Loading...
HomeMy WebLinkAboutR_Drainage_Report_170711_v4REVISION Received: 02/26/2020 / aalexander BUILDING DIVISION PR19000003 B19000388 V4 REVISION Received: 01/13/2021 / aalexander BUILDING DIVISION PR19000030 B19000388 V6 APPROVEDBUILDING DIVISIONTHIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALLTIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BEOCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTONBUILDING DIVISION AND RECEIPT OF CERTIFICATE OFOCCUPANCY.APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TOVIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,OR OTHER REGULATIONS ENFORCED BY THIS CITY.DATE: 07/15/2021 which drainage plan is the final drainage plan? -see drainage plan comment. -Whichever drainage plan is the accurate one, please update it to reflect final dry well location. Call-out cleanouts and provide rim and invert elevations for all drainage features (cleanouts, drains, drywell, etc). oKeep in mind: Drywells must be a min of 15’ from the building and 10’ away from each other. •Covenant needed, most up to date form: https://edocs.rentonwa.gov/Documents/1/edoc/9 63417/Declaration%20of%20Covenant%20for%20I nspection%20and%20Maintenance%20Drainage%20F acilities%20and%20On-Site%20BMPs.pdf