FINAL
TECHNICAL INFORMATION REPORT
FOR
Cyprus Lane Plat
CITY OF RENTON, WASHINGTON
Prepared by: Andrew Oh, E.I.T
Date: August 1, 2022
Revised: January 2023, April 2023
Core No.: 20134
4/27/23
DEVELOPMENT ENGINEERING
NJanders 06/07/2023
SURFACE WATER UTILITY
jfarah 06/07/2023
Core Design, Inc. CYPRUS LANE PLAT i
Cyprus Lane Plat
Table of Contents
1. PROJECT OVERVIEW ............................................................................................................................. 3
Figure 1-1 Vicinity Map ........................................................................................................................ 3
2. CONDITIONS AND REQUIREMENTS SUMMARY ................................................................................... 5
2.1 Core Requirements ............................................................................................................................. 6
2.1.1 Core Requirement #1: Discharge at the Natural Location ......................................................... 6
2.1.2 Core Requirement #2: Offsite Analysis ....................................................................................... 6
2.1.3 Core Requirement #3: Flow Control............................................................................................ 6
2.1.4 Core Requirement #4: Conveyance System ................................................................................ 6
2.1.5 Core Requirements #5: Erosion and Sediment Control .............................................................. 6
2.1.6 Core Requirement #6: Maintenance and Operations ................................................................. 6
2.1.7 Core Requirement #7: Financial Guarantees and Liability .......................................................... 6
2.1.8 Core Requirement #8: Water Quality ......................................................................................... 6
2.1.9 Core Requirement #9: On-Site BMPs .......................................................................................... 6
2.2 Special Requirements ......................................................................................................................... 6
2.2.1 Special Requirement #1: Other Adopted Area Specific Requirements ....................................... 6
2.2.2 Special Requirement #2: Flood Hazard Area Delineation ........................................................... 7
2.2.3 Special Requirement #3: Flood Protection Facilities ................................................................... 7
2.2.4 Special Requirement #4: Source Control .................................................................................... 7
2.2.5 Special Requirement #5: Oil Control ........................................................................................... 7
2.2.6 Special Requirement #6: Aquifer Protection Area ...................................................................... 7
3. OFFSITE ANALYSIS ................................................................................................................................ 8
Task 1 Study Area Definition and Maps .................................................................................................... 8
Task 2 Resource Review ........................................................................................................................... 8
Sensitive Areas Folio............................................................................................................................. 8
Task 3 Field Investigation ......................................................................................................................... 8
Task 4 Drainage System Description and Problem Description ............................................................... 8
4. FLOW CONTROL AND WATER QUALITY ANALYSIS ............................................................................. 10
4.1 Predeveloped Site Hydrology ........................................................................................................... 10
West Basin .......................................................................................................................................... 10
Core Design, Inc. CYPRUS LANE PLAT ii
Table 4.1-1 West Basin Predeveloped Conditions ............................................................................. 10
South Basin ......................................................................................................................................... 10
Table 4.1-2 South Basin Predeveloped Conditions ............................................................................ 10
4.2 Developed Site Hydrology ................................................................................................................ 11
West Vault .......................................................................................................................................... 11
Table 4.2-1 Developed Conditions ..................................................................................................... 11
South Vault ......................................................................................................................................... 12
Table 4.2-2 Developed Conditions ..................................................................................................... 12
4.3 Flow Control System ......................................................................................................................... 14
West Vault .......................................................................................................................................... 14
South Vault ......................................................................................................................................... 14
4.4 BMP Feasibility ................................................................................................................................. 18
4.5 Water Quality Treatment Analysis and Design ................................................................................. 21
South Basin ......................................................................................................................................... 21
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN .................................................................................. 22
6. SPECIAL REPORTS AND STUDIES ........................................................................................................ 25
7. OTHER PERMITS ................................................................................................................................. 26
8. ESC ANALYSIS AND DESIGN ................................................................................................................ 27
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ................................ 1
10. OPERATIONS AND MAINTENANCE ....................................................................................................... 2
Appendix A .................................................................................................................................................... 3
Appendix B .................................................................................................................................................... 4
• MGS Flood Report
Core Design, Inc. CYPRUS LANE PLAT 3
1. PROJECT OVERVIEW
The proposed Cyprus Lane project is located at 5816 NE 4th Place, Renton, WA and 510 Nile Avenue NE,
Renton, WA. See Vicinity Map below.
Figure 1-1 Vicinity Map
The site is composed of parcels #1123059023, #1123059021, and #1123059031 with an area of
approximately 4.92 acres. The site is bordered by NE 4th Place to the south, Nile Avenue to the west, and
single-family residential homes to the north and east.
The south two parcels were previously developed with a single story residential home and detached
garage. The north parcel was previously developed with a single story residential home. The rest of the
site was left as forest. The site generally slopes at 5-10% from northeast to southwest.
Proposed development of the property will include the demolition of all existing structures and the
construction of 14 single family residences, access road, public alley, utilities, and frontage
improvements.
Core Design, Inc. CYPRUS LANE PLAT 4
The subject project’s drainage facilities were designed using the guidelines and requirements
established in the 2017 City of Renton Surface Water Design Manual (RSWDM).Flow Control Duration
Standard (Forested Site Conditions) and Basic Water Quality Treatment are required for this project.
Core Design, Inc. CYPRUS LANE PLAT 5
2. CONDITIONS AND REQUIREMENTS SUMMARY
The proposed project is classified as requiring “Full Drainage Review” per the 2017 RSWDM. Therefore,
all nine core requirements and six special requirements will be addressed per Section 1.2 and 1.3 of the
2017 RSWDM.
Core Design, Inc. CYPRUS LANE PLAT 6
2.1 Core Requirements
2.1.1 Core Requirement #1: Discharge at the Natural Location
The project has two natural discharge locations. Both are to the City’s conveyance system. The west
vault discharge location is along Nile Avenue NE and the south vault discharge location is on NE 4th
Place. The discharge from the two vaults are within the same basin and will converge within a ¼ mile.
There is a small portion of forest located at the southeast corner of the site that is a part of a separate
basin that will be discharged with the rest of the site in the developed conditions. A drainage
adjustment has been submitted for this.
2.1.2 Core Requirement #2: Offsite Analysis
See Section 3 of this Report for the downstream drainage path.
2.1.3 Core Requirement #3: Flow Control
The site falls within the City’s Flow Control Duration Standard (Forested Site Conditions). See City’s Flow
Control Application Map in Appendix A. This flow control standard requires matching forested
conditions for the 2, 10, and 100-year peak rate runoffs. See Section 4 of this report for a detailed Flow
Control Analysis.
2.1.4 Core Requirement #4: Conveyance System
See Section 5 of this report for a detailed conveyance system analysis for the 25-year and 100-year
storm events. The proposed conveyance system will be designed to convey and contain the 25-year
peak flow. The conveyance system may overtop for runoff events exceeding the 25-year design capacity
provided that overflow from the 100-year runoff event does not create or aggravate a severe flooding or
erosion problem. See section 1.2.4.1 of the 2017 RSWDM for conveyance system requirements.
2.1.5 Core Requirements #5: Erosion and Sediment Control
See Section 8 of this report for ESC analysis and design.
