Loading...
HomeMy WebLinkAboutCM_1601_Construction_Mitigation_Description_221216_v1.pdf.pdf1601 Lind Construction Mitigation: Proposed Construction – 07/2023-5/2024 Hours & Days of Construction – Monday through Friday 5AM-2PM. There may be occasional weekend work, but don’t anticipate many. Weekend work would be as needed, and on Saturday with the same standard working hours noted above. The proposed hauling / transportation will vary based on the routes that the waste management company will go to dump the dumpsters. Proposed to have a covered dumpster on site that will be emptied on a weekly basis and depending on which hauler that is, the route may be different each week. The proposed project is mostly interior tenant improvements and do not expect there to be any environmental impacts that need to be addressed. Special Hours – None; all the hauling will be done during daytime hours noted above. Traffic Control – The project will have no impact to the general traffic in the City and surrounding area. Most of the building is unoccupied and has substantial parking and driveway for all traffic. There is not a need for street and/or sidewalk closures, and the work will be limited to this site only.