Loading...
HomeMy WebLinkAboutERC_Triumph_Freezer_FINALDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ERC_Tiumph Freezer_FINAL ENVIRONMENTAL REVIEW COMMITTEE REPORT ERC Meeting Date: June 12, 2023 Project File Number: PR23-000080 Project Name: Triumph Restaurant Outdoor Freezer Alteration Land Use File Number: LUA23-000148, SA-A, ECF Project Manager: Jill Ding, Senior Planner Owner: Ruozhong Zhang, Constant Source Investment, 7901 Aurora Ave N, Seattle, WA 98103 Applicant/Contact: David Lee, Techcraft Corp., 2126 NW 204th St, Shoreline, WA 98177 Project Location: 3750 East Valley Rd, Renton, WA 98055 Project Summary: The applicant is requesting Administrative Site Plan Review and Environmental (SEPA) Review for the addition of a 437-square foot outdoor freezer to an existing 8,460-square foot restaurant. The project site totals 73,020 square feet in area with approximately 112 surface parking spaces and is located within the Commercial Arterial (CA) zone and Urban Design District D. No change in access is proposed. A wetland is mapped along the east side of the project site, however in accordance with RMC 4-3-050B.1.g "Sites Separated from Critical Areas", the wetland buffer may not be applicable to the proposed freezer addition, as the addition is separated from the wetland by existing lawfully constructed improvements (i.e. restaurant building an asphalt parking lot). In addition, the project site is mapped within a seismic hazard area. Exist. Bldg. Area SF: 8,460 sq. ft. Proposed New Bldg. Area (footprint): Proposed New Bldg. Area (gross): 437 sq. ft. 437 sq. ft. Site Area: 73,020 sq. ft. (1.68 acres) Total Building Area GSF: 8,897 sq. ft. STAFF RECOMMENDATION: Staff Recommends that the Environmental Review Committee issue a Determination of Non-Significance (DNS). Project Location DocuSign Envelope ID: 69137D26-2CB8-407C-BA7B-655F480A2583 City of Renton Department of Community & Economic Development Triumph Restaurant Outdoor Freezer Alteration Staff Report to the Environmental Review Committee LUA23-000148, SA-A, ECF Report of June 12, 2023 Page 2 of 3 ERC_Triumph Freezer_FINAL ENVIRONMENTAL REVIEW In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. A. Environmental Threshold Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials: Issue a DNS with a 14-day appeal period B. Exhibits Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Site and Landscape Plan Set Exhibit 3: Building Plan Set Exhibit 4: SEPA Checklist C. Environmental Impacts The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have the following probable impacts: 1. Earth Impacts: The project site is located within a seismic hazard area, a Geotechnical Report was not included with the land use application materials, however it may be required at the time of Building Permit review. The project site is developed with an existing restaurant and a surface parking lot. The proposal includes the replacement of an existing 8’ x 12’ (96 sq. ft.) outdoor freezer with a new 23’ x 19’ (437 sq. ft.) outdoor freezer. The topography of the site is flat. According to the submitted SEPA Checklist (Exhibit 4), the proposal would include the removal of existing asphalt pavement and the replacement with a six-inch (6”) concrete slab for the freezer replacement. It is anticipated that the City’s adopted building code and construction standards would adequately mitigate any impacts of the proposed freezer replacement on the project site; therefore, no further mitigation is recommended. Mitigation Measures: None recommended. Nexus: N/A 2. Water a. Wetland Impacts: A wetland is mapped along the east side of the project site, however in accordance with RMC 4-3-050B.1.g "Sites Separated from Critical Areas", the wetland buffer would not be applicable to the proposed freezer addition, as the addition is separated from the wetland by existing lawfully constructed improvements (i.e. restaurant building an asphalt parking lot). It is not anticipated that the proposed freezer addition would adversely impact the wetland located to the east of the project site; therefore, no further mitigation is recommended. Mitigation Measures: None Recommended DocuSign Envelope ID: 69137D26-2CB8-407C-BA7B-655F480A2583 City of Renton Department of Community & Economic Development Triumph Restaurant Outdoor Freezer Alteration Staff Report to the Environmental Review Committee LUA23-000148, SA-A, ECF Report of June 12, 2023 Page 3 of 3 ERC_Triumph Freezer_FINAL Nexus: N/A b. Storm Water Impacts: A drainage report was not required to be submitted with the project application as the proposal did not include 2,000 sq. ft. of new or replaced impervious surface. The existing onsite drainage system currently flows into the storm drainage system within East Valley Road. No changes are proposed to the existing onsite storm drainage system. It is not anticipated that the proposed project would result in impacts to the existing storm drainage system, therefore no further mitigation is recommended. Mitigation Measures: None recommended Nexus: N/A 3. Transportation Impacts: The proposed freezer addition would not result in additional trip generation to the project site; therefore, a Traffic Impact Analysis was not required to be submitted with the application materials. It is anticipated that any new trips generated by the proposal would be adequately mitigated through the payment of a Traffic Impact Fee, therefore, no further mitigation is recommended. Mitigation Measures: None recommended Nexus: N/A D. Comments of Reviewing Departments The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”  Copies of all Review Comments are contained in the Official File and may be attached to this report. The Environmental Determination decision will become final if the decision is not appealed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on June 26, 2023. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. DocuSign Envelope ID: 69137D26-2CB8-407C-BA7B-655F480A2583 CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: Triumph Restaurant Outdoor Freezer Alteration Land Use File Number: LUA23-000148, SA-A, ECF Date of Meeting June 12, 2023 Staff Contact Jill Ding Senior Planner Project Contact/Applicant David Lee Techcraft Corp. 2126 NW 204th St, Shoreline, WA 98177 Project Location 3750 East Valley Rd, Renton, WA 98055 The following exhibits are included with the ERC Report: Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Site and Landscape Plan Set Exhibit 3: Building Plan Set Exhibit 4: SEPA Checklist DocuSign Envelope ID: 69137D26-2CB8-407C-BA7B-655F480A2583