2.1.6 Core Requirement #6: Maintenance and Operations
See Section 10 of this report for the Maintenance and Operations manual.
2.1.7 Core Requirement #7: Financial Guarantees and Liability
A City of Renton Bond Quantity Worksheet has been provided in Section 9 of this report.
2.1.8 Core Requirement #8: Water Quality
The project is required to provide basic water quality treatment if the new plus replaced pollution
generating impervious surface exceeds 5,000 SF. See section 4.5 for details.
2.1.9 Core Requirement #9: On-Site BMPs
See Section 4.3 of this Report for discussion on how this Core Requirement is addressed.
2.2 Special Requirements
2.2.1 Special Requirement #1: Other Adopted Area Specific Requirements
There are no known additional requirements for the subject project.
Core Design, Inc. CYPRUS LANE PLAT 7
2.2.2 Special Requirement #2: Flood Hazard Area Delineation
Not applicable since the project does not contain nor is adjacent to a flood hazard area.
2.2.3 Special Requirement #3: Flood Protection Facilities
Not applicable since the project does not rely on an existing flood protection facility or plans to modify
or construct a new flood protection facility.
2.2.4 Special Requirement #4: Source Control
Not applicable.
2.2.5 Special Requirement #5: Oil Control
Not applicable since the project is not a high use site. The expected average daily traffic is less than 100
vehicles per 1,000 square feet of gross building area.
2.2.6 Special Requirement #6: Aquifer Protection Area
Not applicable since the project is not in an Aquifer Protection Area.
Core Design, Inc. CYPRUS LANE PLAT 8
3. OFFSITE ANALYSIS
Task 1 Study Area Definition and Maps
The proposed project is located within the Lower Cedar River drainage basin.
Task 2 Resource Review
Sensitive Areas Folio
Renton GIS was reviewed for sensitive areas. The proposed project site does not fall within the
following sensitive area; coal mines, erosion hazard, flood hazard, floodway, channel migration zone,
landslide, seismic hazard, regulated stream, wetland, or wellhead protection.
Task 3 Field Investigation
There is negligible upstream tributary area.
Downstream Drainage Path
West Basin
This downstream route description begins at the catch basin located along the east side of Nile Avenue
NE right at the southwest corner of the project site. This catch basin captures runoff from the site and
directs flow south until the intersection with NE 4th Street. At this point the runoff is redirected west
along the north side of NE 4th Street. This concludes the ¼ mile analysis just before the runoff crosses to
the south side of NE 4th Street near 401 Lyons Avenue NE. The drainage will continue to follow this path
until it is discharged into a stream tributary to Lake Washington.
The other downstream route for the west basin begins at the catch basin located along the south side of
NE 4th Place, approximately 100 feet west of the site. This catch basin captures runoff from the site and
directs flow south into an existing storm control facility. This facility then discharges flows to the west at
which point it merges with the flow from the other downstream route within a ¼ mile.
South Basin
This downstream route description begins at the two catch basins located along the south side of NE 4th
Place, one at the west side and the other at the east side of the site. The two catch basins combine at
the next manhole and flow south along Orcas Place NE until it meets NE 4th Street. The storm system
directs runoff to the west along NE 4th Street for approximately 800 ft at which point the ¼ mile analysis
ends near 5514 NE 4th Street.
The West and South Basin combine 1,600 feet downstream of the west basin and 1,900 feet downstream
of the South Basin so the project has two separate drainage basins.
Task 4 Drainage System Description and Problem Description
Drainage complaints were researched within a quarter mile of the project site. City of Renton does not
list any current complaints along the project’s downstream route.
2,257376
City of Renton Storm
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere
Notes
None
01/17/2023
Legend
256 0 128 256 Feet
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
City and County Labels
Addresses
Parcels
City and County Boundary
<all other values>
Renton
Renton Fire Hydrant
Control Valve
Water Gravity Pipe
Water Main
Water Main - Other System
Network Structures
Access Riser
Inlet
Manhole
Utility Vault
Clean Out
Unknown
Control Structure
Pump Station
Discharge Point
Water Quality
Detention Facilities
Pond
Tank
Vault
Bioswale
Wetland
Other
Surface Water Main
Culvert
Open Drains
Virtual Drainline
Facility Outline
Private Network Structures
Access Riser
Inlet
Manhole
Clean Out
Utility Vault
Unknown
Private Control Structure
Private Pump Station
Private Discharge Point
Private Water Quality
Private Detention Facilities
Tank, No
Stormwater Wetland, No; Natural Wetland, No
Filter Strip, No
Infiltration Trench, No
Vault, No
Pond, No; Pond, Unknown
Bioswale, No
Stormtech Chamber, No
Other, No
Private Pipe
Private Culvert
WEST BASIN
SOUTH BASIN
1/4 MILE ENDS
1/4 MILE ENDS
EXISTING
SOUTH BASIN
DISCHARGE
1,600 LF
1,900 LF
BASINS COMBINE 1,600 LF
DOWNSTREAM OF THE WEST BASINA
ND 1,900 LF DOWNSTREAM OF THE
SOUTH BASIN WHICH IS GREATER THAN
1/4 MILE AND THEREFORE THE
PROJECT HAS TWO SEPARATE
DRAINAGE BASINS
WEST BASINS
CONVERGE
520 LF (SITE TO WEST
BASIN CONVERGENCE)
450LF (SITE TO WEST
BASIN CONVERGENCE)
Core Design, Inc. CYPRUS LANE PLAT 10
4. FLOW CONTROL AND WATER QUALITY ANALYSIS
Two flow control facilities are proposed for the project. See section 4.1 below for details. A water quality
treatment facility is proposed in the south basin as the project is not exempt from water quality
treatment as delineated in Section 4.2 of this Report. The drainage analysis was modeled using MGS
Flood software.
4.1 Predeveloped Site Hydrology
The site was previously developed with two single story residential homes and detached garage. The
rest of the site was left as forest. The total project area is approximately 4.92 acres and includes the site
as well as frontage improvements.
As per the flow control standard designated for the site, the entire project area will be modeled as Till
Forest in MGS Flood. The site has two existing basins that are shown in the table below.
West Basin
The existing impervious in the west basin is from the existing impervious on Nile Avenue NE that will be
grinded and overlayed. This area would not be considered a targeted area for mitigation and as it will
drain into the vault due to the crown of the road, we will be modeling it in its existing condition as
impervious in the developed conditions.
Table 4.1-1 West Basin Predeveloped Conditions
Ground Cover Area (acres)
Till Forest 4.66
Ex. Impervious 0.06
Total Basin 4.72
South Basin
Existing forested area located at the south east corner of the site. This area is not included in the
predeveloped conditions in the flow control model, but will be detained with the rest of the site flows in
the developed conditions. A basin adjustment has been submitted for this area.
