HomeMy WebLinkAboutRPT- Boun SP TIR 2016.11.21 (stamped and signed)
BOUN SHORT PLAT
SITE ADDRESS: 1024 Duvall Ave NE, Renton, Washington
SECTION 10/TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
Technical Information Report
(___________________________)
Associated Permit Number
Prepared For: Warring Properties
Contact: Socheat “Kent” Khnor
845 106th Ave, Suite 200
Bellevue, WA 98003
Date Prepared: November 21, 2016
Prepared By: Drew T. Young, EIT
Reviewed By: Brandon M. Loucks, P.E.
Beyler Consulting LLC
7602 Bridgeport Way W, #3D
Lakewood, WA 98499
253.301.4157
CONTACT phone: 253-301-4157
fax: 253-336-3950
info@beylerconsulting.com
beylerconsulting.com
LAKEWOOD OFFICE
7602 Bridgeport Way W #3D Lakewood, WA 98499
ISSAQUAH OFFICE
455 Rainier Blvd N Issaquah, WA 98027
Plan. Design. Manage.
CIVIL & STRUCTURAL ENGINEERING | LAND SURVEYING | PLANNING PROJECT MANAGEMENT | FEASIBILITY | PERMIT EXPEDITING
Page 1 Boun Short Plat
TABLE OF CONTENTS
I. PROJECT OVERVIEW ................................................................ 2
Project Description ...................................................................... 2
Figure 1. TIR Worksheet ............................................................ 4
Figure 2. Location Map .............................................................. 12
Figure 3. Drainage Basins, Subbasins, and Site Characteristics ....... 13
Figure 4. Soils Map ................................................................... 16
II. CONDITIONS AND REQUIREMENTS SUMMARY ....................... 17
III. OFFSITE ANALYSIS ................................................................ 22
3.1.1 Task 1 - Study Area Definition and Maps ......................... 22
3.1.2 Task 2 - Resource Review ............................................. 22
3.1.3 Task 3 - Field Inspection ............................................... 23
3.1.4 Task 4 - Drainage System Description and Problem
Descriptions ............................................................................. 34
3.1.5 Task 5 - Mitigation of Existing or Potential Problems .......... 34 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS
AND DESIGN ................................................................................... 35 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN ...................... 59
VI. SPECIAL REPORTS AND STUDIES ........................................... 63
VII. OTHER PERMITS ..................................................................... 63
VIII. CSWPPP ANALYSIS AND DESIGN ........................................... 63
IX. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ................................................................................. 63
X. OPERATION AND MAINTENANCE MANUAL .............................. 63
XI. APPENDICES .......................................................................... 64
APPENDIX A – OFFSITE STUDY MAPS...............................................
APPENDIX B – DOWNSTREAM SYSTEM TABLE AND MAPS ...................
APPENDIX C – BOND QUANTITIES WORKSHEETS/COST DATA AND
INVENTORY ..................................................................................
APPENDIX D – DRAFT BMP COVENANT .............................................
APPENDIX E – CSWPPP REPORT ......................................................
Page 2 Boun Short Plat
I. PROJECT OVERVIEW
Project Description
The proponent of the Boun Short Plat proposes to subdivide an undeveloped parcel, with the
exception of an abandoned shed building that is to be removed as part of this project, located
in the City of Renton, King County Washington. The King County parcel number for the
property is 102305-9139. The project parcel is approximately 57,677 sf, 1.32 acres in size.
The parcel is zoned Residential 8 (R-8) according to the City of Renton Zoning Map effective
as of July 1, 2015. The allowed density range in the R-8 zone is a minimum of 4.0 dwelling
units per net acre (DUA) to a maximum of 8.0 DUA. The Boun Short Plat proposes to subdivide
the current parcel into 7 single-family lots equating to a proposed density of 5.29 DUA. The
proposed lots range in size from the smallest being 5,098 sf in size and the largest being
6,453 sf in size. A single stormwater tract will be created with this subdivision for the purpose
of stormwater treatment and mitigation for the development. The remaining area will be
dedicated to the City of Renton for public right-of-way use.
The property is adjacent to Duvall Ave NE to the east, single family parcels to the south and
north, and Chelan Ave NE to the west. The proposed project is keeping consistent with
neighboring land use characteristics.
The site will be accessed through two separate access points. The first access will be an
extension of Chelan Place NE, an existing 20’ alleyway, from the south boundary to the north
boundary of the project parcel. This access way will be developed into a 16’ paved alley within
a 20’ wide right-of-way dedication which meets the current City of Renton street standards
for alleys. An additional access point to Chelan Ave NE will be provided in the east to west
direction through a 16’ paved alley within a 20’ public access and utilities easement.
Half street frontage improvements will be included along the west and east boundary of the
project site. The west half of Duvall Avenue NE will be improved to current City of Renton
Standards for principle arterials by providing two 11-foot travel lanes, a 5-foot bike lane,
vertical curb and gutter, an 8-foot wide planter strip, an 8-foot wide sidewalk and a 2-foot
maintenance area behind the sidewalk. This will require a 3.5-foot right-of-way dedication
along the east boundary line of the project parcel. Chelan Avenue NE will be improved to two
separate variations of the current City of Renton Standards for Residential Access Streets.
Starting from the south boundary of the project site, the east half of Chelan Avenue NE will
be improved to provide a 12-foot travel lane, vertical curb and gutter, an 8-foot wide planter
strip, and a 5-foot wide sidewalk for approximately 120 feet. At this point, the Residential
Access Street will transition into a Limited Residential Access Street which consists of a 20-
foot paved roadway, vertical curb and gutter, an 8-foot wide planter strip, and a 5-foot
sidewalk. This road section will be constructed north until it reaches the north boundary line
of the project. To incorporate these improvements, an 18’ right of way dedication will be
necessary along a portion of the northwest boundary of the project parcel. An 18’ wide section
of right-of-way north of the project site will not be improved as part of this project. As a
condition of preliminary plat approval (LUA16-00124), a road standards modification will be
submitted concurrently with the Utility Construction Permit to allow for the 18’ wide section
of right-of-way to remain undeveloped.
This project is subject to the 2009 King County Surface Water Design Manual (King Manual)
and the City of Renton amendments to the Manual (Renton Manual). Per Figure 1.1.2.A of the
Renton Manual, the Boun Short Plat project is subject to a full drainage review meeting core
requirements #1 through #8 and special requirements #1 through #6.
Page 3 Boun Short Plat
It has been determined that the site consists of two separate threshold discharges areas.
Threshold Discharge Area #1 (West Basin) consists of a majority of the project site area that
naturally discharges stormwater to the southwest corner of the parcel. Threshold Discharge
Area #2 (A-East Basin, B-North basin) consists of a small portion of land along the east
boundary which naturally discharges stormwater east to an existing swale within Duvall Ave
NE (TDA 2.A) and the 18’ wide panhandle section of land located north of the project site that
naturally discharges stormwater to the northwest (TDA 2.B). A drainage adjustment, per
Section 1.4 of the Renton Manual, is proposed to combine a portion of threshold discharge
area #2.A with threshold discharge area #1. See section III and IV of this report for further
details.
Page 4 Boun Short Plat
Figure 1. TIR Worksheet
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/9/2009
1
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner ________________________
Phone ______________________________
Address ____________________________
____________________________________
Project Engineer ______________________
Company ___________________________
Phone ______________________________
Project Name _________________________
DDES Permit # ________________________
Location Township ______________
Range ________________
Section ________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Landuse Services
Subdivison / Short Subd. / UPD
Building Services
M/F / Commerical / SFR
Clearing and Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(circle):
Date (include revision
dates):
Date of Final:
Full / Targeted /
Large Site
___________________
___________________
___________________
Type (circle one):
Date (include revision
dates):
Date of Final:
Full / Modified /
Small Site
__________________
__________________
__________________
Part 6 ADJUSTMENT APPROVALS
Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Date of Approval: ______________________
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/9/2009
2
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : _________________________________
Special District Overlays: __________________________________________________________
Drainage Basin: ___________________________________
Stormwater Requirements: ________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream _______________________
Lake _____________________________
Wetlands ___________________________
Closed Depression ___________________
Floodplain __________________________
Other ______________________________
___________________________________
Steep Slope ______________________
Erosion Hazard ___________________
Landslide Hazard __________________
Coal Mine Hazard __________________
Seismic Hazard ___________________
Habitat Protection __________________
_________________________________
Part 10 SOILS
Soil Type
_________________
_________________
_________________
_________________
Slopes
_________________
_________________
_________________
_________________
Erosion Potential
_________________
_________________
_________________
_________________
High Groundwater Table (within 5 feet)
Other ________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/9/2009
3
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas___________________
SEPA________________________________
Other_________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply)
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis
Level: 1 / 2 / 3 dated:__________________
Flow Control
(incl. facility summary sheet)
Level: 1 / 2 / 3 or Exemption Number ____________
Small Site BMPs ___________________________________
Conveyance System
Spill containment located at: _________________________
Erosion and Sediment Control
ESC Site Supervisor:
Contact Phone:
After Hours Phone:
Maintenance and Operation
Responsibility: Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and
Liability
Provided: Yes / No
Water Quality
(include facility summary sheet)
Type: Basic / Sens. Lake / Enhanced Basicm / Bog
or Exemption No. ______________________
Landscape Management Plan: Yes / No
Special Requirements (as applicable)
Area Specific Drainage
Requirements
Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): ______________
Datum:
Flood Protection Facilities
Describe:
Source Control
(comm./industrial landuse)
Describe landuse:
Describe any structural controls:
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/9/2009
4
Oil Control
High-use Site: Yes / No
Treatment BMP: ________________________________
Maintenance Agreement: Yes / No
with whom? ____________________________________
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize Exposed Surfaces
Remove and Restore Temporary ESC Facilities
Clean and Remove All Silt and Debris, Ensure
Operation of Permanent Facilities
Flag Limits of SAO and open space
preservation areas
Other ______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
Flow Control
BMPs
Other
________________
________________
________________
________________
________________
________________
Biofiltration
Wetpool
Media Filtration
Oil Control
Spill Control
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
________________
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/9/2009
3
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas___________________
SEPA________________________________
Other_________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply)
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis
Level: 1 / 2 / 3 dated:__________________
Flow Control
(incl. facility summary sheet)
Level: 1 / 2 / 3 or Exemption Number ____________
Small Site BMPs ___________________________________
Conveyance System
Spill containment located at: _________________________
Erosion and Sediment Control
ESC Site Supervisor:
Contact Phone:
After Hours Phone:
Maintenance and Operation
Responsibility: Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and
Liability
Provided: Yes / No
Water Quality
(include facility summary sheet)
Type: Basic / Sens. Lake / Enhanced Basicm / Bog
or Exemption No. ______________________
Landscape Management Plan: Yes / No
Special Requirements (as applicable)
Area Specific Drainage
Requirements
Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): ______________
Datum:
Flood Protection Facilities
Describe:
Source Control
(comm./industrial landuse)
Describe landuse:
Describe any structural controls:
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/9/2009
4
Oil Control
High-use Site: Yes / No
Treatment BMP: ________________________________
Maintenance Agreement: Yes / No
with whom? ____________________________________
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize Exposed Surfaces
Remove and Restore Temporary ESC Facilities
Clean and Remove All Silt and Debris, Ensure
Operation of Permanent Facilities
Flag Limits of SAO and open space
preservation areas
Other ______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
Flow Control
BMPs
Other
________________
________________
________________
________________
________________
________________
Biofiltration
Wetpool
Media Filtration
Oil Control
Spill Control
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
________________
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/9/2009
5
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other
Cast in Place Vault
Retaining Wall
Rockery > 4’ High
Structural on Steep Slope
Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
Signed/Date
Page 12 Boun Short Plat
Figure 2. Location Map
Page 13 Boun Short Plat
Figure 3. Drainage Basins, Subbasins, and Site Characteristics
Figure 3.1 – Existing Conditions Map
Figure 3.2 – Proposed Conditions Map
MBMBSS~SHEET OFJOB NUMBERNO. DESCRIPTION INIT. DATE
DRAWN BY:CHECKED BY: SCALE:
HORZ:VERT:
DATE:CIVIL & STRUCTURAL ENGINEERING | LAND SURVEYING | PLANNING
PROJECT MANAGEMENT | FEASIBILITY | PERMIT EXPEDITING
LAKEWOOD OFFICE7602 Bridgeport Way W #3D
Lakewood, WA 98499
phone: 253-301-4157
fax: 253-336-3950
ISSAQUAH OFFICE
455 Rainier Blvd NIssaquah, WA 98027phone: 425-392-8055fax: 425-392-0108
beylerconsulting.com
BEYLER
CONSULTING
Plan. Design. ManageFIGURE 3.11EXISTING BASIN MAP
BOUN SHORT PLAT
BASIN MAPS
CITY OF RENTON,WASHINGTON16-2061A PORTION OF SECTION 10, TOWNSHIP 23 NORTH, 5 WEST, W.M.DUVALL AVE NE
CHELAN AVE NE
THRESHOLD DISCHARGEAREA #1(WEST BASIN)(46,236 SF)(1.06 ACRES)THRESHOLD DISCHARGEAREA #2.A(EAST BASIN)(8,771 SF)(0.20 ACRES)BOUN SHORT PLATEXISTING BASIN MAPSCALE: 1" = 40'2040040THRESHOLD DISCHARGE AREA #2.B(NORTH BASIN)(2,669 SF)(0.061 ACRES)TO REMAIN UNDEVELOPED ANDDEDICATED TO CITY OF RENTONAS PUBLIC RIGHT OF WAY(MODIFICATION REQUEST #NATURAL DISCHARGELOCATION #1(EXISTING CATCH BASIN)NATURAL DISCHARGELOCATION #2.A(EXISTING SWALE)NATURAL DISCHARGELOCATION #2.B(SHEET FLOW TO NATIVEVEGETATION- NO APPARENTDISCHARGE LOCATION)BASIN AREA CALCULATIONSTHRESHOLD DISCHARGE AREA #1ONSITE (WEST BASIN)TOTAL BASIN AREA: 48,706 SF (1.12 ACRES)IMPERVIOUS (EXISTING SHED): 330 SFPERVIOUS (LAWN/GRASS): 48,376 SFOFFSITE (CHELAN AVE NE)TOTAL BASIN AREA: 4,148 SF (0.95 ACRES)IMPERVIOUS (ASPHALT): 1,577 SFPERVIOUS (LAWN/GRASS): 2,571 SFTHRESHOLD DISCHARGE AREA #2.AONSITE (EAST BASIN)TOTAL BASIN AREA: 6,302 SF (0.14 ACRES)PERVIOUS (LAWN/GRASS): 6,302 SFOFFSITE (DUVALL AVE NE)TOTAL BASIN AREA: 8,432 SF (0.19 ACRES)IMPERVIOUS (ASPHALT): 6,375 SFPERVIOUS (LAWN/SWALE): 2,057 SFTHRESHOLD DISCHARGE AREA #2.BONSITE (NORTH BASIN)TOTAL BASIN AREA: 2,669 SF (0.06 ACRES)IMPERVIOUS (GRAVEL DRIVEWAY): 789 SFPERVIOUS (LAWN/GRASS): 1,880 SFTHRESHOLD DISCHARGE AREA #1(OFFSITE)(4,148 SF)(0.095 ACRES)THRESHOLD DISCHARGE AREA #2.A(OFFSITE)(8,432 SF)(0.19 ACRES)
LOT 45,966 SFLOT 55,658 SFLOT 65,638 SFTRACT A7,253 SFLOT 76,453 SFLOT 25,751 SFLOT 15,098 SFLOT 35,893 SFMBMBSS~434436438438
438438434
SHEET OFJOB NUMBERNO. DESCRIPTION INIT. DATE
DRAWN BY:CHECKED BY: SCALE:
HORZ:VERT:
DATE:CIVIL & STRUCTURAL ENGINEERING | LAND SURVEYING | PLANNING
PROJECT MANAGEMENT | FEASIBILITY | PERMIT EXPEDITING
LAKEWOOD OFFICE7602 Bridgeport Way W #3D
Lakewood, WA 98499
phone: 253-301-4157
fax: 253-336-3950
ISSAQUAH OFFICE
455 Rainier Blvd NIssaquah, WA 98027phone: 425-392-8055fax: 425-392-0108
beylerconsulting.com
BEYLER
CONSULTING
Plan. Design. ManageFIGURE 3.21PROPOSED BASIN MAP
BOUN SHORT PLAT
BASIN MAPS
CITY OF RENTON,WASHINGTON16-2061A PORTION OF SECTION 10, TOWNSHIP 23 NORTH, 5 WEST, W.M.DUVALL AVE NE
CHELAN AVE NE
THRESHOLDDISCHARGE AREA #1(WEST BASIN)(50,746 SF)(1.16 ACRES)BOUN SHORT PLATPROPOSED BASIN MAPSCALE: 1" = 40'2040040THRESHOLD DISCHARGE AREA #2.B(NORTH BASIN)(2,665 SF)(0.061 ACRES)TO REMAIN UNDEVELOPED ANDDEDICATED TO CITY OF RENTONAS PUBLIC RIGHT OF WAY(MODIFICATION REQUEST #NATURAL DISCHARGELOCATION #1(RELOCATED CATCHBASIN)NATURAL DISCHARGELOCATION #2.A(EXISTING SWALE)THRESHOLD DISCHARGEAREA #2.A(EAST BASIN)(409 SF)(0.009 ACRES)BASIN AREA CALCULATIONSTHRESHOLD DISCHARGE AREA #1ONSITE (WEST BASIN)TOTAL BASIN AREA: 50,746 SF (1.16 ACRES)IMPERVIOUS (PGIS: ASPHALT/DWAY): 8,944 SFIMPERVIOUS (ROOFTOPS): 18,802 SFPERVIOUS (LAWN/GRASS): 23,000 SFONSITE (VAULT BY-PASS)TOTAL BASIN AREA: 3,559 SF (0.082 ACRES)IMPERVIOUS (PGIS: ASPHALT/SWALK): 1,973 SFPERVIOUS (PLANTER STRIP): 1,586 SFOFFSITE (VAULT BY-PASS)TOTAL BASIN AREA: 2,528 SF (0.058 ACRES)IMPERVIOUS (PGIS: ASPHALT): 2,049 SFPERVIOUS (PLANTER STRIP): 479 SFOFFSITE (CHELAN AVE NE)TOTAL BASIN AREA: 1,620 SF (0.037 ACRES)IMPERVIOUS (ASPHALT): 1,576 SFPERVIOUS (LAWN/GRASS): 44 SFVAULT SIZING CALCULATIONS:TO DETENTION/WQ VAULT:TOTAL IMPERVIOUS: 27,746 SF (0.637 ACRES)TOTAL PERVIOUS: 23,000 SF (0.528 ACRES)VAULT BYPASS AREA CALCULATIONS:TO BYPASS DETENTION/WQ VAULT:TOTAL IMPERVIOUS: 4,022 SF (0.09 ACRES)TOTAL PERVIOUS: 2,065 SF (0.05 ACRES)THRESHOLD DISCHARGE AREA #2.AONSITE (EAST BASIN)TOTAL BASIN AREA: 409 SF (0.009 ACRES)IMPERVIOUS (SIDEWALK): 297 SFPERVIOUS (MAINTENANCE STRIP): 112 SFOFFSITE (DUVALL AVE NE)TOTAL BASIN AREA: 8,432 SF (0.19 ACRES)IMPERVIOUS (ASPHALT): 6,869 SFPERVIOUS (PLANTER STRIP): 1,563 SFTHRESHOLD DISCHARGE AREA #2.BONSITE (NORTH BASIN)TOTAL BASIN AREA: 2,669 SF (0.06 ACRES)IMPERVIOUS (GRAVEL DRIVEWAY): 789 SFPERVIOUS (LAWN/GRASS): 1,880 SFNATURAL DISCHARGELOCATION #2.B(SHEET FLOW TO NATIVEVEGETATION- NO APPARENTDISCHARGE LOCATION)THRESHOLD DISCHARGE AREA #1(OFFSITE)(1,620 SF)(0.037 ACRES)THRESHOLD DISCHARGEAREA #2.A(OFFSITE)(8,432 SF)(0.19 ACRES)THRESHOLD DISCHARGE AREA #1(ONSITE- VAULT BYPASS)(3,559 SF)(0.082 ACRES)THRESHOLD DISCHARGE AREA #1(OFFSITE-VAULT BYPASS)(2,528 SF)(0.058 ACRES)
Page 16 Boun Short Plat
Figure 4. Soils Map
Page 17 Boun Short Plat
II. CONDITIONS AND REQUIREMENTS SUMMARY
The Boun Short Plat, File No. LUA16-000124; SHPL-A, is APPROVED WITH CONDITIONS and subject to the following conditions:
1. The width of Lot 7 shall be increased to comply with the minimum 50-foot lot width
requirement of the R-8 zone.
2. A demolition permit shall be obtained for the removal of the detached accessory structure,
and all required inspections shall be completed prior to the recording of the short plat.
3. A detailed landscape plan shall be submitted at the time of Utility Construction Permit
Review. The detailed landscape plan shall include an 8-foot wide landscaping strip between
the curb and sidewalk along the full length of the Chelan Avenue NE and Duvall Avenue
NE frontages or a modification request to reduce the landscape strip shall be submitted
and approved in accordance with RMC 4-9-250D at the time of Utility Construction Permit
Review.
4. A Final Tree Retention Plan shall be submitted at the time of Utility Construction Permit
Review. The Final Tree Retention Plan shall include minimum 2-inch caliper replacement
trees within the onsite 10-foot landscape strip. The Final Tree Retention Plan shall be
submitted to the Current Planning Project Manager for review and approval.
