HomeMy WebLinkAboutPermit Conditions B19000388DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit B19000388
Building
1 Ground Electrode System (either 1 or 2 are approved methods): 1. An electrode of at least 20 ft long bare copper,
sized in accordance with NEC. 2. An electrode of 20 ft long #4 rebar (not less than 1/2 inch in diameter) and
sized per NEC; either one shall be encased by at least 2 inches of concrete, located within and near the bottom
of a concrete footing that is in direct contact with the Earth, and shall be installed in all new residential and
commercial construction.
2 Water and sewer permits are required to be approved prior to the final inspection for the building.
3 Authorized hours of construction/activity: 7:00 a.m. - 8:00 p.m. Monday Through Friday; 9:00 a.m. - 8:00 p.m.
Saturday; No work allowed on Sunday. Per Ordinance 4703, 2-2-1998
4 All new residential utility installations (electric, cable, phone, Etc.) shall be installed underground.
5 TREE PROTECTION MEASURES FOR ALL TREES IN THE CONSTRUCTION AREA OF A DEVELOPMENT
SITE. THESE MEASURES INCLUDE: 1. 6 foot high chain link fences around the trees out to and including the
drip line of the tree. 2. All the area within the fenced area needs a minimum of 3" of bark mulch. 3. Warning signs
must also be included on the fence. 4. Construction activity, parking, and storage of materials and equipment is
not allowed within the drip line (and therefore fenced) area of any tree. 5. The only new impervious surfaces
allowed within the drip line of existing trees are those shown on approved building or construction plans, which
typically should be limited to the new buildings, new driveways, new parking lots, new streets and new sidewalks.
6 All construction, demolition and land clearing waste must be recycled at a King County licensed or approved
facility, or taken to Regional Disposal Facilities.
7 Erosion control shall be in place and inspection approved prior to disturbance of soil on site.
8 Provide structural calculation at the job site for verification by the Building Inspector.
Engineering
9 Single-family driveways exceeding eight percent (8%) slope shall provide slotted drains at the lower end with
positive drainage discharge to restrict run-off from entering the garage/residence or crossing any public sidewalk.
Driveways shall not exceed fifteen percent (15%) without an approved variance from the CED Administrator.
Fire
10 SPRINKLER SYSTEM IS REQUIRED. PLANS SHALL BE STAMPED BY A STATE CERTIFIED SPRINKLER
CONTRACTOR. PLANS TO BE SUBMITTED TO RENTON FIRE PREVENTION BUREAU FOR REVIEW AND
PERMITTING(425)430-7024. A PLUMBING PERMIT FOR A BACKFLOW PREVENTION DEVICE IS ALSO
REQUIRED PRIOR TO ISSUANCE OF SPRINKLER PERMIT.
Planning
11 An height survey shall be provided to verify compliance with the maximum height permitted in the R-8 zone, which
is 24 feet from Grade Plane to the top of the wall plate. In this case the wall plate is the roof due to the design of
the home with a flat roof. The height survey shall be provided to the Planning Reviewer, Vanessa Dolbee or
designee, prior to building permit final. If the building does not comply with height of the zone, design changes
Page 1 of 2
including but not limited to framing and roof designs may need to be changed to bring the building into
compliance.
Sewer
12 Sewer General Condition
Locate sewer stub at property line and verify cap before starting any site work.
Page 2 of 2