Table 4.1-2 South Basin Predeveloped Conditions
Ground Cover Area (acres)
Till Forest 0.20
Total Basin 0.20
Core Design, Inc. CYPRUS LANE PLAT 11
4.2 Developed Site Hydrology
Proposed development of the property will include the demolition of all existing structures and the
construction of 14 single family residences, access road, utilities, and frontage improvements along NE
4th Place and Nile Avenue NE. Flow control BMP credit has been taken into account for modeling for
future flow control BMPs. A max impervious area per lot of 4,000 SF was found per the guideline of
4,000 SF or max impervious based on zoning, whichever is less. The project is split into two vaults to
capture flows from different areas of the site (West/South), although they are all in the same basin. The
developed conditions are shown below.
West Vault
Table 4.2-1 Developed Conditions
Total Area (SF) Impervious (SF) Pervious (SF)
Lot 9 9,335 4,000 5,335
Lot 10 10,819 4,000 6,819
Lot 11 10,515 4,000 6,515
Tract D 5,872 0 5,872
Tract E 8,134 0 8,134
Right of Way 5,967 4,690 1,277
Total (SF) 50,642 16,690 33,952
Total (Acres) 1.16 0.38 0.78
Core Design, Inc. CYPRUS LANE PLAT 12
South Vault
Table 4.2-2 Developed Conditions
Total Area
(SF)
Impervious
(SF)
Pervious (SF)
Lot 1 10,978 4,000 6,978
Lot 2 9,017 4,000 5,017
Lot 3 9,005 4,000 5,005
Lot 4 9,015 4,000 5,015
Lot 5 10,014 4,000 6,014
Lot 6 10,818 4,000 6,818
Lot 7 9,100 4,000 5,100
Lot 8 9,032 4,000 5,032
Lot 12 12,788 4,000 8,788
Lot 13 9,308 4,000 5,308
Lot 14 9,367 4,000 5,367
Right of Way 36,636 27,919 8,717
Right of Way Connection 667 667 0
Alley 6,985 5,946 1,039
Open Space Tract A 10,846 0 10,846
Total (SF) 163,576 78,532 85,044
Total (Acres) 3.76 1.80 1.95
NE 4TH PLACENILE PLACE NE
ORCAS PLACE NE
NILE AVENUE NE
DESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796320134
NE 4TH PLACENILE PLACE NE
ORCAS PLACE NE
53'
NILE AVENUE NE
139,308± SFTR. ASTORM/ OP. SP.10,846± SF89,032± SF110,978± SF29,017± SFROW6.5' ROW DED.1,070± SF39,005± SFTR. CTREE306± SFTR. BTREE248± SFTR. ITREE740± SFTR. HTREE950± SFTR. FTREE1,051± SFTR. GTREE799± SF149,367± SF99,335± SF49,015± SF1010,819± SFROW36,636± SFTR. DOPEN SPACE5,872± SF1212,788± SF610,818± SF79,100± SF510,014± SFALLEY (PUBLIC)6,985± SFTR. ESTORM8,134± SF1110,515± SFDESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796320134
Core Design, Inc. CYPRUS LANE PLAT 14
4.3 Flow Control System
West Vault
Using the predeveloped and developed areas above, a 40’x30’ with 5.1’ of live storage was sized. The
vault will be providing 6,120 CF of storage at riser crest. Below are the vault details and the flow rates.
The full MGS Flood report can be found in Appendix B.
South Vault
Using the predeveloped and developed areas above, a 58’ x 88’ vault with 10’ of live storage was sized.
The vault will be providing 51,040 CF of storage at riser crest. Below are the tank details and the flow
rates. The full MGS Flood report can be found in Appendix B
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 0.130 2-Year 7.816E-02
5-Year 0.213 5-Year 0.118
10-Year 0.276 10-Year 0.179
25-Year 0.370 25-Year 0.213
50-Year 0.468 50-Year 0.256
100-Year 0.501 100-Year 0.306
200-Year 0.780 200-Year 0.333
500-Year 1.154 500-Year 0.368
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -3.8% PASS
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -3.8% PASS
Maximum Excursion from Q2 to Q50 (Must be less than 10%): -11.4% PASS
Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS
Core Design, Inc. CYPRUS LANE PLAT 15
Core Design, Inc. CYPRUS LANE PLAT 16
Link Name: North Vault
Link Type: Structure
Downstream Link Name: New Copy Lnk3
Prismatic Pond Option Used
Pond Floor Elevation (ft) : 0.00
Riser Crest Elevation (ft) : 5.10
Max Pond Elevation (ft) : 6.10
Storage Depth (ft) : 5.10
Pond Bottom Length (ft) : 40.0
Pond Bottom Width (ft) : 30.0
Pond Side Slopes (ft/ft) : Z1= 0.00 Z2= 0.00 Z3= 0.00 Z4= 0.00
Bottom Area (sq-ft) : 1200.
Area at Riser Crest El (sq-ft) : 1,200.
(acres) : 0.028
Volume at Riser Crest (cu-ft) : 6,120.
(ac-ft) : 0.140
Area at Max Elevation (sq-ft) : 1200.
(acres) : 0.028
Vol at Max Elevation (cu-ft) : 7,320.
(ac-ft) : 0.168
Hydraulic Conductivity (in/hr) : 0.00
Massmann Regression Used to Estimate Hydralic Gradient
Depth to Water Table (ft) : 100.00
Bio-Fouling Potential : Low
Maintenance : Average or Better
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 12.00
Common Length (ft) : 0.000
Riser Crest Elevation : 5.10 ft
Hydraulic Structure Geometry
Number of Devices: 3
---Device Number 1 ---
Device Type : Circular Orifice
Control Elevation (ft) : 0.00
Diameter (in) : 0.81
Orientation : Horizontal
Elbow : No
---Device Number 2 ---
Device Type : Circular Orifice
Control Elevation (ft) : 2.50
Diameter (in) : 1.19
Orientation : Horizontal
Elbow : Yes
---Device Number 3 ---
Device Type : Circular Orifice
Control Elevation (ft) : 3.85
Diameter (in) : 0.62
Orientation : Horizontal
Elbow : Yes
Core Design, Inc. CYPRUS LANE PLAT 17
Link Name: South Vault
Link Type: Structure
Downstream Link Name: New Copy Lnk3
Prismatic Pond Option Used
Pond Floor Elevation (ft) : 0.00
Riser Crest Elevation (ft) : 10.00
Max Pond Elevation (ft) : 10.50
Storage Depth (ft) : 10.00
Pond Bottom Length (ft) : 100.0
Pond Bottom Width (ft) : 58.0
Pond Side Slopes (ft/ft) : Z1= 0.00 Z2= 0.00 Z3= 0.00 Z4= 0.00
Bottom Area (sq-ft) : 5800.
Area at Riser Crest El (sq-ft) : 5,800.
(acres) : 0.133
Volume at Riser Crest (cu-ft) : 58,000.
(ac-ft) : 1.331
Area at Max Elevation (sq-ft) : 5800.
(acres) : 0.133
Vol at Max Elevation (cu-ft) : 60,900.
