HomeMy WebLinkAboutT-423508TF
9
g
11011111
04 l l
U A4_
I
WI�
W
�I
W
rWr^^
v,
II
Z
J
2
U
Q
r-RESTRIPE CROSSWALK
MARKINGS IN EX LOCATION
PER CITY OF RENTON
mmSTANDARD PLAN 127
DRAWINGS HAVE BEEN REVISED PER CONTRACTOR'S CONSTRUCTION RECORDS
THIS CONSTRUCTION RECORD DRAWING IS A COPY OF THE APPROVED
CONSTRUCTION DRAWINGS PREPARED BY LPD ENGINEERING, AND HAS BEEN
EDITED TO REFLECT ASBUILT CONDITIONS. THE INFORMATION PROVIDED ON
THESE RECORD DRAWINGS REFLECT ASBUILT CONDITIONS BASED ON
CONTRACTOR DOCUMENTED FIELD NOTES AND REDLINES.
LEGEND
— — PROPERTY LINE
EX CONTOUR (INDEX)
—23>--
EX CONTOUR
230_ _ PROPOSED CONTOUR (INDEX)
ziKnow what's below.
Call before you dig.
Dial 811
U U
I
V L
V - O
�'0
Sg
U
Saa>
0
o I
32+00
Sja>
dA
sdoo� 3i1 jik4
a
231
PROPOSED CONTOUR
XXX�
SPOT ELEVATION
FF 78.0
FINISHED FLOOR ELEVATION
E Y,q�
1932 First Ave
Suite 201
C
Seattle, WA 98101
p. 206.725.1211
f. 206.973.5344
engineering pllc www•Ipdengineering.com
STA 31 +75.53, 39.3' R —s �I a >
M�
KC METMETRO—TOREINSTALL——L—"M MGM MM M M—
BUS STOP SIGN
—SEE—NOTE --L
9411�M P9gSDG
<,do;S sn8"
PROPOSED BUILDING
14 CONCRETE PAVEMENT
TACTILE WARNING STRIP
M M M M M M M MMM —
jI[Dq-cs
ASPHALT (AC) PAVEMENT
2
CSI-2
3
CSI-3
4
CSI-4
5
CSI-5
6
CSI-6
NO. I REVISION
aaa�Q«Z �
„navy v'Ll,
e-Z2=3Ad,,9(N)]
ZO'92=�] WIC
292t INI
.--------VA - B 1 off -
III III III
LCS
LCS
24 2
LCS
/15/2
LCS
/29/2
LCS
/11/2
SITE WALL
CURB AND GUTTER
LANDSCAPED AREA
DESIGNED:
DRAWN:
CHECKED:
BY DATE APPR I APPROVED:
9'
SCALE:
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
NOTES:
1. CONTRACTOR SHALL NOTIFY KING COUNTY METRO AT
BUSSTOPPROJECTS@KINGCOUNTY.GOV, CONSTRUCTION.000RD@KINGCOUNTY.GOV,
AND DAVID.KORTHALS@KINGCOUNTY.GOV AT LEAST 30 BUSINESS DAYS IN ADVANCE
OF STARTING CONSTRUCTION TO COORDINATE BUS SIGN INSTALLATION.
z
pppp-
10 0 5 10 20
Scale 1"=10'
UCITY OF
RENTON
Planning/Building/Public Works Dept.
T-423508 R-423513
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
SARTORI ELEMENTARY SCHOOL
315 GARDEN AVE N
RENTON, WA 98057
CHANNELIZATION PLAN
00
0
N
N
I
LJ
T
O
O
0
l�
C0
Q
J
DATE:
4 16 2024 co
FIELDBOOK:
PAGE:
DRAWING NO:
C2.7 gym,'�
SHEET: OF: VJ
17 29 Q