5. A modification request shall be submitted and approved for the proposed waiver of
frontage improvements along the 18-foot wide panhandle north of the project site. The
modification request shall be submitted at the time of Utility Construction Permit Review.
6. Access for Lots 1-7 shall be provided via the alley (Chelan Place NE). The front façade of
the houses to be constructed on Lots 1-4 shall Duvall Avenue NE and the front façade of
the houses to be constructed on Lots 5-7 shall face Chelan Avenue NE. A note to this effect
shall be recorded on the face of the Short Plat map.
7. The width of the alley shall be revised to comply with the City’s adopted street standards,
or a modification to these standards shall be requested at the time of Utility Construction
Permit Review.
Page 18 Boun Short Plat
Review of Eight Core Requirements and Six Special Requirements
The following comments are a review of the Core and Special Requirements per the 2009 King
County Surface Water Stormwater Manual with City of Renton Amendments (where
applicable).
Core Requirement No. 1 Discharge at the Natural Location
Threshold Discharge Area #1
Under existing conditions, the site’s topography suggests that stromwater runoff within
threshold discharge area #1 sheet flows to the southwest over densely vegetated land cover
consisting of various types of grass and brush. Any accumulated runoff is allowed to overflow
onto Chelan Ave NE into an existing catch basin near the southwest corner of the project
parcel. Under developed conditions, stormwater will sheet flow over impervious surfaces and
be collected within a closed conveyance system. Rooftop runoff will be directly tightlined to
this conveyance system. The closed conveyance system will route stormwater to a combined
water quality and detention vault. The proposed stormwater vault will ultimately discharge
stormwater to the catch basin located in Chelan Avenue NE near the southwest corner of the
project site, matching the current natural discharge location.
Threshold Discharge Area #2-A
Under existing conditions, threshold discharge area #2-A which is located along the east
boundary of the project parcel allows stormwater to sheet flow towards an existing
conveyance swale located along the west side of Duvall Ave NE. This swale flows north along
the western portion of Duvall Avenue NE. Under developed conditions, a portion of threshold
discharge area #2-A will be allowed to sheet flow towards Duvall Ave NE. Accumulated runoff
will be collected within a closed conveyance system and will be tightlined to a riprap discharge
pad located just north of the project site within the existing drainage swale, meeting the
natural discharge location of threshold discharge area #2-A. The remaining portion of
threshold discharge area #2-A will sheet flow west towards the closed conveyance system of
Threshold Discharge Area #1. This stormwater will be collected, mitigated and released at the
natural discharge location of Threshold Discharge Area #1. A drainage adjustment will be
submitted to the City of Renton at time of Utility Construction Permit Review for approval to
discharge this portion of Threshold Discharge Area #2-A at a location other than the natural
discharge location. A reference to this approval will be added to this report once reviewed and
approved by the City of Renton.
Threshold Discharge Area #2-B
Currently, there are no proposed planned improvements to this TDA. Therefore, this
requirement is not applicable at this time.
Core Requirement No 2 Offsite Analysis
The project proposes to discharge stormwater within both threshold discharge areas to the
May Creek drainage basin. A Level 1 offsite analysis has been completed for each of the two
threshold discharge areas. Further narrative of this analysis can be found in Section III of this
report.
Core Requirement No 3 Flow Control
Flow Control Facility Analysis and Design has been broken into two parts, part 1: Threshold
Discharge Area #1 discussing the threshold area tributary to proposed onsite vault system,
and Threshold Discharge Area #2, discussing the north and east portions of the onsite and
offsite tributary area and improvements. Please refer to the Basin Maps in Figure 3, depicting
areas as described herein.
Page 19 Boun Short Plat
Threshold Discharge Area #1
Flow Control Facility (1.2.3.1.B):
The proposed project is located within the Flow Control Duration Standard – Matching
Forested Site Conditions area. This level of flow control requires new impervious and pervious
surfaces, that are not fully dispersed, to flow to a flow control facility that matches the flow
durations of predeveloped rates for forested (historic) site conditions over the range of flows
extending from 50% of the 2-year up to the full 50-year flow. To satisfy this requirement, an
underground detention vault is proposed to detain onsite runoff to historic flow control levels
per Section 1.2.3.1.B. See Section IV of this report for forested site conditions flow control
performance standards and detention analysis.
Flow Control BMPs (1.2.3.2):
In addition to flow control facility requirements, implementation of flow control BMPs as part
of this “subdivision” project is incentive-based per Section 1.2.3.3 of the Renton Manual.
However, if the applicant wishes to implement or make provision for implementation of BMPs
as part of the subdivision project for purposes of receiving the BMP credits then the
requirements outlined in Section 5.2.2.1 must be met depending on the site location of the
proposed BMPs. Based on a site evaluation, it has been determined that dispersion and
infiltration is infeasible based on proposed lot size and existing soil conditions. The applicant
proposes to implement a restricted footprint for the seven (7) lots following section C.2.9.2
of the King Manual. See Part C of Section IV of this report for the Small Lot BMP performance
standards and further analysis of the proposed BMPs.
Flow Control Bypass (1.2.3.2.E):
A flow control bypass facility per Section 1.2.3.2.E of the Renton Manual is also proposed.
The project proposes to bypass a small amount of targeted onsite impervious area within
Tract A which provides access to Chelan Ave NE as well as the proposed offsite improvements
of Chelan Ave NE. The bypass of this target area is necessary due to grading constraints of
the site. The onsite flow control facility was sized to incorporate a reduction in allowed flow
release to match historic durations for 50% of the 2-year through 50-year peaks at the
downstream point of compliance, Catch Basin 1. See Section IV for further detail.
Threshold Discharge Area #2 (2-A & 2-B)
Flow Control Facility (1.2.3.1.B):
The proposed project is located within the Flow Control Duration Standard – Matching
Forested (Historic) Site Conditions area. This is required unless an exception applies to the
proposed site conditions.
Per Section 1.2.3.1.B – Exemption #2 of the Renton Manual, the facility requirement in Flow
Control Duration Standard Matching Forested Site Conditions Areas is waived for any
threshold discharge area in which there is less than a 0.1 cfs difference in the sum of
developed 100-year peak flows for those target surfaces subject to this requirement and the
sum of forested (historic) site conditions 100-year peak flows for the same surface areas. The
developed conditions for this Threshold Discharge Area do not exceed a 0.1 cfs difference in
the sum of developed 100-year peak flows for those target surfaces subject to the flow control
facility requirement and the sum of historic (forested) site conditions 100-year peak flows for
the same surface areas. Thus, flow control is not required for this threshold discharge area
per section 1.2.3.1.B of the Renton Manual. See Section IV of this report for details and a
table of the target areas.
Core Requirement No. 4 Conveyance System
New pipes systems will be designed with sufficient capacity to convey and contain, at
minimum, the 25-year peak flow. See Section V of this report for the conveyance analysis.
Page 20 Boun Short Plat
Core Requirement No. 5 Erosion and Sediment Control
This development is expected to be constructed in a single phase. Please see Appendix E for
the prepared CSWPPP, and sheets C2-C3 in the prepared Construction Plans.
Core Requirement No. 6 Maintenance and Operations
It is anticipated that the proposed stormwater system will be owned and operated by the City
of Renton. Therefore, operations and maintenance recommendations can be made upon
request by the City of Renton.
Core Requirement No. 7 Financial Guarantees and Liability
Financial guarantees can be made available to the City upon request. Core Requirement No. 8 Water Quality
Water Quality Facility Analysis and Design has been broken into two parts, part 1: Threshold
Discharge Area #1 discussing the threshold area tributary to proposed onsite vault system,
and Threshold Discharge Area #2, discussing the north and east portions of the onsite and
offsite tributary area and improvements. Please refer to the Basin Maps in Figure 3, depicting
areas as described herein.
Threshold Discharge Area #1
Treatment Facility (1.2.8)
This TDA is located within a Basic Water Quality treatment area as designated by the City of
Renton and is not subject to the requirements of Enhanced Water Quality as it is not a
Commercial, Industrial or Multifamily land use or a road project with an expected average
daily traffic (ADT) count of 7,500. The developed conditions of TDA #1 exceed the 5,000 sf
of proposed pollution generating impervious (PGIS) surface area exemption per Section
1.2.8.1 of the Renton Manual. Therefore, the project proposes to satisfy the basic water
quality treatment requirement through the use of an onsite combined detention/wetvault
located near the southwest corner of the project parcel to provide treatment for onsite runoff.
See Section IV of this report for further description of the treatment system.
Untreated Discharge (Treatment Bypass) (1.2.8.2)
This TDA proposes to bypass a small portion of the proposed onsite and the entire offsite
target pollution-generating surface that would need to be pumped to be treated by the
required water quality facility. Per Section 1.2.8.2 of the Renton Manual, the following criteria
must be met; 1) treatment of the constrained area by filter strip, biofiltration, or a linear sand
filter is not feasible, and a treatment trade as described above is not possible. 2) The
untreated target surface is less than 5,000 square feet of new PGIS and is less than 5,000
square feet of new plus replaced PGIS on a redevelopment. 3) Any target PGPS within the
area to be released untreated shall be addressed with a landscape management plan.
The project proposes 4,022 sf of target PGIS which is less than the 5,000 sf threshold to allow
for Untreated Bypass. See Section IV of this report for further description of the untreated
discharge.
Threshold Discharge Area #2 (2-A & 2-B)
Treatment Facility (1.2.8)
This TDA is located within a Basic Water Quality treatment area as designated by the City of
Renton and is not subject to the requirements of Enhanced Water Quality as it is not a
Commercial, Industrial or Multifamily land use or a road project with an expected average
daily traffic (ADT) count of 7,500. The developed conditions of TDA #2 do not exceed the
5,000 sf of proposed pollution generating impervious (PGIS) surface area exemption per
Page 21 Boun Short Plat
Section 1.2.8.1 of the Renton Manual. Therefore, a treatment facility is not required within
threshold discharge area #2.
Special Requirement No. 1 Other Adopted Area-Specific Requirements
This project is not in a designated Critical Drainage Area. This special requirement is not
applicable.
Special Requirement No. 2 Flood Hazard Area Delineation
The project does not contain or is not adjacent to a flood hazard area for a river, stream,
lake, wetland, closed depression, or marine shoreline that is within the 100-year floodplain
according to King County and FEMA.
Special Requirement No. 3 Flood Protection Facilities
This project does not rely on any flood protection facility such as a levee or revetment nor
will construct a new flood protection facility. Special Requirement No. 4 Source Control
This project does not require a commercial building or commercial site development permit.
This special requirement is not applicable.
Special Requirement No. 5 Oil Control
This project is not defined as a high-use site nor is a redevelopment project proposing
$100,000 or more of improvements to an existing high-use site. This special requirement is
not applicable.
Special Requirement No. 6 Aquifer Protection Area
This project is not in a designated Aquifer Protection Area (APA). This special requirement is
not applicable.
Page 22 Boun Short Plat
III. OFFSITE ANALYSIS
An offsite analysis report has been prepared per Section 1.2.2, Core Requirement #2. This
is to identify and evaluate offsite flooding, erosion, and water quality problems that may be
created or aggravated by the proposed project. The primary component of this offsite analysis
report is the downstream analysis. The second component of the report is to evaluate the
upstream drainage system to verify that significant flooding and erosion impact will not occur
as a result of the project.
3.1 DOWNSTREAM ANALYSIS
The following Level 1 downstream analysis is a review of the drainage system up to a mile
downstream of the site.
The four tasks outlined under this review are:
Task 1 – Define and map the study area
Task 2 – Review all available information on the study area
Task 3 - Field inspect the study area
Task 4 - Drainage System Description and Problem Descriptions
Task 5 – Mitigation of Existing or Potential Problems
3.1.1 Task 1 - Study Area Definition and Maps
The project is located in the May Creek Drainage Sub-Basin within the Lake Washington/Cedar
River Watershed. The drainage study area is approximately a mile-long path encompassing
the site's downstream corridor. See Appendix A for maps of the basic study area.
The site is currently unimproved, with the exception of an abandoned shed, surrounded by
single family residential uses on all sides.
3.1.2 Task 2 - Resource Review
The following resources have been reviewed for the downstream analysis. This is a review of
available information on the downstream area at least a mile downstream. Sources include
the City of Renton GIS maps, King County GIS maps, and geotechnical studies.
Adopted Basin Plan
The site is located in the May Creek Drainage Sub-Basin within the Cedar
River/Lake Washington Watershed (WRIA Cedar Sammamish (8))
Sensitive Area (See Appendix A for Sensitive Area Maps)
Erosion- None Mapped
Seismic – None Mapped
Landslide – None Mapped
Coal Mine – None Mapped
Streams and Wetlands Map – None Mapped
Susceptible to Groundwater Contamination – None Mapped
100-year flood plain – According to King County iMAP and the FEMA Flood Maps,
the 100-year flood plain is not located near the project property.
Drainage Complaints and Studies
King County –Relevant DNRP drainage complaints within 1 mile of the downstream
corridor of each threshold discharge area within the last 10 years were
searched.
TDA #1 There are currently no open complaints within the downstream corridor
nor are there any relevant drainage complaints that were made within
Page 23 Boun Short Plat
the last 10 years. Going beyond a Level 1 analysis (within the last 15
years), a single complaint pertaining specifically to a water quality cross
connection was made in regards to the regional stormwater pond in
2004. See Appendix A for a drainage complaint map of the downstream
corridor.
TDA #2 There are currently no open complaints within the downstream corridor
nor are there any relevant drainage complaints that were made within
the last 10 years. Going beyond a Level 1 analysis (within the last 15
years), a single complaint was made in 2003 in regards to a potential
septic tank dumping that was leaching into the roadside swale along
Duvall Ave NE, just north of the site. See Appendix A for a drainage
complaint map of the downstream corridor.
3.1.3 Task 3 - Field Inspection
A site visit was performed on July 18, 2016 for the purpose of analyzing the proposed project
site and its upstream and downstream corridor. The weather and conditions were light rain
and cloudy. A description of the drainage path is described below. See Appendix B for
downstream reach locations.
THRESHOLD DISCHARGE AREA #1 (West Basin) Upstream
The subject site sits on a high point with very little runoff crossing the site from adjacent
properties. The site’s topography suggests that stormwater runoff from the site is divided
and sheets flows to the southwest and to the northeast. The westerly portion of the site
drains to the southwest into an existing catch basin within public right of way (Chelan Ave
NE). Downstream
Runoff contributing to the downstream corridor from the project site consists of the generated
runoff from the improved roadway and rooftop of the project site. The following is a discussion
of the downstream corridor from threshold discharge area #1’s natural discharge location.
See Appendix B for a Summary of each reach including: pipe size, length, and material as
well as a map of each reach’s location.
Downstream Legend
- Surface Flow Arrow
- Closed Conveyance Flow Arrow
- Closed Conveyance Flow Arrow (Tributary)
Page 24 Boun Short Plat
Reach 1
0’ The runoff generated from the project parcel sheet flows southeast and is
collected within a Type 1 Catch Basin (Facility ID# 178992) within Chelan Ave
NE.
Photo 1: Site topography facing northeast from Chelan Ave NE towards Project Site.
Reach 2
0’ – 31’ Stormwater is collected within an existing Type 1 Catch Basin (Facility ID#
178992) and conveyed west within a 12-inch CPEP Storm Main sloped at
3.21% (R-332511). At time of site visit, the pipe did not seem to be flowing
at capacity nor were flooding problems observed.
Photo 2: Facing North on Chelan Ave NE. Stormwater flows south within closed conveyance system.
Project Site
Ex. CB - Type 1
ID: 178992
Ex. CB - Type 1
ID: 178992
Ex. CB - Type 1
ID: 116933
N
Page 25 Boun Short Plat
Reach 3
31’ – 180’ Stormwater is collected within an existing Type 1 Catch Basin (Facility ID#
116931) and conveyed southwest within a 12-inch CPEP Storm Main sloped
at 0.52% (R-332511). At time of site visit, the pipe did not seem to be flowing
at capacity nor were flooding problems observed.
Photo 3: Facing northwest on Chelan Ave NE. Stormwater flows southwest within closed conveyance system.
Reach 4
180’ – 275’ Stormwater is collected within an existing Type 2-54” Catch Basin (Facility
ID# 175753) and conveyed west within a 60-inch CMP WQ Tank (R-332511).
This WQ facility is privately owned and operated.
Photo 4: Facing north on NE 10th Street. Stormwater flows west within closed conveyance system/WQ Facility.
Ex. CB - Type 1
ID: 116931
N
Ex. WQ Facility
ID: 175753
Page 26 Boun Short Plat
Reach 5
275’ – 395’ Stormwater is discharged to an existing Type 2 Catch Basin (Facility ID#
116930) and conveyed west within a 12-inch of unknown material storm main
(R-332511). It should be noted that per as-built R-332511, the storm main
connection is incorrectly shown to connect to the existing sanitary sewer
within NE 10th Street.
Photo 5: Facing West on NE 10th Street. Stormwater flows west within closed conveyance system.
Reach 6
395’ – 477’ Stormwater is collected within a Type 2 Catch Basin (Facility ID# 116927)
and conveyed north within a 12-inch CPEP Storm Main (D-22661A) sloped at
4.86%. This portion of pipe discharges into a regional stormwater facility
which was developed as part of the NE 10th Street/Anacortes Ave NE
Detention Pond and Storm System Improvement Project.
Photo 6: Facing West on NE 10th Street. Stormwater is collected within Type II Catch Basin and conveyed north
within closed conveyance system.
Ex. CB - Type 2
ID: 116930
Ex. CB - Type 2
ID: 116930
Page 27 Boun Short Plat
Reach 7
477’ – 825’ Stormwater is detained within a combined water quality and detention pond.
Stormwater is then released at a controlled flow rate from an existing Type
II-54” Catch Basin (Facility ID# 115504) and conveyed south within an 18-
inch CPEP Storm Main (D-22661A) sloped at 0.20%. Stormwater is collected
within a Type 2-48” Catch Basin (Facility ID# 115505) and conveyed
southwest within an 18-inch CPEP Storm Main (D-22661A) sloped at 0.20%.
From this location, stormwater is convey back into NE 10th Street public right
of way to a Type 2-48” Catch Basin (Facility ID# 116923) (D-226618).
Reach 8
825’ – 1,003’ Stormwater is conveyed west from the Type 2 Catch Basin within an 18-inch
CPEP Storm Main (D-226618) sloped at 0.24%.
Photo 7: Facing Northwest on NE 10th Street. Stormwater is collected in Type II catch basin and conveyed west
within closed conveyance system.
Ex. CB - Type 2
ID: 116923
Page 28 Boun Short Plat
Reach 9
1,003’ – 1,038’ Stormwater is collected within a Type 2 Catch Basin and conveyed west within
an 18-inch CPEP Storm Main (D-226618) sloped at 0.14%.
Photo 8: Facing Northeast on NE 10th Street. Stormwater is collected in Type II catch basin and conveyed west
within closed conveyance system. Additional flow enters the conveyance system from a type I catch basin located to
the north of the type 2 catch basin.
Reach 10
1,038’ – 1,138’ Stormwater is collected within a Type 2 Catch Basin located at the intersection
of NE 10th Street and Anacortes Ave NE and conveyed north within a 30-inch
CPEP Storm Main (D-226617) sloped at 0.39%.
Photo 9: Facing Northwest at intersection of NE 10th Street and Anacortes Ave NE. Stormwater is collected in Type
II catch basin and conveyed north within closed conveyance system. Additional flow enters the conveyance system
from storm main east of this location.
Ex. CB - Type 2
ID: 116903
Ex. CB - Type 2
ID: 116902
Page 29 Boun Short Plat
Reach 11
1,138’ – 1,258’ Stormwater is collected within a Type 2 Catch Basin located approximately
100 feet north of the intersection of NE 10th Street and Anacortes Ave NE.
Stormwater is conveyed north within a 30-inch CPEP Storm Main (D-226617)
sloped at 0.40%.
Photo 10: Facing North along Anacortes Ave NE. Stormwater is collected in Type II catch basin and conveyed north
within closed conveyance system.
Reach 12
1,258’ – 1,333’ Stormwater is collected within a Type 2 Catch Basin (Facility ID# 116900)
within Anacortes Ave NE and conveyed north within a 30-inch CPEP Storm
Main (D-226617) sloped at 0.41%. Completing the downstream analysis ¼
of a mile downstream from the project site natural discharge location.
Photo 11: Facing North along Anacortes Ave NE. Stormwater is collected in Type II catch basin and conveyed north
within closed conveyance system.
Ex. CB - Type 2
ID: 116901
Ex. CB - Type 2
ID: 116900
N
N Ex. CB - Type 2
ID: 116895
¼ mile downstream
Page 30 Boun Short Plat
THRESHOLD DISCHARGE AREA #2.A (East Basin) Upstream
The subject site sits on a high point with very little runoff crossing the site from adjacent
properties. The site’s topography suggests that stormwater runoff from the site is divided and
sheets flows to the southwest and to the northeast. The easterly portion of the site drains to
the northeast into an existing conveyance swale within public right of way (Duvall Ave NE).
Downstream
Runoff contributing to the downstream corridor from the project site consists of the generated
runoff from the existing asphalt within Duvall Ave NE and proposed sidewalk. The following
is a discussion of the downstream corridor from threshold discharge area #2.A’s natural
discharge location. See Appendix B for a Summary of each reach including: pipe size, length,
and material as well as a map of each reach’s location. Reach 1
0’ The runoff generated from the project parcel sheet flows northwest and is
collected within an existing roadside conveyance swale (Facility ID# 450085)
located along the east boundary of the project parcel. Stormwater is conveyed
north.
Photo 12: Facing northwest along Duvall Ave NE. Stormwater sheet flows east within project parcel and enters
existing conveyance swale along the east boundary of the site.