(ac-ft) : 1.398
Hydraulic Conductivity (in/hr) : 0.00
Massmann Regression Used to Estimate Hydralic Gradient
Depth to Water Table (ft) : 100.00
Bio-Fouling Potential : Low
Maintenance : Average or Better
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 12.00
Common Length (ft) : 0.000
Riser Crest Elevation : 10.00 ft
Hydraulic Structure Geometry
Number of Devices: 3
---Device Number 1 ---
Device Type : Circular Orifice
Control Elevation (ft) : 0.00
Diameter (in) : 0.81
Orientation : Horizontal
Elbow : No
---Device Number 2 ---
Device Type : Circular Orifice
Control Elevation (ft) : 5.67
Diameter (in) : 0.87
Orientation : Horizontal
Elbow : Yes
---Device Number 3 ---
Device Type : Circular Orifice
Control Elevation (ft) : 7.10
Diameter (in) : 1.13
Orientation : Horizontal
Elbow : Yes
Core Design, Inc. CYPRUS LANE PLAT 18
4.4 BMP Feasibility
Per Section 1.2.9.1 in the RSWDM, projects subject to Core Requirement #9 must apply flow control
BMPs to either supplement the flow mitigation provided by required flow control facilities or provide
flow mitigation where flow control facilities are not required. Flow control BMPs must be implemented
per the requirements and approach detailed in Sections 1.2.9.2 and 1.2.9.3 for individual lots and
subdivisions or road improvement projects, respectively. The Section applicable to this project is Section
1.2.9.2.
Per Section 1.2.9.2, projects on individual sites/lots, flow control BMPs must be selected and applied
according to the individual lot BMP requirements. The category of requirements applicable to the
subject project is the Small Lot BMP Requirements (for sites/lots <22,000 square feet).
1. The feasibility and applicability of full dispersion as detailed in Appendix C, Section C.2.1 must be
evaluated for all target impervious surfaces. If feasible and applicable, full dispersion must be
implemented as part of the proposed project. Typically, small lot full dispersion will be applicable
only in subdivisions where enough forest was preserved by tract, easement, or covenant to meet
the minimum requirements for full dispersion in Appendix C, Section C.2.1.1
Full dispersion is not feasible since there is no forested area.
2. Where full dispersion of target impervious roof areas is not feasible or applicable, or will cause
flooding or erosion impacts, the feasibility and applicability of full infiltration as detailed in Appendix
C, Section C.2.2 must be evaluated (note, this will require a soils report for the site/lot). If feasible
and applicable, full infiltration of roof runoff must be implemented as part of the proposed project.
As per the Geotechnical report by Cobalt Geosciences dated February 2, 2021, “Infiltration is not
feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard.”
3. All target impervious surfaces not mitigated by Requirements 1 and 2 above, must be mitigated to
the maximum extent feasible using one or more BMPs from the following list. Use of a given BMP is
subject to evaluation of its feasibility and applicability as detailed in Appendix C. Feasible BMPs are
required to be implemented. The BMPs listed below may be located anywhere on the site/lot
subject to the limitations and design specifications for each BMP. These BMPs must be
implemented as part of the proposed project.
• Full Infiltration per Appendix C, Section C.2.2, or per Section 5.2, whichever is applicable
As per the Geotechnical report by Cobalt Geosciences dated February 2, 2021, “Infiltration is not
feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard.”
• Limited Infiltration per Appendix C, Section C.2.3,
As per the Geotechnical report by Cobalt Geosciences dated February 2, 2021, “Infiltration is not
feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard.”
Core Design, Inc. CYPRUS LANE PLAT 19
• Rain Gardens per Appendix C, Section C.2.12, sized as follows:
As per the Geotechnical report by Cobalt Geosciences dated February 2, 2021, “Infiltration is not
feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard.”
• Bioretention per Appendix C, Section C.2.6, sized as follows:
o SeaTac regional scale factor equals 1.0: In till soils, provide bioretention volume based on 0.6
inches of equivalent storage depth; in outwash soils provide bioretention volume based on 0.1
inches of equivalent storage depth,
o SeaTac regional scale factor greater than 1.0: In till soils, provide bioretention volume based on 0.8
inches of equivalent storage depth; in outwash soils, provide bioretention volume based on 0.4
inches of equivalent storage depth,
As per the Geotechnical report by Cobalt Geosciences dated February 2, 2021, “Infiltration is not
feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard.”
• Permeable Pavement per Appendix C, Section C.2.7
As per the Geotechnical report by Cobalt Geosciences dated February 2, 2021, “Infiltration is not
feasible due to the presence of dense fine-grained soil deposits, which act as an aquitard.”
4. All target impervious surfaces not mitigated by Requirements 1, 2 and 3 above, must be mitigated to
the maximum extent feasible using the Basic Dispersion BMP described below. Use of Basic
Dispersion is subject to evaluation of its feasibility and applicability as detailed in Appendix C.
Feasible BMPs are required to be implemented. Basic Dispersion BMPs may be located anywhere on
the site/lot subject to the limitations and design specifications cited in Appendix C. The BMP must
be implemented as part of the proposed project.
• Basic Dispersion per Appendix C, Section C.2.4,
Basic Dispersion will be implemented for walkways. The minimum required BMP area will be met with
basic dispersion through sheetflow dispersion, splash blocks, or dispersion trenches. These BMPs will
be evaluated with the building permits.
5. BMPs must be implemented, at minimum, for an impervious area equal to at least 10% of the
site/lot for site/lot sizes up to 11,000 square feet and at least 20% of the site/lot for site/lot sizes
between 11,000 and 22,000 square feet. For projects located in Zone 1 of the Aquifer Protection
Area, these impervious area amounts must be doubled. Doubling of the minimum impervious area
required for BMP implementation in Zone 1 of the Aquifer Protection Area is not required for
projects located within 200 feet of a steep slope hazard area, landslide hazard, or erosion hazard
area. If these minimum areas are not mitigated using feasible BMPs from Requirements 1, 2, 3, and
4 above, one or more BMPs from the following list are required to be implemented to achieve
compliance. These BMPs must be implemented as part of the proposed project.
• Reduced Impervious Surface Credit per Appendix C, Section C.2.9,
Core Design, Inc. CYPRUS LANE PLAT 20
• Native Growth Retention Credit per Appendix C, Section C.2.10.
• Tree Retention Credit per Appendix C, Section C.2.14
Reduced impervious surface credit is not feasible due to the insufficient lot area/space to provide
applicable compliance levels and maintain required setbacks while having reasonable use of the lot.
The native grown retention credit is not feasible because there is no native vegetation on this site to
maintain.
6. The soil moisture holding capacity of new pervious surfaces (target pervious surfaces) must be
protected in accordance with the soil amendment BMP as detailed in Appendix C, Section C.2.13.
Soil amendment will be incorporated for disturbed areas not covered with hard surfaces.
7. Any proposed connection of roof downspouts to the local drainage system must be via a perforated
pipe connection as detailed in Appendix C, Section C.2.11.
Perforated pipe connections will be provided for any proposed connection of roof downspouts to the
local drainage system.
Core Design, Inc. CYPRUS LANE PLAT 21
4.5 Water Quality Treatment Analysis and Design
West Basin
Water quality will be provided through dead storage in the detention vault. The snip below from MGS
Flood shows that the vault will need a minimum of 2,956 CF of dead storage to achieve basic water
quality treatment. The proposed vault will provide 4,800 CF of dead storage (40’x30’x4’). Therefore,
basic water quality treatment has been met.
