Loading...
HomeMy WebLinkAbout20023-06-07 Filtera Bioscape Sizing Memo June 8, 2023 Tom Chiado (206) 550-8363 tom@chiadollc.com RE Bioscape Size Reduction Due to Turf Infill Revision Dear Tom: With the recent decision to change the infill of the two turf fields on the Seattle Sounders Headquarters project we want to take the opportunity to review the requirements for water quality sizing that was identified in final decision from the Hearing Examiner for the City of Renton. The decision at that time was the Filterra Bioscape should be upsized from the standard 91% with applicable K factor, per the 2022 City of Renton Surface Water Design Manual, to the 2-year storm event due to the SBR Crumb Rubber infill and the concerns related to 6PPD-Q. Due to these changes, we propose revising the Filterra Bioscape sizing to align with the 2002 City of Renton Surface Water Design Manual standards. The Filterra Bioscape area will reduce from 825 sf to 638 sf. Attached are revised calculations for the bioscape sizing, as well as a comparison drawing showing the reduced size. Sincerely, COUGHLIN PORTER LUNDEEN, INC. William Andres, P.E. Civil Project Manager Treatment Flow Rate* 91st % Storm WQ Q 1.3192 cfs (Determined from WWHM) k Factor 1.91 Treatment Flow Rate 2.52 cfs (City of Renton/KC factor) Bioscape Media Filtration Rate 175 in/hr 14.58 ft/hr 0.0041 ft/sec 100 in/hr 8.33 ft/hr 0.0023 ft/sec Bioscape Area Required (Enhanced Basic)622.0 sf 0.0143 (Phosphorus)1088.5 sf 0.0250 Area Provided 638 sf 0.0146 Sounders - Longacres Phosphorus Enhanced Basic Stormwater - Water Quality Calculations 3Bioscape Enlargement 15 15 20 16 16 16 17 18 19 21 15 15 20 16 16 16 17 18 21 73.2' 76' R5' R5'TE O F WASH I NGC ORB.BYHTOM WKCurrent Approved Design Proposed Reduction for Cork Infill 825 SF 638 SF