Project Site
Ex. Conveyance Swale
ID: 450085
Page 31 Boun Short Plat
Reach 2
0’- 695’ Stormwater is conveyed north within the conveyance swale along Duvall Ave
NE. Stormwater passes through a series of CMP culverts that were installed
under various driveways along this segment of flow path. The swale is well
established with various land covers. No evidence erosion or flooding were
observed at time of site visit. Garbage and other types of debris were found
at various locations along the swale which could cause potential issues if not
cleaned.
Photo 13: Facing northwest along Duvall Ave NE. Stormwater shallow channel flows within the swale. Stormwater
flows north.
Reach 3
695’- 753’ Stormwater is collected within a 12-inch concrete culvert (Facility ID#
700093). The inlet to concrete culvert had a small amount of sedimentation
build up and leaf debris.
Photo 14: Facing west along Duvall Ave NE. Shallow channel flow enters concrete culvert.
Debris that could
potential disrupt
channel flow
Ex. Conc. Culvert
(Facility ID #700093)
Page 32 Boun Short Plat
Reach 3
753’- 835’ Stormwater is collected within a Type 1 Catch Basin (Facility ID# 130734).
Stormwater is convey north within a 12-inch concrete pipe.
Photo 15: Facing west along Duvall Ave NE. Stormwater is conveyed north within a Type 1 CB.
Reach 4
835’- 883’ Stormwater is collected within a Type 1 Catch Basin (Facility ID# 130735).
Stormwater is convey north within a 12-inch concrete pipe.
Photo 16: Facing west along Duvall Ave NE. Stormwater is conveyed north within a Type 1 CB.
Ex. CB - Type 1
ID: 130734
Ex. CB - Type 1
ID: 130735
Page 33 Boun Short Plat
Reach 5
883’- 1103’ Stormwater is collected within a Type 1 Catch Basin (Facility ID# 130736).
Stormwater is convey north within a 12-inch concrete pipe. The 12-inch
concrete pipe is sloped at 3.4% (R-147402).
Photo 17: Facing northwest along Duvall Ave NE. Stormwater is conveyed north within a Type 1 CB.
Reach 6
1103’- 1402’ Stormwater is collected within a Type 1 Catch Basin (Facility ID# 130794).
Stormwater is convey north within a 12-inch concrete pipe. The 12-inch
concrete pipe is sloped at 1.3% (R-147402). Completing the downstream
analysis ¼ of a mile downstream from the project site natural discharge
location.
Photo 18: Facing southwest along Duvall Ave NE. Stormwater is conveyed north within a Type 1 CB.
Ex. CB - Type 1
ID: 130736
Ex. CB - Type 1
ID: 130794
Page 34 Boun Short Plat
3.1.4 Task 4 - Drainage System Description and Problem Descriptions
There are no apparent drainage complaints in the vicinity of the project site. However,
during the downstream analysis, a problem was identified with releasing stormwater within
Threshold Discharge Area #1 to an existing water quality facility that was installed to treat
stormwater for the Vuong Short Plat (Project R-332511). Any increase in stormwater above
the design water quality flow rate would cause the facility to improperly function. Mitigation
of this downstream problem is necessary to allow the project vault to discharge to the
downstream network.
3.1.5 Task 5 - Mitigation of Existing or Potential Problems
To mitigate the downstream issue identified in Task 4, a flow splitter is proposed to bypass
flows higher than the water quality flow rate of the existing water quality facility to the
downstream network. See Section IV of this report for further details.
Page 35 Boun Short Plat
IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
The stormwater flow control and water quality facilities were designed in accordance with the
2009 King County Surface Water Design Manual (King Manual) and the City of Renton
amendments to the Manual (Renton Manual).
Threshold Discharge Area #1
Existing Site Hydrology (Part A-1)
Threshold Discharge Area #1 is comprised of approximately 80% (46,236 sf) of the project
parcel. Under existing conditions, the site is currently undeveloped with exception to an
abandoned barn that is located near the northern boundary line of the parcel. The site’s
topography suggests that stormwater runoff within threshold discharge area #1 sheet flows
to the southwest over densely vegetated land cover consisting of various types of grass and
brush. There is approximately six (6) feet of vertical relieve across the site with an average
slope around 5%. Any accumulated runoff is allowed to overflow onto Chelan Ave NE into an
existing catch basin near the southwest corner of the project parcel.
Developed Site Hydrology (Part B-1)
Under developed conditions, a drainage adjustment will allow for nearly the entire site (50,746
sf) to drain to Threshold Discharge Area #1. Stormwater will sheet flow over impervious areas
and be collected within a closed conveyance system. Rooftop runoff will be directly tightlined
to this conveyance system. The closed conveyance system then will route stormwater to a
combined water quality and detention vault for treatment and flow control.
The disturbance on site will include construction clearing and grading, construction of 2 public
alley ways, associated utilities (sewer, water, storm, power, etc.), required landscaping
buffers and tree replacement, and eventually seven single-family houses with an associated
driveway. To account for this future development, an estimated impervious area equating to
the maximum impervious allowed per table 4-2-110A was utilized to size stormwater facilities.
It is proposed that each driveway and roof drain connection will be collected and conveyed to
the stormwater facility.
Tables 4.1 and 4.2 break down the historic site conditions and developed site conditions TABLE 4.1 – Historic Site Conditions – Threshold Discharge Area #1
Sub-basin Total
sf (ac)
Impervious
sf (ac)
Till Grass
sf (ac)
Till Forest
sf (ac)
Threshold Discharge
Area #1 (On-site)
46,236
(1.06) 0 0 46,236
(1.06)
Threshold Discharge
Area #1 (Off-site)
2,528
(0.05) 0 0 2,528
(0.05)
Threshold Discharge
Area #2.A (On-site)
(Drainage Adjustment)
8,362
(0.19) 0 0 8,362
(0.19)
TOTAL AREAS 57,126
(1.31) 0 0 57,126
(1.31)
Page 36 Boun Short Plat
TABLE 4.2 – Developed Conditions – Threshold Discharge Area #1
Sub-basin Total
sf (ac)
Impervious
sf (ac)
Till Grass
sf (ac)
Till Forest
sf (ac)
Threshold Discharge Area
#1 (to Vault)*
(includes TDA 2.A area
per Drainage Adjustment)
50,746
(1.16)
27,746
(0.637)
23,000
(0.528) 0
Threshold Discharge Area
#1 (On-site Bypass)
1,111
(0.026)
376
(0.009)
735
(0.017) 0
Threshold Discharge Area
#1 (Off-site Bypass)
4,976
(0.114)
3,559
(0.082)
1,417
(0.032) 0
TOTAL 56,833 (1.305)31,681 (0.727) 25,152 (0.577) 0 (0)
* The area reflects the site area after ROW dedication
Performance Standards (Part C-1)
Flow Control Facility:
Performance standards for flow control design use Table 1.2.3.1 of the Manual. The site is
located in the Flow Control Duration Standard – Matching Forested Site Conditions as
designated by the City of Renton Flow Control Applications Map. This level of control is
necessary for runoff from target surfaces (new impervious and pervious surfaces not fully
dispersed) within the threshold discharge area. An underground detention vault has been
proposed to detain runoff to the historic flow control levels per the Manual.
Table 1.2.3.2 of the Manual indicates the level of flow control required based on the flow
control area and the identified downstream problems, if any. This project did not identify any
downstream problems and being located in the Flow Control Duration Standard Matching
Forested Site Conditions (conservation flow control area) shall apply: historic site conditions
Level 2 flow control standard, which matches historic durations for 50% of 2-year through
50-year peaks and matches historic 2-year and 10-year peaks.
Target surfaces: new impervious, new pervious per Section 1.2.3.1 page 1-34 of the Manual.
Flow Control BMPs:
In addition to flow control facility requirements, implementation of flow control BMPs as part
of this “subdivision” project is optional per Section 5.2.2.1 of the Manual. However, if the
applicant wishes to implement or make provisions for implementation of BMPs as part of the
subdivision project for purposes of receiving the BMP credits, then the requirements outlined
in Section 5.2.2.1 must be met depending on the site location of the proposed BMPs.
Based on a site evaluation, it has been determined that full dispersion/infiltration and basic
dispersion/partial infiltration is not feasible. Per Section 5.2.1.1 Small Lot BMP Requirements
of the Manual, one or more BMPs must be applied to (or used to mitigate for) an impervious
area equal to at least 10% of site/lot for site/lot sizes up to 11,000 square feet. The project
proposes to utilize a restricted footprint to satisfy the Small Lot BMP implementation
requirement. Utilizing Section C.2.9.2 – Restricted Footprint of the manual, the following lot
coverage areas were determined.
Page 37 Boun Short Plat
TABLE 4.3 – Restricted Footprint (C.2.9.2)
Lot Number Lot Size
(sf)
Allowed Impervious
(sf per Zoning – 65%)
Restricted Imp. Area
(55% or 10% site area)
(sf)
Lot 1 5,098 3,314 2,804
Lot 2 5,751 3,738 3,163
Lot 3 5,893 3,830 3,241
Lot 4 5,966 3,878 3,281
Lot 5 5,658 3,678 3,112
Lot 6 5,638 3,665 3,101
Lot 7 6,453 4,194 3,600
Water Quality
The project is located within a Basic Water Quality treatment area as designated by the King
County 2009 Water Quality Application Maps and is not subject to the Enhanced Basic WQ
menu per Section 1.2.8.1.A of the Manual. The goal of Basic WQ treatment is 80% removal
of total suspended solids. To satisfy this treatment requirement, the project proposed a
combined detention/wetvault located in the southwest corner of the project to provide
treatment for onsite. See Part E of this section for analysis of the water quality facilities.
Stormwater Conveyance
The conveyance system capacity standards require that new conveyance systems contain the
25-year peak flow and ensure that the 100-year event does not create a severe flooding or
erosion problem. See Section V of this report for the conveyance analysis per Core
Requirement #4.
Flow Control Systems (Part D-1)
To address the increased runoff impact of the parcel, stormwater runoff from the proposed
development will be mitigated by an underground detention vault in the southwest corner of
the property within a dedicated Tract. As identified in Section III – Downstream Analysis of
this report, a modification to the downstream drainage network is necessary to allow for the
vault to discharge to the existing storm main within Chelan Ave NE. The existing type 1 catch
basin near the northwest corner of the intersection of Chelan Ave NE and NE 10th Street will
be replaced with a larger type 2 – 60” catch basin to allow for the use of an orifice flow splitter.
Vault
The detention portion of the combination detention and water quality facility was designed
under Section 5.3.3.1 of the Manual. The vault was designed to discharge flow under the Flow
Control Duration Standard – Matching Forested Site Conditions as discussed in Part C of this
section.
The facility was sized according to HSPF methodology using King County Runoff Time Series
(KCTRS) software per Section 3.2.2 of the Manual. The vault will have a primary control
structure designed to discharge stormwater per the flow control requirements. The flow
control system utilizes a flow-restrictor tee with multiple orifices as shown in Figure 5.3.4.D
of the Manual. The detention portion of the vault is 4.5 feet deep. The vault is broken into a
two detention chambers due to site constraints. The first chamber (combined WQ and
Detention) is 17.25’Wx107.5’L, approximately a 6:1 length to width ratio. The second
chamber (detention only) is approximately 17.25’Wx107.5’L, having a total surface area of
3,708 sf (3,700 sf required) The total provided volume within the vault is 16,686 cf.
Page 38 Boun Short Plat
This volume is based on several factors. The size of the contributing basin, the type of ground
cover, and any applicable flow control BMP facility sizing credits listed in Table 5.2.2.A of the
Manual. See Table 4.4 for the vault basin areas used for input into KCTRS. As part of flow
control BMP requirements, at least 10% of each individual lot size must be mitigated using
an applicable Flow Control BMP type to receive Flow Control Sizing Credits. Due to site
constraints, a restricted footprint of the allowed impervious for each lot will be incorporated
into the site design to meet the Flow Control BMP requirement. These credits are reflected in
the table below.
Due to grading constraints of the site, portions of Tract A target pervious and impervious
surfaces as well as off-site right of way improvements of Chelan Ave NE target surfaces cannot
be collected within the proposed stormwater vault. A mitigation of target surfaces that bypass
the facility was incorporated into the sizing the detention vault, as allowed per section
1.2.3.2.E of the manual. A point of compliance analysis was completed within KCRTS to ensure
that the controlled stormwater release of the vault combined with the uncontrolled bypass
flow equates to less than or equal to historic site stormwater durations from ½ of the 2-year
storm event through the 50-year storm event.
TABLE 4.4 – Design Vault Basin Areas
Sub-basin Total Area sf (ac)
Impervious sf (ac)
Till Grass sf (ac)
Till Forest sf (ac)
Threshold
Discharge Area #1
- Onsite
50,746
(1.165)
27,746
(0.637)
23,000
(0.528) -
Threshold
Discharge Area #1
– Onsite (Bypass)
1,111
(0.026)
376
(0.009)
735
(0.017) -
Threshold
Discharge Area #1
– Offsite (Bypass)
4,976
(0.114)
3,559
(0.082)
1,417
(0.032) -
TOTAL Area to
Vault
50,746
(1.165)
27,746
(0.637)
23,000
(0.528) -
TOTAL Area to Bypass Vault 6,087 (0.139) 3,935 (0.090) 2,152 (0.049) -
TABLE 4.5 – Vault Volume Summary
Vault Function Storage
Interval
Required
Volume
(cf)
Provided
Volume (cf)
Sediment Storage 422.66–424.3 - -
Water Quality 424.3-429.3 3,687 9,272
Detention 429.3-433.8 16,650 16,689
Freeboard 433.8-434.3 - 1,854
Page 39 Boun Short Plat
Control Structure (Primary Discharge Control)
The control structure was designed to use multiple orifices in order to discharge flow at a
conservative flow control release rate.
Flow through these offices may be determined at any given elevation through the following
equations listed in Section 5.3.4.2 of the Manual:
ghCAQ2, (Orifice)
Where C = 0.62, A is the area of the orifice in square feet, g is the gravity constant,
and h is the headwater in feet, and
2/3739.9 DHQweir, (Weir)
Where D equals the diameter of the riser (18 inches)
TABLE 4.6 – Flow Summary
Vault Stage Elevation Head, h (ft) Flow Rate, Q (cfs)
429.3 0.0 0.000
430.3 1.0 0.007
431.3 2.0 0.010
432.3 3.0 0.013
433.3 4.0 0.050
434.8 4.5 0.069
Primary Overflow
The primary overflow is the overflow weir on the 18-inch diameter control riser. The weir is
intended as a safety measure if any of the orifices are plugged. The bottom of the weir (top
of riser) is set at the peak detention volume storage depth. Per Table 3.2 of the Manual,
KCRTS with 15-minute time steps is to be used to calculate the peak flow if the majority of
the tributary area is detained. Per section 5.3.1.1 of the Manual, the 100-year, 15-minute
developed peak must be able to bypass the control structure.
The developed 100-yr, 15-minute peak flow = 1.02 cfs. See the following pages for KCRTS
output.
The freeboard necessary above the top of the riser to allow for primary overflow is determined
from the weir equation as shown above.
))(5.1(739.906.1 2/3Hcfs, H = 0.173 ft = 2.1”
Six inches of freeboard have been provided above the top of riser in the vault.
Page 40 Boun Short Plat
KCRTS Peak Flow Output (15-minute time steps)
Flow Frequency Analysis
Time Series File:dev-15min.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.304 6 8/27/01 18:00 1.02 1 100.00 0.990
0.224 8 1/05/02 15:00 0.690 2 25.00 0.960
0.690 2 12/08/02 17:15 0.429 3 10.00 0.900
0.244 7 8/23/04 14:30 0.425 4 5.00 0.800
0.425 4 11/17/04 5:00 0.374 5 3.00 0.667
0.374 5 10/27/05 10:45 0.304 6 2.00 0.500
0.429 3 10/25/06 22:45 0.244 7 1.30 0.231
1.02 1 1/09/08 6:30 0.224 8 1.10 0.091
Computed Peaks 0.909 50.00 0.980
KCRTS Vault Output
Page 41 Boun Short Plat
Flow Frequency Analysis
Time Series File:pre.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.082 2 2/09/01 18:00 0.105 1 100.00 0.990
0.022 7 1/06/02 3:00 0.082 2 25.00 0.960
0.061 4 2/28/03 3:00 0.063 3 10.00 0.900
0.002 8 3/24/04 20:00 0.061 4 5.00 0.800
0.036 6 1/05/05 8:00 0.053 5 3.00 0.667
0.063 3 1/18/06 20:00 0.036 6 2.00 0.500
0.053 5 11/24/06 4:00 0.022 7 1.30 0.231
0.105 1 1/09/08 9:00 0.002 8 1.10 0.091
Computed Peaks 0.097 50.00 0.980
Flow Frequency Analysis
Time Series File:dev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.202 6 2/09/01 2:00 0.412 1 100.00 0.990
0.160 8 1/05/02 16:00 0.245 2 25.00 0.960
0.244 3 2/27/03 7:00 0.244 3 10.00 0.900
0.169 7 8/26/04 2:00 0.214 4 5.00 0.800
0.204 5 10/28/04 16:00 0.204 5 3.00 0.667
0.214 4 1/18/06 16:00 0.202 6 2.00 0.500
0.245 2 10/26/06 0:00 0.169 7 1.30 0.231
0.412 1 1/09/08 6:00 0.160 8 1.10 0.091
Computed Peaks 0.357 50.00 0.980
Flow Frequency Analysis
Time Series File:bypass.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.027 6 2/09/01 2:00 0.053 1 100.00 0.990
0.022 8 1/05/02 16:00 0.034 2 25.00 0.960
0.031 3 2/27/03 7:00 0.031 3 10.00 0.900
0.024 7 8/26/04 2:00 0.028 4 5.00 0.800
0.028 4 10/28/04 16:00 0.028 5 3.00 0.667
0.028 5 1/18/06 16:00 0.027 6 2.00 0.500
0.034 2 10/26/06 0:00 0.024 7 1.30 0.231
0.053 1 1/09/08 6:00 0.022 8 1.10 0.091
Computed Peaks 0.047 50.00 0.980
Page 42 Boun Short Plat
Retention/Detention Facility
Type of Facility: Detention Vault
Facility Length: 60.83 ft
Facility Width: 60.83 ft
Facility Area: 3700. sq. ft
