Loading...
HomeMy WebLinkAboutAdden 01 CAG-15-089, Adden #1-16 � Washington State 'j Department of`11r�nsportation Supplemental Agreement OrganizationandAddress Number 1 KPG, Y.S. 753 9th Ave N, Seattle, WA 98109 Originai Agreement Number CAG-15-089 Phone: 253-627-0720 Project Number Execution Date Completion Date TED4003813 10/23/2015 12/31/2017 Project Title New Maximum Amount Payabie Kainier Ave South-Phase 4(S.3rd St to NW 3rd Ylaee) $$21,63�.12 Description of Work Provide design work for Rainier Ave Sauth - Phase 4, which includes the following: develop 3 channelization alternatives, traffic analysis, preliminary right-of=way area estimates, pavement assessment reports and public outreach. The Loca1 Agency of�'ity �f Renton desires to supplement the agreement entered in to with K�'G.P S and executed on 1O/23/2015 and identified as Agreement No. CAG-15-089 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: The General Scope of Work of the Original Agreement is supplemented to include the attached Exhibit 2. I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: �,hP �omnlet�nn c�atP i� chan�cd frt�m l2/31l16 to 121�1/17 III Section V, PAYMENT, shall be amended as follows: See the attaehed in Exhibits "A", 1, D, and E. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. gy. ;;a;:.Q� �'�'E'���i�,,,/, w r ���� G- °2- G � u tant Signature _ � y Approving Au horit Signatur�' Date �� �� �c ��'tte �' - !o �l ��,Z. � � y Jas n Seth, i erk DOT Form 140-063 � ;���0� `\ Revised 09/2005 �.,; ��;�T_�i"' ''"'��,u!�., , ' Exhibit"A" Summary of Payments Basic Supplement#1 Total Agreement Direct Saiary Cost $ 36,016.47 $ 91,597.56* (Exhibit 1) $ 127,614.03 Overhead $47,358.06 $ 120,441.63 $ 167,799.69 (Including Payroll Additives) Direct Non-Salary Costs $406.80 $ 140,104.47 $ 140,511.27 Fixed Fee $ 10,804.94 $ 27,479.27 $ 38,284.21 Total $ 94,58627 $ 379,622.93 $474,209.20 DOT Form 140-063 Revised 09/2005 EXHIBIT 1 PAYMENT A/E Professional Services Contract with KPG, P.S., CAG-15-089, Supplement No. 1 Rainier Ave S—S 3�d St to NW 3`d PI (aka Rainier Ave Phase 4) Changed From Changed To Total Amount Authorized $94,586.27 $474,209.20 Management Reserve Fund $4,000.00 $47,420.92 Maximum Amount Payable $98,586.27 $521,630.12 *Summary of Payments Direct Salary Cost(DSC)for Supplement No. 1, CAG-15-089 Estimated DSC for Supplement No. 1 $108,392.18 DSC Remainder from Original Contract, CAG-15-089 ($16,794.62) DSC Supplement No. 1,CAG-15-089 $91,597.56 EXHIBIT 2 MODIFIES EXHIBIT A OF THE ORIGINAL AGREEMENT SCOPE OF WORK SUPPLEMENT 1 AGENCY: CITY OF RENTON CONSULTANT: KPG, P.S. (KPG, Inc.) CONTRACT: CAG-15-089 PROJECT: RAINIER AVE 5-5 3'd St to NW 3�d PI A. PROJECT DESCRIPTION The City of Renton is planning to continue infrastructure improvements to the Rainier Ave S corridor with a new Phase 4. The approximate project limits of the new phase are between S 3rd St and NW 3rd PI. Similar to Phase 3, this new phase includes infrastructure improvements for enhanced transit mobility, traffic safety and pedestrian safety. The goals of Phase 4 are to enhance traffic flow, improve safety, eliminate sub-standard conditions and provide an enhanced pedestrian environment. B. PURPOSE The City of Renton (AGENCY) is requesting A&E Professional Services from KPG, P.S. (CONSULTANT) for the design of the Rainier Ave S—S 3rd Street to NE 3rd Place Project (PROJECT). The design of this project is being conducted in multiple phases. Design Phase 1 of this project was completed in January 2016. This supplemental agreement covers the Scope of Work (SCOPE) required to complete Design Phase 2 (PHASE 2). PHASE 2 includes the following: 1. develop three (3) roadway channelization alternatives 2. update traffic operations analysis, 3. preliminary right of way and permanent easement area estimates, 4. pavement assessment report with findings, conclusions and recommendations, 5. public outreach The AGENCY anticipates future design phases will include preliminary engineering design, environmental documentation support, right of way acquisition support,final plans, specifications and estimate and engineering support during construction. The AGENCY anticipates that these future design phases will be initiated through one or more supplement agreements to this contract. C. DESIGN CRITERIA The design of this PROJECT shall be in accordance with the following: • WSDOT Local Agency Guidelines (LAG), M 36-63, December 2015 • WSDOT Design Manual, M 22-01, November 2015 City of Renton Page 1 of 19 KPG Rainier Ave S—5 3�d St to NW 3`d PI Supplement 1 5/25/2016 • WSDOT Pavement Policy, June 2015 • WSDOT Geotechnical Design Manual, M 46-03, May 2015 +� WSDOT Highway Runoff Manual, M 31-16, February 2016 • WSDOT Hydraulics Manuai, M 23-03,January 2015 • WSD07 Right of Way Manual, M 26-01, December 2014 • WSDOT Roadside Manual, M-25-30, February 2416 + WSDOT Traffic Manual, M 51-02, luly 2015 � FHWA Manual on Uniform Traffic Control Devices (MUTCD), 2009 Edition • AASHTO A Policy on Geometric Design of Highways and Streets, 2011 Edition * AASHTO Roadside Design Guide, 2011 Edition • AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals, 2015 Edition • City of Renton Standard Details • King County Surface Water Design Manual, 2009 • City of Renton Amendments to the 2009 King County Surface Water Design Manual • Washington State Dept. of Health Water System Design Manual, DOH 331-123, December 2009 � City of Renton Watery System Plan, 2012, Appendix J • Washington State Dept. of Ecology, Criteria for Sewage Works Design, 98-37 WQ August 2008 The project construction specifications shall be based on the WSDOT Standard Specifications. At this preliminary design phase no special provisions are to be developed. However, design decisions for this phase must consider requirements specified in the WSDOT Standard Specifications. The edition to be utilized for the construction contract provisions will be determined at a later date and specified in a future supplement for the final engineering design phase. D. GENERAL ASSUMPTIONS The following SCOPE and associated costs are based on the assumptions outlined below: + FHWA Surface Transportation Program (STP)funds are being utilized for design services included in this contract. Therefore, this contract is subject to al! rules and regulations associated with this funding source. • Any task or deliverable requested by the AGENCY that is not specifically defined in this SCOPE will not be performed by the CONSULTANT unless one of the following occur: ✓ The CONSULTANT provides a written request to the AGENCY to use Management Reserve funds. This request shall summarize the scope of additional work, estimated hours and associated direct salary costs by task and adjustment in total fee. Once received,the AGENCY will evaluate the request. If approved, the AGENCY will issue a Notice to Proceed in writing. Once received, the CONSULTANT may proceed with the additional work. City of Renton Page 2 of 19 KPG Rainier Ave S—S 3'd St to NW 3'd Pl Supplement 1 5/25/2016 ✓ The CONSULTANT provides a draft supplemental agreement to the AGENCY for review and negotiation. The supplemental agreement shall be complete, including the scope of additional work, estimated hours and associated direct salary costs by task, adjustment in total fee and total amount authorized for the contract. 7he AGENCY will review the supplement agreement. Once complete, further negotiations may occur between the parties. Once a scope of work and budget is agreed to,two (2) complete signed originals will be delivered to the AGENCY, by the CONSULTANT, for execution by the AGENCY. Once executed, the AGENCY will issue a Notice to Proceed in writing. Once received, the CONSULTANT may proceed with the additional work. • The AGENCY is responsible for the following, as necessary: ✓ Reserve and arrange conference room(s) as necessary, for meetings heid at Renton City Hall. ✓ Prepare and mail project notices, as required. ✓ Prepare and publish all public notices, newsletters and news releases. ✓ Host and update a project website. ✓ All coordination with franchise and public utilities, as necessary. ✓ Provide CONSULTANT (via AGENCY's GIS) with existing record drawings (as-built plans) of street and public utilities (water, sanitary sewer, storm), right-of-way (ROW) plans, horizontal and vertical monument information, GIS maps and other applicable information, as may be available. ✓ Provide CONSULTANT with all AGENCY standard contract documents and AGENCY bid forms in Microsoft Word, Microsoft Excel and Adobe pdf formats, as applicable. ✓ Provide CONSULTANT with pdf copies of the final NEPA and SEPA checklists and associated determinations. ✓ Review all submittals from CONSULTANT and provide written comments back to CONSULTANT within 20 working days. Written comments may take the form of red line markups. ✓ Entering into a contract with a separately selected consultant for environmental services and permitting. ✓ Entering into a contract with a separately selected consultant for right-of-way acquisition services. E. TASK ASSUMPTIONS All assumptions are listed below, at the beginning of each task. F. DELIVERABLES All deliverables to be prepared and produced by the CONSULTANT, as part of this SCOPE, are identified at the end of each task listed below. City of Renton Page 3 of 19 KPG Rainier Ave S—S 3rd St to NW 3'd PI Supplement 1 5/25/2016 G. SCOPE TASK 1—PROJECT MANAGEMENT FOR DESIGN PHASE NO. 1 Design Phase 1 is complete. Therefore, Task 1 is complete and no more hours can be charged to this task. TASK 2 -SURVEYING Design Phase 1 is complete. Therefore, Task 2 is complete and no more hours can be charged to this task. TASK 3—PROJECT MANAGEMENT FOR DESIGN PHASE NO. 2 The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 3: • The budget shown in Exhibit D assumes this task is six (6) months in duration. Provide project management of CONSULTANT services, coordination with the AGENCY, monthly progress reports and invoicing. This effort will include the following elements: 3.1 Administration, Coordination and Supervision • Initiate project set-up including establishment of timesheets (charge codesj,creation of project files (electronic and physical) and scheduling of CONSULTANT personnel work activities. • Supervision of CONSULTANT personnel and activities to ensure compliance with contract scope and schedule and proper charging of time against the contract. • Oversite of sub-consultant activities for compliance with contract scope, schedule and budget. 