RE: Starbucks
64 Rainier Ave S
Renton, WA
New construction of conditioned Retail building. Project complies with 2015 WSEC,
Commercial Provisions, using the Component Performance approach.
Roof: R-42 minimum rigid insulation above roof deck. U=0.024, default
Table A102.2.6(3)
Roof (Over drive-up window only): R-20 minimum rigid insulation above roof deck.
U=0.048, default
Table A102.2.6(1)
Wall (Wood, Opaque): Wood studs, 2x6, 16" oc, intermediate framing, with R-21 batt
insulation, U=0.054, default Table A103.3.1(5)
Slab on Grade: R-10 continuous, 4 ft horizontal with NO thermal break at slab edge,
F=0.64, default Table A106.1
Doors (Swinging, Opaque): Insulated metal, U=0.37, default Table A107.1(1)
Vertical Glazing (Fixed): NFRC certified assembly, U=0.36, SHGC=0.40
Vertical Glazing (Operable – Drive-up): Default, double pane, metal frame with thermal
break, U=0.65, SHGC=0.40
Vertical Glazing (Entrances): NFRC certified assembly, U=0.60, SHGC=0.40
Please note that these values are minimum insulation requirements for code compliance.
Higher insulation values may be installed. SHGC = Solar Heat Gain Coefficient
ENVELOPE SUMMARY
Project Summary PROJ-SUM
2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016
General Info Starbucks - Renton Date 10/3/2016
64 Rainier Ave S For Building Department Use
Renton, King, 98057
Project Description
Occupancy Type
Floors Above
Grade Building Gross Conditioned Floor Area
1 2,050 2050.0
Project Gross Conditioned Floor Area
General Compliance
Path
Space Conditioning
Categories
Floor Area and
Stories
Project Title:
Project Street Address:
Project City, County, Zip:
Project Owner or Rep:
Jurisdiction:
New Building Building Addition Addition + Existing
All Commercial Group R - R2, R3, & R4
over 3 stories and all R1
This PROJ-SUM
form shall be
provided as a cover
sheet for all
compliance form
submittals. Project
Title matches project
plans title block.
Alteration Alteration + Existing
Historic Building
Change in Space Conditioning
New Construction and Additions
Existing Building Retrofit
Change of Occupancy
Fully Conditioned
Low Energy Space Category3
Semi-heated2
Select all that apply to the scope of project
Refrigerated Warehouse,
Walk-in Cooler/Freezer,
Refrigerated Display Case1
Unconditioned
Wireless service
equipment shelter
Low energy heating/cooling capacity
Eligible Low Energy Spaces
Greenhouse4 Equipment building
Prescriptive Total Building Performance
Prescriptive -Projects complying prescriptively shall demonstrate compliance with all applicable mandatory
and prescriptve requirements of this code. Refer to C401.2, Item 1 for more information. Compliance forms
to include with a Prescriptive submittal: All applicable ENV, LTG, MECH and C406.
Total Building Performance - Projects complying via total building performance (TBP) shall include a
summary of results from a whole building energy model per Section C407 and shall demonstrate compliance
with all applicable mandatory provisions in this Code. Refer to Section C401.2, Item 2 for more information.
Compliance forms to include with a TPB submital: PROJ-SUM, C406-SUM & C406-DETAIL, ENV-CHK,
LTG-EXT, LTG-CHK, and all MECH forms (except MECH-ECONO).
Mixed Use - Building is greater than three stories above grade and it has both Commercial and Group
R occupancies.
Mixed Occupancy - Building is three stories or less above grade and it has both Commerical and
Group R2, R3 or R4 occupancies. Select All Commercial to document compliance for the commercial
areas of the building. The residential spaces shall comply with the WSEC Residential Provisions.
Select all that apply to the
scope of project.
Select Addition + Existing
or Alteration + Existing if
the existing building will be
combined with the addition
or alteration to demonstrate
compliance per Section
C502.1 or C503.1.
