HomeMy WebLinkAboutLHS 265100-06.0 Lighting Streetlight Cabinet - Shop Drawings - HEI_Review
RESPONSIBLE CONTRACTOR/SUPPLIER: __________________
RE: _________________________
DATE SUBMITTED: _______
SUBMITTAL TRANSMITTAL
TO:CC:ATTN:
SPECIFICATION: _________
Transmittal #
ATTACHMENT:
GENERAL CONTRACTOR REMARKS:
Project:Cornerstone General Contractors
11805 N. Creek Pkwy S., Ste 115
Bothell, WA 98011
Phone: (425) 481-7460
SUBMITTAL SEQUENCE #: _____
SUBMITTAL TYPE:
REQUESTED RETURN DATE: _______CONTRACTOR'S STAMPARCHITECT REVIEW:ARCHITECTS STAMPENGINEER/CONSULTANT REVIEW:ENGINEER'S STAMPCONTRACTOR'S
SUBMITTAL REVIEW
THIS STAMP CERTIFIES THAT THE
G.C. HAS REVIEWED THE ABOVE
ITEMS SUBMITTED AND HAVE
NOTED ANY COMMENTS HEREIN
AS DEEMED REQUIRED. THIS
REVIEW DOES NOT RELEIVE THE
SUBCONTRACTOR OR SUPPLIER
FROM FULL COMPLIANCE WITH
THE CONTRACT DOCUMENTS AND
SCOPE OF WORK
REVIEWED BY:Sean McCauley 05/24/2023
NO EXCEPTIONS
REVISE & RESUBMIT
REJECTED4
Engineer’s review is for general conformance with the design concept andContract Documents. Markings or comments shall not be construed asrelieving the Contractor from compliance with the project plans andspecifications, not departures therefrom.The contractor remains responsible for details and accuracy, for confirmingand correlating all quantities and dimensions, for selecting fabricationprocesses, for techniques of assembly, and for performing their work in asafe manner. Contractor to verify all dimensions at job site before orderingmaterials and equipment.
MAKE CORRECTIONS NOTED;NO RESUBMITTAL REQUIRED
REFER TO SUBMITTAL COMMENT SHEET
DATE 05/25/2023
Review Action Code:
NE no exceptions CN make correction noted, no
RJ rejected, revise & resubmit resubmittal required
RR revise & resubmit SUB submit
NR not reviewed
submittal comment sheet N o. 2 6 S U B -2 7
PROJECT Renton SD
Lindbergh HS Mod
REVIEWED BY Jeff Hoover, Taylor
VanderKley
HARGIS PROJECT NO. 21064.01 RECEIVED DATE May 24, 2023
CONTRACTOR SUBMITTAL
NO.
265100-5.1 – Street
Lighting Service Cabinet
HARGIS SUBMITTAL NO. 26SUB-27 REVIEWED DATE May 25, 2023
Engineer's review is for general conformance with the design concept and Contract Documents. Markings or
comments shall not be construed as relieving the Contractor from compliance with the Contract Documents.
The Contractor remains responsible for details and accuracy, for confirming and correlating quantities,
dimensions and weights, for selecting fabrication processes, for techniques of assembly and construction, for
performing their work in a safe manner and providing complete and operating systems. Contractor to verify
quantities, dimensions, and weights before ordering materials and equipment.
Note: First review uses standard text font. For subsequent reviews, items indicated in bold text were reviewed as part
of this submittal.
spec section
& paragraph product description review
action comments
Section 260500 General Electrical Provisions
1.3.J. SOV Previously Approved (NE)
Section 260519 Wire and Cables
1.3.B. Product Data Previously Approved (26SUB-02: CN)
Section 260521 Metal Clad Cables
1.3.B. Product Data Previously Approved (26SUB-02: NE)
Section 260526 Grounding
1.3.B. Product Data SUB
1.3.C. Shop Drawings SUB
Section 260529 Supporting Devices
1.3.B. Product Data Previously Approved (26SUB-02: NE)
Section 260533 Raceway Systems
1.3.B. Product Data Previously Approved (26SUB-02: NE)
Section 260534 Outlet Boxes
1.3.B. Product Data Previously Approved (26SUB-02: NE)
Section 260535 Floor Outlet Devices
1.3.B. Product Data SUB
Section 260536 Cable Trays
1.3.B. Product Data Previously Approved (26SUB-05: NE)
1.3.C. Shop Drawings N/A
May 25, 2023
Renton SD
CONTRACTOR SUBMITTAL NO. 265100-5.1 – Street Lighting
Service Cabinet
HARGIS SUBMITTAL NO. 26SUB-27
page 2
Review Action Code:
NE no exceptions CN make correction noted, no resubmittal required
RJ rejected, revise & resubmit SUB submit
