PROJECT NUMBER: LUA23-000174, CAE
PROJECT NAME: Benson Road South Pole Replacement Project
PROJECT MANAGER: Clark H. Close, Principal Planner
APPLICANT/CONTACT: Mary Nicholl
6500 Ursula Pl S
Seattle, WA 98108
OWNER: Puget Sound Energy
6500 Ursula Pl S
Seattle, WA 98108
Carpantino Brothers Inc
1148 Central Ave N
Kent, WA 98032
PROJECT LOCATION: Parcel Nos. 2023059090 and 2023059010
LEGAL DESCRIPTIONS: POR W 1/2 OF SEC 20 TGW POR NE 1/4 OF SEC 19 - BEG AT 1/4 COR COMMON TO
SECS 19 & 20 TH N 0-44-05 E ALG THE COMMON LN 329.59 FT TO S LN OF CITY OF
SEATTLE 200 FT DIABLO R/W UNDER AUD FILE NO 3560496 & TPOB TH N 87-23-49 E
83.71 FT TO SWLY LN OF BONNEVILLE POWER ADMIN COVINGTON RENTON FUTURE
LN NO 2 100 FT R/W UNDER AUD FILE NO 3292927 TH S 42-35-54 E 218.88 FT TAP
ON CURVE TO LFT ON W LN OF BENSON RD RADIAL CENTER BEARING N 76 -03-31 E
2895 FT THEREFROM TH ALG SD CURVE & LN ARC DIST 118.28 FT TO PT OF
TANGENCY TH CONTG ALG SD R/W S 16-16-56 E 72.42 FT TO NLY LN OF BONNEVILLE
ADMIN 250 FT R/W UNDER AUD FILE NO 3241106 TH N 55-13-32 W 519.29 FT TAP
OF CURVE TO RGT ON E LN BURNETT ST EXT RAD CENTER WCH CURVE BEARS N 85 -
06-39 E 2795 FT THEREFROM TH ALG SD E LN & CURVE TO RGT ARC DIST 38.29 FT TO
S LN OF AFOREMENTIONED CITY OF SEATTLE DIABLO R/W TH N 87-29-49 E 146.78
FT TO TPOB.
POR GL 2 IN NW 1/4 LY WITHIN PARCEL DESC UNDER RECORDING NO 7910190367
TGW POR GL 2 WITHIN BONNEVILLE POWER ADMIN DIABLO-SEATTLE RELOCATION
R/W LESS POR SD BPA DAF - BEG SW COR GL 2 TH N 00-44-05 E ALG WLY LIMIT GL 2
DocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
City of Renton Department of Community & Economic Development Certificate of Exemption From Critical Areas Regulations
Benson Road South Pole Replacement Project LUA23-000174, CAE
Permit Date: June 5, 2023 Page 2 of 3
D_Critical_Areas_Exemption_Decision_230605
329.59 FT TO SLY MGN SD BPA R/W TH N 87-23-49 E ALG SD SLY MGN 256.46 FT TO
TPOB TH CONTG ALG SD SLY MGN N 87-23-49 E 600.22 FT TH N 02-36-11 W 100 FT
TH S 87-23-49 W 612.72 FT TO ELY MGN OF BENSON RD TH SLY ALG SD RD MGN TO
TPOB TGW BPA COVINGTON RENTON FUTURE LN NO 2 LESS POR SD BPA LY ELY OF
WLY LN OF BENSON RD LESS ST HWY LESS BENSON RD LESS EAGLE RIDGE DR TGW
CITY LIGHT SEATTLE COVINGTON LN NO 1 ESMT LY IN SD GL 2 LESS POR FOR RD PER
REC #20070522001182 LESS POR FOR HWY PER REC# 20080423000732 TCO 17-
1773.
PROJECT DESCRIPTION: The applicant, Puget Sound Energy (PSE), is requesting a Critical Areas Exemption to
replace a utility pole (Pole 01) near Benson Road S (Attachment 1). The proposed pole replacement work is located
on two (2) parcels (APNs 2023059090 and 202305-9010) and all work would occur in existing PSE utility easements
and franchise area where PSE has operating rights (Attachments 2 and 3). The current use on both properties
include a developed office building, an office parking lot, and a vacant parcel. According to PSE, the existing pole
is located in a geologic hazard area, has exceeded its useful lifespan, and must be removed and replaced in order
to continue serving safe and reliable power to customers. Typically, PSE replaces their poles as close to their current
location as reasonably possible and the old poles are removed and taken off site once all overhead attachments
have been transferred by the responsible owners. In addition, the proposed work would include 520 square feet
of vegetation removal for site access. The proposed access road would extend approximately 53 feet westerly off
Benson Road South right-of-way within the vacant parcel. The access road would be temporary in nature and
vegetation cleared would be restored to original condition or better upon completion of construction. No tree
removal is proposed. According to City of Renton (COR) Maps, the proposed pole replacement project is located
within a regulated slope, high erosion hazard area, and a moderate landslide hazard area.
