HomeMy WebLinkAboutCM_1602_Construction_Mitigation_Description_230516_v1.pdf1602 Raymond Construction Mitigation: Proposed Construction – 9/1/2023 to 1/1/2024 Hours & Days of Construction – Monday through Friday 6AM-3PM. There may be a need for occasional weekend work, but don’t anticipate a ton. That would be as needed, and on Saturday with the same standard working hours noted above. Our proposed hauling / transportation will vary based on the routes that the waste management company will go to dump our dumpsters. We are proposing to have a covered dumpster on site that will be emptied on a weekly basis and depending on which hauler that is, the route may be different each week. Our project is an interior tenant improvement, we do not expect there to be any environmental impacts that need to be addressed. There will be no traffic and or transportation impacts to the City and surrounding areas due to our project. Special Hours – There will not be a need for any special hours through the duration of the project. We anticipate staying within the noted hours and days of construction as noted above. Traffic Control – Our project will have no impact to the general traffic in the City and surrounding area. The building is unoccupied, has substantial parking and driveway for all traffic. There is not a need for street and/or sidewalk closures, and the work will be limited to this building only.