RR revise & resubmit NR not reviewed
spec section
& paragraph product description review
action comments
Section 260543 Underground Vaults and Raceway
1.3.B. Product Data Previously Reviewed (26SUB-15: CN)
Previously Reviewed (26SUB-19: RJ)
Previously Reviewed (26SUB-20: NE)
1.3.C. Shop Drawings Previously Reviewed (26SUB-15: NE)
Previously Reviewed (26SUB-20: NE)
Section 260548 Vibration Isolation and Seismic Control for Electrical Systems
1.3.B. Product Data Previously Reviewed (26SUB-03: NE)
1.3.C. Delegated Design Submittal SUB
1.3.D. Welding Certificates SUB
Section 260553 Electrical Identification
1.3.B. Product Data Previously Reviewed (26SUB-13: NE)
Section 260573 Electrical Power Studies
1.3.B. Study Outline Previously Reviewed (26SUB-23: NE)
1.3.C. Initial Submittals Previously Reviewed (26SUB-23: NE)
1.3.D. Final Calculations & Study Previously Reviewed (26SUB-24: NE)
Section 260810 Electrical Testing
1.3.B. Qualifications SUB
1.3.C. Testing Plan and Schedule SUB
1.3.D. Test Procedures SUB
1.3.E. Detailed Report of Testing Functions SUB
Section 260923 Lighting and Receptacle Controls
1.3.B. Product Data Previously Reviewed (26SUB-06: NE)
1.3.C. Shop Drawings Previously Reviewed (26SUB-13: RR)
Previously Reviewed (26SUB-21: NE)
Section 262200 Transformers
1.3.B. Product Data Previously Reviewed (26SUB-03: NE)
1.3.C. Shop Drawings Previously Reviewed (26SUB-03: NE)
Section 262410 Service Entrance
1.3.B. Product Data SUB
1.3.C. Shop Drawings SUB
Section 262416 Panelboards
1.3.B. Product Data Previously Reviewed (26SUB-03: CN)
Section 262726 Wiring Devices
1.3.B. Product Data Previously Reviewed (26SUB-03: CN)
1.3.B. Missing Product Data – Cord Reels Previously Reviewed (26SUB-08: RR)
May 25, 2023
Renton SD
CONTRACTOR SUBMITTAL NO. 265100-5.1 – Street Lighting
Service Cabinet
HARGIS SUBMITTAL NO. 26SUB-27
page 3
Review Action Code:
NE no exceptions CN make correction noted, no resubmittal required
RJ rejected, revise & resubmit SUB submit
RR revise & resubmit NR not reviewed
spec section
& paragraph product description review
action comments
Previously Reviewed (26SUB-10: CN)
1.3.B Missing Product Data – GFCI Controlled
Receptacles
Previously Reviewed (26SUB-08: NE)
Section 262813 Overcurrent Protective Devices
1.3.B. Product Data - Fuses Previously Reviewed (26SUB-04: NE)
1.3.B Product Data – Circuit Breakers Previously Reviewed (26SUB-16: NE)
Section 262816 Disconnect Switches and Enclosed Circuit Breakers
1.3.B. Product Data Previously Reviewed (26SUB-04: CN)
1.3.B Product Data – D-Y1A Previously Reviewed (26SUB-08: NE)
Section 263353 Uninterruptible Power Supply Systems
1.3.B. Product Data SUB
1.3.C. Shop Drawings SUB
1.3.E. Report SUB
1.3.F. Certification SUB
Section 263600 Transfer Switches
1.3.B. Product Data Previously Reviewed (26SUB-18: NE)
Section 264313 Surge Protective Devices
1.3.B. Certifications Previously Reviewed (26SUB-11: NE)
1.3.C. Product Data Previously Reviewed (26SUB-04: RR)
Previously Reviewed (26SUB-09: CN)
Section 265100 Lighting
1.3.B. Product Data Previously Reviewed (26SUB-01: CN)
Previously Reviewed (26SUB-02: CN)
1.3.B Product Data - Street Lighting Previously Reviewed (26SUB-07: NE)
Previously Reviewed (26SUB-09: CN)
Previously Reviewed (26SUB-25: NE/CN)
Previously Reviewed (26SUB-26R1: CN)
1.3.C. Shop Drawings – Street Lighting Service
Cabinet
NE
1.3.C. Shop Drawings Previously Reviewed (26SUB-14: CN)
Previously Reviewed (26SUB-22: CN)
m:\jobs\21\21064\ca\submittals\division 26\21064.01esub 20230525 lindbergh hs sub26-27.docx
8365 Hogum Bay Lane NE - Lacey, WA 98516
Office 360-491-9621 / Fax 360-438-6920 Page 1 of 1
Contractor # PREMIPE935QL
Electrical Shop Drawings Submittal
Project: Lindberg High School
16426 128th Ave SE
Renton, WA 98058
Owner: Renton School District
7812 S 124th Street
Renton WA 980178
Architect: Bassetti Architects
71 Columbia St, Ste 501
Seattle, WA 98104
Electrical Engineer: Hargis Engineers Inc.
