Loading...
HomeMy WebLinkAboutAdden 1 CAG-15-236, Adden #1-17 DEPARTMENT OF � ECOLCJGY State of Washington AMENDMENT NO. 1 TO AGREEMENT NO.WQSWCAP-1517-Renton-00019 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND CITY OF RENTON PURPOSE: To amend the above-referenced agreement(AGREEMENT)between the state of Washington Department of Ecology(ECOLOGY)and City of Renton(RECIPIENT) for the 2015-2017 Biennial Stormwater Capacity Grants (PROJECT). The purpose of this amendment is to reduce total funding from$50,000,to$25,000. There are no changes to the effective dates or scope of work. The FY2015-17 Biennial Municipal Stormwater Capacity-Building Grant(Capacity Grant), funded via the Model Toxics Control Act(MTCA)account,has been significantly reduced due to decreased oil tax revenues. In order to address this significant decline,ECOLOGY was directed in the enacted 2015-17 Operating Budget to reduce the funding amount of the Capacity Grant. , IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: Total Cost: Original: 50,000.00 Amended: 25,000.00 Total Eligible Cost: Original: 50,000.00 Amended: 25,000.00 CHANGES TO SCOPE OF WORK Task Number: 2 Task Cost: $25,000.00 Task Title: Project Administration/Management Task Description: Conduct work related to implementation of municipal stormwater National Pollutant Discharge Elimination System (NPDES)permit requirements. If the RECIPIENT is out of compliance with the municipal stormwater National Pollutant Discharge Elimination System(NPDES)permit,the RECIPIENT will ensure funds are used to attain compliance where applicable. RECIPIENT may conduct work related to implementation of additional activities required by the municipal stormwater NPDES permits. The following is a list of elements RECIPIENT's project may include. 1)Public education and outreach activities,including stewardship activities. Version 10/30/2015 State of Washington Department of Ecology Page 2 of 6 City of Renton 2015-2017 Biennial Stormwater Capacity Grants Project AgreementNo WQSWCAP-1517-Renton-OOOl9 Amendment No 1 2)Public involvement and participation activities. 3)Illicit discharge detection and elimination(IDDE)program activities, including: a)Mapping or geographic information systems of municipal separate storm sewer systems(MS4s). b) Staff training. c)Activities to identify and remove illicit stormwater discharges. d)Field screening procedures. e)Complaint hotline database or tracking system improvements. 4)Activities to support programs to control runoff from new development,redevelopment, and construction sites, including: a)Development of an ordinance and associated technical manual or update of applicable codes. b) Inspections before, during,and upon completion of construction,or for post-construction long-term maintenance. c)Training for plan review and/or inspection staff. d)Participation in applicable watershed planning effort. 5)Pollution prevention,good housekeeping,and operation and maintenance program activities, such as: a)Inspecting and/or maintaining the MS4 infrastructure. b)Developing and/or implementing policies,procedures,or stormwater pollution prevention plans at municipal properties ar facilities. 6)Annual reporting activities. 7)Establishing and refining stormwater utilities, including stable rate structures. 8)Water quality monitoring to implement permit requirements for a Water Cleanup Plan(TMDL).Note that any monitoring funded by this program requires submittal of a Quality Assurance Project Plan(QAPP)that the DEPARMENT approves prior to awarding funding for monitoring. Monitoring, including: a)Development of applicable QAPPs. b)Monitoring activities,in accordance with a DEPARTMENT-approved QAPP,to meet Phase I/II permit requirements. 