All Building Envelope Mechanical Systems
Electrical Systems
Building Elements Scope - Select all that apply
Service Hot Water Systems Lighting Systems
Envelope Summary ENV-SUM
2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016
Project Info Project Title:Date 10/03/2016
For Building Department Use
Company Name:
Company Address:
Applicant Name:
Applicant Phone:
Applicant Email:
Project Description
Occupancy Type
Envelope Compliance Path
Total Vertical
Fenestration
(rough opening) divided by
Gross Exterior
Above Grade
Wall Area times 100 equals
% Vertical
Fenestration
983.0 ÷÷÷÷ 2997.0 X 100 =32.8%
Total Skylight divided by
Gross Exterior
Roof Area times 100 equals % Skylight
0.0 ÷÷÷÷ 2050.0 X 100 =0.0%
Vertical
Fenestration
Area
Skylight Area
Sidelight Daylight
Zone Area
Toplight Daylight
Zone Area
Percent Daylight
Zone Area
1282 0.625365854
Qualifies for Daylight Zone Alternate
Space Area (ft2) DLZ Area (ft
2)SRR or Aperature Exception
Indicate aperature with "AP" prefix ( AP 1.1%)
Starbucks - Renton
Spaces in Single Story
Building Requiring Skylights
Lance Mueller & Associates
130 Lakeside Ave Ste 250 - Seattle, WA 98122
Kathy Schilb
kathy@lmueller.com
Air Barrier Testing
VERTICAL FENESTRATION AREA COMPLIES
SKYLIGHT AREA COMPLIES
Fenestration Area Compliance
Vertical Fenestration
Alternates
206-325-2553
Component Performance
Calculation Type
Daylight Zone Calculations
Building Conditioned Floor Area
(building < 3 stories)
2050
Vertical Fenestration and
Skylight Area Calculation
New Building Addition Alteration
Prescriptive Component Performance
Prescriptive Path - Enter values for
vertical fenestration, skylights, gross
walls and roof on this ENV-SUM
worksheet.Component Performance - Enter values
in ENV-UA and/or ENV-UA-GROUP-R
worksheet. These values auto-fill from
Compliance forms
do not require a
password to use.
Instructional and
calculating cells are
write-protected.
Selection required to enable forms.
In buildings ≥ 3 stories, 25% or more of NET floor area is in daylight zones per
List all enclosed spaces that exceed 2,500 ft
2, have ceiling height greater than 15 ft, and are space
types required to comply with this provision.
In buildings < 3 stories, 50% or more of CONDITIONED floor area is within daylight zones per
C402.4.1.1
High performance fenestration U-factors and SHGC per C402.4.1.3
Dedicated outdoor air system per C402.4.1.4 and C403.6
Standard Change of Occupancy/Conditioning
Selection required to enable ENV-UA
and ENV-SHGC forms.
Applicant Information. Provide contact information for individual who can
respond to inquiries about compliance form information provided.
Show locations of qualifying daylight zone
areas and ft2 on project plans.
For Daylight Zone Area Calculations -
a) Sidelight areas include primary +
secondary daylght zone areas.
b) Include overlapping toplight and
sidelight daylight zone areas under
Toplight.
c) Refer to Chapter 2 for net floor area
Additional Efficiency Package Option - C406.8 Enhanced Envelope
All Commercial Group R - All R1 and R2, R3, R4 over 3 storiesSelection required to enable forms.
To comply, demonstrate building thermal envelope performance is 15% lower than the Target UA.
Air barrier testing per Section C402.5.1.2
included in project scope Air barrier testing not required
Additional Efficiency Package Option - C406.9 Reduced Air Infiltration
To comply, demonstrate that measured air leakage of building envelope does not exceed 0.25
cfm/ft2 (air barrier surface area) under test pressure of 0.3 inch w.g.
Code requires a minimum of 50% of the floor
area to be within a skylight daylight zone for
specific space types. Refer to C402.4.2 for
requirements.