Effective Storage Depth: 4.50 ft
Stage 0 Elevation: 0.00 ft
Storage Volume: 16650. cu. ft
Riser Head: 4.50 ft
Riser Diameter: 18.00 inches
Number of orifices: 3
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.52 0.016
2 3.50 1.35 0.049 4.0
3 4.10 0.50 0.004 4.0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 0.00 0. 0.000 0.000 0.00
0.01 0.01 37. 0.001 0.001 0.00
0.02 0.02 74. 0.002 0.001 0.00
0.03 0.03 111. 0.003 0.001 0.00
0.04 0.04 148. 0.003 0.002 0.00
0.05 0.05 185. 0.004 0.002 0.00
0.15 0.15 555. 0.013 0.003 0.00
0.25 0.25 925. 0.021 0.004 0.00
0.35 0.35 1295. 0.030 0.004 0.00
0.45 0.45 1665. 0.038 0.005 0.00
0.55 0.55 2035. 0.047 0.005 0.00
0.65 0.65 2405. 0.055 0.006 0.00
0.75 0.75 2775. 0.064 0.006 0.00
0.85 0.85 3145. 0.072 0.007 0.00
0.95 0.95 3515. 0.081 0.007 0.00
1.05 1.05 3885. 0.089 0.008 0.00
1.15 1.15 4255. 0.098 0.008 0.00
1.25 1.25 4625. 0.106 0.008 0.00
1.35 1.35 4995. 0.115 0.009 0.00
1.45 1.45 5365. 0.123 0.009 0.00
1.55 1.55 5735. 0.132 0.009 0.00
1.65 1.65 6105. 0.140 0.009 0.00
1.75 1.75 6475. 0.149 0.010 0.00
1.85 1.85 6845. 0.157 0.010 0.00
1.95 1.95 7215. 0.166 0.010 0.00
2.05 2.05 7585. 0.174 0.010 0.00
2.15 2.15 7955. 0.183 0.011 0.00
2.25 2.25 8325. 0.191 0.011 0.00
2.35 2.35 8695. 0.200 0.011 0.00
Page 43 Boun Short Plat
2.45 2.45 9065. 0.208 0.011 0.00
2.55 2.55 9435. 0.217 0.012 0.00
2.65 2.65 9805. 0.225 0.012 0.00
2.75 2.75 10175. 0.234 0.012 0.00
2.85 2.85 10545. 0.242 0.012 0.00
2.95 2.95 10915. 0.251 0.013 0.00
3.05 3.05 11285. 0.259 0.013 0.00
3.15 3.15 11655. 0.268 0.013 0.00
3.25 3.25 12025. 0.276 0.013 0.00
3.35 3.35 12395. 0.285 0.013 0.00
3.45 3.45 12765. 0.293 0.014 0.00
3.50 3.50 12950. 0.297 0.014 0.00
3.51 3.51 12987. 0.298 0.014 0.00
3.53 3.53 13061. 0.300 0.015 0.00
3.54 3.54 13098. 0.301 0.017 0.00
3.56 3.56 13172. 0.302 0.020 0.00
3.57 3.57 13209. 0.303 0.023 0.00
3.58 3.58 13246. 0.304 0.027 0.00
3.60 3.60 13320. 0.306 0.029 0.00
3.61 3.61 13357. 0.307 0.031 0.00
3.63 3.63 13431. 0.308 0.032 0.00
3.73 3.73 13801. 0.317 0.038 0.00
3.83 3.83 14171. 0.325 0.043 0.00
3.93 3.93 14541. 0.334 0.047 0.00
4.03 4.03 14911. 0.342 0.051 0.00
4.10 4.10 15170. 0.348 0.053 0.00
4.11 4.11 15207. 0.349 0.054 0.00
4.12 4.12 15244. 0.350 0.055 0.00
4.13 4.13 15281. 0.351 0.055 0.00
4.14 4.14 15318. 0.352 0.056 0.00
4.24 4.24 15688. 0.360 0.060 0.00
4.34 4.34 16058. 0.369 0.064 0.00
4.44 4.44 16428. 0.377 0.067 0.00
4.50 4.50 16650. 0.382 0.069 0.00
4.60 4.60 17020. 0.391 0.534 0.00
4.70 4.70 17390. 0.399 1.380 0.00
4.80 4.80 17760. 0.408 2.480 0.00
4.90 4.90 18130. 0.416 3.780 0.00
5.00 5.00 18500. 0.425 5.250 0.00
5.10 5.10 18870. 0.433 6.680 0.00
5.20 5.20 19240. 0.442 7.210 0.00
5.30 5.30 19610. 0.450 7.700 0.00
5.40 5.40 19980. 0.459 8.170 0.00
5.50 5.50 20350. 0.467 8.600 0.00
5.60 5.60 20720. 0.476 9.020 0.00
5.70 5.70 21090. 0.484 9.420 0.00
5.80 5.80 21460. 0.493 9.800 0.00
5.90 5.90 21830. 0.501 10.170 0.00
6.00 6.00 22200. 0.510 10.530 0.00
6.10 6.10 22570. 0.518 10.870 0.00
6.20 6.20 22940. 0.527 11.200 0.00
6.30 6.30 23310. 0.535 11.530 0.00
6.40 6.40 23680. 0.544 11.840 0.00
6.50 6.50 24050. 0.552 12.150 0.00
Page 44 Boun Short Plat
Hyd Inflow Outflow Peak Storage
Stage Elev (Cu-Ft) (Ac-Ft)
1 0.20 0.07 4.48 4.48 16579. 0.381
2 0.41 0.07 4.38 4.38 16223. 0.372
3 0.24 0.04 3.69 3.69 13668. 0.314
4 0.21 0.01 3.05 3.05 11282. 0.259
5 0.24 0.06 4.29 4.29 15864. 0.364
6 0.20 0.01 2.88 2.88 10671. 0.245
7 0.16 0.01 2.90 2.90 10723. 0.246
8 0.17 0.01 1.43 1.43 5296. 0.122
Hyd R/D Facility Tributary Reservoir POC Outflow
Outflow Inflow Inflow Target Calc
1 0.07 0.03 ******** ******* 0.08
2 0.07 0.05 ******** 0.10 0.09
3 0.04 0.03 ******** ******* 0.04
4 0.01 0.03 ******** ******* 0.04
5 0.06 0.03 ******** ******* 0.08
6 0.01 0.03 ******** ******* 0.03
7 0.01 0.02 ******** ******* 0.03
8 0.01 0.02 ******** ******* 0.03
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.413 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.068 CFS at 20:00 on Feb 9 in Year 1
Peak Reservoir Stage: 4.48 Ft
Peak Reservoir Elev: 4.48 Ft
Peak Reservoir Storage: 16579. Cu-Ft
: 0.381 Ac-Ft
Add Time Series:bypass.tsf
Peak Summed Discharge: 0.093 CFS at 9:00 on Jan 9 in Year 8
Point of Compliance File:dsout.tsf
Flow Duration from Time Series File:rdout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.001 28578 46.605 46.605 53.395 0.534E+00
0.003 6557 10.693 57.298 42.702 0.427E+00
0.005 7915 12.908 70.205 29.795 0.298E+00
0.007 7315 11.929 82.135 17.865 0.179E+00
0.009 4253 6.936 89.070 10.930 0.109E+00
0.011 3741 6.101 95.171 4.829 0.483E-01
0.012 2011 3.280 98.451 1.549 0.155E-01
0.014 693 1.130 99.581 0.419 0.419E-02
0.016 37 0.060 99.641 0.359 0.359E-02
0.018 22 0.036 99.677 0.323 0.323E-02
Page 45 Boun Short Plat
0.020 18 0.029 99.706 0.294 0.294E-02
0.022 15 0.024 99.731 0.269 0.269E-02
0.024 9 0.015 99.746 0.254 0.254E-02
0.026 8 0.013 99.759 0.241 0.241E-02
0.028 16 0.026 99.785 0.215 0.215E-02
0.029 17 0.028 99.812 0.188 0.188E-02
0.031 2 0.003 99.816 0.184 0.184E-02
0.033 10 0.016 99.832 0.168 0.168E-02
0.035 9 0.015 99.847 0.153 0.153E-02
0.037 6 0.010 99.856 0.144 0.144E-02
0.039 5 0.008 99.865 0.135 0.135E-02
0.041 5 0.008 99.873 0.127 0.127E-02
0.043 7 0.011 99.884 0.116 0.116E-02
0.045 4 0.007 99.891 0.109 0.109E-02
0.047 5 0.008 99.899 0.101 0.101E-02
0.048 6 0.010 99.909 0.091 0.913E-03
0.050 7 0.011 99.920 0.080 0.799E-03
0.052 10 0.016 99.936 0.064 0.636E-03
0.054 6 0.010 99.946 0.054 0.538E-03
0.056 5 0.008 99.954 0.046 0.457E-03
0.058 5 0.008 99.962 0.038 0.375E-03
0.060 4 0.007 99.969 0.031 0.310E-03
0.062 5 0.008 99.977 0.023 0.228E-03
0.064 5 0.008 99.985 0.015 0.147E-03
0.065 3 0.005 99.990 0.010 0.978E-04
0.067 2 0.003 99.993 0.007 0.652E-04
Flow Duration from Time Series File:dsout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.001 28043 45.732 45.732 54.268 0.543E+00
0.003 8072 13.164 58.896 41.104 0.411E+00
0.006 8986 14.654 73.550 26.450 0.264E+00
0.008 6637 10.824 84.374 15.626 0.156E+00
0.010 4721 7.699 92.073 7.927 0.793E-01
0.013 2621 4.274 96.347 3.653 0.365E-01
0.015 1275 2.079 98.426 1.574 0.157E-01
0.017 354 0.577 99.004 0.996 0.996E-02
0.020 208 0.339 99.343 0.657 0.657E-02
0.022 85 0.139 99.481 0.519 0.519E-02
0.024 60 0.098 99.579 0.421 0.421E-02
0.027 38 0.062 99.641 0.359 0.359E-02
0.029 36 0.059 99.700 0.300 0.300E-02
0.031 33 0.054 99.754 0.246 0.246E-02
0.034 23 0.038 99.791 0.209 0.209E-02
0.036 12 0.020 99.811 0.189 0.189E-02
0.038 14 0.023 99.834 0.166 0.166E-02
0.040 11 0.018 99.852 0.148 0.148E-02
0.043 5 0.008 99.860 0.140 0.140E-02
0.045 8 0.013 99.873 0.127 0.127E-02
0.047 8 0.013 99.886 0.114 0.114E-02
0.050 6 0.010 99.896 0.104 0.104E-02
0.052 4 0.007 99.902 0.098 0.978E-03
0.054 7 0.011 99.914 0.086 0.864E-03
Page 46 Boun Short Plat
0.057 7 0.011 99.925 0.075 0.750E-03
0.059 5 0.008 99.933 0.067 0.669E-03
0.061 9 0.015 99.948 0.052 0.522E-03
0.064 7 0.011 99.959 0.041 0.408E-03
0.066 5 0.008 99.967 0.033 0.326E-03
0.068 4 0.007 99.974 0.026 0.261E-03
0.070 3 0.005 99.979 0.021 0.212E-03
0.073 3 0.005 99.984 0.016 0.163E-03
0.075 3 0.005 99.989 0.011 0.114E-03
0.077 3 0.005 99.993 0.007 0.652E-04
0.080 2 0.003 99.997 0.003 0.326E-04
0.082 1 0.002 99.998 0.002 0.163E-04
Duration Comparison Anaylsis
Base File: pre.tsf
New File: dsout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutoff Base New %Change Probability Base New %Change
0.018 | 0.97E-02 0.90E-02 -6.9 | 0.97E-02 0.018 0.017 -2.6
0.023 | 0.63E-02 0.48E-02 -24.7 | 0.63E-02 0.023 0.020 -12.2
0.028 | 0.50E-02 0.33E-02 -33.4 | 0.50E-02 0.028 0.022 -19.1
0.033 | 0.37E-02 0.22E-02 -40.8 | 0.37E-02 0.033 0.026 -20.4
0.038 | 0.29E-02 0.17E-02 -41.0 | 0.29E-02 0.038 0.030 -21.5
0.043 | 0.22E-02 0.14E-02 -36.3 | 0.22E-02 0.043 0.033 -23.2
0.048 | 0.15E-02 0.11E-02 -24.7 | 0.15E-02 0.048 0.040 -15.9
0.053 | 0.10E-02 0.98E-03 -4.8 | 0.10E-02 0.053 0.050 -3.8
0.057 | 0.64E-03 0.72E-03 12.8 | 0.64E-03 0.057 0.059 3.5
0.062 | 0.34E-03 0.46E-03 33.3 | 0.34E-03 0.062 0.065 4.1
0.067 | 0.23E-03 0.28E-03 21.4 | 0.23E-03 0.067 0.070 4.4
0.072 | 0.16E-03 0.18E-03 10.0 | 0.16E-03 0.072 0.073 1.3
0.077 | 0.82E-04 0.65E-04 -20.0 | 0.82E-04 0.077 0.076 -1.4
0.082 | 0.16E-04 0.16E-04 0.0 | 0.16E-04 0.082 0.083 0.9
Maximum positive excursion = 0.004 cfs ( 6.1%)
occurring at 0.061 cfs on the Base Data:pre.tsf
and at 0.065 cfs on the New Data:dsout.tsf
Maximum negative excursion = 0.010 cfs (-23.8%)
occurring at 0.041 cfs on the Base Data:pre.tsf
and at 0.031 cfs on the New Data:dsout.tsf
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.413 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.068 CFS at 20:00 on Feb 9 in Year 1
Peak Reservoir Stage: 4.48 Ft
Peak Reservoir Elev: 4.48 Ft
Peak Reservoir Storage: 16579. Cu-Ft
Page 47 Boun Short Plat
: 0.381 Ac-Ft
Add Time Series:bypass.tsf
Peak Summed Discharge: 0.093 CFS at 9:00 on Jan 9 in Year 8
Point of Compliance File:dsout.tsf
Flow Duration from Time Series File:rdout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.001 28578 46.605 46.605 53.395 0.534E+00
0.003 6557 10.693 57.298 42.702 0.427E+00
0.005 7915 12.908 70.205 29.795 0.298E+00
0.007 7315 11.929 82.135 17.865 0.179E+00
0.009 4253 6.936 89.070 10.930 0.109E+00
0.011 3741 6.101 95.171 4.829 0.483E-01
0.012 2011 3.280 98.451 1.549 0.155E-01
0.014 693 1.130 99.581 0.419 0.419E-02
0.016 37 0.060 99.641 0.359 0.359E-02
0.018 22 0.036 99.677 0.323 0.323E-02
0.020 18 0.029 99.706 0.294 0.294E-02
0.022 15 0.024 99.731 0.269 0.269E-02
0.024 9 0.015 99.746 0.254 0.254E-02
0.026 8 0.013 99.759 0.241 0.241E-02
0.028 16 0.026 99.785 0.215 0.215E-02
0.029 17 0.028 99.812 0.188 0.188E-02
0.031 2 0.003 99.816 0.184 0.184E-02
0.033 10 0.016 99.832 0.168 0.168E-02
0.035 9 0.015 99.847 0.153 0.153E-02
0.037 6 0.010 99.856 0.144 0.144E-02
0.039 5 0.008 99.865 0.135 0.135E-02
0.041 5 0.008 99.873 0.127 0.127E-02
0.043 7 0.011 99.884 0.116 0.116E-02
0.045 4 0.007 99.891 0.109 0.109E-02
0.047 5 0.008 99.899 0.101 0.101E-02
0.048 6 0.010 99.909 0.091 0.913E-03
0.050 7 0.011 99.920 0.080 0.799E-03
0.052 10 0.016 99.936 0.064 0.636E-03
0.054 6 0.010 99.946 0.054 0.538E-03
0.056 5 0.008 99.954 0.046 0.457E-03
0.058 5 0.008 99.962 0.038 0.375E-03
0.060 4 0.007 99.969 0.031 0.310E-03
0.062 5 0.008 99.977 0.023 0.228E-03
0.064 5 0.008 99.985 0.015 0.147E-03
0.065 3 0.005 99.990 0.010 0.978E-04
0.067 2 0.003 99.993 0.007 0.652E-04
Flow Duration from Time Series File:dsout.tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.001 28043 45.732 45.732 54.268 0.543E+00
0.003 8072 13.164 58.896 41.104 0.411E+00
0.006 8986 14.654 73.550 26.450 0.264E+00
0.008 6637 10.824 84.374 15.626 0.156E+00
0.010 4721 7.699 92.073 7.927 0.793E-01
Page 48 Boun Short Plat
0.013 2621 4.274 96.347 3.653 0.365E-01
0.015 1275 2.079 98.426 1.574 0.157E-01
0.017 354 0.577 99.004 0.996 0.996E-02
0.020 208 0.339 99.343 0.657 0.657E-02
0.022 85 0.139 99.481 0.519 0.519E-02
0.024 60 0.098 99.579 0.421 0.421E-02
0.027 38 0.062 99.641 0.359 0.359E-02
0.029 36 0.059 99.700 0.300 0.300E-02
0.031 33 0.054 99.754 0.246 0.246E-02
0.034 23 0.038 99.791 0.209 0.209E-02
0.036 12 0.020 99.811 0.189 0.189E-02
0.038 14 0.023 99.834 0.166 0.166E-02
0.040 11 0.018 99.852 0.148 0.148E-02
0.043 5 0.008 99.860 0.140 0.140E-02
0.045 8 0.013 99.873 0.127 0.127E-02
0.047 8 0.013 99.886 0.114 0.114E-02
0.050 6 0.010 99.896 0.104 0.104E-02
0.052 4 0.007 99.902 0.098 0.978E-03
0.054 7 0.011 99.914 0.086 0.864E-03
0.057 7 0.011 99.925 0.075 0.750E-03
0.059 5 0.008 99.933 0.067 0.669E-03
0.061 9 0.015 99.948 0.052 0.522E-03
0.064 7 0.011 99.959 0.041 0.408E-03
0.066 5 0.008 99.967 0.033 0.326E-03
0.068 4 0.007 99.974 0.026 0.261E-03
0.070 3 0.005 99.979 0.021 0.212E-03
0.073 3 0.005 99.984 0.016 0.163E-03
0.075 3 0.005 99.989 0.011 0.114E-03
0.077 3 0.005 99.993 0.007 0.652E-04
0.080 2 0.003 99.997 0.003 0.326E-04
0.082 1 0.002 99.998 0.002 0.163E-04
Vault - Flow Control Performance Evaluation (Per Section 3.2.2)
1. The post-developed flow duration curve lies strictly below the predevelopment curve
at the lower limit of the range of control (between 50% of the 2-year and the 2-
year).
Requirement Satisfied - The dsout (combined flow duration of release of vault and
bypass structure) duration curve lies strictly below the target duration curve.
2. At any duration within the range of control, the post-development flow is less than
1.1 times the predevelopment flow.
Requirement Satisfied – After running a flow durations comparison analysis, a
maximum positive excursion found among the range of control was less than 10%.
3. The target duration curve may not be exceeded along more than 50% of the range
of control.
Requirement Satisfied - After running a flow duration’s comparison analysis, 5 of the
14 flow duration cutoff values (50%) were exceeded.
Page 49 Boun Short Plat
4. The peak flow at the upper end of the range of control (historical 50-year) may not
exceed predeveloped levels by more than 10%.
Requirement Satisfied – Peak flows at the upper end of the range of control do not
exceed predeveloped flow levels by greater than 10%.
Flow Splitter (Catch Basin #12)
The following flow splitter was sized, in part, utilizing stormwater calculations that were
completed during the development of the Vuong Short Plat, prepared by Touma Engineers.
For further information about this stormwater system, see below.
The flow splitter was sized utilizing Section 6.2.5 of the King County Manual. Per 6.2.5.1,
orifice flow splitters shall be sized per Section 5.3.4.2.
Qwq=CAorifice(2gh)^0.5
Where Qwq=0.11 cfs (Water Quality Flow Rate Per Vuong Short Plat)
C = 0.62 (for plate orifice)
G = 32.2 (ft/s2)
H = Hydraulic Head (overflow elevation – outlet IE) = 429.37 - 427.87 = 1.5’
Solve A = 0.11/(0.62*(2*32.2*1.5)^0.5) = 0.0181 ft2
Solve for r = ϖr2 = (0.181/ϖ)^0.5 = 0.0759’
Solve for d = 2r = 2*0.0759 = 0.1518’ = 1.82”
A 1.82” diameter orifice shall be installed at the bottom of the riser tee within the proposed
type 2-60” catch basin. See sheet C5 of the plan set for further flow splitter details.
Flow Splitter Flow Capacity Check: Per Section 6.2.5.2 – Design Criteria Item 3, the
maximum head shall be minimized to flow in excess of the water quality design flow.
Specifically, flow to the WQ facility at the 100-year water surface shall not increase the
design WQ flow by more than 10%.
To analyze the flow splitter at the 100-year storm event, the rational method was utilized to
calculate a 100-year storm event flow rate for both the Boun Short Plat and Vuong Short
Plat which are tributary to this conveyance point. An assumed time of concentration was
utilized of 6.3 minutes (minimum).
Vuong Short Plat Total Sub-Basin Area = 1.13 acres (per Approved TIR)
Impervious = 0.83 acres
Pervious = 0.30 acres
Boun Short Plat Total Sub-Basin Area = 1.31 acres
Impervious = 0.73 acres
Pervious = 0.58 acres
Total contributing Sub-Basin Areas:
Total Impervious = 1.56 acres
Total Pervious = 0.88 acres
Page 50 Boun Short Plat
Rational Method Equation
Qr=CIrA
Where Cc= (C1A1+C2A2+C3A3+….CnAn)/At
Cc = (1.56 acres * 0.90 (per Table 3.2.1.A) + 0.88 acres * 0.25 (per Table 3.2.1.A))/2.44
Cc = 0.67 unitless
Where Ir = Pr *ir;
Pr = the total precipitation at the project site for the 24-hour duration storm event for a
given return frequency. Per Figure 3.2.1.D for the 100-Year Storm Event, Pr = 3.9 inches.
ir = (Ar)(Tc)(-br), where Ar = 2.61, Br = 0.63 per Table 3.2.1.B.
ir = 2.61*6.3-0.63
ir = 0.8186
Ir = 3.9” * 0.8186 = 3.19
Q100 = 0.67*3.19*2.44 = 5.22 cfs
Per Figure 5.3.4.H – Riser Inflow Curves, an approximate increase of 0.36’ of head will be
necessary to pass the 100-year storm event through the top of the overflow riser with
utilizing a 30” (2.5’) standpipe riser. However, a correction needs to be made to this figure
to account for the minor flow that will leave the facility through the WQ facility orifice outlet.
The following equation was derived to account for this flow loss.
Q100 = 9.739 DH3/2 + CAorifice(2gh)^0.5
5.22 cfs = 9.739 * 2.5 * H3/2 + 0.62* 0.0181 (2*32.2*h)^0.5
Solving for H, H = 0.36’
Verify that the change of 0.36’ in head does not increase the amount of flow to WQ facility
>10%. A modified flow splitter is proposed at Catch Basin #12 to allow for the overflow
elevation of the WQ facility to be 0.4’ higher than the overflow elevation of the downstream
network outlet. This will allow for water to flow into the downstream network prior to
allowing water to surcharge the water quality facility.
The change in flow between the WQ flow rate and the 100-year storm event is the following
(note: overflow above the 12” tee is not allowed, therefore weir flow was ignored):
Qorifice=CAorifice(2gh)^0.5 = 0.62*0.0181*(2*32.2*(1.5+.36))^0.5 = 0.122
Percent Difference = (0.122 – 0.11)/0.123 = 0.976 = 9.7% < 10%
Therefore, a 30” standpipe will have the capacity to convey the 100-year storm event
without increase the amount of flow conveyed to the WQ facility by more than 10%. See
Plan Sheet C5 of the accompanying plan set for further details.
3.2.1 RATIONAL METHOD
2009 Surface Water Design Manual 1/9/2009 3-13
TABLE 3.2.1.A RUNOFF COEFFICIENTS - "C" VALUES FOR THE RATIONAL METHOD
General Land Covers Single Family Residential Areas*
Land Cover C Land Cover Density C
Dense forest
Light forest
Pasture
Lawns
Playgrounds
Gravel areas
Pavement and roofs
Open water (pond, lakes,
wetlands)
0.10
0.15
0.20
0.25
0.30
0.80
0.90
1.00
0.20 DU/GA (1 unit per 5 ac.)
0.40 DU/GA (1 unit per 2.5 ac.)
0.80 DU/GA (1 unit per 1.25 ac.)
1.00 DU/GA
1.50 DU/GA
2.00 DU/GA
2.50 DU/GA
3.00 DU/GA
3.50 DU/GA
4.00 DU/GA
4.50 DU/GA
5.00 DU/GA
5.50 DU/GA
6.00 DU/GA
0.17
0.20
0.27
0.30
0.33
0.36
0.39
0.42
0.45
0.48
0.51
0.54
0.57
0.60
* Based on average 2,500 square feet per lot of impervious coverage.