3.2 Invoicing • Preparation of monthly invoices with progress reports that include the following: ✓ Spreadsheet summary of budget, expenses to date, expenses for work period, estimate to complete and estimate at completion, for each task. ✓ Summary of work accomplished for the work period. ✓ Summary of outstanding issues to be resolved by the AGENCY. ✓ Estimate of percent of work complete for the work period, to justify fee earned. ✓ Graph showing monthly budgeted expenses and actual expense, for the time period of the contract. ✓ Backup detail that includes the name, direct salary rate and hours charged by date, for each individual charging time to this contract, for the work period. City of Renton Page 4 of 19 KPG Rainier Ave S—S 3'�Sf f0 NW 3rd P� Supplement 1 5/25/2016 ✓ Backup detail of all direct non-salary casts included in the invoice for the work period. 3.3 Projec# Meetings and Site Visits • Project Kickoff Meeting—After receiving a Notice to Proceed (NTP) from the Agency, set up a project kickoff ineeting with key Agency and CONSULTANT design team personnel. The purpose of the meeting is to discuss key elements of the SCOPE, project schedule timelines and critical path elements. This meeting is to be held at Renton City Hall. * For any face-to-face project meetings with the AGENCY, the CONSULTANT shall prepare an agenda, sign-in sheet, record of ineeting including a list of action items, if any. • Bi-Monthly design coordination meetings with AGENCY staff. These meetings are to be held at Renton City Hall. It is estimated that 12 meetings will be held during Design Phase 2. + Internal design coordination meetings—The CONSULTANT project manager wiil conduct regular internal design coordination meetings with key design team members including sub-consultants. DELIVERABLES The fol{owing deliverables and delivery times are included in Task 3. � Meeting agenda(s)in Microsoft Word format—Delivered to the AGENCY one (1J business day before scheduled meeting. • Sign-in sheet(sJ in Microsoft Word format—Delivered to the AGENCY at the scheduled meeting. • Draft record of ineeting in Microsoft Word format—Delivered to the AGENCV three (3J business days afterscheduled meeting. • Fina1 record of ineetinq in Microsoft Word format—Delivered to the AGENCY three (3) business days after comments received from AGENCY. • Monthly invoices with progress reports—Detivered to the AGENCY monthly. TASK 4—ADDITIONAL FIELD SURVEY The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 4: • The budget shown in Exhibit D assumes this task is three (3) months in duration. 4.1 Field survey to locate paint marks provided per Task 5.1 and any surface features not surveyed during Design Phase 1 (valves, manholes, catch basins,junction boxes, vaults). Irrigation systems will not be included. The CONSULTANT will prepare a utility base map from this information. City of Renton Page 5 of 19 KPG Rainier Ave S—S 3'd St to NW 3rd P� Supplement 1 5/25/2016 4.2 Perform observation and measure-downs of existing storm drain catch basins and manholes and sanitary sewer manholes. The approximate size,type (brick, concrete), and genera! condition of the structures to confirm suitability for continued use, and approximate size, location, flow direction and elevation of pipe inverts will be documented. These observations will be made from the surface. DELIVERABLES The following deliverables and delivery times are included in Task 4. + Two(2)compact disks with electronic copy of the completed updaied field topographic basemap in AutoCAD format and a basemap p/ot in pdf format—Delivered to the AGENCV within twelve (12) weeks after the Notice to Proceed date. TASK 5—UTILITY MAPPING AND INSPECTION The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 5: � The budget shown in Exhibit D assumes this task is three (3) months in duration. 5.1 CONSULTANT shall utilize the services of a utility locating company to locate and mark with paint all underground utility locations within the project footprint. Service line locations for existing storm drain and sanitary sewer pipes will not be field located by utility locating company. 5.2 Request record drawings from franchise utilities. Obtain record drawings from AGENCY far water, sewer and storm utilities using AGENCY's COR maps (available through AGENCY's external web site). Use record drawings obtained from franchise utilities and AGENCY utilities to cross-check the locate paint marks prepared in Task 4.1. Update base map as applicable. Record drawings for all utilities will be used to verify the type, size and location of utilities within the project limits. 5.3 CONSULTANT shall utilize the services of a CCTV pipeline inspection company, to video and document the condition of the existing storm drain and sanitary sewer pipes. The location and condition of laterals stubs will be documented in a report. DfLIVERABLES The following deliverables and delivery times are included in Task 5. • Two (2)compact disks wirh electronic copies of the completed CCTV inspection reports, videos, and associated data—Delivered to the AGENCY within twelve (12) weeks after the Notice to Proceed date. City of Renton Page 6 of 19 KPG Rainier Ave S—S 3'd St to NW 3'd PI Supplement 1 5/25/2016 TASK 6—TRAFFIC ANALYSIS REPORT The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 6: • The budget shown in Exhibit D assumes this task is five (5) months in duration. A preliminary Traffic Analysis was completed in August 2014 titled "Rainier Ave S—Phase IV Traffic Analysis". The analysis included recommendations for improvements to the corridor and a preliminary channelization plan from S 3rd Street to the northern City limits. The original analysis did not include two-way traffic operations on S 2nd Street and S 3rd Street through downtown Renton. This task will update the traffic operations analysis to include two-way traffic operations on S 2nd Street and S 3rd Street. Synchro/SimTraffic 9 shall be used for this task. 6.1 The CONSULTANT shall update the existing conditions portion of the traffic analysis to include the AM peak hour, PM peak hour and mid-day (1 PM to 3 PM) traffic volumes. Three (3) Synchro models are anticipated, one for each time period. The CONSULTANT shall update the Synchro models with signal timing provided by the AGENCY and traffic data obtained in Task 11. The following existing parameters shall be checked/updated for the 2016 existing conditions Synchro models: • Distances between intersections • Lane approach info + Saturation flow rate as calculated by Synchro methodology • Lane width + Grade (%) • Storage length • Number of storage lanes • Detector information • Lane utilization factor for movements with two or more lane approaches • Heavy vehicle (%) • Signal timing • Pedestrian calls The 2016 existing conditions Synchro models shall be calibrated to match real-world conditions using SimTraffic. Saturation flow rates shall use Synchro methodology which calculates the rate based on adjustment to lane widths, grade, lane utilization, turning movements and pedestrian-bicycle conflicts, and reflects changes for future conditions. For the SimTraffic, a minimum of five (5) and maximum of ten (10) simulation runs shall be performed for each 2016 existing conditions Synchro model. The results shall be City of Renton Page 7 of 19 KPG Rainier Ave S—5 3�d St to NW 3re PJ Supplement 1 5/25/2016 averaged. A 10 minute seed time and 60 minute record time shall be used for each run. The SimTraffic results shall be compared with the traffic data collected in Task 11 to determine if the model results are in line with observed traffic patterns and volumes. The output from the Synchro models shall be included in an appendix to the report. This output shall include the following: * Intersection report for the following signalized intersections: ✓ Rainier Ave S and SW Sunset Blvd./S 3rd St ✓ Rainier Ave S and 5 2nd St ✓ Rainier Ave S and Renton Ave Ext./Airport Way • The intersection report shall include the following: ✓ Lane, volume, timing and actuated inputs ✓ Queues ✓ los info ✓ Volume/Capacity Ratio ✓ Delay • HCM reports for the following unsignalized intersections: ✓ Rainier Ave S and SW Victoria St ✓ Rainier Ave S and Hayes PI SW ✓ Rainier Ave S and S Tobin St ✓ Rainier Ave N and Nelson PI NW ✓ Rainier Ave N and NW 3rd PI 6.2 The CONSULTANT shall perform a traffic operations analysis for the 2035 AM, mid-day and PM peak hours The 2035 PM analysis wilt use the traffic forecasts from the Downtown Circulation Traffic Analysis, which includes two-way operations on S 2nd Street and S 3rd Street. The AGENCY does not have AM or mid-day travel demand models, and the 2035 AM and mid-day forecasts will be developed based on the growth rates identified for the 2035 PM peak hour. The CONSULTANT shall analyze traffic operations for 2035 baseline conditions (based on 2016 channelization of Rainier) and the three (3) channelization alternatives, described in Task 10. Three (3) Synchro models are anticipated, one for each time period, for the 2035 baseline, 2035 alternative 1, 2035 alternative 2 and 2035 alternative 3 (total = 12). The report shall include a summary of the LOS at each signalized intersection, for 2016 existing conditions, 2035 baseline conditions and each alternative described in Task 10. The following existing parameters shall be input based on each alternative: • Distances between intersections • Lane approach info City of Renton Page 8 of 19 KPG Rainier Ave 5—5 3'd