DLZ = Daylight zone,
SRR = Skylight to roof ratio
Component Performance Path, pg. 1 ENV-UA
2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016
Project Title:Starbucks - Renton Date 10/03/2016
Calculation Adjustments For Building Department Use
None Applied
Fenestration Area as % gross above-grade wall area 32.8%Max. Target:40.0%
Skylight Area as % gross roof area 0.0%Max. Target:3.0%
Vertical Fenestration Alternates: 50% Conditioned Floor Area in Daylight Zone
Envelope Component Proposed UA Target UA
Cavity+CI Plan/Detail #U-factor Source & Table # 2 U-factor x Area (A)= UA (U x A)U-factor x Area (A) = UA (U x A)
R=42 Table A102.2.6(3); main roof 0.024 2000 48.0 0.027 2050 55.4
R=20 Table A102.2.6(1); drive-up window 0.048 50 2.4 Above Deck Insulation U-0.027
R=
R=0.031
R=Metal Building U-0.031
R=
R=0.027
R=Joist/single rafter U-0.027
R=
R=0.021
R=Single raft, attic, other U-0.021
R=
R=0.055
R=Steel/metal frame U-0.055
R=
R=0.052
R=Metal Building U-0.052
R=
R=21 Table A103.3.1(5) - int framing 0.054 1986 107.2 0.054 1986 107.2
R=Wood Frame, other U-0.054
R=
R=0.104
R=Mass Wall U-0.104
R=
R=0.200
R=Mass Transfer Deck U-0.20
R=
R=0.078
R=Group R Mass Wall U-0.078
R=
R=0.104
R=Assumed to be Mass Wall U-0.104
R=
R=0.078
R=Assumed to be Mass Wall U-0.078
R=
R=0.031
R=Mass Floor U-0.031
R=
R=0.029
R=Joist/Framing U-0.029
R=
Area1 UA Area1 UA
Page 1 Subtotal 4036 158 4036 163
Component Performance Compliance (UA)UA COMPLIESDeckMtl BldOpaque Walls - Above Grade4,6Comm4,7FramedFloorsAttic/OthSteel Wood/OthTransfer5RoofsMtl Bld.MassJoist/RftrMass3Vertical Fenestration Alternates:Mass7Group RGroup R4,7Below Grade
Component Performance Path, pg. 2 ENV-UA
2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Jun 2016
Project Title: Starbucks - Renton Date 10/03/2016
Fenestration Area as % gross above-grade wall area 32.8%Max. Target:40.0%For Building Department Use
Skylight Area as % gross roof area Max. Target:3.0%
Building Component Proposed UA Target UA
Ins. R Plan/Detail # F-factor Source & Table # 8 F-factor x Perimeter = UA(U x A) F-factor x Perimeter =UA (U x A)
R=10 Table 106.1 - 4 ft horiz, NO thermal brk 0.640 194 124.2 0.540 194 104.8
R=Slab-On-Grade F-0.54
R=
R=0.550
R=Heated Slab-On-Grade F-0.55
R=
U-factor Source9,10 U-factor x Area (A)= UA (U x A)U-factor x Area (A) = UA (U x A)
Table A107.1(1) 0.370 28 10.4 0.37 28 10.4
Opaque Swing Doors U-0.37
0.34
Opaque rollup & sliding U-0.34
0.30
Non-Metal Frame U-0.30
NFRC 0.36 925 333.0 0.38 925 351.5
Metal Frame, Fixed U-0.38
Double pane w/tb - drive up 0.65 16 10.4 0.40 16 6.4
Metal Frame, Operable U-0.40
NFRC 0.60 42 25.2 0.60 42 25.2
Metal Entrance Door U-0.60
0.50
All types U-0.50
Area1 UA Area1 UA
Page 2 Subtotal 1205 503 1205 498
Page 1 Subtotal 4036 158 4036 163
Project Total 5241 661 5241 661
Component Performance Compliance (UA)UA COMPLIES
Schedule ID Vertical Fenestration6,10Skylights10Note 1 - If vertical fenestration or skylight area exceeds maximum allowed per C402.4.1, then Target Area Adjustment of all applicable envelope
elements will be calculated automatically by the compliance form. Refer to Target Area Adjustments worksheet for this calculation.
Note 2 - Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1.
Note 3 - Proposed CMU mass wall in non-Group R that meet Table C402.1.4 Footnote D requirements can enter the target U-value of 0.014
Note 4 - For semi-heated spaces utilizing the wall insulation exception, enter Target Wall U-factors under Proposed Wall U-factors so exterior
walls are neutral to the calculation.
Note 5 - Mass transfer slab edges must be covered with an assembly having an overal U-factor of 0.2.
Note 6 - Demising walls, doors, and vertical fenestration separating spaces with different degrees of space conditioning (unconditioned, semi-heated,
fully conditioned) shall be included only on the ENV-UA form for the space with the greatest degree of space conditioning.
Note 7 - List Group R above grade mass walls here. List all other mass walls, Commercial and Group R, in the Opaque Walls - Above Grade section.
Note 8 - Slab-on-grade F-Factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1.
Note 9 - Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. A door is defined as
opaque if less than 50% of the door area has glazing.
Note 10 - Fenestration assembly U-Factors shall be the manufacturer's NFRC product rating, which includes the glazing and frame, or shall be
the default value per Section C303.1.3.All TypesNon-MetalMetal, op.Mtl entranceUnheatedHeatedMetal, fixed SwingingOtherSlab-on-gradeTO COMPLY - The Proposed Total UA shall not
exceed the Target Total UA.Doors6,9
Vertical Fenestration Target Area Adjustment Calculations
VF = Vertical fenestration NW = Net above grade wall (excludes fenestration and doors.)
