BE PROVIDED TO CITY INSPECTOR. 8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. CHECKED FOR COMPLIANCE TO CITY STANDARDS SCALE 1 10maw ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY vornCAL: NAVD 19W HORIZONTAL- MAD 1983/1991 DATUM & CI TY OF RENTON Planning/Building/Public Works Dept. DATE: KINKADE CROSSING 04/01/2016 COMPOSITE UTILITY PLAN: RECEIVE AI DRAINING NO: APR 0 4 2016 UT-01 UTILIW PERMIT # CITY OF RENT - 9 �19 PLAN ING VI 1