St to NW 3`d PI Supplement 1 5/25/2016 • Saturation flow rate as calculated by Synchro methodology • Lane width • Grade (%) • Storage length • Number of storage lanes • Detector information • Lane utilization factor for movements with two or more lane approaches i Heavy vehicle (%) • Signal timing • Pedestrian calls The output from the Synchro models shall be included in an appendix to the report. This output shall include the following: • Intersection report for the following signalized intersections: ✓ Rainier Ave S and SW Sunset Blvd./S 3rd St ✓ Rainier Ave 5 and S 2nd St ✓ Rainier Ave S and Renton Ave Ext./Airport Way • The intersection report shall include the following: ✓ Lane, volume, timing and actuated inputs ✓ Queues ✓ Los info ✓ Volume/Capacity Ratio ✓ Delay + HCM reports for the following unsignalized intersections: ✓ Rainier Ave S and SW Victoria St ✓ Rainier Ave S and Hayes PI SW ✓ Rainier Ave S and S Tobin St ✓ Rainier Ave N and Nelson P) NW ✓ Rainier Ave N and NW 3rd PI 6.3 The CONSULTANT shall perform the traffic analysis to add one (1} pedestrian actuated signalized crossing of Rainier Avenue S in the vicinity of SW Victoria Street. For the non- motorized crossing,the CONSULTAN7 shall identify the appropriate crossing location, crossing treatments, type of signal, and conduct a warrants analysis for a HAWK or pedestrian-only signal based on existing count data. The previous Rainier Avenue S Phase 4 traffic analysis included a new pedestrian-only signal, located in the vicinity of SW Victoria Street that could require the closure of the Hayes Place SW connection to Rainier Avenue S. The Consultant will further evaluate the traffic operations and impacts of this non-motorized crossing, including other lacation options to avoid the City of Renton Page 9 of 19 KPG Rainier Ave S—5 3rd St to NW 3rd P� Supplement 1 5/25/2016 potential of a street closure. The proposed location may vary depending on the channelization alternative. 6.4 Since plans for the Central Sound Aerospace Training Center have been indefinitely postponed,the CONSULTANT shall update the previous traffic operations analysis and channelization at the Rainer Avenue S/NW 3rd Place intersection. The analysis will include a signal warrant analysis for the intersection, based on the existing volumes or future potential use of the parking lot at the former Chamber of Commerce Building. Due to the proximity to the intersection, Nelson Place NW may need to be restricted to right-in and right-out access or the connection to Rainier Avenue S may be closed. 6.5 The CONSULTANT shall update the previous Traffic Analysis Report with the new information from Tasks 6.1 to 6.4 along with applicable data collected in Task 11. The CONSULTANT shall provide a draft Preliminary Traffic Analysis Report for review by the AGENCY. Once comments are received fram the AGENCY,the CONSULTANT shall update the report and submit a final Preliminary Traffic Analysis Report to the AGENCY. DELIVERABLES The following deliverables and delivery times are included in Task 6. + Two(2) CD's with electronic pdf copies of the draff Preliminary Traffic Ana/ysis— Delivered to the AGENCY within sixteen (16) weeks after fhe Notice to Proceed date. � Two (2)DVD's with electronic copies of pretiminary Synchro models(total=15)— Delivered to the AGENCY within sixteen (16J weeks after the Notice to Proceed date. • Two (2) CD's with electronic pdf copies of the final Preliminary Traffic Analysis and responses to review comments—Delivered to the AGENCY within two (2) weeks after comments are received from AGENCY. • Two(2)DVD's with electronic copies of final Synchro models(tota1=15)—Delivered to the AGENCY within two (2) weeks after comments are received from AGENCY. TASK 7—PAVEMENT ASSESSMENT REPORT The following items are to be performed by the sub-consultant, AMEC Foster Wheeler Environment & Infrastructure, Inc. (AMEC), under this task. Assumptions for Task 7: • The budget shown in Exhibit D assumes this task is four (4) manths in duration. • Base maps showing topography and existing structures and utilities will be provided for AMEC's use prior to the field exploration. • AGENCY will provide ROW Use Permit(s) based on traffic control plans provided by AMEC. Any fees or deposits related to ROW Use Permits will be waived by the AGENCY. City of Renton Page 10 of 19 KPG Rainier Ave 5—5 3'd St to NW 3'd PI Supplement 1 5/25/2016 • Field exploration can be conducted during normal business hours (Monday through Friday, 7 am -7 pm) within traffic lanes subject to any restrictions that may be imposed by ROW Use Permit conditions and/or City Ordinances. • Asphalt and concrete pavement will be less than 16 inches thick. If the pavement is thicker than 16 inches,the field costs will increase and a budget increase may be needed. + Pavement core holes will be patched with hot-mix asphalt. • AGENCY will provide historical pavement information (if available), such as pavement condition reports and as-builts from previous paving projects. • Preliminary plans showing the proposed improvements will be provided to Amec Foster Wheeler for engineering analyses and report preparation. + The CONSULTANT with input from the AGENCY will provide traffic volumes, assumed design life, and assumed traffic growth for pavement design. • Engineering will be based on the WSDOT Pavement Interactive and AASNTO design methods to the extent practical. Amec Foster Wheeler will conduct a field investigation and analyze the existing pavement and subgrade conditions within the project limits. These services wili include visual surface mapping of pavement conditions, falling weight deflectometer (FWD)testing, pavement coring, and the preparation of a preliminary pavement assessment report that will provide up to five (5) options for pavement restoration. 7.1 Administration, Coordination and Supervision + Initiate project set-up including establishment of timesheets (charge codes), creation of project files (electronic and physical) and scheduling of Amec Foster Wheeler personnel work activities. • Coordinate task work activities with CONSULTANT and project schedule. • Supervision of Amec Foster Wheeler personnel and activities to ensure compliance with contract scope and schedule and proper charging of time against the contract. • Oversite of activities of sub-consultants and service companies for compliance with contract scope, schedule and budget. 7.2 Invoicing • Preparation of monthly invoices with progress reports that include the following: ✓ Spreadsheet summary of budget, expenses to date, expenses for invoice period, estimate to complete and estimate at completion, for each task assigned to Amec Foster Wheeler. ✓ Summary of work accomplished for the invoice period. ✓ Estimate of percent of work complete for the invoice period, to justify fee earned. ✓ Summary of outstanding issues to be resolved by the AGENCY and/or CONSULTANT. City of Renton Page 11 of 19 KPG Rainier Ave S—5 3rd St to NW 3'd PI Supplement 1 5/25/2016 ✓ Backup detaii that include the name, direct salary rate and hours charged by date, for each individual charging time to this contract, for the work period. ✓ Backup detail of all direct non-salary costs included in the invoice for the work period. 7.3 Project Meetings • Project Kickoff Meeting—After receiving a Notice to Proceed (NTP) from the CONSULTANT, attend a project kickoff ineeting with key Agency and CONSULTANT design team personnel. The purpose of the meeting is to discuss key elements of the SCOPE, project schedule timelines and critical path elements. This meeting is to be held at Renton City Hall. • Design coordination meetings with AGENCY and CONSULTANT staff. These meetings are to be held at Renton City Hall. It is estimated that Amec Foster Wheeler will attend up to 3 meetings. • Internal design coordination meetings—Amec Foster Wheeler will conduct regular internal design coordination meetings with key design team members and as applicable Amec Foster Wheeler sub-consultants. 7.4 Amec Foster Wheeler will research and review relevant documents that include the following: � Available construction documents provided by the City from previous projects along Rainier Avenue. � Design and construction documents from Rainier Avenue S Phase 3. • Pavement condition reports from the AGENCY (if available). � Traffic counts from the CONSULTANT (see Task 11). • Topographic survey showing existing surface features and utilities. 7.5 Amec Foster Wheeler will conduct field exploration of the project limits. In general, field exploration wi11 consist of site reconnaissance, falling weight deflectometer (FWD) testing, and pavement coring. Amec Foster Wheeler will perform the site reconnaissance and oversee the testing services. The FWD testing and pavement coring will be a service subcontracted by Amec Foster Wheeler. 7.5.1 Site Reconnaissance: An Amec Foster Wheeler geologist and geotechnical engineer will walk the length of the project to identify significant surface geotechnical features (like pavement settlement and cracking) which will be marked on the survey drawings provided by CONSTULTANT. They will also select potential coring locations that are located with the project limits and accessible. Potential coring locations shall be located outside wheel lines, as much as passible. The selected locations will be marked with white paint for utility locators, prior to any digging. City of Renton Page 12 of 19 KPG Rair►ier Ave S—S 3'd St to NW 3`d PI Supplement 1 5/25/2016 7.5.2 Field Exploration Preparation: The following activities will be performed in preparation of the subsurface investigation: • Amec Foster Wheeler will prepare traffic control plans and apply for a ROW Use permit from the AGENCY. • Amec Foster Wheeler will schedule FWD testing, coring, patching and traffic control. • Amec Foster Wheeler will notify the Underground Utility Location Center of the proposed drilling locations and allow time for the utilities in the vicinity to be located with paint. 