For combinations of land covers listed above, an area-weighted "Cc:x At" sum should be computed based on the
equation Cc: x At = (C1 x A1) + (C2 x A2) + ...+(Cn x An), where A8 = (A1 + A2 + ...+An), the total drainage basin area.
TABLE 3.2.1.B COEFFICIENTS FOR THE RATIONAL METHOD "iR" EQUATION
Design Storm Return Frequency aR bR
2 years
5 years
10 years
25 years
50 years
100 years
1.58
2.33
2.44
2.66
2.75
2.61
0.58
0.63
0.64
0.65
0.65
0.63
TABLE 3.2.1.C kR VALUES FOR Tt USING THE RATIONAL METHOD
Land Cover Category kR
Forest with heavy ground litter and meadow 2.5
Fallow or minimum tillage cultivation 4.7
Short grass pasture and lawns 7.0
Nearly bare ground 10.1
Grassed waterway 15.0
Paved area (sheet flow) and shallow gutter flow 20.0
3.2.1 RATIONAL METHOD
2009 Surface Water Design Manual 1/9/2009 3-17
FIGURE 3.2.1.D 100-YEAR 24-HOUR ISOPLUVIALS
SNOHOMISH COUNTY
KING COUNTY
KING COUNTY
PIERCE COUNTY
KIRKLAND
REDMOND
REDMOND
DUVALL
WOODINVILLEBOTHELL
MERCERISLAND
RENTON
TUKWILA
SEATTLE
SEATTLE
BURIEN
NORMANDY
PARK
SEATAC
BELLEVUE
NEWCASTLE ISSAQUAH
SNOQUALMIE
CARNATION
NORTH
BEND
SEATTLE
SHORELINE
MEDINA
BEAUXARTS
CLYDEHILL
YARROW
POINTHUNTSPOINT
LAKEFOREST
PARK
FEDERAL
WAY
PACIFICMILTON
ALGONA
AUBURN
KENT
KENT
DES
MOINES
BLACK
DIAMOND
ENUMCLAW
KENT
Vashon
Island
MauryIsland
COVINGTON MAPLEVALLEY
520
522
104
5
522
405
908
900
167
169
515
516
509
518
509
90
405
405
99
5
5
900
90
99
99
99
509
161
164
167
18
18
18
516
169
169
410
520
Elliott
Bay
LakeSamm amishLakeWashington
P ugetSound CedarRiver
Green
River
Whi
t
eRi
ver
Sa
mmami
shRiverSnoqualmie River
0 2 4 Miles
N
100-Year 24-Hour
Precipitation
in Inches
WESTERN
KING COUNTY
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.83.
9
3.93.94.0
4.04.05.04.14.24.34.44.55.55.5
6.0
6.56.56.04.1
4.2
4.3
4.
4
4.54.6
5.3.4 CONTROL STRUCTURES — METHODS OF ANALYSIS
2009 Surface Water Design Manual 1/9/2009 5-47
Riser Overflow
The nomograph in Figure 5.3.4.H may be used to determine the head (in feet) above a riser of given
diameter and for a given flow (usually the 100-year peak flow for developed conditions).
FIGURE 5.3.4.H RISER INFLOW CURVES
1
10
100
0.1 1 10HEAD IN FEET (measured from crest of riser)
Qweir=9.739 DH3/2
Qorifice=3.782 D2H1/2
Q in cfs, D and H in feet
Slope change occurs at weir-orifice transition Q (cubic feet per second)18
21
24
27
30
42
487254
10
12
15
33
36
RISER DIAMETER (inches)
WATERQUALITYThefollowingcalculationistodeterminewaterqualityvolume,itisbasedon1/3of2-yearstorm,whichis2/3=0.67”.The0.67”precipitationisusedforcomputingthewaterqualityvolume.SBUWSCSMETHODFORCOMPUTINGRUNOFFHYDROGRAPHSTORMOPTIONS:1-S.C.S.TYPE-lA2-7-DAYDESIGN STORM3-STORM DATAFILESPECIFYSTORMOPTION:1S.C.S.TYPE-lARAINFALLDISTRIBUTIONENTER:FREQ(YEAR),DURATION(HOUR),PRECIP(INCHES)1,24,0.67S.C.S.TYPE-lADISTRiBUTION1-YEAR24-HOURSTORM.67hTOTALPRECIP.*********ENTER:A(PERV),CN(PERV),A(IMPERV),CN(IMPERV),TCFORBASINNO.I0.3,86,0.83,98,6.3DATAPRINT-OUT:AREA(ACRES)PERVIOUSIMPERVIOUSTC(MINUTES)ACNACN1.1.386.0.898.06.3PEAK-Q(CFS)T-PEAK(HRS)VOL(CU-FT).117.8314961496cu.ft.isrequired.Itisproposedtoconstructunderground60-inchpipetostorethecalculatedwaterqualityvolume.Cross-sectionareaof60-inchpipelessthebottomandtop6-inchesis16.02s.fRefertosketchonfollowingsheetLengthof60-inchpipeis1496/16.02=93.33 IfUSE95.00ifof6Oinch
Page 55 Boun Short Plat
Water Quality System (Part E-1)
The project is located within a Basic Water Quality treatment area as discussed in Part C in
this Section. To satisfy this treatment requirement, the project proposes a combined
detention/wetvault located in the southwest corner of the project to provide basic treatment
for onsite runoff.
Vault (Water Quality)
The proposed water quality wetvault for the site has been sized to obtain adequate particulate
removal efficiency per section 6.4.1.1 of the Manual. This is based on the volume of the
wetvault in relation to the volume of stormwater runoff from the mean annual storm, VB/VR.
For basic water quality vaults, this ratio, vault volume/mean annual storm, shall equal at least
3.
The sizing of the wetvault is accomplished by first determining the acreage of pervious and
impervious areas. These values are used to calculate the treatment runoff volumes by
multiplying the acreage of each surface type by the mean annual storm (0.04 feet, per Figure
6.4.1.A of the Manual). Runoff factors are also applied to each surface type, 0.25 for grass
and 0.90 for impervious. The sum of the grass and impervious runoff volumes is the total
runoff volume from the mean annual storm, VR. To calculate the minimum required volume of
the wetpool (VB), the mean annual runoff volume (VR) was multiplied by 3.
Grass runoff = (23,000 sf)(0.04’)(0.25) = 230 cf
Impervious runoff = (27,746 sf)(0.04’)(0.90) = 999 cf
Forest runoff= (0 sf)(0.039’)(0.10)= 0 cf
Total runoff volume, VR = 230 cf + 999 cf + 0 cf = 1,229 cf
Total basin volume, VB = 1,229 cf x 3 = 3,687 cf
The water quality portion of the vault is 17.25’Wx107.5’L, a 6:1 length to width ratio. The
proposed depth of the wetvault is 5.00 feet. This provides a total volume of 9,270 cf. See
sheet C8 of the engineering plan set for vault dimensions and details.
Threshold Discharge Area #2 (2.A & 2.B)
Existing Site Hydrology (Part A-2)
Threshold Discharge Area #2 is comprised of approximately 20% (11,440 sf) of the project
parcel. This includes 8,771 sf of area near the southeast corner of the project parcel and
2,669 sf of project area which consists of an 18-foot strip of land to be dedicated as part of
this project. Under existing conditions, Threshold Discharge Area 2.A (the eastern portion of
the project site) is currently undeveloped. The site’s topography suggests this portion of land
sheet flows to the northeast over densely vegetated land cover consisting of various types of
grass and brush. There is approximately six (3) feet of vertical relieve across the site with an
average slope around 5%. Any accumulated runoff is allowed to enter a stormwater
conveyance swale within Duvall Ave NE near the northeast corner of the project parcel.
Threshold Discharge Area 2.B (the 18’ strip of land located near the northwest corner of the
project site) is currently undeveloped with the exception of an existing gravel driveway. The
site’s topography suggests this portion of land sheet flows to the northwest over vegetated
land cover consisting of short lawn. There is approximately one (1) foot of vertical relieve
across the site with an average slope around 2%. Any accumulated runoff would flow
Page 56 Boun Short Plat
northwest along the western edge of the existing gravel access road. Threshold Discharge
Area 2.A and 2.B join approximately ½ of a mile downstream of the project site.
Developed Site Hydrology (Part B-2)
Under developed conditions, a drainage adjustment will allow for a large portion of the
Threshold Discharge Area 2.A (8,362 sf) to drain to Threshold Discharge Area #1. The
remaining 409 sf will allow stormwater to sheet flow over impervious areas and be collected
within a closed conveyance system within Duvall Ave NE. The closed conveyance system will
discharge to a rock outfall pad just north of the project site to the existing stormwater ditch.
The disturbance within threshold discharge area #2 will include construction clearing and
grading, construction of right of way improvements within Duvall Ave NE, associated utilities
(storm, power, etc.), required landscaping buffers, and tree replacement.
Tables 4.7 and 4.8 break down the historic site conditions and developed site conditions TABLE 4.7 – Historic Site Conditions – Threshold Discharge Area #2
Sub-basin Total sf (ac) Impervioussf (ac) Till Grass sf (ac) Till Forest sf (ac)
Threshold Discharge
Area #2.A - Onsite
8,771
(0.20) 0 0 8,771
(0.20)
Threshold Discharge
Area #2.A – Offsite
(Historic Conditions)
8,432
(0.19) 0 0 8,432
(0.19)
Threshold Discharge
Area #2.B
2,669
(0.06) 0 0 2,669
(0.06)
TOTAL 19,872
(0.456) 0 0 19,872
(0.456)
TABLE 4.8 – Developed Conditions – Threshold Discharge Area #2
Sub-basin Total sf (ac) Impervioussf (ac) Till Grass sf (ac) Till Forest sf (ac)
Threshold Discharge
Area #2.A - Onsite
409
(0.009)
297
(0.006)
112
(0.003) 0
Threshold Discharge
Area #2.A – Offsite
(Existing Conditions w/
Planter Strip Addition)
8,432
(0.19)
6,869
(0.16)
1,563
(0.03) 0
Threshold Discharge
Area #2.B
2,669
(0.06)
789
(0.02)
1,880
(0.04) 0
TOTAL 11,510
(0.26)
7,955
(0.18)
3,555
(0.08)
0
(0)
* The area reflects the site area after ROW dedication
Page 57 Boun Short Plat
Performance Standards (Part C-2)
Flow Control Facility:
The proposed project is located within the Flow Control Duration Standard – Matching Historic
Site Conditions area: Match developed discharge durations to historic (forested) duration for
the range of pre-developed discharge rates from 50% of the 2-year peak flow up to the full
50-year peak flow.
The above is required unless a flow control exception applies to the proposed site conditions.
Per Section 1.2.3.1.B – Exception 2, The facility requirement in Flow Control Duration
Standard Matching Forested Site Conditions Areas is waived for any threshold discharge area
in which there is no more than 0.1-cfs difference in the sum of the developed 100-year peak
flows for those target surfaces subject to this requirement and the sum of forested (historic)
site conditions 100-year peak flows for the same surface areas.
The developed conditions do not exceed a 0.1 cfs difference in the sum of developed 100-
year peak flows for those target surfaces subject to the flow control facility requirement and
the sum of historic site conditions 100-year peak flows for the same surface areas. Thus flow
control is not required for this threshold discharge area per section 1.2.3.1.B of the Renton
Manual. Part D of this section for analysis output comparing the pre and post flow rates.
Water Quality
The project is located within the Basic Water Quality treatment area as designated by the
King County 2009 Water Quality Application Maps and is not subject to the Enhanced Basic
WQ menu per Section 1.2.8.1.A of the Manual. The goal of Basic WQ treatment is 80%
removal of total suspended solids. This is required unless an applicable exemption to Core
Requirment #8 applies. This threshold discharge area meets the treatment exemption for
surface area per Section 1.2.8 Exemptions. The proposed conditions will not increase PGIS
surface areas within Threshold Discharge Area #2. The proposed conditions will include the
construction of 297 sf of sidewalk impervious (not recognized as PGIS per the Manual) and
112 sf of pervious area. Therefore, a water quality facility for TDA #2.A is not proposed at
this time.
Stormwater Conveyance
The conveyance system capacity standards require that new conveyance systems contain the
25-year peak flow and ensure that the 100-year event does not create a severe flooding or
erosion problem. See Section V of this report for the conveyance analysis per Core
Requirement #4.
Flow Control Systems (Part D-2)
As mention in part C-2, a flow control facility is not required for this TDA. Flow calculations
for each basin condition subject to the flow control analysis were analyzed at the 100-year
storm event. See Table 4.9 and 4.10 below and following page for basin areas and KCRTS
output.
TABLE 4.9 – Historic Site Conditions – Threshold Discharge Area #2.A – Target Surfaces
Sub-basin Total
sf (ac)
Impervious
sf (ac)
Till Grass
sf (ac)
Till Forest
sf (ac)
Threshold Discharge
Area #2.A - Onsite
409
(0.009) 0 0 409
(0.009)
Page 58 Boun Short Plat
TABLE 4.10 – Developed Site Conditions – Threshold Discharge Area #2.A – Target Surfaces
Sub-basin Total
sf (ac)
Impervious
sf (ac)
Till Grass
sf (ac)
Till Forest
sf (ac)
Threshold Discharge
Area #2.A - Onsite
409
(0.009)
297
(0.007)
112
(0.002) 0
Flow Frequency Analysis
Time Series File: hist.tsf
Project Location: Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.001 2 2/09/01 2:00 0.001 1 100.00 0.990
0.000 6 11/28/01 14:00 0.001 2 25.00 0.960
0.001 3 2/28/03 3:00 0.001 3 10.00 0.900
0.000 7 3/03/04 19:00 0.001 4 5.00 0.800
0.000 8 11/17/04 16:00 0.001 5 3.00 0.667
0.001 4 1/18/06 16:00 0.000 6 2.00 0.500
0.001 5 11/24/06 5:00 0.000 7 1.30 0.231
0.001 1 1/09/08 6:00 0.000 8 1.10 0.091
Computed Peaks 0.001 50.00 0.980
Flow Frequency Analysis
Time Series File: dev.tsf
Project Location: Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.002 5 2/09/01 2:00 0.004 1 100.00 0.990
0.002 7 1/05/02 16:00 0.003 2 25.00 0.960
0.002 3 12/08/02 18:00 0.002 3 10.00 0.900
0.002 8 8/26/04 2:00 0.002 4 5.00 0.800
0.002 6 10/28/04 16:00 0.002 5 3.00 0.667
0.002 4 1/18/06 16:00 0.002 6 2.00 0.500
0.003 2 10/26/06 0:00 0.002 7 1.30 0.231
0.004 1 1/09/08 6:00 0.002 8 1.10 0.091
Computed Peaks 0.003 50.00 0.980
The difference at the 100-year storm event frequency is 0.003 cfs (0.004-0.001) which is less
than the 0.1 cfs increase requirement. Therefore, a flow control facility is not required in
Threshold Discharge Area #2.
Page 59 Boun Short Plat
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Onsite
The conveyance system was designed per Section 3 and 4 of the Manual. Table 3.2 of the
Manual suggests that the Rational Method of analysis is required for undetained areas for
tributary areas less than 10 ac.
To analyze the proposed systems, the Rational Method was used based on:
QR = CIRA
King county I.D.F. Family (2009 Manual)
25 and 100-year 24-hour storm event flow
Runoff coefficients
Appropriate Manning’s number
The Rational Method was used per section 3.2.1. of the Manual. The runoff coefficients, ‘C’
values were taken from Table 3.2.1.A. A C value of 0.9 was used for the roofed surface and
a conservative time of concentration value of 6.3 minutes was used. This is a low travel time,
but will provide relatively higher flow rate.
Conveyance Pipes
The new stormwater conveyance system has been proposed to convey runoff in a way that
does not impact the drainage basin of the existing site.
A conveyance and backwater analysis for the proposed project have been calculated as shown
on the following page. Stormwater runoff will drain to catch basins and then flow through
varying diameter storm pipes. All new pipes are to be designed with sufficient capacity to
convey and contain at minimum the 25-year peak flow and not cause a flooding nuisance
during a 100-year storm event.
If for larger storms that may overtop the storm structures, all stormwater will be isolated on
site.
LOT 45,966 SFLOT 55,658 SFLOT 65,638 SFTRACT A7,253 SFLOT 76,453 SFLOT 25,751 SFLOT 15,098 SFLOT 35,893 SFSS~434436438438
438438434
SHEET OFJOB NUMBERNO. DESCRIPTION INIT. DATE
DRAWN BY:CHECKED BY: SCALE:
HORZ:VERT:
DATE:CIVIL & STRUCTURAL ENGINEERING | LAND SURVEYING | PLANNING
PROJECT MANAGEMENT | FEASIBILITY | PERMIT EXPEDITING
LAKEWOOD OFFICE7602 Bridgeport Way W #3D
Lakewood, WA 98499
phone: 253-301-4157
fax: 253-336-3950
ISSAQUAH OFFICE
455 Rainier Blvd NIssaquah, WA 98027phone: 425-392-8055fax: 425-392-0108
beylerconsulting.com
BEYLER
CONSULTING
Plan. Design. ManageEXHIBIT1CONVEYANCE MAP
BOUN SHORT PLAT
BASIN MAPS
CITY OF RENTON,WASHINGTON16-2061A PORTION OF SECTION 10, TOWNSHIP 23 NORTH, 5 WEST, W.M.DUVALL AVE NE
CHELAN AVE NE BOUN SHORT PLATCONVEYANCE MAPSCALE: 1" = 30'1530030NATURAL DISCHARGELOCATION #1(RELOCATED CATCHBASIN)NATURAL DISCHARGELOCATION #2.A(EXISTING SWALE)CB #6SUB-BASIN #6SUB BASIN AREA = 47,846 SFIMPERVIOUS AREA = 26,885 SFPERVIOUS AREA = 20,961 SFCB #4CB #5SUB-BASIN #5SUB-BASIN AREA = 2,899 SFIMPERVIOUS AREA = 1,289 SFPERVIOUS AREA = 1,610 SFCB #3CB #2CB #1CB #7CB #8OUTLET #1EX. CB #SUB-BASIN #8SUB-BASIN AREA = 3,917 SFIMPERVIOUS AREA = 2,927 SFPERVIOUS AREA = 990 SFSUB-BASIN #7SUB-BASIN AREA = 1,264 SFIMPERVIOUS AREA = 964 SFPERVIOUS AREA = 300 SFSUB-BASIN #2SUB-BASIN AREA = 2,529 SFIMPERVIOUS AREA = 1,598 SFPERVIOUS AREA = 931 SFSUB-BASIN #9SUB-BASIN AREA = 8,687 SFIMPERVIOUS AREA = 6,775 SFPERVIOUS AREA = 1,912 SFSUB-BASIN #11SUB-BASIN AREA = 1,005 SFIMPERVIOUS AREA = 838 SFPERVIOUS AREA = 167 SFCB #9CB #10CB #11LINK 1LINK 2LINK 3LINK 4LINK 5LINK 6LINK 7LINK 8LINK 9LINK 10LINK 11LINK 12
COMPOSITE A C*A Tc i25 I25 Q25 (basin)Q25 (accum.)DIA. MATERIAL SLOPE QFULL VFULL V25 RThetaDEPTHd/D
PIPE FROM TO (ac) C (ac) C C (ac) (Min.) cfs cfs in. n ft/ft cfs fps fps radians ft
LINK‐1 CB11 CB10 0.00 0.25 0.02 0.9 0.79 0.02 0.02 6.3 0.804 2.774 0.050 0.050 8 0.012 0.005 0.97 2.78 1.49 0.07 1.65 0.10667 0.16
LINK‐2 CB10 CB9 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.804 2.774 0.000 0.050 12 0.012 0.005 2.72 3.47 1.56 0.08 1.41 0.12 0.12
LINK‐3 CB9 OUTLET #2 0.04 0.25 0.16 0.9 0.76 0.20 0.15 6.3 0.804 2.774 0.419 0.469 12 0.012 0.006 2.90 3.70 2.76 0.16 2.23 0.28 0.28
LINK‐4 CB8 CB7 0.02 0.25 0.07 0.9 0.74 0.09 0.07 6.3 0.804 2.774 0.183 0.183 12 0.012 0.010 3.87 4.93 2.65 0.10 1.65 0.16 0.16
LINK‐5 CB7 CB2 0.01 0.25 0.02 0.9 0.75 0.03 0.02 6.3 0.804 2.774 0.060 0.243 12 0.012 0.010 3.87 4.93 2.85 0.11 1.75 0.18 0.18
LINK‐6 CB6 CB4 0.48 0.25 0.62 0.9 0.62 1.10 0.68 6.3 0.804 2.774 1.875 2.301 12 0.012 0.010 3.87 4.93 5.71 0.31 2.90 0.56 0.56
LINK‐7 CB5 CB4 0.04 0.25 0.03 0.9 0.54 0.07 0.04 6.3 0.804 2.774 0.099 0.099 12 0.012 0.027 6.33 8.06 3.63 0.08 1.41 0.12 0.12
LINK‐8 CB4 CB3 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.804 2.774 0.000 2.401 12 0.012 0.046 8.27 10.54 9.26 0.21 2.66 0.38 0.38
LINK‐9 CB3 Vault*0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.804 2.774 0.000 2.401 12 0.012 0.022 5.77 7.35 7.08 0.24 2.98 0.46 0.46
LINK‐10 Vault* CB2 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.804 2.774 0.000 2.401 12 0.012 0.011 4.01 5.10 5.92 0.31 2.90 0.56 0.56
LINK‐11 CB2 CB1 0.02 0.25 0.04 0.9 0.66 0.06 0.04 6.3 0.804 2.774 0.106 2.750 12 0.012 0.010 3.87 4.93 6.72 0.40 2.62 0.63 0.63
LINK‐12 CB 1 OUTLET #1 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.804 2.774 0.000 2.750 12 0.012 0.010 3.95 5.03 6.40 0.36 2.74 0.6 0.6
(1) (2) (3) (4) (5) (6) (7) (8)(9)(10) (11) (12)(13)(14)(15)(16)(17)(18)(19) (20)
Q Length Pipe Size n Value Outlet IE Inlet IE Barrel Area Vf Barrel Velocity Head TW Elev. Friction Loss Entr. HGL Elev. Entr. Head Loss Exit Head Loss Outlet Cont. Elev. Inlet Cont. Elev. Appr. Vel. Head Bend Head Loss Junction Head Loss HW Rim El Diff.