South Basin
Water quality will be provided through dead storage in the detention vault. The snip below from MGS
Flood shows that the vault will need a minimum of 11,270 CF of dead storage to achieve basic water
quality treatment. The proposed vault will provide 15,200 CF of dead storage in two out of the three
cells (100’x38’x4’). Therefore, basic water quality treatment has been met.
Core Design, Inc. CYPRUS LANE PLAT 22
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
The conveyance system was designed for the 25-year, 24-hour and 100-year, 24-hour storm events. A
conveyance spreadsheet was generated for basin using the rational method to calculate flows for the
area collected by each catch basin. The precipitation rates for the 25-year, 24-hour and 100-year, 24-
hour storm events are 3.4 inches and 3.9 inches respectively. The flows generated from the conveyance
system spreadsheets for both storm events were input into backwater analysis spreadsheets to confirm
adequate sizing.
The backwater analysis was performed to ensure that during the 25-year, 24-hour storm event, the
headwater elevation in each structure did not overtop any of the rims. For the 100-year, 24-hour storm
event, structures are allowed to overtop, but all runoff must be safely conveyed to ensure that
overflowing runoff or ponding would not cause structural damage. These requirements are found in
section 1.2.4 of the 2016 KCSWDM.
Weighted C values for basin was used in the rational method spreadsheet. Impervious area has a C value
of 0.9 and grass area has a C value of 0.25. These values along with the impervious area and grass area
of the developed basin was used to calculate the weighted C values. See calculations provided below.
((2.09 x 0.25)+ (1.88 x 0.9))/3.96 =0.56 =C
The tailwater elevations within the vault were derived from the MGS Flood report. See the MGS Flood
generated reports provided in Section 4. Tailwater elevations for the 25-year storm event and the 100-
year storm event are provided in the table below.
Storm Year Tailwater Elevation
25-year 483.29
100-year 484.05
During the 25-year storm all headwater elevations remained below the rim elevations of all catch basins.
During the 100-year storm all headwater elevations also remained below the rim elevations of all catch
basins. Therefore, the conveyance system meets the requirements of the 2016 KCSWDM.
See conveyance and backwater spreadsheets for the 25 and 100-year storms below. A Conveyance
Exhibit is also provided showing the area assumed to drain to each catch basin on the following pages.
Core Design, Inc. CYPRUS LANE PLAT 23
A conveyance analysis has been completed to verify if the 18-inch pipe of CB 21 has adequate capacity
to convey runoff.
The pipe capacity analysis will be for a 18” pipe. The slope for this pipe is 5%. Using the nomograph
above, the flow capacity of the 18” pipe at 5% slope is roughly 25 CFS. CB 21 is taking in roughly 1.06 CFS
at the 100-year storm, which is significantly under the max capacity of 25 CFS.
Q = 25 cfs
(25 cfs >> 1.06 cfs)
Therefore, the proposed
pipes will convey the
100-year peak flows.
Core Design, Inc. CYPRUS LANE PLAT 24
A conveyance analysis has been completed to verify if the 12-inch pipes of CB 20 and 25 have adequate
capacity to convey runoff.
The pipe capacity analysis will be for a 12” pipe. The project is using a conservative 0.5% slope. Using the
nomograph above, the flow capacity of a 12” pipe at 0.5% slope is roughly 2.6 CFS. CB 20 is taking in
roughly 0.12 CFS at the 100-year storm and the mitigated flows from the vault into CB25 is 0.11 CFS,
which are both significantly under the max capacity of 2.6 CFS.
Q = 2.6 cfs
(2.6cfs >> 0.12 & 0.11 cfs)
Therefore, the proposed
pipes will convey the 100-
year peak flows.
NE 4TH PLACEPASCO PLACE NE
53'
NILE AVENUE NE
DESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796320134
RATIONAL METHOD CONVEYANCE SYSTEM DESIGN LOCATION: KING COUNTY
PR (24-HR RAINFALL):3.4 INCHES
PROJECT NAME: Cyprus Lane PROJECT NUMBER: 20134 PREPARED BY: AO DESIGN STORM: 25 YEAR
SUBBASIN PIPE PIPE PIPE ACTUAL TRAVEL PIPE CAPACITY SUMMARY
LOCATION AREA SUM OF Tc
IR QR MANNING'S SIZE SLOPE LENGTH
VELOCITY (VR)TIME Q(FULL) V(FULL)
QR/Q(FULL)
FROM TO (AC) "C" (A * C) (A * C) (MIN) (IN/HR) (CFS) "n" (IN) (%) (FT) (FT/SEC) (MIN) (CFS) (FT/SEC) (%)
14 13 0.270 0.56 0.151 0.151 6.30 2.73 0.413 0.012 12 0.530 19 2.49 0.13 2.810 3.58 14.7%
13 12 0.060 0.56 0.034 0.185 6.43 2.70 0.499 0.012 12 1.700 57 3.88 0.25 5.032 6.41 9.9%
12 11 0.240 0.56 0.134 0.319 6.67 2.63 0.841 0.012 12 0.500 25 3.02 0.14 2.729 3.47 30.8%
11 10 0.060 0.56 0.034 0.353 6.81 2.60 0.917 0.012 12 1.760 62 4.73 0.22 5.120 6.52 17.9%
10 8 0.040 0.56 0.022 0.375 7.03 2.55 0.955 0.012 12 2.790 54 5.70 0.16 6.447 8.21 14.8%
17 16 0.070 0.56 0.039 0.039 6.30 2.73 0.107 0.012 12 6.720 46 3.89 0.20 10.005 12.74 1.1%
16 15 0.030 0.56 0.017 0.056 6.50 2.68 0.150 0.012 12 9.580 98 4.64 0.35 11.946 15.21 1.3%
15 9 0.760 0.56 0.426 0.482 6.85 2.59 1.247 0.012 12 3.110 23 6.54 0.06 6.807 8.67 18.3%
9 8 0.100 0.56 0.056 0.538 6.91 2.58 1.384 0.012 12 2.100 25 5.84 0.07 5.593 7.12 24.8%
