HomeMy WebLinkAbout20160674E003 Bethany Corner 2023-05-11 TESC 124.pdf
www.aesgeo.com
This document is considered DRAFT until reviewed and initialed by an AESI Project Manager
Temporary Erosion and
Sediment Control Monitoring
DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO.
05/11/2023 Bethany Corner 20160674E003 124
LOCATION CITY MUNICIPALITY CSWGP
16541 111th Ave SE Renton Renton WAR307077
PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL
5/01/2023
Mark Seek (Tiger Mountain
Homes) Cloudy 0.00" 1.00"
AESI FIELD REP AESI PROJECT MANAGER Matthew A. Miller P.E.
QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS)
CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS
Asphalt pavement No
WHEEL WASH SEDIMENT TRACK OUT
N/A None
ROADWAY SURFACE CATCH BASIN
Asphalt Silt socks installed along 165th St
LIMITS BUFFER AREA STABILIZATION
Silt fence, wood fence Landscaping grass, bark
SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation)
Installed along S and W perimeter None
COVER MEARSURES OVERALL STRAW
Fair - exposed soils N/A
PLASTIC SHEETING HYDROSEED
N/A N/A
CONVEYENCE CHANNEL CHECK DAMS
N/A N/A
STOCKPILE COVER PIPE SLOPE DRAINS
N/A N/A
LEVEL SPREADER LANDSCAPE/MULCH
South side of site Sidewalk planters and yard landscaping - active
SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET
Detention vault N/A
SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION
(Creek, Wetland, or Lake) (Clear, Turbid, Sheen)
Concrete (detention vault) N/A
WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL
Yes See next page see
next
page
BMPs in good working condtion, starting landscaping
SAMPLE LOCATION AREAS OF CONCERN
SE of site: 111th Ave swale outfall Exposed soils around housing footing print
CORRECTIVE ACTIONS
Cover exposed soils
PAST CORRECTIVE ACTIONS
Is this site in compliance with the terms and conditions
of the SWPP and NPDES discharge Permit?
Yes
www.aesgeo.com
TESC REPORT
DATE CSWGP PROJECT NO. TESC REPORT NO.
05/11/2023 WAR307077 20130674E003 124
Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance
111th Ave Swale
outfall
10 gpm 6.14 6.5 Yes
ADDITIONAL COMMENTS:
AESI was onsite for a weekly TESC visit. No discharge was observed at the time of visit. AESI took a water sample from the
111th Ave swale outfall. The turbidity of the water can be seen above. This is in compliance with the SWPP. AESI noted
that the contractor was still landscaping and working on house construction.