7.5.3 Field Exploration: This initial phase of work is intended to characterize the existing pavement conditions. 7.5.3.1 Amec Foster Wheeler will subcontract Pavement Consultants, Inc. to perform the falling-weight deflectometer(FWD)testing along#he alignment of the project to obtain pavement and subgrade modulus values. 7.5.3.2 Amec Foster Wheeler will subcontract the services of a concrete coring company to core the asphalt and concrete pavement at 15 to 25 selected locations to determine the thickness and types of pavement. Locations will be determined in the field by Amec Foster Wheeler personnel. The core holes will be 6 to 8 inches in diameter. The budget assumes three days of coring. The number of cores will depend on the time required to set up and move the traffic control, and the thickness of the pavement. After collecting the cores, the holes will be backfilled with Ready-Mix concrete. 7.5.3.3 Amec Foster Wheeler will subcontract the services of a paving contractor to patch the core holes with Ready-Mix concrete. 7.5.3.4 Amec Foster Wheeler will subcontract the services of a traffic control company to place signs, cones, and flaggers and a barrier truck to route traffic around the work area in accordance with AGENCY approved traffic control plans. 7.6 Amec Foster Wheeler will prepare a Preliminary Pavement Assessment Report that summarizes findings, conclusions and recommendations. The report will include up to five (5) options for pavement restoration. A draft preliminary report will be provided to the CONSULTANT for review by the CONSULTANT and AGENCY. Once review comments are received, a final preliminary report will be submitted to the CONSULTANT to deliver to the AGENCY. DELIVERABLES: The following deliverables and delivery times are included in Task 7. � Completed ROW Use Permit application and associated traffic contro/p/an for FWD testing—Delivered to the AGENCY's permit caunter within eight(8J weeks after the City of Renton Page 13 of 19 KPG Rainier Ave S—5 3r°St to NW 3'd PI Supplement 1 5/25/2016 Notice to Proceed date. • Completed ROW User Permit application and associated traffic contro/plan(sJ for pavement coring—Delivered to the AGENCY's permit counter within eight(8J weeks after the Notice to Proceed date. � Two (2J CD's with electronic pdf summaries of FWD testing resu/ts and pavement thicknesses at core locarions—Delivered to the AGENCY within twelve (12J weeks of the Notice to Proceed date. • Two(2) CD's with electronic pdf copy of draft Preliminary Pavement Assessment Report—Delivered to the Agency within twelve (12) weeks after the Notice to Proceed date. • Two (2) CD's with electronic pdf copy of final Preliminary Pavement Assessment Report and responses to review comments—Delivered to the Agency within two (2J weeks after review comments received. TASK 8—COMMUNITY AND AGENCY COORDINATION The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 8: • The budget shown in Exhibit D assumes this task is six f 6) months in duration. 7his task covers the effort required for the public involvement process during the development of the project. The goal of this effort is to obtain input from project stakeholders, including property and business owners located within the project limits, Renton residents living in the vicinity of the project and the public traveling through the corridor. The purpose is to build public support for the project and identify key areas of concern so they can be addressed at this preliminary stage of design. 8.1 The CONSULTANT shall attend up to 40 meeting with property owners and 40 meetings with business owners. The CONSULTANT shall take notes at these meetings and develop a project issues list based on issues identified by the property owners and/or business owners about the project. 8.2 The CONSULTAIVT shall prepare for and attend one (1) Project Open House. As part of the planning it is assumed the CONSULTANT shall attend one (1) planning meeting at AGENCY prior to the open house. It is anticipated that the following items will be prepared by the CONSULTANT for the open house: open house flyer, sign in sheet, comment form, 3 roll-plots, photos of existing conditions, photos of before/after of Rainier Phase 3 , project schedule exhibit and other informational exhibits conveying general project information (i.e. project goals, project budget, etc.). Once the meeting is complete,the CONSULTANT shall review the comments and add any applicable City of Renton Page 14 of 19 KPG Rainier Ave 5—S 3'd St to NW 3'd PI Supplement 1 5/25/2016 concerns to the project issues list developed in Task 8.1. DELIVERABLES: The following deliverables and delivery times are included in Task 8. • Draft Open House Materials listed in Task 8.2—Delivered to the AGENCY one (1J week before the open house. + Fina/Open House Materials listed in Task 8.2—Delivered to the AGENCY at the open house. • Two(2J compact disks with electronic copies of Final Open House Materials and spreadsheet summpry of project issues lisr—Delivered to the AGENCY one week after rhe open house. TASK 9—PRELIMINARY RIGHT OF WAY INVESTIGATION The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 9: + The budget shown in Exhibit D assumes this task is six (6) months in duration. • Title reports for 40 tax parcels will be obtained by the AGENCY and delivered to the CONSULTANT on one (1) CD or DVD. This task covers the effort required to establish the existing right of way along the corridor. 9.1 Research Records. Determine which existing corners and monuments should be field located and surveyed. Review title reports received from AGENCY. 9.2 Calculations for existing ROW centerline alignment, ROW, and property lines. Using the research information and the survey work described in Task 9.1, calculate location and surveyed corners, roadway features and monuments. The CONSULTANT will determine the existing centerline alignment for Rainier Avenue South within the project limits defined in this SCOPE. The existing ROW centerline will be defined geometrically using Washington state plane coordinates and stationing will be assigned to the alignment. Property line locations will be established on project base map. 9.3 The CONSULTANT shall prepare a summary of estimated ROW take and permanent easement areas for each parcel, for each alternative described in Task 10. DEt/VERA8lE5: The following deliverables and delivery times are included in Task 9. City of Renton Page 15 of 19 KPG Rainier Ave S—5 3rd St to NW 3'°PI Supplement 1 5/25/2016 • One (1)Excel spreadsheet summary(delivered via e-mail)of estimated right-of-way take and permanent easement areas for each parcel,for each alternative(3 spreadsheet summaries total)—Delivered to the AGENCY within twenty(20) weeks after the Notice to Proceed date. TASK 10— PRELIMINARY ROADWAY ALTERNATIVES The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 10: • The budget shown in Exhibit D assumes this task is six (6) months in duration. • All drafting will be done in accordance with standards listed in Exhibit C. • For the purposes of this alternatives analysis the AGENCY is assuming this project qualifies as a "re-construction project" as defined in the WSDOT LAG Manual. Therefore, the street design elements will be subject to the requirements of the WSDOT LAG Manual, Local Agency Design Matrices. • The CONSULTANT will not develop a horizontal alignment for each alternative. The horizontal alignment of the preferred alternative will be prepared in the next design phase. * The CONSULTANT will analyze and summarize the traffic impacts for each alternative in the traffic analysis to be performed in Task 6. 10.1 The CONSULTANT wil) prepare a project photo log of existing conditions along the corridor, within the project footprint. 10.2 The CONSULTANT will develop three (3) preliminary roadway channelization alternatives. The alternatives are as follows: • Alternative 1—Update the preliminary channelization plan from the "Rainier Ave S— Phase IV Traffic Analysis" dated August 2014 with some modifications from the AGENCY. These modifications will be discussed at a design team meeting. • Alternative 2— Modify the preliminary channelization plan from the "Rainier Ave S— Phase IV Traffic Analysis" dated August 2014 by eliminating the center turn lane proposed for Rainier Ave S between S 2nd St and Renton Ave Ext./Airport Way, except left turn pockets at intersections. Additionally, the layout will allow for U- turns at the intersections of Rainier Ave S and 5 3rd St (SB to NB), S 2nd St (NB to SB, SB to NB), SW Victoria St (NB to SB, SB to NB), Renton Ave Ext./Airport Way (NB to SB, SB to NB). For design of U-turns, the same type/size vehicle used to design U- turns for Rainier Phase 3,will be used. Include removal of pork chop island at SE quadrant of intersection of Rainier Ave S and S 3rd St, to allow transit traveling NB on Rainier to transition from the BAT lane, south of the intersection, into a general purpose lane, north of the intersection, with a queue jump. • Alternative 3— Modify the preliminary channelization plan from the "Rainier Ave S— City of Renton Page 16 of 19 KPG Rainier Ave S—5 3'd St to NW 3'd PI Supplement 1 5/25/2016 Phase IV Traffic Analysis" dated August 2014 by eliminating the center turn lane proposed for Rainier Ave S between S 2nd St and Renton Ave Ext./Airport Way, except left turn pockets at intersections. Modify the plan to include two (2) general purpose lanes plus an outside Business Access and Transit (BAT) lane for each direction. Use lane widths utilized for Rainier Phase 3. Include removal of pork chop island at SE quadrant of intersection of Rainier Ave S and S 3rd St, to allow the NB BAT lane to be continuous through the intersection. All alternatives are to accommodate the future conversion of S 3rd St and S 2nd 5t from one way to two way streets. The channelization plan developed far each alternative shall be overlaid on top of the survey base map developed in design phases 1 and 2. All existing features, ROW and parcel boundaries map shall be shown in gray scale. All proposed improvements for each alternative shall not been shown in gray scale. Proposed improvements include locations of curbs, sidewalks and planter strips, center medians, pavement markings, curb ramps, signal poles and mast arms, pedestrian crossings, HAWK/RRFB Signal(s), ROW and permanent easement boundaries. DELI VERABLES: The following deliverables and delivery times are included in Task 10. • One(1 j roll plot of preliminary channelization p/an for each a/ternative (3 ro11 plots totalJ—Delivered to the AGENCY within twenty(20) weeks after the Notice to Proceed dare. • Two (2J compact disks with electronic copies of preliminary channelization plans and spreadsheet summaries(from Task 9J, along with the project photo log—Delivered to the AGENCY within twenty(20) weeks after the Notice to Proceed date. TASK 11—TRAFFIC COUNTS AND SPEED STUDIES The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 11: + The budget shown in Exhibit D assumes this task is two (2) months in duration. 