DR = Opaque doors Gross Exterior Above-Grade Wall Area= VF + NW + DR
AG = Above-grade
Proposed Areas
Vertical Fenestration -> VF=983.0
Opaque -> NW=1986.0 DR=28.0
Gross Exterior
AG Wall Area
Max Vert. Fen. %
(C402.3.1)
Maximum Target
Vert. Fen. Area
2997.0 x 40.0%÷ 100 =1198.8
Total Vertical
Fenestration
Delta Vertical
Fenestration 0 Excess Vertical
Fenestration
983.0 -1198.8 =-215.8 greater =
-215.8
Total Vertical
Fenestration
Excess Vertical
Fenestration
Target Vertical
Fenestration
Total Vertical
Fenestration Target VF Multiplier
983.0 -=983.0 ÷ 983.0 =1.00
Net AG Wall Area Excess Fenestration Target Net Wall Area Net Wall Target Net Wall Mult.
1986.0 +=1986.0 ÷ 1986.0 =1.00
Target Areas - UA
Commercial
Vertical Fenestration Proposed Area Target VF Mult. Target Area
Non-metal frame x =
Metal frame, fixed 925.0 x 1.00 =925.0
Metal frame, operable 16.0 x 1.00 =16.0
Metal frame, entrance door 42.0 x 1.00 =42.0
Above-grade Wall Proposed Area Target Net Wall Mult. Target Area
Steel Frame x =
Metal Building x =
Wood / Other frame 1986.0 x 1.00 =1986.0
Mass x =
Mass Transfer Deck x =
Group R Mass x =
Sum of ProposedSum of Proposed 2969.0 Sum of Target 2969.0
Target Areas - SHGC x A
Non-North Vertical Fenestration Proposed Area Target VF Mult. Target Area
PF < 0.2 x =
0.2 ≤ PF < 0.5 x =
PF ≥ 0.5 x =
North Vertical Fenestration
PF < 0.2 x =
0.2 ≤ PF < 0.5 x =
PF ≥ 0.5 x =
If vertical fenestration area exceeds maximum allowed per Section C402.4.1, then Target Area Adjustment of all applicable envelope elements is
required. This worksheet automatically calculates these adjustments and updates target areas in the ENV-UA and ENV-SHGC worksheets. Information
shown in this worksheet is for reference only and is write-protected. Submit this Target Area Adjustment form with ENV-UA and ENV-SHGC forms.
SHGC target areas in
shaded boxes are applied
to target areas on ENV-
SHGC
Multiplier applied to all
Proposed Vertical
Fenestration Areas to
calculate Target Vertical
Fenestration Area
Multiplier applied to all
Proposed Opaque Above-
Grade Wall Areas to
calculate Target Above-
Grade Wall Area
Maximum Target
Target areas in shaded
boxes are applied to
target areas on ENV-UA
Sum of target above-grade
wall and vertical
fenestration areas are
calculated to equal the
Skylight Target Area Adjustment Calculations
SKY= Skylight NR - Net roof (excludes skylight)Gross Exterior Roof Area = SKY + NR
Proposed Areas
Skylight (Horizontal Fenestration) ->SKY=
Opaque Roof -> NR=2050.0
Gross Exterior
Roof Area
Max Skylight %
(C402.3.1)
Maximum Skylight
Fenestration Area
2050.0 x 3.0%÷ 100 =61.5
Total Skylight Area Maximum Target Delta Skylight Area 0
-61.5 =-61.5 greater =
-61.5
Total Skylight Area Excess Skylight Target Skylight Area Total Skylight Area Target SKY Multiplier
-=÷ =
Net Roof Area Excess Skylight Target Net Roof Area Net Roof Target Net Roof Mult.
2050.0 +=2050.0 ÷ 2050.0 =1.00
Target Areas - UA and SHGC x A
Skylight Proposed Area Target SKY Mult. Target Area
All x =
Roof Proposed Area Target Net Roof Mult. Target Area
Insulation Above Deck 2050.0 x 1.00 =2050.0
Metal Building x
Joist / Single Rafter x =
Attic / All Others x =
Sum of Proposed 2050.0 Sum of Target 2050.0
Excess Skylight
Target areas in shaded
boxes are applied to target
areas on ENV-UA
Multiplier applied to all
Proposed Skylight Areas
to calculate Target
Skylight Area
Multiplier applied to all
Proposed Opaque Roof
Areas to calculate Target
Roof Area
Sum of target roof and
skylight areas are
calculated to equal the
If skylight area exceeds maximum allowed per Section C402.4.1, then Target Area Adjustment of all applicable envelope elements is required. This