PIPE FROM TO (cfs) (ft) (in) (ft) (ft) (sqft) (fps) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
LINK‐12 OUTLET #1 CB1 2.75 25 12 0.012 428.52 428.78 0.79 3.50 0.190 429.62 0.08 429.70 0.10 0.190 429.98 429.88 ‐0.19 0.24 0.00 430.03 432.29 2.26
LINK‐11 CB1 CB2 2.75 8 12 0.012 428.78 428.86 0.79 3.50 0.190 430.03 0.02 430.05 0.10 0.190 430.34 429.96 ‐0.15 0.18 0.01 430.39 432.36 1.97
LINK‐10 CB2 Vault*2.40 41 12 0.012 428.86 429.30 0.79 3.06 0.145 430.03 0.12 430.15 0.07 0.145 430.37 430.35 0.00 0.00 0.00 430.37 433.38 3.01
LINK‐9 Vault* CB3 2.40 9 12 0.012 427.30 427.50 0.79 3.06 0.145 433.80 0.04 433.84 0.07 0.145 434.05 428.60 ‐0.15 0.18 0.00 434.09 437.19 3.10
LINK‐8 CB3 CB4 2.40 21 12 0.012 427.83 428.79 0.79 3.06 0.145 434.09 0.10 434.20 0.07 0.145 434.41 429.89 ‐0.13 0.17 0.01 434.45 436.84 2.39
LINK‐7 CB4 CB5 0.10 120 12 0.012 428.79 432.00 0.79 0.13 0.000 434.45 0.00 434.46 0.00 0.000 434.46 432.00 0.00 0.00 0.00 434.46 436.29 1.83
LINK‐6 CB4 CB6 2.30 64 12 0.012 428.79 429.43 0.79 2.93 0.133 434.46 0.17 434.63 0.07 0.133 434.83 430.33 0.00 0.00 0.00 434.83 436.48 1.65
LINK‐5 CB2 CB7 0.24 47 12 0.012 428.86 429.33 0.79 0.31 0.001 430.37 0.01 430.37 0.00 0.001 430.38 429.33 0.00 0.00 0.00 430.37 432.83 2.46
LINK‐4 CB7 CB8 0.18 39 12 0.012 429.33 429.72 0.79 0.23 0.001 430.37 0.00 430.38 0.00 0.001 430.38 429.72 0.00 0.00 0.00 430.38 432.93 2.55
LINK‐3 OUTLET #2 CB9 0.47 16 12 0.012 434.90 434.99 0.79 0.60 0.006 435.61 0.00 435.61 0.00 0.006 435.62 434.99 0.00 0.00 0.00 435.62 437.16 1.54
LINK‐2 CB9 CB10 0.05 190 12 0.012 434.99 435.93 0.79 0.06 0.000 435.62 0.00 435.62 0.00 0.000 435.62 435.93 0.00 0.00 0.00 435.93 438.38 2.45
LINK‐1 CB10 CB11 0.05 22 8 0.012 435.93 436.05 0.35 0.14 0.000 435.93 0.00 435.93 0.00 0.000 435.93 436.05 0.00 0.00 0.00 436.05 437.75 1.70
BOUN SHORT PLAT BACKWATER CALCULATION SHEET (25 YEAR)
LOCATION
*Vault TW Elevation = Top Detention = 433.80
BOUN SHORT PLAT CONVEYANCE SYSTEM ANALYSIS AND SIZING TABLE USING THE RATIONAL METHOD (25 YEAR)
LOCATION PERVIOUS IMPERVIOUS
*Vault Modelled as a flow through structure at full capacity
COMPOSITE A C*A Tc i100 I100 Q100 (basin)Q100 (accum.)DIA. MATERIAL SLOPE QFULL VFULL V100 RThetaDEPTHd/D
PIPE FROM TO (ac) C (ac) C C (ac) (Min.) cfs cfs in. n ft/ft cfs fps fps radians ft
LINK‐1 CB11 CB10 0.00 0.25 0.02 0.9 0.79 0.02 0.02 6.3 0.819 3.192 0.058 0.058 8 0.012 0.005 0.97 2.78 1.60 0.07 1.75 0.12 0.18
LINK‐2 CB10 CB9 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.819 3.192 0.000 0.058 12 0.012 0.005 2.72 3.47 1.39 0.06 1.29 0.1 0.1
LINK‐3 CB9 OUTLET #2 0.04 0.25 0.16 0.9 0.76 0.20 0.15 6.3 0.819 3.192 0.482 0.539 12 0.012 0.006 2.90 3.70 2.76 0.16 2.23 0.28 0.28
LINK‐4 CB8 CB7 0.02 0.25 0.07 0.9 0.74 0.09 0.07 6.3 0.819 3.192 0.211 0.211 12 0.012 0.010 3.87 4.93 2.44 0.09 1.53 0.14 0.14
LINK‐5 CB7 CB2 0.01 0.25 0.02 0.9 0.75 0.03 0.02 6.3 0.819 3.192 0.069 0.280 12 0.012 0.010 3.87 4.93 3.03 0.12 1.85 0.2 0.2
LINK‐6 CB6 CB4 0.48 0.25 0.62 0.9 0.62 1.10 0.68 6.3 0.819 3.192 2.157 2.648 12 0.012 0.010 3.87 4.93 6.28 0.36 2.74 0.6 0.6
LINK‐7 CB5 CB4 0.04 0.25 0.03 0.9 0.54 0.07 0.04 6.3 0.819 3.192 0.114 0.114 12 0.012 0.027 6.33 8.06 3.23 0.06 1.29 0.1 0.1
LINK‐8 CB4 CB3 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.819 3.192 0.000 2.763 12 0.012 0.046 8.27 10.54 9.50 0.21 2.74 0.4 0.4
LINK‐9 CB3 Vault*0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.819 3.192 0.000 2.763 12 0.012 0.022 5.77 7.35 7.28 0.25 3.10 0.49 0.49
LINK‐10 Vault* CB2 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.819 3.192 0.000 2.763 12 0.012 0.011 4.01 5.10 6.50 0.36 2.74 0.6 0.6
LINK‐11 CB2 CB1 0.02 0.25 0.04 0.9 0.66 0.06 0.04 6.3 0.819 3.192 0.122 3.165 12 0.012 0.010 3.87 4.93 7.71 0.49 2.36 0.69 0.69
LINK‐12 CB 1 OUTLET #1 0.00 0.25 0.00 0.9 0.00 0.00 0.00 6.3 0.819 3.192 0.000 3.165 12 0.012 0.010 3.95 5.03 7.69 0.47 2.41 0.68 0.68
(1) (2) (3) (4) (5) (6) (7) (8)(9)(10) (11) (12)(13)(14)(15)(16)(17)(18)(19) (20)
Q Length Pipe Size n Value Outlet IE Inlet IE Barrel Area Vf Barrel Velocity Head TW Elev. Friction Loss Entr. HGL Elev. Entr. Head Loss Exit Head Loss Outlet Cont. Elev. Inlet Cont. Elev. Appr. Vel. Head Bend Head Loss Junction Head Loss HW Rim El Diff.
PIPE FROM TO (cfs) (ft) (in) (ft) (ft) (sqft) (fps) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
LINK‐12 OUTLET #1 CB1 3.16 25 12 0.012 428.52 428.78 0.79 4.03 0.252 429.62 0.07 429.69 0.13 0.252 430.07 430.03 ‐0.25 0.32 0.00 430.14 432.29 2.15
LINK‐11 CB1 CB2 3.16 8 12 0.012 428.78 428.86 0.79 4.03 0.252 430.14 0.02 430.16 0.13 0.252 430.54 430.11 ‐0.19 0.24 0.01 430.60 432.36 1.76
LINK‐10 CB2 Vault*2.76 41 12 0.012 428.86 429.30 0.79 3.52 0.192 430.14 0.13 430.26 0.10 0.192 430.55 430.40 0.00 0.00 0.00 430.55 433.38 2.83
LINK‐9 Vault* CB3 2.76 9 12 0.012 427.30 427.50 0.79 3.52 0.192 433.80 0.05 433.85 0.10 0.192 434.13 428.60 ‐0.19 0.24 0.00 434.18 437.19 3.01
LINK‐8 CB3 CB4 2.76 21 12 0.012 427.83 428.79 0.79 3.52 0.192 434.18 0.13 434.32 0.10 0.192 434.60 429.89 ‐0.18 0.22 0.01 434.66 436.84 2.18
LINK‐7 CB4 CB5 0.11 120 12 0.012 428.79 432.00 0.79 0.15 0.000 434.66 0.01 434.66 0.00 0.000 434.66 432.00 0.00 0.00 0.00 434.66 436.29 1.63
LINK‐6 CB4 CB6 2.65 64 12 0.012 428.79 429.43 0.79 3.37 0.177 434.66 0.18 434.85 0.09 0.177 435.11 430.48 0.00 0.00 0.00 435.11 436.48 1.37
LINK‐5 CB2 CB7 0.28 47 12 0.012 428.86 429.33 0.79 0.36 0.002 430.55 0.01 430.56 0.00 0.002 430.56 429.33 0.00 0.00 0.00 430.56 432.83 2.27
LINK‐4 CB7 CB8 0.21 39 12 0.012 429.33 429.72 0.79 0.27 0.001 430.56 0.00 430.56 0.00 0.001 430.57 429.72 0.00 0.00 0.00 430.57 432.93 2.36
LINK‐3 OUTLET #2 CB9 0.54 16 12 0.012 434.90 434.99 0.79 0.69 0.007 435.61 0.01 435.62 0.00 0.007 435.63 434.99 0.00 0.00 0.00 435.63 437.16 1.53
LINK‐2 CB9 CB10 0.06 190 12 0.012 434.99 435.93 0.79 0.07 0.000 435.63 0.00 435.63 0.00 0.000 435.63 435.93 0.00 0.00 0.00 435.93 438.38 2.45
LINK‐1 CB10 CB11 0.06 22 8 0.012 435.93 436.05 0.35 0.17 0.000 435.93 0.00 435.93 0.00 0.000 435.93 436.05 0.00 0.00 0.00 436.05 437.75 1.70
BOUN SHORT PLAT BACKWATER CALCULATION SHEET (100 YEAR)
LOCATION
*Vault TW Elevation = Top Detention = 433.80
BOUN SHORT PLAT CONVEYANCE SYSTEM ANALYSIS AND SIZING TABLE USING THE RATIONAL METHOD (100 YEAR)
LOCATION PERVIOUS IMPERVIOUS
*Vault Modelled as a flow through structure at full capacity
Page 63 Boun Short Plat
VI. SPECIAL REPORTS AND STUDIES
Geotechnical Report
Geotechnical Report, Proposed Boon-Phany Short Plat
October 12, 2015; Prepared by PanGEO Incorporated
VII. OTHER PERMITS
Existing Permits:
There are currently no other permits that effect the drainage submittal or the Technical
Information Report.
Future Permits:
NPDES Permit
Building Permit for Each Lot
VIII. CSWPPP ANALYSIS AND DESIGN
Please refer to Appendix E for the prepared CSWPPP
IX. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
A completed Bond Quantities Worksheet can be found in Appendix D.
X. OPERATION AND MAINTENANCE MANUAL
A Maintenance and Operations Manual will be provided upon request/at a later date when
plans are closer to approval.
XI. APPENDICES
APPENDIX A – OFFSITE STUDY MAPS
3,983 332
COR Critical Areas Map - Regulated Slopes
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
None
8/29/2016
Legend
2260 113
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
226
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Slope City of Renton
>15% & <=25%
>25% & <=40% (Sensitive)
>40% & <=90% (Protected)
>90% (Protected)
Slope King County
>15% & <=25%
>25% & <=40%
>40% & <=90%
>90%
3,983 332
COR Critical Areas Map - Seismic
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
None
8/29/2016
Legend
2260 113
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
226
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Seismic Hazard Areas
3,983 332
COR Critical Areas Map - Wellhead Protection Areas
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
None
8/29/2016
Legend
2260 113
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
226
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Wellhead Protection Area Zones
Zone 1
Zone 1 Modified
Zone 2
3,983 332
COR Critical Areas Map - Wetland
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
None
8/29/2016
Legend
2260 113
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
226
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Wetlands
Date: 8/29/2016
±The information included on this map has been compiled by King County staff from a variety of sources and issubject to change without notice. King County makes no representations or warranties, express or implied,as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intendedfor use as a survey product. King County shall not be liable for any general, special, indirect, incidental, orconsequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuseof the information contained on this map. Any sale of this map or information on this map is prohibited except bywritten permission of King County.
Legend
Parcels
Erosion hazard(1990 SAO)
Seismic hazard(1990 SAO)
Landslide hazard(1990 SAO)
Coal mine hazard(1990 SAO)
class 1
class 2 perennial
class 2 salmonid
class 3
unclassified
Wetland (1990SAO)
Sensitive areanotice on title
Chinookdistribution
Wildlife network
severe
moderate
King County Critical Areas Map
Date: 8/29/2016
±The information included on this map has been compiled by King County staff from a variety of sources and issubject to change without notice. King County makes no representations or warranties, express or implied,as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intendedfor use as a survey product. King County shall not be liable for any general, special, indirect, incidental, orconsequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuseof the information contained on this map. Any sale of this map or information on this map is prohibited except bywritten permission of King County.
Legend
Parcels
Bonded
Commercial-MF
Commercial-SF
Construction
DOT
FMD
Regional
Residential
Drainagecomplaints
King County Drainage Complaints Map
APPENDIX B – DOWNSTREAM SYSTEM TABLE AND MAPS
1,991 166
Threshold Discharge Area #1 - Downstream Map
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
8/29/2016
Legend
1130 56
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
113
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Wetlands
Network Structures
Inlet
Manhole
Utility Vault
Unknown Structure
Control Structure
Pump Station
Discharge Point
Water Quality
Detention Facilities
Pond
Tank
Vault
Wetland
Pipe
Culvert
Open Drains
Virtual Drainline
Facility Outline
Private Network Structures
1,991 166
Threshold Discharge Area #1 - Downstream Map 2
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
8/29/2016
Legend
1130 56
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
113
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Wetlands
Network Structures
Inlet
Manhole
Utility Vault
Unknown Structure
Control Structure
Pump Station
Discharge Point
Water Quality
Detention Facilities
Pond
Tank
Vault
Wetland
Pipe
Culvert
Open Drains
Virtual Drainline
Facility Outline
Private Network Structures
OFF-SITEANALYSISDRAINAGE SYSTEMTABLESURFACEWATER DESIGNMANUAL,COREREQUIREMENT#2Basin:Subbasin Name: Subbasin Number:Symbol DrainageComponent Type, Name, and Size DrainageComponentDescriptionSlopeDistancefrom site dischargeExistingProblemsPotentialProblemsObservations of field inspector, resource reviewer, or resident see map Type: sheet flow, swale, stream, channel, pipe, pond; Size: diameter, surface area drainage basin, vegetation, cover, depth, type of sensitive area, volume %¼ ml = 1,320 ft. constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosion tributary area, likelihood of problem, overflow pathways, potential impacts
3,983 332
Threshold Discharge Area #2.A - Downstream Map 1
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
9/1/2016
Legend
2260 113
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
226
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Network Structures
Inlet
Manhole
Utility Vault
Unknown Structure
Control Structure
Pump Station
Discharge Point
Water Quality
Detention Facilities
Pond
Tank
Vault
Wetland
Pipe
Culvert
Open Drains
Facility Outline
Private Network Structures
Inlet
Manhole
3,983 332
Threshold Discharge Area #2.A - Downstream Map 2
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
9/1/2016
Legend
2260 113
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
226
WGS_1984_Web_Mercator_Auxiliary_Sphere
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Boundary
Other
City of Renton
Addresses
Parcels
Network Structures
Inlet
Manhole
Utility Vault
Unknown Structure
Control Structure
Pump Station
Discharge Point
Water Quality
Detention Facilities
Pond
Tank
Vault
Wetland
Pipe
Culvert
Open Drains
Facility Outline
Private Network Structures
Inlet
Manhole
OFF-SITEANALYSISDRAINAGE SYSTEMTABLESURFACEWATER DESIGNMANUAL,COREREQUIREMENT#2Basin:Subbasin Name: Subbasin Number:Symbol DrainageComponent Type, Name, and Size DrainageComponentDescriptionSlopeDistancefrom site dischargeExistingProblemsPotentialProblemsObservations of field inspector, resource reviewer, or resident see map Type: sheet flow, swale, stream, channel, pipe, pond; Size: diameter, surface area drainage basin, vegetation, cover, depth, type of sensitive area, volume %¼ ml = 1,320 ft. constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosion tributary area, likelihood of problem, overflow pathways, potential impacts
APPENDIX C – BOND QUANTITIES WORKSHEETS/COST DATA AND
INVENTORY
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200••Section I: Project Information•••Section II: Bond Quantities Worksheets•• Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))• Section II.b TRANSPORTATION (Street and Site Improvements)• Section II.c DRAINAGE (Drainage and Stormwater Facilities): • Section II.d WATER ‐ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON• Section II.e SANITARY SEWER ‐ ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON••••••Section III. Bond Worksheet• This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close‐out submittals to release the permit bond on a project. All unit prices include labor, equipment, materials, overhead and profit. Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right‐of‐Way (ROW), Future Public Improvements and Private Improvements.The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the project with the exception of the maintenance period reduction.Excel will auto‐calculate and auto‐populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need completing.Additional items not included in the lists can be added under the "write‐in" sections. Provide a complete description, cost estimate and unit of measure for each write‐in item. Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the form. Stormwater facilities (public and private) are required to be included in the bond amount.BOND QUANTITY WORKSHEET INSTRUCTIONSThis worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial submittal to project close‐out approval. Submit this workbook, in its entirety, as follows:The following forms are to be completed by the engineer/developer/applicant as applicable to the project: The Bond Worksheet form will auto‐calculate and auto‐populate from the information provided in Section I and Section II.This section includes all pertinent information for the projectSection II contains a separate spreadsheet TAB for each of the following specialties: (1) electronic copy and (2) hard copies of the entire workbook for civil construction permit submittal. Hard copies are to be included as part of the Technical Information Report (TIR).(1) electronic copy and (1) hard copy of the entire workbook for final close‐out submittal.This section must be completed in its entiretyInformation from this section auto‐populates to all other relevant areas of the workbookPage 1 of 14Ref 8‐H Bond Quantity WorksheetINSTRUCTIONSUnit Prices Updated: 03/2016Version: 06/2016Printed 11/21/2016