11.1 CONSULTANT shall utilize the services of a traffic data company to perform seven (7) day traffic counts on Rainier Ave S within the project limits. The locations are as follows: • Between NW 3rd PI and Renton Ave Ext/Airport Way • Between Renton Ave Ext/Airport Way and S 2nd St • Between S 2nd St and S 3rd St/Sunset Blvd 11.2 The CONSULTANT shall utilize the services of a traffic data company to perform speed City of Renton Page 17 of 19 KPG Rainier Ave S—5 3�d St to NW 3'd PI Supplement 2 5/25/2016 studies at the following locations: • Between NW 3rd PI and Renton Ave Ext/Airport Way • Between Renton Ave Ext/Airport Way and S 2nd St 11.3 The Consultant shall utilize the services of a traffic data company to perform turning movement counts for the following intersections. • Rainier Avenue S/Airport Way • Rainier Avenue S/S 2nd Street + Rainier Avenue S/S 3�d Street � Rainier Avenue S/NE 3rd Place • Rainier Avenue S/Nelson Place NW • Rainier Avenue S/Hayes Place SW • Rainier Avenue S/SW Victoria St • Rainier Avenue S/S Tobin St The turning movement counts shall include left turns, right turns,thru movements, pedestrians and heavy vehicles. Turning movement counts shall be conducted for three (3), 2-hour time periods during the day:the AM peak, PM peak and mid-day (1 PM to 3 PM). 11.4 The Consultant shall utilize the services of a traffic data company to perform two (2)day traffic counts on the minor approaches to the Rainier Avenue S/NW 3'd Place intersection for use in the determination of a signal warrant analysis. • NW 3`d Place • Nelson Pl NW • Former Chamber of Commerce Parking Lot DELIVERABLES: The following deliverables and delivery times are included in Task 11. • Two(2J compact disks with electronic copies of traffic count data summaries, speed studies and turning movement counts in pdf format—Delivered to the AGENCY within eight(SJ weeks after the Notice co Proceed date. ADDITIONAL SERVICES The AGENCY may require additional services from the CONSULTANT. The scope of work for additional services will be determined based on anticipated or unanticipated project needs or other considerations at the sole discretion of the AGENCY. This work may include items identified in the current task authorizations as well other items, which may include, but are not City of Renton Page 18 of 19 KPG Rainier Ave S—S 3rd St to NW 3'd PI Supplement 1 5/25/2016 necessarily limited to the following: � Engineering Support for Environmental Documentation � Preliminary Engineering Design Services � Final Engineering Design Services • Engineering Support for Right of Way Services • Additional Surveying Services • Engineering Support During Construction • Other services not specifically referenced in this scope of work These services will be authorized under a future contract supplement if necessary. At the time these services are required,the CONSULTANT shall provide a detailed scope of work and an estimate of costs. The CONSULTANT shall not proceed with the work until the AGENCY has authorized the work and issued a notice to proceed. City of Renton Page 19 of 19 KPG Rainier Ave S—5 3�d St t0 NW 3rd P� Supplement 1 5/25/2016 KPG Exhibit D PRIME CONSULTANT COST COMPUTATIONS - PAGE 1/11 CONSULTANT FEE DETERMINATION SUMMARY OF COST City of Renton Rainier Avenue S - S 3rd St to NW 3rd PI Supplement 1 Direct Salary Direct Salary Classification Cost Total Hours Totai Cost Senior Engineer $89.18 19 $1,694.42 Project Manager $64.42 312 $20,099.04 Survey Manager $72.84 27 $1,966.68 Project Surveyor $47.12 283 $13,334.96 Sr. Proj Engineer/LA $58.65 272 $15,952.80 Sr. Dsn Engineer/LA/Surv $43.72 468 $20,460.96 Design Engr/LA Tech $25.90 476 $12,328.40 Survey Field $43.27 104 $4,500.08 Technician $37.62 432 $16,251.84 Clerical $30.05 60 $1,803.00 DSC Subtotal 2,453 $108,392.18 ICR Cost (Include Salary Additives) ICR x DSC of 131.49% $108,392.18 $142,524.88 Fixed Fee (FF) FF Rate 30.00% $108,392.18 $32,517.65 DSC Tota) $283,434.71 Direct Reimbursables Mileage $2,581.20 Amec Foster Wheeler $79,363.27 Traffic Control Services $10,000.00 CN I $19,000.00 Bravo $24,000.00 IDAX $5,160.00 Reproduction $0.00 � Reimbursable Total $140,104.47 Total Agreement Amount $ 423,539.18 Su lement 1 Mana ement Reserve/Carr Forward MR $ 47,448.88 Total Supplement 1 Agreement Amount with MR $ 470,988.06 Ori inal Contract Ex enditures $ 51,137.39 Maximum Amount Payable $ 522,125.45 City of Renton Date: 5/25/16 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 2/11 FEE SUMMARY K p G ♦ nrctoiscot�i�c • I.xs�clr;capc ArchitnCtur� Project: City of Renton • t'ivil E�nginocring ♦ Rainier Avenue S - S 3rd St to NW 3rd PI - Supplement 1 5/25/2016 Description Estimated Fee Task 3- Project Management for Design Phase 2 $29,942.75 Task 4 -Additional Field Survey $36,842.34 Task 5- Utility Mapping and Inspection $55,800.77 Task 6-Traffic Analysis Report $39,281.71 Task 7 - Pavement Assessment Report $84,022.13 Task 8- Community and Agency Coordination $48,522.03 Task 9 - Preliminary Right of Way Investigation $53,422.62 Task 10- Preliminary Roadway Alternatives $66,364.39 Task 11 -Traffic Counts and Speed Studies $9,340.44 Total Estimated Fee $423,539.18 City of Renton Rainier Avenue S-S3rd St to NW 3rd PI Page i of 5 KPG Supplement y 5/25/2016 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 3111 HOUR AND FEE ESTIMATE Project: City of Renton K P G Rainier Avenue S-S 3rd St to NW 3rd PI-Supplemerrt t • n.�n�4-n„� • 5/25f2016 [.�naRcape n�ehitcen� • Civit Engine.�ering • T WDor Hour Estimete Tota1 Fae Sr Dsn En9N, Desgn � Serra ' Piojeat . Survey Prqect Sr Prq Engd� W Engtl Survey � Tesk Description Engineer!Managet ��� Manager Surveyo� SeniorW Surveyor � lATech Field Txh '� Gerical Direcl Overhead PrdR Ettedlremultipiier f 89.18 S 6642 S 72 B4�S 4712�S 5865 S 4372 S 2590� 3 I327�. S 3762� S 3005 Fburs LaborCosl 131 49'Y 30°/, 2.6749 Task 7•Prolact Management tw Design V�au 2 3 1 AArtwnMnfian.foadnaian ard S�ywv�wn 0 � 40�_0 0 � ! 0 0 0 __.�_0 I 8 58_�___�SSB; lJt1 986 S 8.590.61 32 Ma%tdyimdcitg 0 7? ; 0 � 0 ', 0 .. 0 � 0 0 �i 0 T 6 �8 953� 1,254� 2A6 S 2AqQ.8g _, .. ... 3 3 Ptu�w!A/«I�ny{anA Sile Vwls(1�AqNicy.20 SiaB MMINpt) :.. 3 4G t.. 9 , 3 p 40 .�... 20 20 0 t 0 � 0 i29��---..,�.8 .._..9,129, 2. $ 18.156 26 CWm6uraaDte myanws�w br�sAd,wn la dNula � . , 5 19Q.00 Task ToIN 3 92 3 � 3 �! � 20 20 0 0 14 200 11,782.36 14,706 J.355 S 29.912.75 Tesk4•Addilio�N FioW Sur 4.1 LOCltr uMRy pNnt msrks an7 Palece l�ilvas � ..p .1 2 ; a �r 16 t�- 0 b 56 � 48 ��. 0 128 5.587f �.�7� L678 S 11,610 70 4.2 C8 aid MH me:f6yra<YJwns � 0 � 2 ( 4 0 8 I 0 � 48 '. 40 �* 0 102 4 d77 5,875 1.341 S 11,691 W .,_ ...,_.. .....,.. �. .._. R�unb�rrM���p�nvs•see Meakdown for tletails S 10.St0.00 Taak ToW 0 1 8 0 26 0 0 10� !8 0 22S! 10.056.W 13.226' 9.018�S 36.Bt2.34 Task 5•UtiU IIH n and In n 5.7 CcorWnaletie�d�Ny�ocaies 0 4 D ' 76 0 0 0 0 .,. r.� .*. 0 20L tAfp t.�p 3D3 5 2.64523 52 RaRwaunmYoorr�wryra�a+marrvyd�c j o a �� zn a o 0 o k ie a sg �.�; 3423 lei S s.�o6.�R _.__._... S.� CCTV Wpelkie�na�ectl0� � 0 4 0 _ p 0 . f; 0 2C � 32� 1.281. 7 684 ... 384 3 �.319.06 ReimbursaWe a -see�reakdown la dela�is � .�.� .. S ��� Tasic ToMI 0 16 0 00 a 0 0 0 �0 8 10B t.895.12 6,a37 i.169 5 SS.d00.7T Tulc 6-Trslfi�Ansl Yt H R 6.i U�rio£itailrtg Condi�i�ns ot Tratfic Malyzts 0 0 0 j 0 ; Q 48 0 0 0 0 48 2,099� 2159 8'JO 5 6.487.62 � __ __ }- . —- __—... - a2 W1eme�tves�fnaly9s 0 8.._.. . 0 I 0 �. i6 __i_.-100���0�� 0 0 0 i2a� .. 5.820; 7.660 ... .,�Jae S �5293TB 6 3 AnalY+u One(1)New Non-MotorizeC Crtisq++gf 0 2 ... .0.. . S . --.--....:. � 2� 8 a 0 0 42� 1.855 Y A:19� �556 S �.N9.38 6A SigNl War2ni AnalyNc al Rainier Avenue S3rd Piace Irrtersectioi ��-�._�� _—+�� 9�y� 0 2 0 ...0 4 24 8 0 0 0 38 1.82A 2.130 488 S 123597 . .._. 6,5 UpAale Traflic Analysis Fepon 2 8 , 0 0__ 0 _..,, 40 d0 0 I 0 4 9a 3.599 a.732 t,080 S 9�f02$ RamOlMsabl�ua �aee breaktlown Itt dMudo - __� S 8�80 TsskTotal 4 20 0 0 28 236 56 0 0 4 346 14.997.e8 19.720 0.499 S 39.2Dt.77 TasN�•Cavement Asseament R n >> �r.n,,,_eoora�ra��«��,a swer.am e o o a o 0 0 0 0 o w o; o s __ _._ �.p ��„o;�i„y o , o 0 o y o 0 0 0 0 01 0 0 o s _.. _ . . 7 3 Prolecl AAaehnp6 0 � 0 � 0 D 0 0 0 0 0 0 0�� 0 O D S * ��- 0 0 0 0 0 0� �� 0 0 2( 129 169 39�5 33690 7 4 Gedech Pesearc� 0 2 7.5 F,eMfs�brffilo� � � � 0 2 0 0 0 0 0 0 0 0 p 129 t69 39 5 33690 _._. .. . ... .,.. __. ..,_.. . _ . 7.6 Pavemwn Asses�iau Rkyw/ . 2 ... 6__._;.�D . . !t 8 .... 0... ... �.��... 0 H � 2 28 L524 2.Ooe 457 5 3.885.08 ...... _ .. +..__"_ RermDursade a •�N OroskOoxo 1a WfeNs ... ... .. �5� 79.3fil 27 Task TotM Z 12 0 0 8 0 0 0 8 2 32 7.787.66 2.343 534 S 6a.C22.13 City o!Repton Raineer Avertue S-S3r0 Sf t0 NW 3rd P! Page 2 of 5 KAG Supplemen(1 5/252016 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 4/11 HOUR AND FEE ESTIMATE P�o;e�: ��y o,�Mo� K p G Rainier Avenue S-S 3rd St to NW 3rd PI-SupplemeM 1 • Anhieecturc ♦ $/25/2016 frn.frce�e nreni�eerurc ♦ Civil EnQi�ee�ie�Q ♦ I� Ubor Mour Estfmate Total Fee Sr Dsn Engr� Design . : Seniw Proiect Survey Prqeci S�Proj Eng�/ lA! Engr/ Survey Task Dletriptio� Ergmeer Manager Manager Surveya Senia lA/ Surveyor IA Tech Field Tec� Clencai Direct Overhead Profit Eltvqlw muttq�lier S 8?18 S G4.42 S 72.SS�� S a7.72 i.3 68.55 $ 43.72 $ 25.90'. $ 4327'�.