CRITICAL AREA: The proposed work is located within mapped regulated slope (>15% & <=40%), high
erosion hazard area, and a moderate landslide hazard area.
EXEMPTION JUSTIFICATION: Renton Municipal Code (RMC) 4-3-050 Critical Areas Regulations Subsection
C.3.e.ii Maintenance, Operation, and Repair of existing Parks, Trails, Roads, Facilities, and Utilities, and the
Construction of New Trails and Subsection C.3.e.iv Modification of Existing Utilities and Streets by Ten Percent
(10%) or Less.
FINDINGS: The proposed development is consistent with the following findings pursuant to RMC section 4-3-
050C.2.d:
i. The activity is not prohibited by this or any other provision of the Renton Municipal Code or
State or Federal law or regulation;
ii. The activity will be conducted using best management practices as specified by industry
standards or applicable Federal agencies or scientific principles;
iii. Impacts are minimized and, where applicable, disturbed areas are immediately restored;
iv. Where water body or buffer disturbance has occurred in accordance with an exemption
during construction or other activities, revegetation with native vegetation shall be
required;
v. If a hazardous material, activity, and/or facility that is exempt pursuant to this Section has a
significant or substantial potential to degrade groundwater quality, then the Administrator
DocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
City of Renton Department of Community & Economic Development Certificate of Exemption From Critical Areas Regulations
Benson Road South Pole Replacement Project LUA23-000174, CAE
Permit Date: June 5, 2023 Page 3 of 3
D_Critical_Areas_Exemption_Decision_230605
may require compliance with the Wellhead Protection Area requirements of this Section
otherwise relevant to that hazardous material, activity, and/or facility. Such determinations
will be based upon site and/or chemical-specific data.
DECISION: An exemption from the Critical Areas Regulations is hereby Approved with Conditions*
and subject to the following condition:
*CONDITION(S) OF APPROVAL:
1. No alteration or additional fill materials shall be placed other than the minimum alteration and/or fill needed
for normal and routine maintenance, restoration, and/or repair of utilities. Critical area and required buffer
impacts shall be minimized and disturbed areas shall be restored during and immediately after the use of
construction equipment.
SIGNATURE & DATE OF DECISION:
________________________________________ ____________________________________
Vanessa Dolbee, Planning Director Date
RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the
approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the
original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request,
if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the
appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame.
APPEALS: This administrative land use decision will become final if not appealed in writing to the Hearing Examiner
on or before 5:00 PM on June 20, 2023. An appeal of the decision must be filed within the 14-day appeal period (RCW
43.21.C.075(3); WAC 197-11-680). Appeals must be submitted electronically to the City Clerk at
cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee,
normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals
to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process
may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
EXPIRATION: Five (5) years from the date of decision (date signed).
Attachments: 1) Plan Drawings, 2) Aerial Maps, and 3) Site Photographs
cc: Carpantino Brothers Inc / Owner
DocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
6/5/2023 | 4:05 PM PDT
AØAFR065BØAFR066CØAFR067AØAFR062BØAFR063CØAFR064S PUGET DRTALBOT RD S BRUSH CLEARNINGREQ'D FOR ACCESSCBA NVicinity MapN.T.S.Owner / Developer Contact InfoofficeATTN:PSE--KELLY ULICNY425-429-0949THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met.PHONECABLE TV11801240 101146281 N/A 593242777N/A N/AN/A N/AN/A N/AN/A 108134682PROJECT PHASEPWRNOTIF# ORDER#SuperiorOH Misc ExpenseUG Misc ExpenseOH Xfmr ExpenseUG Xfmr ExpenseRemovalDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPK. ULICNY 425-429-0949 10/13/22MS JEWELL 360-434-5315 10/13/22...S. MORALES 253-244-1200 10/13/22N/A RENTONGRA-25 REPL 1 POLEDISTRIBUTION POLE REPLACEMENT1400 TALBOT RD S, RENTON, WA 98055ASPLUNDH CONSTRUCTIONN/A N/AN/A 101146281AS NOTED 1 OF 1KING N/A N/A QCSOKENW20-T23N-R05E N/A N/A2305E078 2305E088 2305E078 GRA-25COMCAST...........E-Mail:Cell Phone:Project Manager Contact Information:Manager:KELLY ULICNY425-429-0949KELLY.ULICNY@PSE.COM.........101146281