1201 Third Avenue, Suite 600
Seattle, WA 98101
General Contractor: Cornerstone General Contractors
11805 North Creek Pkwy S, Ste 115
Bothell, Wa 98011
For Information regarding this project, please contact:
Jon Wood
360.350.7111
Div 265100 Lighting PPE Comments Reviewer response
Street Lighting Service Cabinet
LINDBERGH HS
GEXPRO for PREMIER POWER
SKYLINE ELECTRIC & MFG. CO.
SCALE DATE / DRAWN BY DRAWING NO.
N.T.S. 5-10-23 / C.S.T. 68035
1
2
3
4
5 6
FRONT SIDE
CITY OF RENTON
SKYLINE SERIES# 64380-5G
1 REQUIRED
SEE COMPONENT SCHEDULE AND CABINET SPECIFICATIONS
THE METER DOOR IS
REMOVABLE AND COMES
STANDARD HINGED ON THE LEFT.
HINGING ON THE RIGHT IS AVAILABLE AS
A NO-CHARGE OPTION
FOOTPRINT
DEADFRONT
SERVICE WIREWAY
WIRING SCHEMATIC
METER BASE
MAIN
CONTROL
LTG.
GROUND
FAULT RECEPT. NEUTRAL
GROUND
PHOTO CELL
TEST SWITCH
120/240V, SINGLE PHASE, 3 WIRE
CITY OF RENTON SERVICE CABINET
PER STANDARD PLANS 122.1, 122.2
SKYLINE SERIES# 64380-5G
COMPONENT SCHEDULE
1 METERBASE: 200 AMP, 4 JAW, MANUAL BYPASS, B-LINE U264
W/ 5TH JAW AT 9:00 POSITION
2 PANELBOARD: 120/240 VAC, 250 AMP COPPER BUS, 1 PHASE, 3 WIRE, 18 CKT, 65K AIC SERIES RATED
MAIN BREAKER: 200 AMP FRAME, 200 AMP TRIP, 2 POLE, EATON PDD22G0200TFFJ
BOLT-ON BRANCH BREAKERS, EATON TYPE BAB:
2 - 20/2 ILLUMINATION A, B
1 - 20/1 ITS
1 - 20/1 GROUND FAULT RECEPTACLE
* - 40/1 SIGNAL (IF PRESENT)
* - 40/1 AUXILIARY SIGNAL (IF PRESENT)
2 - 60/2 SMALL CELL BRANCH
1 - 15/1 CONTROL
3 - 20/1 SPARE
(PLEASE CONFIRM BREAKER SCHEDULE, NONE PROVIDED)
3 CONTACTOR: NEMA LIGHTING RATED, 30 AMP 4 POLE, 120 VAC COIL,
SQD 8910DPA34V02 – 1 REQUIRED
4 PHOTO ELECTRIC CELL: 1800 WATT, 120 VAC, TWIST LOCK, ALR #SST-IES-UL
MOUNTED INSIDE CABINET BEHIND WIREGLASS WINDOW
5 PHOTO-CELL BYPASS SWITCH:
SPDT, 15 AMP, RATED (UP TO) 277 VAC (FED THROUGH TERMINAL BLOCK)
6 GROUND FAULT RECEPTACLE: 20 AMP, 125 VAC, DUPLEX
CABINET:
CONSTRUCTION:
NEMA TYPE 3R, OUTDOOR PADMOUNT, 1/8” 5052-H32 ALUMINUM CONSTRUCTION, OPEN BOTTOM
FRAMED WITH 2” ANGLE, 2 SCREENED AND GASKETED VENTS, REMOVABLE EQUIPMENT
MOUNTING PAN, CABINET GROUND WITH MINIMUM BONDING WIRE TO NEUTRAL
DOORS: HEAVY-DUTY CONCEALED HINGES (LIFT-OFF TYPE),STAINLESS STEEL VAULT HANDLES WITH
ROLLER RODS THAT PROVIDE 3-POINT COMPRESSION ON CLOSED CELL NEOPRENE GASKET,
“BEST” LOCK ON LOWER DISTRIBUTION DOOR WITH CARD HOLDER,
PADLOCKABLE UPPER METER DOOR WITH POLISHED SAFETY GLASS WINDOW
DEADFRONT: HINGED AND SECURED WITH QUARTER-TURN FASTENERS
FINISH: MILL FINISH ALUMINUM
1 – REQUIRED
UL LISTED PER STANDARD #508A
“SUITABLE FOR USE AS SERVICE ENTRANCE”
LINDBERGH HS
GEXPRO P.O.# S136551006
PREMIER POWER
5-10-23 C.S.T. S.O.# 68035
SKYLINE ELECTRIC & MFG. COMPANY
I N C O R P O R A T E D
Switchboards
Panelboards
Steel Cabinets
UL Registered
Metal Punching . . Forming . . Welding
Industrial Control Panels
3619 7TH AVENUE SOUTH
SEATTLE, WASHINGTON 98134
TELEPHONE (206) 682-4422 FAX (206) 682-0927