$ 37 62 $ 30.05 Hours Labor Cos� 131.49% �96 2,6149 _ I Task 8-Comenuni a„d Aoenc COortin�tion e,t One on one qo�)erty owner/busiress owner(80 M9t) 1 0 8D 0 D i6 10 60 0 t !D 8 2<0 1 t,0T8 it.566; 3.]23 S 28.966 61 82 CommarwpW�deflp�w�House f B �2a � o ' 0 t6 4 � 40 0 I 16 16 t60� 7.065 9290� 2.720 8 18ATi1? -'._' .. . . . ..__...__.__-w. . ........ .... ..+---. ..._. RettnbtRsn9�B ByDO�ea•6Re DteiKdyrm IOt Cc7e110 ,,---�� .... ..... . . S 1.08Q.OD Task Total 0 1 7W 0 ��� 0 32 56 d0 0 96 24 400 18.14296 ' 23.856� 5.443 S al.524.03 Task 9•PreUml R M of Way lnveslf alion 9.1 Research Recortis and Title Rapertf(AO Ptrcq6y o 0 0 80 0 0 � 0 0 D 80�� 3.7T0 s,957 1.731 S 9.857 13 92 CalcalaliontaWW 0 0 16 160 B 0 0 0 40 � 224 10.679 14.041 3.20< $ 21,42358 93 PrelirtnroriestimatedROWandEasemenl 0 8 0 0 24 24 0 0 8o 0 138 5982 7.866 1,795 $ 15.64191 R9imbusaW9�ape�es�see breakQowo for d�tsih S Task Total 0 B 16 ta0 32 24 0 0 120 0 aW p0.410.08 26.D6A 6.129 5 53.424.6Z Task 10•Prclimfnary Roetlwey Allematives _ 101 Crojed Photo lAq 0 16 0 ...L. 0 .l t6 16 0 . 0 0 i R 55 2969 3.825� B73 S 7.606.85 -_ �_ . 10 2 OevMoD 3 cross section/pfan altematives 4 � 40 0 I 0 I BO BO 320 , 0 80 �_.D 604�,. 22.a21 29 481 6,728 $ 58.627 94 Rambwwtu�exoer�ses see Geakdown�a dKa�u _�- � I g �2Y Eo T�sk Total 4 56 0 0 % % � 320 �f 0 80 8 660 j, Y5.329.76 33.�06 7.599 S 66.7W.�9 Task 11-Tntllc Counts and Soeed Stu6ies i t t Ttsltk Counis 0 0 0 , 0 iY..... ....4 8 . 0 .....,' 0 ......... 0 Q 8� 760 46Q. ..105 S 914 S9 ��p $��§��py 0 0 0 0 , 0 . B 0 .. a . 0 0 8 350 460 105 $ 914 59 11 3 7�aevnpMoveme�lf.oVfrta 0 0 0 0 0 16 .. .... D _0 __. 0 0 __ __±t�_ 700 920 210 S 1.82917 t1.6 War2ntCounls � 0 . .0.. . . � ... . �.. ., 4 .... � ...... .._.. _�._ . ...di. 779 230� 52 S 45729 PavnMrcalfe expergas•see break6ovm for deleUe � S 5224.8p Task To1a1 0 0 0 0 I 0 36 0 � 0 0 0 36� 1.573.92 � 2.070 472 $ 4,�qp.41 SUPPLEMEM 1-TOTAL HOURS AND TOTAI ESTiMATED FEE 79 ; 3i2 � 27 283 272 _968_____ 476 104 I 432 60 �. 2.453 108,392.18 I 142.525 � 32.518 __ 5423.539J8� Suppkment 1 MR(Carry Forw�d): $47,448.88 (1 T� otal SuPPbment 1 Agrecment 5470.968.06 (2)Original Contract Expenditures: 551,13).39 (1+2)Maximum Amount Payabk: $522,125.45 Neison Jason M�ke Ron Nandez Kanna Emiiy rim Vonn�e Dani PaW Liz Phuong Casey Karen Terri Jan Mic�ael Yaxin John Judy 89.t8 64A2 72.84 47.12 64.42 4i.71 28.85 43.27 39-06 31.25 89.i8 Sa.57 a0.38 25.24 36.�8 28.85 5697 46.88 23.08 45.9� 26.44 avg 89.18 64 a2 72.84 aZi2 SB.65 a3J2 25 90 43.27 37.62 30.05 Cdy ol Renfon Rainiei Avenue S-S3rtl Sf to NW 3rd PI Page 3 0!5 KPG Supplement f ����s EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 5/11 HOUR AND FEE ESTIMATE Project: City of Renton K P G Rainier Avenue S-S 3rd St to NW 3rd PI-Supptement 1 • f.r�n�«ci�� ♦ 5/25/2016 Landxcape Architec�ure ♦ C:ivil Ea{�ino�rin{� ♦ Reimbursable Breakdown Task 3-Projecl Management tor Design Phese 2 Mileage(est. 1300 miles z 0.54 cents/mile) $ 702.00 ReproducNon $ - Task 3-Tofai $ 702.00 Tesk 4-Additional Field Survey Mileaye(est.1000 miles x 0.54 centslmile) $ 5A0.00 ReproducHan $ - Traffic Control Services-Pians and TralliC Conirot�Task 4 2) S t0,000.Q0 Task 4-Total $ 10,540.00 Task 5-Utility Mapping and Inspection Mileage $ - Reproduction $ - CNI-Field Utility locates(Task 5.1) $ 19,000.00 Bravo-Pipe Inspection(Task 5.3) $ 24,000.00 Task 5-Total $ 43,000.00 Task 6-Traific Analysis Report Miieage(est.120 miles x 0.54 cents/mile) $ 64.80 Reproduction $ - Task 6-Total $ 64.80 Task 7-Pavement Assessment Report Nliiea�e � $ - Aeproduction $ - Amec Foster Wheeler-Pavement Assessment $ 79,363.27 Task 7-Total $ 79,363.27 Task 8-Communily and Aqencv Coordination Mileage(est.2000 miles x 0.54 cents/mile) $ 1,080.00 ReproduCtiOn $ - Task 6-Totai $ 1,080.00 Task 9-Prelimi�ary Right of Way Investigation Mileage $ - Reproduction $ - g . Task 9-Totel $ - Task 10-Preliminary Roadway Atternatives Mileage(est.200 miles x 0.54 cents/mile) $ 129.60 Reproduction $ • Task 10-Total $ 129.60 Task 11-Traffic Counts end SpeeA Stutliea Mlleage(esL 120 mlles x 0.54 centSJmile� � 64.80 Repreduclion 5 • IDAX Data-7 day trallic counts-3 location{Task 11.11 $ 1,200,00 IDAX Data-Speed Sludies-2 locations{Task 71.2) S 100.00 IDAX Data-Tumin�Movement counts-8 locations AM.Midday,PM{7aBk 11.3} S 2,960.00 IDAX Data-Warranl Analysfs CounR-1 focation-2 days(Task 11.4� $ 900.00 Task 11-Total S 5,224.80 TOTAL REIMBURSABLES $ 140,104.47 Ciry of Renton Rainier Avenue S-S3rd St to NW 3rd P1 Page 4 oI5 KPG Supplement t 5/25/2016 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 6/11 Employees Titie DSC OH(131.49%) Fee(30%) Rate Nelson Davis QA/QC Manager $89.18 $117.26 $26.75 $233.20 Paul Fuesel LA Manager $89.18 $117.26 $26.75 $233.20 Jason Fritzler Project Manager $64.42 $84.71 $19.33 $168.45 Nandez Miller Engineering Lead $64.42 $84.71 $19.33 $168.45 Kirk Smith Stormwater Lead $60.22 $79.18 $18.07 $157.47 Michael Lapham Traffic Analysis Lead $46.88 $61.64 $14.06 $122.59 Jan Ciganik Signal/Illumination/ITS Lead $56.97 $74.91 $17.09 $148.97 Karina Franada Roadway Lead $41.71 $54.84 $12.51 $109.07 Nelle Alexander Utility Lead $41.47 $54.53 $12.44 $108.44 Mike Bowen Survey Lead $72.84 $95.78 $21.85 $190.47 Ron Reichei ROW $47.12 $61.96 $14.14 $123.21 Tim Bioom Survey Field $43.27 $56.90 $12.98 $113.15 Karen Weisser Survey Tech $36.18 $47.57 $10.85 $94.61 Chris Johnson Survey Tech $29.81 $39.20 $8.94 $77.95 Elizabeth Gibson Landscape/Irrigation Lead $54.57 $71.75 $16.37 $142.70 Phuong Nguyen Urban Design Lead $40.38 $53.10 $12.11 $105.59 Nathan Monroe CM Lead $49.52 $65.11 $14.86 $129.49 John Davies Traffic Engineer $45.91 $60.37 $13.77 $120.05 Blake Costa Signai/Lighting Engineer $27.76 $36.50 $8.33 $72.59 Emily Logan Roadway Engineer $28.85 $37.93 $8.66 $75.44 Casey Jeszeck Roadway Engineer $25,24 $33.19 $7.57 $66.00 Judy Johnson Landscape Tech $26.44 $34.77 $7.93 $69.14 Yaxin Shi landscape Tech $23.08 $30.35 $6.92 $60.35 Danielle Winklemann Admin $3125 $41.09 $9.38 $81.72 Terri Simms Admin $28.85 $37.93 $8.66 $75.44 Michelle Torres Admin $19.59 $25.76 $5.88 $51.23 Cify of Renfon Rainier Avenue S-S3rd Sf fo NW 3rd PI Page 5 of 5 KPG Supplemeni 1 5/25/2016 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 7/11 KPC,Inc, Indlrect Caet Rate Scheclule For the Yoa�^E��decl December 31,2013 l+lnenclol 3lefemraif Accepted Ilcecrl�tlon _ Amonnt KPG Ad�. VVSD01'AA]. Ref. Amounf 'Y Doptooielfmt 1201Y1 12(1,11i A.004G 'fotalGenernlOvcrhenA � sa,I16L1T ��37G,4d1��SS1�11t806� Z,59 GfiS BG.4'2.�4 Toisl IndirectCosls&Overhend I�Gd��477 ��S)?3�198� _iSJ IG�� µ ',_,i,949 822 �I31.35°.6 Indiroet Cnrf Itnte(Lew RCC) 154,90% 141.8996 131,3J"�(, ,r..�....�. FacilitieaCostoFCopil�l 54,130 1�1,130 U,(q°h S4,6A4,B07 (S]T,I;�B) (131G,SSG) 53,953,952 Indfrect Coet Ratc(b�cludes FCC) 1�1.49% XPCr',!ne-Revlrwed anAAecrpferl BS S/1.3lZOl� '�Indlrecl Cnrl Rale sifl!srrk/ecl!o IYSDOT AHMI'r EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 8/11 h:PG,Ync, lndirect Cost Rate Schedule t�or the Ye.Ar�nded December 3l,2013 f�'inancfal 3Glcment Accepfed DeacrlEl,l�n Amaimt xP,GAd�� 1}'�D�TAJ�. k�(� Amount "/ Uirect Lebor ,�f,��, gl 1,000 A S3,f10G,989 100 a04�a Indirect Coste: Fringo Oene0la VaoalionPay .$2AO,b6G 51,719 B 5282,384 9,39%. Sick Pny 118,058 191 C ]18.249 ].9]% lioliday Poy 177,603 534 D 178,I9? 332% Payroll Texcs 450,022 450,022 14.97% Hcalth Lisurwice 280,A84 28Q48A 9,33% Workcrs'Cnmp.Insuronce 9,344 9,344 031°/a Prn£1 Sha�ing(�101-k) 2R,606 28,GOG 095'S6 Bonus 175,050 (Ef75,050) 0 0 0,00% Commuter Paases ___^_V__.���q� e. , 3,930 0.l3Y. Tu1u1 Prin�.nNenefiln ._,_��,.5�?,74f ,. __S2,A.d3 ,_._�175U501 „A,Ii�51,l3'! 4A.93'/. Cencrnl Orcr6cad �tdirccl T,aLur $98G,39J 528,770 � 51,OI5,163 33.76'Yo Bid&ProposelLabar 302,A27 302,427 ]0.06% BnsinessUcanees 2,Oi7 2,Ot7 O.b'/% LifeLuur�uue(KcyPerxon) 16,593 (18,593) r (0) 0.00% Disobilily Income A'ateation 59,620 53,G20 1,78°h Auto Allowufices 46,981 (546,981) P 0 0.00% Professiunal Devdupment 17,b90 (')08) Q 1G,981 0.56% Profcsslonel Rc�iatretiony S,d25 (35S) R 5,070 0.17% Gmployce Wclfero 38,888 (21,429) (3,837) G,S 13,fi23 0.45Yo Roorvilmant 832 (832) H 0 0,00"/0 (hdeidc Temp Scrviuea 2,052 2,OS2 n,0'!% Peyroll Sorviacs 2,741 2,741 0,09% RCrtI 547,489 (331,471) � 216,U17 )J89� Ulililies 37,005 37,005 �,23% lanitor 28,990 28,9J0 0,96% Aepairs&Meintcnance 70,I7J 9D,173 233% JT Repeirs Cc Mniutenanae 4,790 �,790 OJ6°ln I.ensc Expanse SG4 SG4 0.02% Oflico S��ppllca 9?,852 (2�948) T 90,904 3.02�6 Copinr&Ploticr Supplies 13,G60 l�,6G0 0.65% 1'1'Compuler Supplies 13,9G2 13,9G2 0.4G°/a Yrinling&Reproduction (1,842) (1,842) -0,06°/u Publivations 2,404 2,404 0.08% 1vlembarsliips&Organizations 13,465 (3,160) U 10,305 0 34% Acuounling&Lcgal 1 Q99b (9,125) T 1,771 O.tl6°/. I3enkChnrge 1,004 1,004 D.03%. late Chnrges 36 (3lS) K (0) 0,00% ']'eleoanmimioations 112,323 112,323 3.7A°/a Posingo&Dnlivory 4,330 4,330 0.14% 17'Loasc Expensc 100�892 100,892 336°h nutu Meintcnancc&Registrxlian 27,410 (21,410) V (0) 0.00% Parking&Tolls 12,8�6 12,87H 0,43".6 Trovel 10,518 (1,145) W 9,372 n.3i�s6 Meals 43,194 (47,194) X 0 D.00°h Dusiness lnsurancc 89,151 87,151 2.90"/0 Lrterest I1,AlA (i1,4G8) Y 0 0,00% AusiaassTaxes 231,073 271,073 7,66% Marlceting Reproduulion 232 (232) 1, 0 O.OU°/a Websile Devatopment&Maintenanee I,90D 1,900 0.06°/a Ausincsa Enlcrieinmcnf 3,303 (3,303) M 0 0.00% Confarcnces 15,7T4 (G00) 2 15,174 0.50°/a MarkelingTravcl 1,114 (1.114) L 0 0,00°/u Merkatin@ Meals R,08M1 {8,084) L 0 0,00% Polilical Contribulions/Public Rclntions 6,000 (G,000) L 0 0.00°h C'.I�e�ir�Ulc Donntious 4,994 (4,994) N 0 0,00% EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 2/11 � INDIRECT COST RATE Washington State Transportatfon Building �,,� Department of Transportation 310 Maple Park Avenue S.E. P.O.Box 47300 Olympia,WA 98504-7300 Lynn Peterson Secreta of Trans ortation 360-705-7000 rY P TIY:i-800-833-6388 www.wsdot.wa.gov August 6, 2015 KPG, Inc. 753 - 9`h Avenue N Seattle, WA 98109-4309 Subject: Acceptance FYE 2014 ICR—Risk Assessment Review Dear Mr. Jason Fritzler: Based on Washington State Department of Transportation's (WSDOT) Risk Assessment review of your Indirect Cost Rate(ICR), we have accepted your proposed FYE 2014 ICR of 131.49%. This ICR acceptance is in accordance with 23 CFR 172.7 and must be updated on an annual basis. T'his rate may be subject to additional review if considered necessary by WSDOT and will be applicable for: ❑ WSDOT Agreements � Local Agency Contracts in Washington State only Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreementicontract. This was not a cognizant review. Any other entity contracting with the firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7104 or via email c«»sti[tantrates�vWS(]t)t.