GRA-25 REPL 1 POLEDISTRIBUTION POLE REPLACEMENTNoNoNoYesYesYes"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILE POLE RETIREMENT TABLETEMP TRANSFERS ST. LIGHT TRANSFERSSITE#POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP01 317326-166063 40 3 1958POLE TABLE (NEW)Site#Pole DataGrid #HeightClass Year Remarks / Location Ref.P01 317326-166063 45 1LEGENDCONDUIT RISEROVERHEAD TRANSFORMERJUNCTION VAULT/JUNCTION BOXNEW CONDUCTOR AND OR TRENCH LINEDISCONNECT - FUSEDPULL VAULT OR SPLICE VAULTEXISTING POLEDOWN GUYDISCONNECT - UNFUSEDNEW POLEPADMOUNT TRANSFORMERSECONDARY HANDHOLEEXISTING CONDUCTOR TO BE REMOVEDOR ABANDONEDSTREET LIGHTTOTAL UNDERGROUND TRANSFORMERENERGY CUSTOMER DEMAND POINTOROROROVERHEAD JUMPER CONNECTIONSITE 1S PUGET DR
P01: 317326-166063BRUSH REMOVAL REQ'DGRID # MISSING IN FIELD-EX 40' CL 3, 1958 POLE TO BE REPLACED-INST 45' CL 1 (PD451) 6010.1000-DEEP SET +2' DUE TO SLOPE-INST 3Ø DE 336ACSR (DE3315) (E) 6033.1042-INST 3Ø SLACK SPAN 336ACSR (SSF313) (W) 6033.5010-TRANSFER 3Ø 336 ACSR PRI & 4/0 NEUT (E/W)-ROLL NEUT TO COMMON POSITION-RM EX DG (E)-INST 24" PLATE ANC (ANDP24) 6012.1000 (30', E)-INST 7/16” DBL PR & 3/8” NEUT DG (GYDD71A) (GYD3SAN) 6013.1000 TO NEW ANC-TOP POLE ABOVE COMM-REMOVE POLE STUB AFTER COMM HAS TRANSFERREDSITE PLAN 11" = 50'General- Return removed materials to the local storeroom or PSE storeroom.OVERHEAD CONSTRUCTIONPoles & Structures- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurementsare from the roadside face of the pole.- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole thanspecified.- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification6014.1000 at new gang operated switch locations.- Install grid numbers on all new and existing poles as shown on sketch.- Straighten existing poles as indicated or as necessary.- Treat all field-drilled poles with copper napthenate wood preservative.- Remove old poles after communication companies have transferred off and return to PSE storeroom. Filland crown pole holes and restore area similar to adjacent landscaping.Conductors & Equipment- Transfer all overhead and underground primary, secondary and service conductors and guys to new polesset, unless otherwise indicated on this sketch.- Transfer existing transformers to new poles unless otherwise indicated on this sketch.- Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sitesbeing worked within the scope of the project where they are currently missing.- For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SDaluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers withpreformed helical grip ties.- Apply avian protection devices when required per Standard 6015.2000.- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.- Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.- All neutral connections to be made with solid compression connectors. Connect all pole grounds tocommon neutral.- Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fusedprotection above 40T.- Install Wildlife Protectors on all transformers..MORAL10/14/2210/14/222-812-10A2-129ATTACHMENT 1RECEIVEDClark Close 05/24/2023PLANNING DIVISIONDocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
Puget Sound Energy
P.O. Box 97034
Bellevue, WA 98009-9734
pse.com
Figure 1: Location of Pole 01 within the City of Renton Regulated Slopes
P01
Figure 2. Location of P01 within the City of Renton Landslide Mapping
P01
RECEIVED
Clark Close 05/24/2023
PLANNING DIVISION
ATTACHMENT 2
DocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
Figure B-1
Site Photographs
May 3, 2023 Site Visit
PSE –GRA-25 REPL 1 Pole Project
Renton, King County, Washington
9186-184-00 Task 10.0 Date Exported: 05/23/2023 CRWPhotograph 1. P01, looking west from Benson Road S.shoulder
Photograph 2. P01, looking northwest from Benson Road S. shoulder
P01
P01
Glen Acres
Road SW
ATTACHMENT 3
RECEIVED
Clark Close 05/24/2023
PLANNING DIVISION
DocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
Figure B-2
Site Photographs
May 3, 2023 Site Visit
PSE –GRA-25 REPL 1 Pole Project
Renton, King County, Washington
9186-184-00 Task 10.0 Date Exported: 05/23/2023 CRWPhotograph 3. P01, looking south from Benson Road S. shoulder
Photograph 4. P01, looking southwest
P01
P01
DocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
Figure B-3
Site Photographs
May 3, 2023 Site Visit
PSE –GRA-25 REPL 1 Pole Project
Renton, King County, Washington
9186-184-00 Task 10.0 Date Exported: 05/23/2023 CRWPhotograph 5. P01, looking west from east side of Benson Road S. shoulder
Photograph 6. west of P01, looking west
P01
DocuSign Envelope ID: 64D3E031-09D8-4CF5-A6F0-ACA8C2261700
Figure B-4
Site Photographs
May 3, 2023 Site Visit
PSE –GRA-25 REPL 1 Pole Project
Renton, King County, Washington
9186-184-00 Task 10.0 Date Exported: 05/23/2023 CRWPhotograph 7. P01, looking east towards Benson Road S.
Photograph 8. P01, looking at base of pole, looking east
P01