9)Structural stormwater controls program activities(Phase I permit requirement) 10) Source control for existing development(Phase I permit requirement),including: a)Inventory and inspection program. b)Technical assistance and enforcement. c) Staff training. I 1)Equipment purchases that result directly in improved compliance with permit requirements.Allowed costs for equipment purchases must be specific to implementing a permit requirement(such as a vactor truck)rather than general use(such as a general use pick-up truck). Qualified equipment purchases include but are not limited to: a)Illicit discharge testing equipment and materials. b) Vactor truck or sweeper truck or MS4 maintenance activities. c)Electronic devices dedicated to mapping of MS4 facilities and attributes. d) Software dedicated to tracking permit implementation activities. As a deliverable,documentation of all tasks completed is reyuired. Documentation includes but is not limited to: maps, field reports,dates and number of inspections conducted, dates of trainings held and participant lists,number of illicit discharges investigated and removed, summaries of planning, stormwater utility or procedural updates,annual reports,copies of approved QAPPs,summaries of structural or source control activities,summaries of how equipment purchases have increased or improved permit compliance. Task Goal Statement: Vers�on 10/30/2015 State of Washington Department of Ecology Page 3 of 6 City of Renton 2015-2017 Biennial Stormwater Capacity Grants Pro�ect Agreement No.WQSWCAP-1517-Renton-00019 Amendment No. 1 This task will improve water quality in the State of Washington by reducing the pollutants delivered by stormwater to lakes,streams, and the Puget Sound by implementing measures required by Phase I and II NPDES permits. Task Ex�ected Outcome: RECIPIENTS will implement measures required by Phase I and II NPDES permits. Deliverables Number Description Due Date ].1 Quarterly Progress Reports 1.2 Recipient Closeout Report 13 Project Outcome Summary Report 2.1 Documentation of tasks completed CHANGES TO THE BUDGET Funding Distribution EG160452 Funding Title: Capacity Grant FY17 Funding Type: Grant Funding Effective Date: 07/O1/2016 Funding Expiration Date: 03/31/2017 Funding Source: Title: ELSA: Environmental Legacy Stewardship Account Type: State Funding Source%: 100% Description: MTCA Approved Indirect Costs Rate: Approved State Indirect:25% Recipient Match%: 0% InKind Interlocal Allowed: No InKind Other Allowed: No Is this Funding Distribution used to match a federal grant? No Capacity Grant FY17 Task Total Permit Implementation $ 0.00 Vers�on 10/30/2015 State of Washington Department of Ecology Page 4 of 6 City of Renton 2015-2017 Biennial Stormwater Capacity Grants Project AgreementNo WQSWCAP-1517-Renton-OOOl9 Amendment No 1 Total: $ 0.00 Version 10/30/2015 .�-- State of Washington Department of Ecology Page 5 of 6 City of Renton 2015-2017 Biennial Stormwater Capacity Grants Project AgreementNo.WQSWCAP-1517-Renton-00019 Amendment No. 1 FundinE Distribution Summarv Recipient/Ecology Share Funding Distribution Name Recipient Match % Recipient Share Ecology Share Total Capacity Grant FY16 0 % $ 0.00 $ 25,000.00 $ 25,000.00 Capacity Grant FY17 0 % $ 0.00 $ 0.00 $ 0.00 Total $ 0.00 $ 25,000.00 $ 25,000.00 � � .4 � ' a..t � . ,,,,,r . 'F , r " , . mi +�r Version 10/30/2015 —� State of Washington Depariment of Ecology Page 6 of 6 City of Renton 2015-2017 Biennial Stormwater Capncity Grants Project AgreementNo.WQSWCAP-1517-Renton-OOOl9 Amendment No.1 AUTHORIZING SIGNATURES All other terms and conditions of the original Agreement including any Amendments remain in full force and effect, except as expressly.provided by this Amendment. The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective organizations to this Amendment. This amendment will be effective 07/01/2015. IN WITNESS WHEREOF: the parties hereto,having read this Amendment in its entirety,including all attachments, do agree in each and every particular and have thus set their hands hereunto. Washington State City of Renton Department of Ecology By� l 03 / ZEl/� BY� L�� t 7 �Heather R. Bartlett Date Denis Law, Mayor Date Water Quality Program Manager Attest: . �O � J son A. Se ,CMC,City Clerk Template Approved to Form by N��N��111i1������►p Attorney General's Office ``.��`���``����R�FN�.����i,� � �� ��` ��. 0 �� ; x --,ti � _ * SEAL - * � y�y��'•, � � " � i" C� ii ..•� 0 S �'�i,��+A��''��n������ar�``6;`w���• ����hl'aR�;ED S�Q;,````��. Version 10/30/2015