8 6 0.040 0.56 0.022 0.935 7.19 2.51 2.347 0.012 12 2.320 65 6.96 0.16 5.879 7.49 39.9%
7 6 0.260 0.56 0.146 0.146 6.30 2.73 0.398 0.012 12 1.000 25 3.10 0.13 3.860 4.91 10.3%
6 3 0.330 0.56 0.185 1.266 7.34 2.47 3.132 0.012 12 2.630 179 7.97 0.37 6.259 7.97 50.0%
2 1 0.830 0.56 0.465 0.465 6.30 2.73 1.271 0.012 12 0.500 19 3.41 0.09 2.729 3.47 46.6%
1 3 0.020 0.56 0.011 0.476 6.39 2.71 1.289 0.012 12 0.500 32 3.41 0.16 2.729 3.47 47.2%
3 Vault 0.11 0.56 0.062 2 7.717 2.40 4.321 0.012 12.000 55.600 29 25.47 0.02 28.780 36.64 15.0%
RATIONAL METHOD CONVEYANCE SYSTEM DESIGN LOCATION: KING COUNTY
PR (24-HR RAINFALL):3.9 INCHES
PROJECT NAME: Cyprus Lane PROJECT NUMBER: 20134 PREPARED BY: AO DESIGN STORM: 100 YEAR
SUBBASIN PIPE PIPE PIPE ACTUAL TRAVEL PIPE CAPACITY SUMMARY
LOCATION AREA SUM OF Tc
IR QR MANNING'S SIZE SLOPE LENGTH
VELOCITY (VR)TIME Q(FULL) V(FULL)
QR/Q(FULL)
FROM TO (AC) "C" (A * C) (A * C) (MIN) (IN/HR) (CFS) "n" (IN) (%) (FT) (FT/SEC) (MIN) (CFS) (FT/SEC) (%)
14 13 0.270 0.56 0.151 0.151 6.30 3.19 0.483 0.012 12 0.530 19 2.59 0.12 2.810 3.58 17.2%
13 12 0.060 0.56 0.034 0.185 6.42 3.15 0.583 0.012 12 1.700 57 4.04 0.24 5.032 6.41 11.6%
12 11 0.240 0.56 0.134 0.319 6.66 3.08 0.984 0.012 12 0.500 25 3.18 0.13 2.729 3.47 36.1%
11 10 0.060 0.56 0.034 0.353 6.79 3.05 1.075 0.012 12 1.760 62 5.05 0.20 5.120 6.52 21.0%
10 8 0.040 0.56 0.022 0.375 6.99 2.99 1.122 0.012 12 2.790 54 5.95 0.15 6.447 8.21 17.4%
17 16 0.070 0.56 0.039 0.039 6.30 3.19 0.125 0.012 12 6.720 46 3.89 0.20 10.005 12.74 1.3%
16 15 0.030 0.56 0.017 0.056 6.50 3.13 0.175 0.012 12 9.580 98 4.64 0.35 11.946 15.21 1.5%
15 9 0.760 0.56 0.426 0.482 6.85 3.03 1.459 0.012 12 3.110 23 6.72 0.06 6.807 8.67 21.4%
9 8 0.100 0.56 0.056 0.538 6.91 3.01 1.620 0.012 12 2.100 25 6.09 0.07 5.593 7.12 29.0%
8 6 0.040 0.56 0.022 0.935 7.14 2.95 2.758 0.012 12 2.320 65 7.34 0.15 5.879 7.49 46.9%
7 6 0.260 0.56 0.146 0.146 6.30 3.19 0.465 0.012 12 1.000 25 3.27 0.13 3.860 4.91 12.0%
6 3 0.330 0.56 0.185 1.266 7.29 2.91 3.685 0.012 12 2.630 179 8.29 0.36 6.259 7.97 58.9%
2 1 0.830 0.56 0.465 0.465 6.30 3.19 1.484 0.012 12 0.500 19 3.54 0.09 2.729 3.47 54.4%
1 3 0.020 0.56 0.011 0.476 6.39 3.16 1.506 0.012 12 0.500 32 3.54 0.15 2.729 3.47 55.2%
3 Vault 0.11 0.56 0.062 2 7.652 2.82 5.093 0.012 12.000 55.600 29 26.57 0.02 28.780 36.64 17.7%
BACKWATER CALCULATIONS
PROJECT NAME: Cyprus Lane PREPARED BY: AO
PROJECT NUMBER: 20134 DESIGN STORM: 25 YEAR
ENTRANCE ENTRANCE EXIT OUTLET INLET APPROACH BEND JUNCTION
PIPE PIPE MANNING'S OUTLET INLET PIPE FULL VELOCITY TAILWATER FRICTION HGL HEAD HEAD CONTROL CONTROL VELOCITY HEAD HEAD HEADWATER RIM
FROM TO Q LENGTH SIZE "n" ELEVATION ELEVATION AREA VELOCITY HEAD ELEVATION LOSS ELEVATION LOSS LOSS ELEVATION ELEVATION HEAD LOSS LOSS ELEVATION ELEVATION FREEBOARD
CB CB (CFS) (FT) (IN) VALUE (FT) (FT) (SQ FT) (FT/SEC) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT)
3 vault 4.33 29 12 0.012 472.50 484.79 0.79 5.52 0.47 483.29 0.36 485.79 0.24 0.47 486.50 486.46 0.25 0.62 0.14 487.01 489.62 2.61
1 3 1.29 32 12 0.012 484.79 484.95 0.79 1.64 0.04 487.01 0.04 487.05 0.02 0.04 487.11 485.95 0.04 0.05 0.00 487.13 488.97 1.84
2 1 1.27 19 12 0.012 484.95 485.07 0.79 1.62 0.04 487.13 0.02 487.15 0.02 0.04 487.21 486.07 0.00 0.05 0.00 487.26 489.35 2.09
6 3 3.13 179 12 0.012 484.79 489.50 0.79 3.98 0.25 487.01 1.16 490.50 0.12 0.25 490.87 490.79 0.14 0.33 0.03 491.09 493.77 2.68
7 6 0.40 25 12 0.012 489.50 489.75 0.79 0.51 0.00 491.09 0.00 491.09 0.00 0.00 491.10 490.75 0.00 0.01 0.00 491.10 493.77 2.67
8 6 2.34 65 12 0.012 489.50 491.00 0.79 2.98 0.14 491.09 0.24 492.00 0.07 0.14 492.21 492.00 0.05 0.00 0.06 492.22 495.23 3.01
9 8 1.38 25 12 0.012 491.00 491.15 0.79 1.76 0.05 492.22 0.03 492.25 0.02 0.05 492.33 492.15 0.04 0.06 0.00 492.35 495.18 2.83
15 9 1.25 23 12 0.012 491.15 492.95 0.79 1.59 0.04 492.35 0.02 493.95 0.02 0.04 494.01 493.95 0.00 0.00 0.00 494.01 496.95 2.94
16 15 0.15 98 12 0.012 492.95 501.28 0.79 0.19 0.00 494.01 0.00 502.28 0.00 0.00 502.28 502.28 0.00 0.00 0.00 502.28 505.28 3.00
17 16 0.11 46 12 0.012 501.28 503.86 0.79 0.14 0.00 502.28 0.00 504.86 0.00 0.00 504.86 504.86 0.00 0.00 0.00 504.86 507.86 3.00
10 8 0.95 54 12 0.012 491.00 492.50 0.79 1.21 0.02 492.22 0.03 493.50 0.01 0.02 493.53 493.50 0.02 0.01 0.00 493.52 496.64 3.12
11 10 0.92 62 12 0.012 492.50 493.50 0.79 1.17 0.02 493.52 0.03 494.50 0.01 0.02 494.53 494.50 0.02 0.00 0.00 494.52 497.75 3.23
12 11 0.84 25 12 0.012 493.50 493.62 0.79 1.07 0.02 494.52 0.01 494.62 0.01 0.02 494.65 494.62 0.01 0.02 0.00 494.66 497.81 3.15
13 12 0.50 57 12 0.012 493.62 494.51 0.79 0.63 0.01 494.66 0.01 495.51 0.00 0.01 495.52 495.51 0.00 0.00 0.00 495.52 498.97 3.45
14 13 0.41 19 12 0.012 494.51 494.63 0.79 0.53 0.00 495.52 0.00 495.63 0.00 0.00 495.64 495.63 0.00 0.00 0.00 495.64 499.05 3.41
PIPE
SEGMENT
BACKWATER CALCULATIONS
PROJECT NAME: Cyprus Lane PREPARED BY: AO
PROJECT NUMBER: 20134 DESIGN STORM: 100 YEAR
ENTRANCE ENTRANCE EXIT OUTLET INLET APPROACH BEND JUNCTION
PIPE PIPE MANNING'S OUTLET INLET PIPE FULL VELOCITY TAILWATER FRICTION HGL HEAD HEAD CONTROL CONTROL VELOCITY HEAD HEAD HEADWATER RIM
