HomeMy WebLinkAboutKinkade Crossing Utility Plan II CommentsADD A STREET SIGN FOR
ROAD B AND 116TH
AVENUE SE INTERSECTION
AT T OF INTERSECTION ADD NOTE TO REMOVE
BOTH SETS OF DOUBLE
YELLOW LINE STRIPING AT
INTERSECTION TO ALLOW
FOR A LEGAL LEFT TURN
ROTATE SIGN SO IT
FACES SOUTH
ADD NOTE STATING THAT A
STORMWATER ACCESS AND
MAINTEANCE EASEMENT SHALL
COVER ALL OF TRACT B.
ADD STOP SIGN AND 16" STOP
BAR AT ROAD B AND 116TH
AVENUE SE INTERSECTION.
THE STOP SIGN SHALL BE PER
STANDARD R1-1 OF THE
MUTCD. THE STOP BAR SHALL
BE THERMOPLASTIC.
CESCL #EF8181808
NPDES PERMIT #
___________
A BUILDING PERMIT APPLICATION FOR
THE POND WALLS WILL BE REQUIRED
PRIOR TO UTILITY PERMIT ISSUANCE
AS THE POND IS BEING USED AS THE
TEMPORARY STORMWATER POND.
SHOW A BLOW UP OF THE DRIVEWAY CUT
AND TIE-IN AS IT IS NOT A STANDARD
INSTALLATION. PROVIDE EXISTING AND
PROPOSED SPOT ELEVATIONS ALONG
WITH DRIVEWAY AND SIDEWALK SLOPES.
SHOW HOW
OFF-SITE DRAINAGE
FROM THIS AREA IS
BEING COLLECTED
AND ROUTED TO
THE POND.
REFERENCE COR STD. PLAN 203.00
FOR OPEN FACE CURB AND COR
STD. PLAN 204.30 FOR A
BI-DIRECTIONAL VANED GRATE.
PROVIDE
POSTMASTER
APPROVAL FOR
LOCATION
PROVIDE DETAIL SHOWING
HOW PIPES WILL ENTER CB
#10 AND CB #11
RAMP WING SHALL BE
LESS THAN 10% TO
CONFORM TO ADA
STANDARDS
POND DOES NOT MEET FLOWPATH OR ACCESS
REQUIREMENTS FOR A WETPOND. ENSURE ALL
REQUIREMENTS PER SECTION 6.4.1.2 OF THE 2009 KCSWDM
ARE MET OR CONSIDER AN ALTERNATIVE DESIGN TO
ACHIEVE BASIC WATER QUALITY REQUIREMENTS.
GRAVEL ACCESS ROADS
SHALL HAVE 4" TO 8" OF RIP
RAP / QUARRY SPALLS UNDER
A MINIMUM OF 4" OF CSTC
WITH GEOTEXTILE FABRIC
BETWEEN THE LAYERS.
STORMWATER POND
SIGN TO BE INSTALLED
ON FENCE PER DETAIL
SHEET PN-03.
ADD NOTE TO PLAN STATING THAT A PUBLIC
STORM DRAINAGE MAINTENANCE AND ACCESS
EASEMENT TO OCCUPY THE ENTIRETY OF TRACT B
SHOW AND CALL OUT
APPROXIMATE LOCATION OF
GAS CROSSING BETWEEN
CB #18 AND CB #19.
12"
-7.41%
1.00%
4.08%
UTILITY PERMIT # U16-001701
TOP RAIL
SHOW LOCATION
OF EXISTING
POWER POLES IN
STREET SECTION.
ADD THE FOLLOWING CITY OF RENTON DETAILS:
101.1 - CEMENT CONCRETE CURB INSTALLATION AT CATCH BASINS
H032.1 - TYPICAL TRANSVEERSE PATCH FOR FLEXIBLE PAVEMENT
204.30 - RECTANGULAR BI-DIRECTIONAL VANED GRATE
202 - CATCH BASIN INSTALLATION
204.50 - STORM ROUND FRAME AND COVER