�r'c1.�0�'. �,'Fli'(j5; ���E [K K. JC3NSC1 anagcr, Consultant Servi �s Office EKJ:kal Acceptance ICR Risk Assessment Review EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 10l11 ��► � Washington 6tato Memorandum � Doparlment af Transpo�tatfon May 13, 2014 ► , TO; Stacie Kelsey, Local Programs � FROM: Mactha Roach, Agreement Compliance Audit M�t��,��ce SUB]ECT: KPG, Ine. Indirect Cost Rate for fiscal year end December 31,2013. We have completed our desk review of KPG, lnc. Indirect Cost Rate for the above � refcrenced fiscal year. The review was compieted at the request of WSDOT Northwest 1 Region Local Programs. We reviewed t]ie documentation supporting the rate for � compliance with criterie contained in the Fedaral Acquisition Regulations(FAR), Subpart 31. Our review included a site visit to the firm. � � Based on our review we are issuing this memo.establishing KPQ, Inc. Indirect Cost Rate '� for fiscal yeer ending December 31,ZO]3, at 13l.49% of direct labor(rate includes '� 0.14%Facilities Cost of Capital). KPG,Inc.provided a FHWA Certificate of Final , Indirect Costs indicating all costs included in the indirect cost rate schedule are in compliance with Federal Acquisition Regulations(FAR), Subpart 31. ; ; Costs billed to agreements will still be subject to audit of actual costs,based on the tenns � and conditions of the respective agreement. f; �, This was not a cognizant review. Any other entity contracting with the firm is '� responsible for determining tl�e aeceptability of the Indirect Cost Rate, If you havo any questians, feel free to call me at(360) 705-7006 or via email at � ro�cl�ma(r�H�sc�ot.wn,gov. 4 { Cc: Steve McKerney �� File � � � � � i � 1 { oor Fo�,�oo�ooe� R��Ited bIBB ! .I EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS-PAGE 11/11 Certification of Final Indir�ct Costs Ftrm Name:KPD,inc. Indirect Coet Rale Proposel;13�.4s''Jo Date aF Proposal Preperallan(mm/ddlyyyy�:0311�12o1a � _.. t Fiacai Period Covered(mm/ddlyyyy to mm/ddlyyyy);otl0llta�o�213�12oy3 � . � l, Ihe undersigned, certlty fhat 1 have revlewed lhe propasal to estabfish Crna!indlrecf cosf ratea i� for(he fJscs!per lod es spec/fled above end to the besl oimy lcnowledge and bellef.• i.)Alf costs IncJuded In Ihls proposal to esrsbllsh fina!7ndirect cosf rafes are�How�ble 1n � accorda�ce with the cosf princlples of Ihe Federel Acqufslflon Regulatlons(FAFi)of llNe 49, Code of Federa!Regulatlons(CFRJ,parf 31. � 2.J This proposa!does no!tnclude any cosfs whlch are expressly una�lowable under the cosf princlples of�ho FAR ol 48 CFR 31. � Al1 known m�terlal fransacUons or 9venfs t�at have pccurred af�ecting fhe frm's ownershfp, � organlzatlon andlndirect cost rates have been dJsclosed. � / { Si nature; __..__�_____._____�....___._.._..._.__..v__ j� � Name of Certifying Officfal' (Print}:rtelson �avis � � � Title: Preslden► __ �y � Date of Certificatian(mm/ddlyyyy):06/12/2014 1 � •The"Certlfying Offlclal"must be an Individuel executiva or flnanclal ofticer of the flrm at a level no lower than a Vlce President or Chiei Financlai Officer,or equivaleni,who hes the authority lo representthe Tlnencial Informatlon utlllxed lo establlsh lhe indirect cost rate fo�use under Agency �. conirects. Ref.FHWA Directive 4470.1A available on line at: h�./lwww;jhwo.dot.ciov/Iensruasld(�eativeslord�rst44 T01a.t�im �; . � � 1 ! �!H Certificatioil;Nov 2U10 � i � E I EXHIBIT E SUB CONSULTANT COST COMPUTATION- 1/7 EXHIBIT E - SUMMARY OF COSTS � Geotechnical Study � Rainier Avenue South Phase 4 amec Renton, Washington foster whee(er Amec Foster Wheeler Environment & Infrastructure, Inc. DIRECT SALARY COST(DSC): Task Cla�sification(AMEC Class Codej Hours x Hourl�Rate = Cost Ta�k Total Principal Geotechnical Engineer(624 to 625) 10 $72.63 $726.30 Associate Engineer(620 to 623) 128 $66.85 $8,556.80 Senior Geologist/Engineer(616 to 619) 52 $44.40 $2,308.80 Project Geologist/Engineer(614 to 615) 48 $39.57 $1,899.36 Staff Geologist/Engineer(611 to 613) 28 $32.10 $898.80 CAD Drafter(517) 32 $31.52 $1,008.64 _ �lerical/Word Processor 5808 to 809�_ 42 $26.06 �iL094.�2 TOTAL DSC 340 $16.493.22 OVERHEAD COST(OH COST-including salary additives): OH Rate of 1.600 x DSC 1.6 x $16,493.22 = $26,389.15 FIXED FEE(FF): FF Rate of 0.31 x (DSC) 0.31 x $16,493.22 = $5,112.90 REIMBURSABLES: Field Expenses(mileage, equipment, etc.) $262.00 Subcontract Expenses(driller,traffic, lab)(0% mark-up) $31,106.00 TOTAL REIMBURSABLES - $31,368.00_ TOTAL $79,363.27 EXHIBIT E SUB CONSULTANT COST COMPUTATION-2/7 Levei of Effort Hours Estimate ; � , Parsonne!and Maximum Hourly R,�tes Per Cat o � ` ,,.o �o �`�' `° y ..�` J w� �~ a �,o � C.i� d` Z � p�n.� O��.'Cri �h "� �? qt Q� a m e c �Q�',�.c` `�°�'-, .'� `,,,.°`�'-� o `...° ,, �° � -, ..°°y�'�., ..�` � � `� f o s te r c° �`' �,` `y`'� �� m+. `y°' �w ,�i �.g C� �,� *.``' �o ti �,c� � �m o��o°' ;�. ,,. �, � y m �o < �+ `O �. �` �O C� a,°' � pi ;� �a`' o .c Q.� c o •c � ti c ¢� whee le r ¢C7Q�� �o`, �,c �� �o: r°j ��a �,� �,.o r,���'��`' t����� k, 4r � �✓ Q �/ � �v G Q hvtask T&sk TaskDescription �72.63 $fiR.P.S $d4.4(! $39.57 $32.tt? $31.�2 �^c6.��b hours 1 Contract Administration GonFrar.t aRC su�contract s�tup 2 12 6 'Q 30 Irrvr�-ct';g �3 $ 16 F'ro�ect�nana ement 4 3J iQ 44 2 Fiefd Pre aration 1 eaftic(;ontrol t'Eans,Apply tv��troci Use t''ormit Satest $ 8 12 & 36 3 Geolo ic Reconnaissance S�te rec�n and rrappmp�aver*�eni 10 10 20 4 PYND and Cancrete Co+�in F atli��We�ght F�efiectoTeter Survey ? A 10 t;onc:rete Coring ii� 20 Petchar� 8 g 5 Review and Anal sis Rev�r_w or3 ime and in-hc�usc saurces 4 q Com�iie and sumr,anze f,eia data 6 6 � 1 n 34 f n ine�nng:Ftaveni�nt dFsiqrt 7��;ians ? lf� 16 �1 36 6 Re artin E�ra=3 rreport 1 t2 $ 6 4 8 39 Hespa�d to rev�ew comrie^ts 4 2 g �inal tepor 1 �i �4 2 7 fi 19 7 Meetin s Meetint�s wittk KPG and Gity(4) 16 �g ', total hours per category 10 128 52 48 28 32 42 340 ', DSC(Direct Salary Cost) y 726 $ 8,557 $ 2,309 $ 1,899 $ 899 $ 1,009 $ 1,095 $ 16,493 I OH= DSC X 1.600 $ 1,162 $ 13,691 $ 3,694 $ 3,039 $ 1,438 $ 1,614 $ 1,751 $ 26,389 FF=0.31 X(DSC) $ 225 $ 2,653 $ 716 $ 589 $ 279 $ 313 $ 339 $ 5,113 Total burdened labor � 2,114 $ 24,900 $ 6,719 $ 5,527 $ 2,616 $ 2,935 $ 3,185 $ 47,995 Subtotai AMEC Expenses $ 262 Subtota{Subcontract Expenses $ 31,106 0%markup $ - TOTAL ODCs $ 31,368 TOTAL ESTIMATED FEE � 79,363 EXHIBIT E SUB CONSULTANT COST COMPUTATION-3/7 EXHIBIT E Subconsultant Fee Determination Summary Sheet ACTUALS NOT TO EXCEED TABIE �� Rainier Avenue S Phase 4 ,� Amec Foster Wheeler Environment&Infrastructure,Inc. � 11810 North Creek Parkway North �m�� Botheii,Washington 98011 ��r���ar Prepared 2J25/2016 wheeler Rates Valid through 12/31/2016 Current Ratea Overhead Fee Billfn fiate Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum 8ase Direct Labor 160.00� 30.00qo Billin Rate=Direct lass Code Class Code Descri tion Rate Rate OH OH Fee Fee Rate Rate PROFESStONAI LEVELS 601 Protessional Level 1 $11.00 $yy.�2 $17,60 $18.75 $3.30 $3.52 $31.90 $33.99 602 Protessional Level 2 $11.73 $13.28 $18.77 $21.25 $3.52 $3 98 $34.02 $38.51 603 Professional Level 3 $13.29 $14.84 $21.26 $23.74 $3.99 $4.45 $38.54 $43.04 604 Professional Level 4 $14.85 $16.41 $23.76 $2626 $4.46 $4.92 $43.07 $47.59 605 Protessional Level 5 $16.42 $17.97 $26.27 $28.75 $4.93 $5.39 $47.62 $52.11 606 Protessional Level 6 $17.98 $19.53 $28.77 $31.25 $5.39 $5.86 $52.14 $56.64 607 Proiessional Level 7 $19.54 $21.09 $3126 $33.74 $5.86 $6.33 $56.67 $61.16 608 Professional Leve18 $21.10 $22.66 $33.76 $36.26 $6.33 $6.80 $61.19 $65.71 609 Protessional Level 9 $22.67 $24.22 $3627 $38.75 $6.80 $7.27 $65.74 $70.24 610 Professionai�evel 10 $24.23 $25.78 $38.77 $4125 $727 $7 73 $7027 $74.76 611 Professionai Levei 11 $25.79 $28.28 $4126 $45.25 $7.74 $8.48 $74.79 $82.01 612 Professional Level 12 $2829 $3125 $45.26 $50.00 $8.49 $9.38 $82.04 $90.63 613 Professional Level 13 $31.26 $34.32 $50.02 $54.91 $9.38 $10.30 $90.65 $99.53 614 Professional Level 14 $34.33 $37.30 $54.93 $59.68 $10.30 $11.19 $99.56 $108.17 615 Professional Level 15 $37.31 $40.50 $59.70 $64.80 $11.19 $12.15 $108.20 $117.45 616 Professional Level 16 $40.51 $43.55 $64.82 $69.68 $12.15 $13.07 $117.48 $126.30 617 Protessional Level 17 $43.56 $47.19 $69.70 $75.50 $13.07 $14.16 $126.32 $136.85 618 Professional Level 18 $47.20 $50.70 $75.52 $81.12 $14.76 $15.21 $136.88 $147.03 619 Proiessional Level 19 $50.71 $54.21 $81.14 $86.74 $15.21 $16.26 $147.06 $157.21 620 Professional Level 20 $5422 $57.72 $86.75 $92.35 $16.27 $17.32 $15724 $767.39 621 Professional Level 21 $57.73 $61.23 $92.37 $97.97 $17.32 $18.37 $167.42 $177.57 622 Proiessional Level 22 $6124 $64.74 $97.98 $103.58 $18.37 $19.42 $177.60 $187.75 623 Protessional Level 23 $64.75 $68.25 $103.60 $10920 $19.43 $20.48 $187,78 $197.93 624 Protessional Level 24 $68.26 $71.76 $109.22 $114.82 $20.48 $21.53 $197.95 $208.10 625 Protessional Level 25 $71.77 $75.27 $114.83 $120.43 $21.53 $22.58 $208.13 $218.28 626 Protessional Level 26 $75.28 $145.00 $120.45 $232.00 $22.56 $43.50 $218.31 $420.50 TECHNlCAI LEVELS 501 Technician Level 1 $8.00 $8.00 $12,80 $12.80 $2.40 $2.40 $23.20 $2320 502 Technician Levei 2 $8.01 $8.90 $12.82 $14.24 $2,40 $2.67 $23.23 $25.81 503 Technician Level 3 $8.91 $9.80 $14.26 $15.68 $2.67 $2.94 $25.84 $28.42 504 Technician Level 4 $9.81 $10.70 $15.70 $17.12 $2.94 $321 $28.45 $31.03 505 Technician Level 5 $10.71 $11.60 $17.14 $18.56 $3.21 $3.48 $31.06 $33.64 506 Technician Level 6 $11.61 $12.50 $18.58 $20.00 $3.48 $3.75 $33.67 $3625 507 Technician�evel 7 $12.51 $13.50 $20.02 $21.60 $3 75 $4.05 $3628 $39.15 508 Technician Level 8 $13.51 $14.50 $21.62 $23.20 $4.05 $4.35 $39 18 $42.05 509 TechnicianLevel9 $14.51 $15.50 $23.22 $24.80 $4.35 $4.65 $42.08 $44.95 510 Technician Level 10 $15.51 $17.00 $24.82 $27.20 $4.65 $5.10 $44.98 $49.30 511 Technician Level 11 $17.01 $18.50 $27.22 $29.60 $5.10 $5.55 $49.33 $53.65 512 Technician Level 12 $18.51 $20.50 $29.62 $32.80 $5.55 $6.15 $53.68 $59.45 513 Technician Level 13 $20.51 $23.00 $32.82 $36.80 $6.15 $6 90 $59.48 $66.70 514 Technician Level 14 $23.01 $25.50 $36.82 $40.80 $6.90 $7.65 $66.73 $73.95 515 Technician Level 15 $25.51 $28.00 $40.82 $44.B0 $7.65 $8.40 $73.98 $81.20 516 Technician Level 16 $28.01 $30.50 $44.82 $48.80 $8.40 $9.15 $81.23 $88.45 517 Technician Level 17 $30.51 $33.00 $48.62 $52.80 $9.15 $9.90 $88.48 $95.70 518 Technician Level 18 $33.01 $40.00 $52.82 $64.00 $9.90 $12.00 $95.73 $116.00 ADMINISTRATIVE LEYEI,S 801 Administrative Level 1 $6.36 $9.17 $10.18 $14.67 $1.91 $2.75 $18.44 $26.59 802 Administrative Level 2 $9.16 $10.93 $14.69 $17.49 $2.75 $3.28 $26.62 $31.70 803 Administrative Level 3 $10.94 $12.69 $17.50 $20.30 $3.28 $3.81 $31.73 $36.80 804 Administrative Level 4 $12.70 $14.45 $20.32 $23.12 $3.81 $4.34 $36.83 $41.91 805 Adminisirative Level 5 $14.46 $16.21 $23.14 $25.94 $4.34 $4.86 $41.93 $47.01 806 Administrative Level 6 $16.22 $17.97 $25.95 $28.75 $4.67 $5,39 $47.04 $52.11 807 Administrative Level 7 $17.98 $20-48 $28.77 $32.77 $5.39 $6.14 $52.14 $59.39 808 Administrative Level B $20.49 $23.49 $32.78 $37.58 $6.15 $7.05 $59.42 $68.12 809 Administrative Level 9 $23.50 $26.50 $37,60 $42.40 $7.05 $7.95 $68.15 $76.85 810 Administrative Level 10 $26.51 $50.00 $42.42 $80.00 $7.95 $15.00 $76.88 $145.00 EXHIBIT E SUB CONSULTANT COST COMPUTATION-4/7 Estimated Fee Summary Other Direct Costs � � amec foster wheeler Breakdown of Expenses AMEC ExPenses Expense�0uanti U�it Unit Cost Total Mileage 300 Miles $0.540 $162 Su lies 1 Each $100.00 $100 Subtotal AMEC Expenses $262 Subcontract Laboratory Expenses Expense Item Ouantity Unit Unit Cost Totai Moisture 0 Ea�h $20 ��0.00 Subrota!Laboratory Expenses $0 Subcontract Private UtilitY Locate APS Expense Item puantily Unit Unit Cost Total Labor p hours $80 $0.00 Subtola!Private Locate Expenses $0 Subcontract Traffic Control Plans(Kenny's Traffic Control Plans Expense Itgq�.�Quantity Unit Unit Cost Total Labor 8 ho�rs �100 $800 Subtola/Traflic Contro!Plan Expenses $800 Subcontrect Traffic Control Services(Emerald City Flagging) Expense Item Quanlity Unit Unit Cost Total Mobilization 3 day $25 $75 Barrier Truck 2 days $500 � Sion��& 9 each $a $36 ___ Cones 100 each $0.75 $7� Arrowb ards 4 day $100 $A00 Equipment Truck 4 day $75 $300 Flag�ers 64 hour $55 $3,520 Subtofaf Traffic Contro!Service Expanses $5.406 Subco�tract Fallin Wei ht Deflectometer Survey(Pavement Consultants.Inc. Ex ense Item Quantity Unit Unit Cost Total Field testing 1 each $4.000 $4,000 Prepanng data and correlating subg�ade and_pavement properties 1 each $8,000 $8,000_ Re oR each $3.000 $3,000 Subtota/FWO Survey Expenses $15,000 Subcontract Paveme�t Coring(Cascade Sawing and Drillin Ex ense Item Quantity Unit Unit Cost Tolal Estimate for coring and backfilling with Ready-Mix 16 hours $150 $2.400 Subtola/Concrete Coring Expenses $2.400 Subcontract Pavement Patchin McCartne Industries Expense�tem Quantity Unit Unil Cost Total Patching cores with Ready-Mix co�crete 25 hole $300 $7,500 Subtola!Concrete Conng Expenses $7.500 Subtotal AMEC Expenses $262 Subtotal Subcontract Expenses $31,106 ° n 'r ct 31 6 5/25/2016 nmd�e„e�ei esumaie aa���a�nve s ososis,nsK EXHIBIT E SUB CONSULTANT COST COMPUTATION-5/7 AMEC FOSTER WHEELER ENVIRONMENT 8 INFRASTRUCTURE,INC. Schedule of Direct Labor,Fringe Benefits,and Genetal Overhead(with field Rate)Costs Year Ended December 31,2014 Allocation Less General Ledger Unallowable Home Office Account Description Balance Costs FAR Reference Total Proposed Field Office Costs Costs DirectLabor $ 173,928,075 $ - $ 173,928,075 $ 13,174,946 $ 160,753,129 Indirect Costs Fringe Benefits Payroll Taxes $ 23,725,655 $ 132,567 31.205-1,31.205-6�a� $ 23,593,088 $ 1,787,162 $ 21,805,926 Holiday,Uacation,and Sick 34,732,486 • 34,732,486 2,630,965 32,101,521 Group Insurance 31,975,662 - 31,975,662 2,422,137 29,553,525 Employee Retirement Contribution 9,966,742 - 9,966,742 754,975 9,211,767 Tuition Reimbursement 124,348 - 124,348 9,419 114,929 Employee Benefits 3,545,939 500,833 31.205-13�"� 3,045,106 230,665 2,814,441 Bonus Provision 2,285,932 417,065 31.201-3"� 1,868,867 141,566 1,727,301 Total Fringe Benefits $ 106,356,764 $ 1,050,465 $ 105,306,299 $ 7,976,889 $ 97,329,410 General Overhead Costs Indirect Labor $ 92,840,084 $ 3,020,809 31.205-1,31205-&ro�k� $ 89,819,275 $ 6,803,755 $ 83,015,520 Professional Memberships-Employee 362,362 � 362,362 27,449 334,913 Seminars&Training 904,075 53,116 31.205-1"'� 850,959 64,460 786,499 Employee Relocation 211,007 161,209 31.205-351tl 49,798 3,772 46,026 Recruiting 1,027,837 - 1,027,837 77,858 949,979 Indirect Travel and Entertainment 8,177,988 1,885,389 31.205�6,31.205-14�`�m 6,292,599 476,661 5,815,938 Legal&Professionai 13,644,516 1,751,047 31.205-27,31.205-47�0�°� 11,893,469 900,923 10,992,546 Occupancy 24,270,939 14,003 31.205-36��� 24,256,936 - 24,256,936 Advertising and Promotion 3,314,316 1,164,895 31.205-t�"� 2,149,421 162,817 1,986,604 Oftice Furniture and Suppfies 2,004,968 - 2,004,968 144,636 1,860,332 ComputerlSoftware Costs 14,801,976 � 14,801,976 1,121,241 13,680,735 Oftice Equipment Rental&Maintenance 2,992,335 - 2,992,335 - 2,992,335 Depreciation 2,416,862 - 2,416,862 14,562 2,402,300 Communications 4,489,721 • 4,489,721 214,587 4,275,134 Postage and Shipping 698,543 - 698,543 28,843 669,700 Business and Property Taxes,Fees&Permits 987,773 - 31.205-01'°� 987,773 74,823 912,950 Insurance 3,931,420 - 3,931,420 297,803 3,633,617 Bad Debt (217,456) (217,456) 31.2053� - • - Dues,Memberships,and Subscriptions 937,283 221,425 31.205-43"° 715,858 54,226 661,632 Contributions 2,350 2,350 31.205-8m - - - Penalties&Fines 387,874 387,874 31.205-15�'"� - - . Bank Charges 153,180 - 153,18� 11,603 141,577 OtherOpereting 1,349,118 2,226,761 31205-2807 (877,643) (66,481) (811,162) Amortization 1,378,004 - 1,378,004 104,383 1,273,621 Internal Restructuring 77,994 77,994 31.205.27� - • - Inlercompany Charges,net 8,330,230 8,330,230 31.201•3,31.205-61°� - - - Interest (415,743) (415,743) 31.205-20�"� - - - Income Taxes 13,686,825 13,686,825 31.205-41�°� - - - Totai General Overhead $ 202,746,381 $ 32,350,728 $ 170,395,653 $ 10,517,921 $ 159,877,732 TotallndirectCosts $ 309,103,145 $ 33,401,193 $ 275,701,952 $ 18,494,810 $ 257,207,142 Overhead Rales(°�of Direct Labor) 140.38°� 160.00°� See accompanying notes to schedute. 2 EXHIBIT E SUB CONSULTANT COST COMPUTATION-6/7 AMEC FOSTER WHEELER ENVIRONMENT&INFRASTRUCTURE,INC. Schedule of Direct Labor,Fringe Benefits,and General Overhead(with Field Rate)Costs Year Ended December 31,2014 Notes: �°�Employer porUon of OASDI lax on unallowable tabor is disallowed �"�Labor cosls associa(ed with general public relalions,advertising,and oiher unallowable ac6vi6es is disallowed �`�Compensation above a reasonable Ihreshold is disallowed ��Employee benefitcosts related to recrealion,entertamment,and other unallowable aclivihes are disallowed �`�Travel costs in excess of maximum per diem rates in effect at the 6me of travel are disallowed �� Enterlainment is disallowed. fo1 Costs associated with legal settlements in lieu of hGgation are disallowed. �'�AdverGsingimarke6ng costs nol explicitly staied as allowable are disallowed � Cosls not generally allocable lo a conhact or related lo allowable activilies necessary for Ihe overall operation o!ihe business are disallowed m Bad debts ansing Gom uncoilecUble accounts are disallowed �`�Cosis of civic and canmuntly memberships are disallowed �� Contributions and tlonations are disallowed �'"�Fines and penalties are disallowed �"�Interest and other linancial costs are disallowed �°�Federal and stale income Wxes,deferred mcome taxes,and tax credds are disallowed �°�Interwmpany management Fees are disallowed �°� Internal reorgamzahon costs are disallowed �'�UnallowaWe costs associated with employee reloca6on. �'�Disallovued costs associated Nnth moving expenses �`�Stcek based compensafion is unallowable �°�Prowsion For bonus in excess of amounts paid are unallowable See accompanying notes to schedule. 3 EXHIBIT E SUB CONSULTANT COST COMPUTATION-7/7 � '„�"�"'„ Washington State Transportation Building �j/� Department of"T�ransportation 310 Maple Park Avenue S.E. P.O.Box 47300 Olympia,WA 88504-7300 �ynn Peterson 360-705-7000 Secretary of Transportation TTV:1-800-833-6388 www.wsdot.wa.gov AUgUSt �, ZO 1 S Amec Foster Wheeler Environment & Infrastructure, Inc. 1105 Lakewood Parkway, Suite 300 Alpharetta, GA 30009 Subject: Acceptance FYE 2014 ICR —Cognizant Review Dear Eddie Goyne: We have accepted your firms FYE 2014 Indirect Cost Rate (ICR) of 160.00% based on the "Cognizant Review" from the Georgia Department of Transportation. Your ICR acceptance is in accordance with 23 CFR 172.7 and must be updated on an annual basis. This rate will be applicable for: � WSDOT Agreements � Local Agency Contracts in Washington State only Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7104 or via email consult�ni���tes(u(u.?wsciat.wa. *� (�5; _,� E K K. JONSON ��---Mai�ager, Consultant Services fice EKJ:kal Acceptance ICR Cognizant Review