FROM TO Q LENGTH SIZE "n" ELEVATION ELEVATION AREA VELOCITY HEAD ELEVATION LOSS ELEVATION LOSS LOSS ELEVATION ELEVATION HEAD LOSS LOSS ELEVATION ELEVATION FREEBOARD
CB CB (CFS) (FT) (IN) VALUE (FT) (FT) (SQ FT) (FT/SEC) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT)
3 vault 5.11 29 12 0.012 472.50 484.79 0.79 6.50 0.66 484.05 0.50 485.79 0.33 0.66 486.78 486.93 0.34 0.87 0.19 487.65 489.62 1.97
1 3 1.50 32 12 0.012 484.79 484.95 0.79 1.91 0.06 487.65 0.05 487.69 0.03 0.06 487.78 485.95 0.06 0.08 0.00 487.80 488.97 1.17
2 1 1.48 19 12 0.012 484.95 485.07 0.79 1.89 0.06 487.80 0.03 487.83 0.03 0.06 487.91 486.07 0.00 0.07 0.00 487.98 489.35 1.37
6 3 3.68 179 12 0.012 484.79 489.50 0.79 4.68 0.34 487.65 1.61 490.50 0.17 0.34 491.01 491.03 0.19 0.45 0.04 491.33 493.77 2.44
7 6 0.46 25 12 0.012 489.50 489.75 0.79 0.59 0.01 491.33 0.00 491.34 0.00 0.01 491.35 490.75 0.00 0.01 0.00 491.35 493.77 2.42
8 6 2.75 65 12 0.012 489.50 491.00 0.79 3.51 0.19 491.33 0.33 492.00 0.10 0.19 492.29 492.15 0.07 0.00 0.08 492.31 495.23 2.92
9 8 1.62 25 12 0.012 491.00 491.15 0.79 2.06 0.07 492.31 0.04 492.35 0.03 0.07 492.45 492.15 0.05 0.09 0.00 492.48 495.15 2.67
15 9 1.46 23 12 0.012 491.15 492.95 0.79 1.86 0.05 492.48 0.03 493.95 0.03 0.05 494.03 493.95 0.00 0.01 0.00 494.04 496.95 2.91
16 15 0.18 98 12 0.012 492.95 501.28 0.79 0.22 0.00 494.04 0.00 502.28 0.00 0.00 502.28 502.28 0.00 0.00 0.00 502.28 505.28 3.00
17 16 0.13 46 12 0.012 501.28 503.86 0.79 0.16 0.00 502.28 0.00 504.86 0.00 0.00 504.86 504.86 0.00 0.00 0.00 504.86 507.86 3.00
10 8 1.12 54 12 0.012 491.00 492.50 0.79 1.43 0.03 492.31 0.05 493.50 0.02 0.03 493.55 493.50 0.03 0.01 0.00 493.53 496.64 3.11
11 10 1.07 62 12 0.012 492.50 493.50 0.79 1.37 0.03 493.53 0.05 494.50 0.01 0.03 494.54 494.50 0.02 0.01 0.00 494.52 497.75 3.23
12 11 0.98 25 12 0.012 493.50 493.62 0.79 1.25 0.02 494.52 0.02 494.62 0.01 0.02 494.66 494.62 0.01 0.03 0.00 494.68 497.81 3.13
13 12 0.58 57 12 0.012 493.62 494.51 0.79 0.74 0.01 494.68 0.01 495.51 0.00 0.01 495.52 495.51 0.01 0.00 0.00 495.52 498.97 3.45
14 13 0.48 19 12 0.012 494.51 494.63 0.79 0.61 0.01 495.52 0.00 495.63 0.00 0.01 495.64 495.63 0.00 0.00 0.00 495.64 499.05 3.41
PIPE
SEGMENT
Core Design, Inc. CYPRUS LANE PLAT 25
6. SPECIAL REPORTS AND STUDIES
The following reports and assessments are provided under separate cover for reference and
informational purposes only. Core Design takes no responsibility or liability for these reports,
assessments or designs as they were not completed under the direct supervision of Core Design.
➢ Geotechnical Evaluation
February 2, 2021
Cobalt Geosciences, LLC
P.O Box 82243
Kenmore, WA 98028
206-331-1097
➢ Arborist Report
June 21, 2021
Greenforest Inc
4547 S. Lucile Street
Seattle, WA 98118
206-723-0656
Core Design, Inc. CYPRUS LANE PLAT 26
7. OTHER PERMITS
• Civil Construction Permit
• NPDES Permit
• Building Permit (Vaults)
• Franchise Permits
• Electrical Permits
Core Design, Inc. CYPRUS LANE PLAT 27
8. ESC ANALYSIS AND DESIGN
This project will comply with Section 1.2.5 and Appendix D of the 2016 KCSWDM. This project will also
comply with the 13 Elements presented in the 2014 Washington State Department of Ecology
Stormwater Management Manual for Western Washington.
Part A: ESC Plan Analysis and Design
The following ESC measure have been considered for this project. A brief discussion of each measure is
also provided below. Additional information on ESC measures can be found in the SWPPP Report
provided under separate cover.
1. Clearing Limits: Clearing Limits will be marked with orange construction fencing or silt fence where
shown on the TESC Plans.
2. Cover Measures: Plastic covering will be used to cover exposed soils.
3. Perimeter Protection: Perimeter protection will be provided using silt fence.
4. Traffic Area Stabilization: Traffic Area Stabilization will be provided by a stabilized construction
entrance.
5. Sediment Retention: Sediment Retention will be completed using silt fence and temporary sediment
ponds. Temporary sediment ponds will be in the permanent detention facility. Sizing is below.
West Temporary Sediment Pond
See undetained developed flow rates for area draining to the proposed detention vault during
construction from MGS Flood Below.
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 5.244E-02 2-Year 0.235
5-Year 8.526E-02 5-Year 0.328
10-Year 0.107 10-Year 0.410
25-Year 0.140 25-Year 0.531
50-Year 0.179 50-Year 0.701
100-Year 0.194 100-Year 0.882
200-Year 0.288 200-Year 0.892
500-Year 0.416 500-Year 0.900
Runoff from the site will sheet flow across cleared areas into temporary interceptor swales and into the
proposed temporary sediment pond within the proposed detention vault.
The Temporary Sediment Pond was sized using the 10-year storm event.
Unmitigated Developed 10-year Storm, 15-min interval: Q10 = 0.410 CFS
Temporary Sediment Pond minimum surface area, SA, is determined by the following equation:
Core Design, Inc. CYPRUS LANE PLAT 28
SA = 2080 sf/cfs * (Total Q10-Developed)
SA = 852.8 SF
The total design surface areas of the proposed detention vault is 1,200 SF which is more than enough to
provide adequate erosion and sedimentation control.