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200Date Prepared: Name:PE Registration No:Firm Name:Firm Address:Phone No.Email Address:Project Name: Project Owner:CED Plan # (LUA):Phone:CED Permit # (U):Address: Site Address:Street Intersection:Addt'l Project Owner:Parcel #(s):Phone:Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NOWater Service Provided by:If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: SITE IMPROVEMENT BOND QUANTITY WORKSHEETPROJECT INFORMATIONCITY OF RENTONCITY OF RENTON1 Select the current project status/phase from the following options: For Approval ‐ Preliminary Data Enclosed, pending approval from the City; For Construction ‐ Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout ‐ Final Costs and Quantities Enclosed for Project Close‐out SubmittalEngineer Stamp Required (all cost estimates must have original wet stamp and signature)Clearing and Grading Utility ProvidersN/AProject Location and Description Project Owner InformationBoun Short PlatBellevue, WA 98004102305‐9139Kent Khnor ‐ Warring Properties16‐000124, SHPL‐A 206‐715‐982611/21/2016Prepared by:FOR APPROVALProject Phase 1Brandon@BeylerConsulting.comBrandon Loucks50085Beyler Consulting LLC7602 Bridgeport Way W, STE D Lakewood, WA 98253‐301‐41571012 Duvall Avenue NE Renton, WA 98059845 106th Ave, Suite 200NE 10th Street & Duvall Ave NE########Abbreviated Legal Description:THE EAST HALF OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 10, TOWNSHIP 23 NORTH, RANGE 5 EAST, WILLAMETTE MERIDIAN, IN KING COUNTY, WASHINGTON;EXCEPT THE SOUTH 200 FEET; ANDPage 2 of 14Ref 8‐H Bond Quantity WorksheetSECTION I PROJECT INFORMATIONUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########UnitReference # Price Unit Quantity CostBackfill & compaction‐embankmentESC‐16.50$ CYCheck dams, 4" minus rockESC‐2SWDM 5.4.6.380.00$ EachCatch Basin ProtectionESC‐335.50$ Each 12426.00Crushed surfacing 1 1/4" minusESC‐4WSDOT 9‐03.9(3)95.00$ CYDitchingESC‐59.00$ CYExcavation‐bulkESC‐62.00$ CY 15483,096.00Fence, siltESC‐7SWDM 5.4.3.11.50$ LF 480720.00Fence, Temporary (NGPE)ESC‐81.50$ LFGeotextile FabricESC‐92.50$ SYHay Bale Silt TrapESC‐100.50$ EachHydroseedingESC‐11SWDM 5.4.2.40.80$ SYInterceptor Swale / DikeESC‐121.00$ LFJute MeshESC‐13SWDM 5.4.2.23.50$ SYLevel SpreaderESC‐141.75$ LFMulch, by hand, straw, 3" deepESC‐15SWDM 5.4.2.12.50$ SYMulch, by machine, straw, 2" deepESC‐16SWDM 5.4.2.12.00$ SYPiping, temporary, CPP, 6"ESC‐1712.00$ LFPiping, temporary, CPP, 8"ESC‐1814.00$ LFPiping, temporary, CPP, 12"ESC‐1918.00$ LFPlastic covering, 6mm thick, sandbaggedESC‐20SWDM 5.4.2.34.00$ SYRip Rap, machine placed; slopesESC‐21WSDOT 9‐13.1(2)45.00$ CY 4180.00Rock Construction Entrance, 50'x15'x1'ESC‐22SWDM 5.4.4.11,800.00$ EachRock Construction Entrance, 100'x15'x1'ESC‐23SWDM 5.4.4.13,200.00$ Each 13,200.00Sediment pond riser assemblyESC‐24SWDM 5.4.5.22,200.00$ EachSediment trap, 5' high berm ESC‐25SWDM 5.4.5.119.00$ LF 24456.00Sed. trap, 5' high, riprapped spillway berm section ESC‐26SWDM 5.4.5.170.00$ LF 302,100.00Seeding, by handESC‐27SWDM 5.4.2.41.00$ SYSodding, 1" deep, level groundESC‐28SWDM 5.4.2.58.00$ SYSodding, 1" deep, sloped groundESC‐29SWDM 5.4.2.510.00$ SYTESC SupervisorESC‐30110.00$ HR 4440.00Water truck, dust controlESC‐31SWDM 5.4.7140.00$ HRUnitReference # Price Unit Quantity CostEROSION/SEDIMENT SUBTOTAL: 10,618.00SALES TAX @ 9.5% 1,008.71EROSION/SEDIMENT TOTAL: 11,626.71(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)WRITE‐IN‐ITEMS Page 3 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostGENERAL ITEMS Backfill & Compaction‐ embankment GI‐1 6.00$ CYBackfill & Compaction‐ trench GI‐2 9.00$ CY 2502,250.003002,700.00Clear/Remove Brush, by hand (SY) GI‐3 1.00$ SYBollards ‐ fixed GI‐4 240.74$ EachBollards ‐ removable GI‐5 452.34$ EachClearing/Grubbing/Tree Removal GI‐6 10,000.00$ Acre 0.232,300.001.111,000.00Excavation ‐ bulk GI‐7 2.00$ CYExcavation ‐ Trench GI‐8 5.00$ CY 2501,250.003001,500.00Fencing, cedar, 6' high GI‐9 20.00$ LFFencing, chain link, 4' GI‐10 38.31$ LFFencing, chain link, vinyl coated, 6' high GI‐11 20.00$ LFFencing, chain link, gate, vinyl coated, 20' GI‐12 1,400.00$ EachFill & compact ‐ common barrow GI‐13 25.00$ CYFill & compact ‐ gravel base GI‐14 27.00$ CYFill & compact ‐ screened topsoil GI‐15 39.00$ CYGabion, 12" deep, stone filled mesh GI‐16 65.00$ SYGabion, 18" deep, stone filled mesh GI‐17 90.00$ SYGabion, 36" deep, stone filled mesh GI‐18 150.00$ SYGrading, fine, by hand GI‐19 2.50$ SYGrading, fine, with grader GI‐20 2.00$ SY 641012,820.00Monuments, 3' Long GI‐21 250.00$ EachSensitive Areas Sign GI‐22 7.00$ EachSodding, 1" deep, sloped ground GI‐23 8.00$ SYSurveying, line & grade GI‐24 850.00$ Day 21,700.0054,250.0032,550.00Surveying, lot location/lines GI‐25 1,800.00$ Acre 11,800.00Topsoil Type A (imported) GI‐26 28.50$ CYTraffic control crew ( 2 flaggers ) GI‐27 120.00$ HRTrail, 4" chipped wood GI‐28 8.00$ SYTrail, 4" crushed cinder GI‐29 9.00$ SYTrail, 4" top course GI‐30 12.00$ SYConduit, 2" GI‐31 5.00$ LF 5002,500.00Wall, retaining, concrete GI‐32 55.00$ SFWall, rockery GI‐33 15.00$ SF 1752,625.00SUBTOTAL THIS PAGE:7,700.00 10,750.00 30,795.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)Page 4 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000sy RI‐1 30.00$ SYAC Grinding, 4' wide machine 1000‐2000sy RI‐2 16.00$ SYAC Grinding, 4' wide machine > 2000sy RI‐3 10.00$ SYAC Removal/Disposal RI‐4 35.00$ SY 29510,325.00Barricade, Type III ( Permanent ) RI‐5 56.00$ LF 16896.00Guard Rail RI‐6 30.00$ LFCurb & Gutter, rolled RI‐7 17.00$ LFCurb & Gutter, vertical RI‐8 12.50$ LF 190023,750.00Curb and Gutter, demolition and disposal RI‐9 18.00$ LF 50900.00Curb, extruded asphalt RI‐10 5.50$ LFCurb, extruded concrete RI‐11 7.00$ LFSawcut, asphalt, 3" depth RI‐12 1.85$ LF 8321,539.20Sawcut, concrete, per 1" depth RI‐13 3.00$ LFSealant, asphalt RI‐14 2.00$ LF 8321,664.00Shoulder, gravel, 4" thick RI‐15 15.00$ SYSidewalk, 4" thick RI‐16 38.00$ SY 30011,400.00Sidewalk, 4" thick, demolition and disposal RI‐17 32.00$ SYSidewalk, 5" thick RI‐18 41.00$ SYSidewalk, 5" thick, demolition and disposal RI‐19 40.00$ SYSign, Handicap RI‐20 85.00$ EachStriping, per stall RI‐21 7.00$ EachStriping, thermoplastic, ( for crosswalk ) RI‐22 3.00$ SFStriping, 4" reflectorized line RI‐23 0.50$ LF 610305.00Additional 2.5" Crushed Surfacing RI‐24 3.60$ SY 50180.00HMA 1/2" Overlay 1.5" RI‐25 14.00$ SYHMA 1/2" Overlay 2" RI‐26 18.00$ SYHMA Road, 2", 4" rock, First 2500 SY RI‐27 28.00$ SYHMA Road, 2", 4" rock, Qty. over 2500SY RI‐28 21.00$ SYHMA Road, 4", 6" rock, First 2500 SY RI‐29 45.00$ SY 27012,150.0065029,250.00HMA Road, 4", 6" rock, Qty. over 2500 SY RI‐30 37.00$ SYHMA Road, 4", 4.5" ATB RI‐31 38.00$ SYGravel Road, 4" rock, First 2500 SY RI‐32 15.00$ SYGravel Road, 4" rock, Qty. over 2500 SY RI‐33 10.00$ SYThickened Edge RI‐34 8.60$ LF 1301,118.00SUBTOTAL THIS PAGE:62,033.20 31,264.00 180.00(B)(C)(D)(E)Page 5 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)PARKING LOT SURFACING No.2" AC, 2" top course rock & 4" borrow PL‐1 21.00$ SY2" AC, 1.5" top course & 2.5" base course PL‐2 28.00$ SY4" select borrow PL‐3 5.00$ SY1.5" top course rock & 2.5" base course PL‐4 14.00$ SYSUBTOTAL PARKING LOT SURFACING:(B)(C)(D)(E)LANDSCAPING & VEGETATION No.Street Trees LA‐1 225.00$ Each 122,700.00173,825.00Median Landscaping LA‐2 35.00$ Each 632,205.00Right‐of‐Way Landscaping LA‐3Wetland Landscaping LA‐4SUBTOTAL LANDSCAPING & VEGETATION:2,700.00 6,030.00(B)(C)(D)(E)TRAFFIC & LIGHTING No.Signs TR‐1Street Light System ( # of Poles) TR‐2 2,000.00$ Each 36,000.00Traffic Signal TR‐3Traffic Signal Modification TR‐4SUBTOTAL TRAFFIC & LIGHTING:6,000.00(B)(C)(D)(E)WRITE‐IN‐ITEMSSUBTOTAL WRITE‐IN ITEMS:STREET AND SITE IMPROVEMENTS SUBTOTAL: 78,433.20 42,014.00 37,005.00SALES TAX @ 9.5% 7,451.15 3,991.33 3,515.48STREET AND SITE IMPROVEMENTS TOTAL: 85,884.35 46,005.33 40,520.48(B)(C)(D)(E)Page 6 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D‐1 26.00$ SY 481,248.00* (CBs include frame and lid)Beehive D‐2 90.00$ EachThrough‐curb Inlet Framework D‐3 400.00$ EachCB Type I D‐4 1,500.00$ Each 710,500.0011,500.00CB Type IL D‐5 1,750.00$ EachCB Type II, 48" diameter D‐6 2,300.00$ Each 12,300.0024,600.0012,300.00 for additional depth over 4' D‐7 480.00$ FT 157,200.00125,760.0083,840.00CB Type II, 54" diameter D‐8 2,500.00$ Each for additional depth over 4' D‐9 495.00$ FTCB Type II, 60" diameter D‐10 2,800.00$ Each 12,800.00 for additional depth over 4' D‐11 600.00$ FT 21,200.00CB Type II, 72" diameter D‐12 6,000.00$ Each for additional depth over 4' D‐13 850.00$ FTCB Type II, 96" diameter D‐14 14,000.00$ Each for additional depth over 4' D‐15 925.00$ FTTrash Rack, 12" D‐16 350.00$ Each 1350.00Trash Rack, 15" D‐17 410.00$ EachTrash Rack, 18" D‐18 480.00$ EachTrash Rack, 21" D‐19 550.00$ EachCleanout, PVC, 4" D‐20 150.00$ EachCleanout, PVC, 6" D‐21 170.00$ Each 71,190.00Cleanout, PVC, 8" D‐22 200.00$ EachCulvert, PVC, 4" (Not allowed in ROW)D‐23 10.00$ LFCulvert, PVC, 6" (Not allowed in ROW)D‐24 13.00$ LFCulvert, PVC, 8" (Not allowed in ROW)D‐25 15.00$ LFCulvert, PVC, 12" (Not allowed in ROW)D‐26 23.00$ LFCulvert, PVC, 15" (Not allowed in ROW)D‐27 35.00$ LFCulvert, PVC, 18" (Not allowed in ROW)D‐28 41.00$ LFCulvert, PVC, 24" (Not allowed in ROW)D‐29 56.00$ LFCulvert, PVC, 30" (Not allowed in ROW)D‐30 78.00$ LFCulvert, PVC, 36" (Not allowed in ROW)D‐31 130.00$ LFCulvert, CMP, 8" D‐32 19.00$ LFCulvert, CMP, 12" D‐33 29.00$ LFSUBTOTAL THIS PAGE:24,350.00 13,050.00 7,388.00(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)Page 7 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)DRAINAGE (Continued)Culvert, CMP, 15" D‐34 35.00$ LFCulvert, CMP, 18" D‐35 41.00$ LFCulvert, CMP, 24" D‐36 56.00$ LFCulvert, CMP, 30" D‐37 78.00$ LFCulvert, CMP, 36" D‐38 130.00$ LFCulvert, CMP, 48" D‐39 190.00$ LFCulvert, CMP, 60" D‐40 270.00$ LFCulvert, CMP, 72" D‐41 350.00$ LFCulvert, Concrete, 8" D‐42 42.00$ LFCulvert, Concrete, 12" D‐43 48.00$ LFCulvert, Concrete, 15" D‐44 78.00$ LFCulvert, Concrete, 18" D‐45 48.00$ LFCulvert, Concrete, 24" D‐46 78.00$ LFCulvert, Concrete, 30" D‐47 125.00$ LFCulvert, Concrete, 36" D‐48 150.00$ LFCulvert, Concrete, 42" D‐49 175.00$ LFCulvert, Concrete, 48" D‐50 205.00$ LFCulvert, CPE, 6" (Not allowed in ROW)D‐51 14.00$ LFCulvert, CPE, 8" (Not allowed in ROW)D‐52 16.00$ LFCulvert, CPE, 12" (Not allowed in ROW)D‐53 24.00$ LFCulvert, CPE, 15" (Not allowed in ROW)D‐54 35.00$ LFCulvert, CPE, 18" (Not allowed in ROW)D‐55 41.00$ LFCulvert, CPE, 24" (Not allowed in ROW)D‐56 56.00$ LFCulvert, CPE, 30" (Not allowed in ROW)D‐57 78.00$ LFCulvert, CPE, 36" (Not allowed in ROW)D‐58 130.00$ LFCulvert, LCPE, 6" D‐59 60.00$ LFCulvert, LCPE, 8" D‐60 72.00$ LFCulvert, LCPE, 12" D‐61 84.00$ LFCulvert, LCPE, 15" D‐62 96.00$ LFCulvert, LCPE, 18" D‐63 108.00$ LFCulvert, LCPE, 24" D‐64 120.00$ LFCulvert, LCPE, 30" D‐65 132.00$ LFCulvert, LCPE, 36" D‐66 144.00$ LFCulvert, LCPE, 48" D‐67 156.00$ LFCulvert, LCPE, 54" D‐68 168.00$ LFSUBTOTAL THIS PAGE:(B) (C) (D) (E)Page 8 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)DRAINAGE (Continued)Culvert, LCPE, 60" D‐69 180.00$ LFCulvert, LCPE, 72" D‐70 192.00$ LFCulvert, HDPE, 6" D‐71 42.00$ LFCulvert, HDPE, 8" D‐72 42.00$ LFCulvert, HDPE, 12" D‐73 74.00$ LFCulvert, HDPE, 15" D‐74 106.00$ LFCulvert, HDPE, 18" D‐75 138.00$ LFCulvert, HDPE, 24" D‐76 221.00$ LFCulvert, HDPE, 30" D‐77 276.00$ LFCulvert, HDPE, 36" D‐78 331.00$ LFCulvert, HDPE, 48" D‐79 386.00$ LFCulvert, HDPE, 54" D‐80 441.00$ LFCulvert, HDPE, 60" D‐81 496.00$ LFCulvert, HDPE, 72" D‐82 551.00$ LFPipe, Polypropylene, 6" D‐83 84.00$ LFPipe, Polypropylene, 8" D‐84 89.00$ LFPipe, Polypropylene, 12" D‐85 95.00$ LFPipe, Polypropylene, 15" D‐86 100.00$ LFPipe, Polypropylene, 18" D‐87 106.00$ LFPipe, Polypropylene, 24" D‐88 111.00$ LFPipe, Polypropylene, 30" D‐89 119.00$ LFPipe, Polypropylene, 36" D‐90 154.00$ LFPipe, Polypropylene, 48" D‐91 226.00$ LFPipe, Polypropylene, 54" D‐92 332.00$ LFPipe, Polypropylene, 60" D‐93 439.00$ LFPipe, Polypropylene, 72" D‐94 545.00$ LFCulvert, DI, 6" D‐95 61.00$ LFCulvert, DI, 8" D‐96 84.00$ LFCulvert, DI, 12" D‐97 106.00$ LFCulvert, DI, 15" D‐98 129.00$ LFCulvert, DI, 18" D‐99 152.00$ LFCulvert, DI, 24" D‐100 175.00$ LFCulvert, DI, 30" D‐101 198.00$ LFCulvert, DI, 36" D‐102 220.00$ LFCulvert, DI, 48" D‐103 243.00$ LFCulvert, DI, 54" D‐104 266.00$ LFCulvert, DI, 60" D‐105 289.00$ LFCulvert, DI, 72" D‐106 311.00$ LFSUBTOTAL THIS PAGE:(B) (C) (D) (E)Page 9 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)Specialty Drainage ItemsDitching SD‐1 9.50$ CYFlow Dispersal Trench (1,436 base+) SD‐3 28.00$ LF French Drain (3' depth) SD‐4 26.00$ LFGeotextile, laid in trench, polypropylene SD‐5 3.00$ SYMid‐tank Access Riser, 48" dia, 6' deep SD‐6 2,000.00$ EachPond Overflow Spillway SD‐7 16.00$ SYRestrictor/Oil Separator, 12" SD‐8 1,150.00$ EachRestrictor/Oil Separator, 15" SD‐9 1,350.00$ EachRestrictor/Oil Separator, 18" SD‐10 1,700.00$ EachRiprap, placed SD‐11 42.00$ CY 8336.00Tank End Reducer (36" diameter) SD‐12 1,200.00$ EachInfiltration pond testing SD‐13 125.00$ HRPermeable Pavement SD‐14Permeable Concrete Sidewalk SD‐15Culvert, Box __ ft x __ ft SD‐16SUBTOTAL SPECIALTY DRAINAGE ITEMS:336.00(B) (C) (D) (E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention Pond SF‐1 Each Detention Tank SF‐2 Each Detention Vault SF‐3 65,000.00$ Each 165,000.00Infiltration Pond SF‐4 Each Infiltration Tank SF‐5 Each Infiltration Vault SF‐6 Each Infiltration Trenches SF‐7 Each Basic Biofiltration Swale SF‐8 Each Wet Biofiltration Swale SF‐9 Each Wetpond SF‐10 Each Wetvault SF‐11 37,000.00$ Each 137,000.00Sand Filter SF‐12 Each Sand Filter Vault SF‐13 Each Linear Sand Filter SF‐14 Each StormFilter SF‐15 Each Rain Garden SF‐16 Each SUBTOTAL STORMWATER FACILITIES:102,000.00(B) (C) (D) (E)Page 10 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)WRITE‐IN‐ITEMSWI‐1WI‐2WI‐3WI‐4WI‐5WI‐6WI‐7WI‐8WI‐9WI‐10WI‐11WI‐12WI‐13WI‐14WI‐15SUBTOTAL WRITE‐IN ITEMS:DRAINAGE AND STORMWATER FACILITIES SUBTOTAL: 24,686.00 13,050.00 109,388.00SALES TAX @ 9.5% 2,345.17 1,239.75 10,391.86DRAINAGE AND STORMWATER FACILITIES TOTAL: 27,031.17 14,289.75 119,779.86(B) (C) (D) (E)Page 11 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostConnection to Existing Watermain W‐1 2,000.00$ Each 24,000.00Ductile Iron Watermain, CL 52, 4 Inch Diameter W‐2 50.00$ LFDuctile Iron Watermain, CL 52, 6 Inch Diameter W‐3 56.00$ LF 15840.00Ductile Iron Watermain, CL 52, 8 Inch Diameter W‐4 60.00$ LF 38523,100.00Ductile Iron Watermain, CL 52, 10 Inch Diameter W‐5 70.00$ LFDuctile Iron Watermain, CL 52, 12 Inch Diameter W‐6 80.00$ LFGate Valve, 4 inch Diameter W‐7 500.00$ EachGate Valve, 6 inch Diameter W‐8 700.00$ Each 1700.00Gate Valve, 8 Inch Diameter W‐9 800.00$ Each 43,200.00Gate Valve, 10 Inch Diameter W‐10 1,000.00$ EachGate Valve, 12 Inch Diameter W‐11 1,200.00$ EachFire Hydrant Assembly W‐12 4,000.00$ Each 14,000.00Permanent Blow‐Off Assembly W‐13 1,800.00$ Each 11,800.00Air‐Vac Assembly, 2‐Inch Diameter W‐14 2,000.00$ EachAir‐Vac Assembly, 1‐Inch Diameter W‐15 1,500.00$ EachCompound Meter Assembly 3‐inch Diameter W‐16 8,000.00$ EachCompound Meter Assembly 4‐inch Diameter W‐17 9,000.00$ EachCompound Meter Assembly 6‐inch Diameter W‐18 10,000.00$ EachPressure Reducing Valve Station 8‐inch to 10‐inch W‐19 20,000.00$ EachWATER SUBTOTAL:4,000.00 33,640.00SALES TAX @ 9.5% 380.00 3,195.80WATER TOTAL: 4,380.00 36,835.80(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B) (C)Page 12 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostClean Outs SS‐1 1,000.00$ Each 77,000.00Grease Interceptor, 500 gallon SS‐2 8,000.00$ EachGrease Interceptor, 1000 gallon SS‐3 10,000.00$ EachGrease Interceptor, 1500 gallon SS‐4 15,000.00$ EachSide Sewer Pipe, PVC. 4 Inch Diameter SS‐5 80.00$ LFSide Sewer Pipe, PVC. 6 Inch Diameter SS‐6 95.00$ LF 15014,250.00Sewer Pipe, PVC, 8 inch Diameter SS‐7 105.00$ LF 20321,315.00Sewer Pipe, PVC, 12 Inch Diameter SS‐8 120.00$ LFSewer Pipe, DI, 8 inch Diameter SS‐9 115.00$ LFSewer Pipe, DI, 12 Inch Diameter SS‐10 130.00$ LFManhole, 48 Inch Diameter SS‐11 6,000.00$ Each 212,000.00Manhole, 54 Inch Diameter SS‐13 6,500.00$ EachManhole, 60 Inch Diameter SS‐15 7,500.00$ EachManhole, 72 Inch Diameter SS‐17 8,500.00$ EachManhole, 96 Inch Diameter SS‐19 14,000.00$ EachPipe, C‐900, 12 Inch Diameter SS‐21 180.00$ LFOutside Drop SS‐24 1,500.00$ LSInside Drop SS‐25 1,000.00$ LSSewer Pipe, PVC, ____ Inch Diameter SS‐26Lift Station (Entire System) SS‐27 LSSANITARY SEWER SUBTOTAL:54,565.00SALES TAX @ 9.5% 5,183.68SANITARY SEWER TOTAL: 59,748.68(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B) (C)Page 13 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a) (a)11,626.71$ Existing Right‐of‐Way Improvements Subtotal (b) (b)90,264.35$ Future Public Improvements Subtotal (c) (c)142,589.81$ Stormwater & Drainage Facilities Subtotal (d) (d)161,100.78$ Bond Reduction (Quantity Remaining)2(e) (e)‐$ Site RestorationCivil Construction PermitMaintenance Bond78,790.99$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only ‐ May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. T(P +R ‐ S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)253‐301‐4157Brandon@BeylerConsulting.comBoun Short Plat16‐000124, SHPL‐A1012 Duvall Avenue NE Renton, WA 98059102305‐9139FOR APPROVAL########7602 Bridgeport Way W, STE D Lakewood, WA 98335608,372.47$ P (a) x 150%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS11/21/2016Brandon Loucks50085Beyler Consulting LLCR((b)+(c)+(d)) x 150%EST1((b) + (c) + (d)) x 20%‐$ MAINTENANCE BOND */**(after final acceptance of construction)11,626.71$ 90,264.35$ 590,932.41$ 17,440.07$ ‐$ 142,589.81$ 161,100.78$ S(e) x 150%Page 14 of 14Ref 8‐H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 11/21/2016
APPENDIX D – DRAFT BMP COVENANT
APPENDIX E – CSWPPP REPORT
BOUN SHORT PLAT
SITE ADDRESS: 1012 DUVALL AVE NE RENTON, WA 98059
SECTION 32, TOWNSHIP 24 N., RANGE 05 E., W.M.
Construction Stormwater
Pollution Prevention Plan
Prepared for: Warring Properties
Contact: Kent Khnor
845 106th Ave, Suite 200
Federal Way, WA 98003
Date Prepared:
October 5, 2016
Prepared by: Drew Young, EIT
Reviewed by: Brandon M. Loucks, P.E.
Beyler Consulting
7602 Bridgeport Way W #3D
Lakewood, WA 98499
253.301.4157
Project Number: 16-206
Project Name: Boun Short Plat RPT-CSWPPP-Boun Short Plat 2016.10.05
Page 2 of 10
TABLE OF CONTENTS
I. Construction Pollution Prevention Plan .................................... 3
Section 1 – Project Overview ........................................................ 3
Section 3 – Existing Site Conditions ............................................... 4
Section 4 – Adjacent Areas ........................................................... 4
Section 5 – Critical Areas ............................................................. 4
Section 6 – Soils ......................................................................... 4
Section 7 – Potential Erosion Problems ........................................... 4
Section 8 – Construction Stormwater Pollution Prevention Elements ... 5
Section 9 – Construction Phasing .................................................. 9
Section 10 – Construction Schedule ............................................... 9
Section 11 – Financial/Ownership Responsibilities .......................... 10
Section 12 – Engineering Calculations .......................................... 10
Section 13 – Conclusion ............................................................. 10
**EROSION CONTROL RESPONSIBILITY**
The Construction Stormwater Polllution Prevention Plan should be kept onsite with a copy of
the plans at all time. The objective is to control erosion and prevent sediment and other
pollutants from leaving the site during the construction of the project.
The owner or assigned contractor shall be responsible for maintaining erosion control Best
Management Practices during construction. All BMPs shall be inspected, maintained, and
repaired as needed to assure continued performance of their intended function. The owner
or contractor shall identify a Certified Erosion and Sediment Control Lead. This person shall
be on-site or on-call at all times. The Erosion Control Lead information shall be inserted into
this report.
The CSWPP shall be modified, if during inspection or investigations conducted by the
owner/operator, or the applicable local or state regulatory authority, it is determined that
the CSWPPP is ineffective in elimination or significantly minimizing pollutants in stormwater
discharges from the site. The CSWPPP shall be modified as necessary to include additional
or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be
completed within seven (7) calendar days following the inspection.
Construction site operators are required to be covered by a Construction Stormwater
General Permit through the Department of Ecology if they are engaged in clearing, grading,
and excavating activities that disturb one or more acres and discharge stormwater to
surface waters of the state. Smaller sites may also require coverage if they are part of a
larger common plan of development that will ultimately disturb one acre or more.
Page 3 of 10
I. Construction Pollution Prevention Plan
Section 1 – Project Overview
The proponent of the Boun Short Plat proposes to subdivide an undeveloped parcel, with the
exception of an abandoned shed building that is to be removed as part of this project,
located in Renton, King County Washington. The King County parcel number for the
property is 102305-9139. The project parcel is approximately 57,677 sf, 1.32 acres in size.
The parcel is zoned Residential 8 (R-8) according to the City of Renton Zoning Map effective
as of July 1, 2015. The allowed density range in the R-8 zone is a minimum of 4.0 dwelling
units per net acre (DUA) to a maximum of 8.0 DUA. The Boun Short Plat proposes to
subdivide the current parcel into 7 single-family lots equating to a proposed density of 6.80
DUA. The proposed lots range in size from the smallest being 5,098 sf in size and the
largest being 6,453 sf in size. A single stormwater tract will be created with this subdivision
for the purpose of stormwater treatment and mitigation for the development. The remaining
area will be dedicated to the City of Renton for public right-of-way use.
The property is adjacent to Duvall Ave NE to the east, single family parcels to the south and
north, and Chelan Ave NE to the west. The proposed project is keeping consistent with
neighboring land use characteristics.
The site will be accessed through two separate access points. The first access will be an
extension of Chelan Place NE, an existing 20’ alleyway, from the south boundary to the
north boundary of the project parcel. This access way will be developed into a 16’ paved
alley within a 20’ wide right-of-way dedication which meets the current City of Renton street
standards. An additional access point to Chelan Ave NE will be provided in the east to west
direction through a 16’ paved alley within a 20’ public access and utilities easement.
Half street frontage improvements will be included along the west and east boundary of the
project site. The west half of Duvall Avenue NE will be improved to current City of Renton
Standards for principle arterials by providing two 11-foot travel lanes, a 5-foot bike lane,
vertical curb and gutter, an 8-foot wide planter strip, an 8-foot wide sidewalk and a 2-foot
maintenance area behind the sidewalk. This will require a 3.5-foot right-of-way dedication
along the east boundary line of the project parcel. Chelan Avenue NE will be improved to
two separate variations of the current City of Renton Standards for Residential Access
Streets. Starting from the south boundary of the project site, the east half of Chelan Avenue
NE will be improved to provide a 12-foot travel lane, vertical curb and gutter, an 8-foot wide
planter strip, and a 5-foot wide sidewalk for approximately 120 feet. At this point, the
Residential Access Street will transition into a Limited Residential Access Street which
consists of a 20-foot paved roadway, vertical curb and gutter, an 8-foot wide planter strip,
and a 5-foot sidewalk. This road section will be constructed north until it reaches the north
boundary line of the project. To incorporate these improvements, an 18’ right of way
dedication will be necessary along a portion of the northwest boundary of the project parcel.
An 18’ wide section of right-of-way north of the project site will not be improved as part of
this project. As a condition of preliminary plat approval (LUA16-00124), a road standards
modification will be submitted concurrently with the Utility Construction Permit to allow for
the 18’ wide section of right-of-way to remain undeveloped.
This project is subject to the 2009 King County Surface Water Design Manual (King Manual)
and the City of Renton amendments to the Manual (Renton Manual). Per Figure 1.1.2.A of
the Renton Manual, the Boun Short Plat project is subject to a full drainage review meeting
core requirements #1 through #8 and special requirements #1 through #6.
Page 4 of 10
It has been determined that the site consists of two separate threshold discharges areas.
Threshold discharge area #1 consists of a majority of the project site area that naturally
discharges stormwater to the southwest corner of the project site. Threshold discharge area
#2 consists of a small portion of land along the east boundary which naturally discharges
stormwater east to an existing swale with Duvall Ave NE and the 18’ wide panhandle section
of land located north of the project site that naturally discharges stormwater to the
northwest. A drainage adjustment, per Section 1.4 of the Renton Manual, is proposed to
combine a small portion of threshold discharge area #2 with threshold discharge area #1.
See section III and IV of this report for further details.
Section 2 – Erosion Control Specialist
It will be responsibility of the owner and/or the contractor to regularly inspect and maintain
the proposed erosion control BMPs, and will take additional measures, as necessary, to
respond to changing site conditions. Should it become necessary, the engineer will be made
available in providing recommendations for additional erosion control measures to the site.
Section 3 – Existing Site Conditions
Currently, the parcel is undeveloped with the exception of an abandoned shed building that
is to be removed as part of this project. The project is composed of two (2) threshold
discharge areas. The site has a localized high point near the south central portion of the
property. Water sheet flows southwest and northeast from this high point with an overall
vertical relieve of 5 feet.
Several existing utility service connections (sewer, storm, water, power, cable, etc.) are
located within the existing right of way boundary of Chelan Ave NE and Duvall Ave NE. There
are no known vegetative buffers, floodplains, wetlands, geologic hazard areas, streams,
creeks, ponds, ravines, or well protection areas present within or near the project area.
Section 4 – Adjacent Areas
The property is adjacent to Duvall Ave NE to the east, single family parcels to the south and
north, and Chelan Ave NE to the west. The proposed project is keeping consistent with
neighboring land use characteristics.
Section 5 – Critical Areas
King County GIS mapping and City of Renton GIS mapping were utilized to determine critical
areas that may be located on or near the project site. There are no known vegetative buffers,
floodplains, wetlands, geologic hazard areas, streams, creeks, ponds, ravines, or well
protection areas present within or near the project area.
Section 6 – Soils
The Soil Conservation Service Soil Survey shows that the project area soils are comprised of
Alderwood Gravelly Sandy Loam (Map Unit Symbol: AgC). Alderwood Gravelly Sandy Loam
soils are generally derived from glacial drift and/or glacial outwash over dense glaciomarine
deposits and are moderately well drained that range in slope from 8 to 15 percent.
Page 5 of 10
Section 7 – Potential Erosion Problems
Due to the existing stabilized ground cover and the site consisting of slopes between 0 to 5
percent, it is anticipated the site will be adequately protected from potential erosion
problems. Care shall be given to stockpiled materials during construction to minimize the
potential for erosion. Catch basins shall be fitted with inlet silt protections, both on-site and
off-site, to protect the existing stormwater management systems. The existing drainage
swale along Duvall Ave NE shall be protected from erosion, at a minimum, with silt
perimeter fencing along cleared/graded areas.
To minimize any potential erosion problems, Grade roads/driveways and construct bases as
soon as possible. Cover any unworked soil during extended times of no construction activity.
Keep as much construction traffic as possible on the road base and off open soils to avoid
compaction of the native soils. Silt fences or other BMPs that are capable of retaining water
shall be utilized to retain silt laden runoff to the project area.
Section 8 – Construction Stormwater Pollution Prevention Elements
Element 1: Mark Clearing Limits
Prior to beginning land disturbing activities, including clearing and grading, all clearing limits,
sensitive areas and their buffers, and trees that are to be preserved within the construction
area shall be clearly marked, both in the field and on the plans, to prevent damage and offsite
impacts
Plastic, metal, or stake wire fence may be used to mark the clearing limits. The duff layer,
native top soil, and natural vegetation shall be retained in an undisturbed state to the
maximum extent practicable. If it is not practicable to retain the duff layer in place, it should
be stockpiled on-site, covered to prevent erosion, and replaced immediately upon completion
of the ground disturbing activities
Suggested BMPs:
BMP: Preserving Natural Vegetation
BMP D.3.1.1: High Visibility Plastic or Metal Fence
BMP D.3.3.1: Silt Fence
Element 2: Establish Construction Access
Construction vehicle access should utilitize the proposed stabilized construction entrance
within the project clearing limits. Contractor shall restrict movement in and out of the site to
one entrance and one exit. When a construction entrance is not preventing sediment from
being tracked onto pavement, a wheel wash should be considered.
If sediment is tracked off site, the public roads shall be cleaned thoroughly at the end of each
day. During wet weather, public roads may need to be cleaned more frequently to prevent
sediment from entering water of the state.
Suggested BMPs:
BMP D.3.4.1: Stabilized Construction Entrance/Exit
BMP D.3.4.2: Construction Road/Parking Area Stabilization
Page 6 of 10
Element 3: Control Flow Rates
Properties and waterways downstream from development sites shall be protected from
erosion due to increases in the volume, velocity, and peak flow rate of stormwater runoff from
the project site.
Temporary interceptor swales will be installed, as necessary, to direct runoff during
construction to the temporary sediment trap located along the west boundary of the project
site. Depending on the longitudinal slope of the swale, rock check dams will be placed to
control flow rates of runoff.
Suggested BMPs:
BMP D.3.6.1: Interceptor Dike and Swale
BMP D.3.6.4: Check Dams
BMP D.3.5.1: Sediment Trap
BMP D.3.6.5: Outlet Protection
Element 4: Install Sediment Controls
Prior to leaving a construction site, stormwater runoff from disturbed areas shall pass through
a sediment removal BMP. Runoff from fully stabilized areas may be discharged without a
sediment removal BMP. Full stabilization means the use of erosion products or vegetative
cover that will fully prevent soil erosion.
Suggested BMPs:
BMP D.3.5.1: Sediment Trap
BMP D.3.3.1: Silt Fence
Element 5: Stabilize Soils
The following constraints will apply. From October 1 through April 30, no soils shall remain
exposed and unworked for more than 2 days. From May 1 to September 30, no soils will
remain exposed and unworked for more than 7 days. This condition will apply to all soils on
site, whether at final grade or not. The areas outside of the roadway will be stabilized with
mulch, grass planting or other approved erosion control treatment during the construction
phase.
Suggested BMPs
BMP D.3.2.1: Surface Roughening
BMP D.3.2.6: Temporary and Permanent Seeding
BMP D.3.2.2: Mulching
BMP D.3.2.3: Nets and Blankets
BMP D.3.2.4: Plastic Covering
BMP D.3.2.7: Sodding
BMP D.3.2.9: Compost Blankets
BMP D.3.8: Dust Control
Page 7 of 10
Element 6: Protect Slopes
Design and construct cut and fill slopes in a manner that will minimize erosion.
If found necessary to aid in surface water routing during construction, temporary interceptor
swales shall be excavated to slope any developed runoff to a sediment trap or pond. Rock
check dams shall be placed at regular intervals to reduce slope runoff velocities within the
temporary inceptor swales. Exposed soils on slopes shall be stabilized as specified in
Element 5.
Suggested BMPs:
BMP D.3.2.6: Temporary and Permanent Seeding
BMP D.3.2.2: Mulching
BMP D.3.2.3: Nets and Blankets
BMP D.3.6.4: Check Dams
Element 7: Protect Drain Inlets
All storm drain inlets made operable during construction shall be protected so that
stormwater runoff shall not enter the conveyance system without first being filtered or
treated to remove sediment. Existing downstream catch basins located within the vicinity of
the project site shall be protected using storm drain inlet protection. After installation of
grated inlets on the property, these structures shall be provided a form of inlet protection.
Suggested BMPs
BMP D.3.5.3: Storm Drain Inlet Protection
Element 8: Stabilize Channels and Outlets
All temporary stormwater channels shall be stabilized to limit the erosion potential during
construction. Temporary on-site conveyance channels shall be designed, construction and
stabilized to prevent erosion. When the permanent outlets are installed, they shall be
protected with washed rock/rip rap for erosion protection.
Suggested BMPs
BMP D.3.6.4: Check Dams
BMP D.3.6.5: Outlet Protection
Element 9: Control Pollutants
Control of pollutants are the responsibility of the construction superintendent. Maintenance
and repair of heavy equipment and vehicles involving oil changes, hydraulic system drain
down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and
other activities that may result in discharge or spillage of pollutants to the ground or into
stormwater runoff must be conducted using spill prevention measures, such as drip pans.
Contaminated surfaces will be cleaned immediately following any discharge or spill incident.
The superintendent will be expected to use his best judgment in addressing any and all
Page 8 of 10
conditions that are potentially damaging to the environment. Emergency repairs may be
performed on-site using temporary plastic placed beneath and, if raining, over the vehicle.
All pollutants, including waste materials and demolition debris that occur on-site during
construction will be handled and disposed of in a manner that does not cause contamination
of stormwater. Cover, containment, and protection from vandalism will be provided for all
chemicals, liquid products, petroleum products, and non-inert wastes present on the site.
Suggested BMPs
BMP C151: Concrete Handling (2015 Washington State DOE Manual)
BMP C152: Sawcutting and Surfacing Pollution Prevention (2015 DOE Manual)
BMP C153: Material Delivery, Storage and Containment (2015 DOE Manual)
Element 10: Control De-Watering
De-watering is not anticipated. However, if encountered, de-watering shall be discharged
into a closed conveyance system for discharge from the site. The water resulting from
construction site de-watering activities must be treated prior to discharge or disposed in a
manner that is consistent with the City of Renton Manual. Highly turbid or otherwise
contaminated dewatering water, such as from construction equipment operation will be
handled separately from stormwater.
Element 11: Maintain BMPs
All temporary and permanent erosion and sediment control BMPs shall be maintained and
repaired as needed to assure continued performance of their intended function. All
maintenance and repair will be conducted in accordance with standard procedures for the
BMPs.
Sediment control BMPs will be inspected weekly or after a runoff-producing storm event
during the dry season and daily during the wet season.
All temporary erosion and sediment control BMPs will be removed within 30 days after final
site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped
sediment shall be removed or stabilized on site. Disturbed soil areas resulting from removal
of BMPs or vegetation will be permanently stabilized with mulch, grass planting or other
approved erosion control treatment.
Suggested BMPs
BMP C150: Materials On Hand (2015 DOE Manual)
BMP C160: Certified Erosion and Sediment Control Lead (2015 DOE Manual)
Element 12: Manage the Project
Site construction will be performed after the erosion and sediment control measures have
been constructed. Preparation for site grading and earthwork should include procedures
intended to drain ponded water and control surface water runoff. Grading the site without
adequate drainage control measures may negatively impact site soil.
From October 1 through April 30, clearing, grading, and other soil disturbing activities shall
only be permitted if the transport of sediment from the construction site to receiving waters
will be prevented through a combination of favorable site and weather conditions,
Page 9 of 10
limitations on extent of activity, and proposed erosion and sediment control measures. The
Contractor and/or owner should stop the permitted activity if sediment leaves the
construction site causing a violation of the surface water quality standard or if erosion and
sediment control measures are not adequately maintained.
Trenches should be opened only immediately prior to construction and the trenches will be
backfilled immediately after any required testing or inspections of the installed
improvements. Trenching spoils will be treated as other disturbed earthwork and measures
will be taken to cover or otherwise stabilize the material, as required.
All BMPs shall be inspected, maintained, and repaired as needed to assure continued
performance of their intended function.
Section 9 – Construction Phasing
The recommended construction sequence will include these steps in this order, but some
portions of the steps may be performed out of sequence as conditions require.
The Construction Sequence is as follows:
1. The contractor shall become familiar with the property, construction drawings
and geotechnical conditions on site. The contractor shall meet with the developer,
civil engineer, and any other design professional to review the physical
constraints affecting the proposed construction.
2. The contractor shall schedule and attend a pre-construction meeting with the City
of Renton prior to preforming any site work.
3. For each phase of work, the project surveyor shall flag the limits of clearing and
grading, and the contractor shall install all temporary erosions control measures.
4. When TESC measures are approved by the City inspector, install site
improvements.
5. Proceed with site improvements making adjustments to the Erosion Control
measures as needed.
6. Install final soil stabilization/amendments in areas where final grades have been
achieved and future disturbance can be avoided.
7. Hydroseed or place straw mulch on any other disturbed areas.
8. Once the threat of erosion has passed, and all construction is complete, the
remaining erosion control measure may be removed with approval from the City
inspector.
9. All permanent drainage facilities shall be cleaned of any sediment and
construction debris. Sediment laden water shall not be flushed downstream.
All storm drainage facilities shall be protected in place from construction activity via brightly
flagged stakes or, if necessary, temporary construction fencing.
Section 10 – Construction Schedule
The project is intended to begin construction in the Spring of 2017. Special consideration is
required for source control during the wet season period, which may include phased
construction, materials available for immediate stabilization of denuded areas and diligent
review of site for noted erosion concerns.
Page 10 of 10
Section 11 – Financial/Ownership Responsibilities
The property owner will be responsible for bonds and other required securities for this
project.
Section 12 – Engineering Calculations
Sediment Trap Calculations 15-Minute Peak Flow Calculations using KCRTS
Flow Frequency Analysis
Time Series File:dev-15min.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.304 6 8/27/01 18:00 1.02 1 100.00 0.990
0.224 8 1/05/02 15:00 0.690 2 25.00 0.960
0.690 2 12/08/02 17:15 0.429 3 10.00 0.900
0.244 7 8/23/04 14:30 0.425 4 5.00 0.800
0.425 4 11/17/04 5:00 0.374 5 3.00 0.667
0.374 5 10/27/05 10:45 0.304 6 2.00 0.500
0.429 3 10/25/06 22:45 0.244 7 1.30 0.231
1.02 1 1/09/08 6:30 0.224 8 1.10 0.091
Computed Peaks 0.909 50.00 0.980
SA = FS (Q2-year/Vs) = 2 * (0.304/.00096) = 633.3 sf = 634 sf
See sheet C2 of the plan set for sediment trap location and details.
Section 13 – Conclusion
Erosion control procedures as described in this report and illustrated on the design plans, if
properly implemented, should mitigate anticipated erosion effects from the development of
this project.
The success of erosion control measures is usually related to the Contractor’s attention to
maintenance of such measures. However, in some instances, even with proper attention
being paid to erosion control, measures such as those shown on the plans are unable to
prevent the discharge of turbid water. In this event, secondary measures may be required.
These additional BMPs are provided in Appendix D of the 2009 King County Surface Water
Design Manual and Volume 2 of the 2012 edition of the Washington State Department of
Ecology Stormwater Management Manual for Western Washington.