South Temporary Sediment Pond
See undetained developed flow rates for area draining to the proposed detention vault during
construction from MGS Flood Below.
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 8.539E-02 2-Year 0.924
5-Year 0.137 5-Year 1.218
10-Year 0.178 10-Year 1.505
25-Year 0.245 25-Year 1.897
50-Year 0.308 50-Year 2.518
100-Year 0.327 100-Year 3.123
200-Year 0.523 200-Year 3.164
500-Year 0.786 500-Year 3.197
Runoff from the site will sheet flow across cleared areas into temporary interceptor swales and into the
proposed temporary sediment pond within the proposed detention vault.
The Temporary Sediment Pond was sized using the 10-year storm event.
Unmitigated Developed 10-year Storm, 15-min interval: Q10 = 1.51 CFS
Temporary Sediment Pond minimum surface area, SA, is determined by the following equation:
SA = 2080 sf/cfs * (Total Q10-Developed)
SA = 3,140.8 SF
The total design surface areas of the proposed detention vault is 5,800 SF which is more than enough to
provide adequate erosion and sedimentation control.
Core Design, Inc. CYPRUS LANE PLAT 29
6. Surface Water Collection: Surface water collection will be done using interceptor swales.
7. Dewatering Control: No dewatering is anticipated to be required. If any dewatering does need to
occur, water will be discharged through a stabilized channel to the proposed Temporary Sediment Pond.
8. Dust Control: Dust control will be provided using a water truck as needed.
9. Flow Control: Flow control will be provided using check dams and the temporary sediment pond. The
sediment ponds will be properly sized with the 10-year unmitigated developed conditions.
10. Control Pollutants: Pollutants will be controlled as needed using Best Management Practices. See the
SWPPP report for more detailed information on controlling pollutants.
11. Protect Existing and Proposed Flow Control BMPs: No flow control BMPs are proposed.
12. Maintain BMPs: BMPs will be maintained in order to provide adequate erosion and sediment
control.
13. Manage the Project: Project will be managed to provide adequate erosion and sediment control
during construction. See the SWPPP report for more information on managing the project.
Core Design, Inc. CYPRUS LANE PLAT 30
Part B: SWPPS Plan Design
Refer to the SWPPP Report provided under separate cover for information on anticipated pollutants and
BMPs to address pollutants of concern.
See Section 3, Task 5, for a discussion of the downstream receiving waters. This section discusses all 7
types of downstream water quality problems requiring special attention
Core Design, Inc. CYPRUS LANE PLAT Page 1
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF
COVENANT
See the following page for the bond quantities worksheet.
1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date Prepared:
Name:
PE Registration No:
Firm Name:
Firm Address:
Phone No.
Email Address:
Project Name: Project Owner:
CED Plan # (LUA): Phone:
CED Permit # (C):Address:
Site Address:
Street Intersection: Addt'l Project Owner:
Parcel #(s): Phone:
Address:
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No:YES Water Service Provided by:
If Yes, Provide Forest Practice Permit #:Sewer Service Provided by:
Abbreviated Legal
Description:
SW1/4, SW1/4, SEC. 11, TWP. 23 N., RGE. 5 E., W.M.
5816 NE 4th Place
PO Box 2170,22-001966
21-000287 206.714.6707
4/27/2023
Prepared by:
FOR APPROVALProject Phase 1
shm@coredesigninc.com
Sheri Murata
41846
Core Design Inc.
12100 NE 195th St, Suite #300, Bothell, WA 98011
425.885.7877
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
KC WATER DISTRICT 90
CITY OF RENTON
Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)
Clearing and Grading Utility Providers
FPP not Required
Project Location and Description Project Owner Information
Cyprus Lane
Renton, WA 98056
1123059023;1123059021;1123059031
Tuscany Construction
Page 1 of 14
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
10.1%
Total Estimated Construction Costs E
A + B + C + D 1,459,987.66$
Estimated Civil Construction Permit - Construction Costs2
Stormwater (Erosion Control + Drainage)C 688,298.96$
As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance.
Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees.
Roadway (Transportation)D 441,575.87$
Water A -$
Wastewater (Sanitary Sewer)B 330,112.83$
2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is:
1 Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
Page 2 of 14
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Unit
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 7.50$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 90.00$ Each
Catch Basin Protection ESC-3 145.00$ Each 22 3,190.00
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)110.00$ CY
Ditching ESC-5 10.50$ CY
Excavation-bulk ESC-6 2.30$ CY 250 575.00
Fence, silt ESC-7 SWDM 5.4.3.1 5.00$ LF 1568 7,840.00
Fence, Temporary (NGPE)ESC-8 1.75$ LF
Geotextile Fabric ESC-9 3.00$ SY
Hay Bale Silt Trap ESC-10 0.60$ Each
Hydroseeding ESC-11 SWDM 5.4.2.4 0.90$ SY
Interceptor Swale / Dike ESC-12 1.15$ LF
Jute Mesh ESC-13 SWDM 5.4.2.2 4.00$ SY
Level Spreader ESC-14 2.00$ LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.90$ SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.30$ SY
Piping, temporary, CPP, 6"ESC-17 13.75$ LF
Piping, temporary, CPP, 8"ESC-18 16.00$ LF
Piping, temporary, CPP, 12"ESC-19 20.50$ LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.60$ SY
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)51.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 2,050.00$ Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,675.00$ Each
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,525.00$ Each
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 22.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 80.00$ LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.15$ SY
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 9.20$ SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 11.50$ SY
TESC Supervisor ESC-30 125.00$ HR 40 5,000.00
Water truck, dust control ESC-31 SWDM 5.4.7 160.00$ HR 40 6,400.00
Unit
Reference #Price Unit Quantity Cost
8.00$ LF 1535 12,280.00
EROSION/SEDIMENT SUBTOTAL:35,285.00
SALES TAX @ 10.1%3,563.79
EROSION/SEDIMENT TOTAL:38,848.79
(A)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
Description No.
(A)
Tree Protection Fence
WRITE-IN-ITEMS
Page 3 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 7.00$ CY 500 3,500.00
Backfill & Compaction- trench GI-2 10.25$ CY 72 738.00 111 1,137.75
Clear/Remove Brush, by hand (SY)GI-3 1.15$ SY
Bollards - fixed GI-4 275.00$ Each
Bollards - removable GI-5 520.00$ Each
Clearing/Grubbing/Tree Removal GI-6 11,475.00$ Acre 0.87 9,983.25 3.86 44,293.50
Excavation - bulk GI-7 2.30$ CY 500 1,150.00
Excavation - Trench GI-8 5.75$ CY 72 414.00 111 638.25
Fencing, cedar, 6' high GI-9 23.00$ LF
Fencing, chain link, 4'GI-10 44.00$ LF
Fencing, chain link, vinyl coated, 6' high GI-11 23.00$ LF
Fencing, chain link, gate, vinyl coated, 20' GI-12 1,600.00$ Each
Fill & compact - common barrow GI-13 28.75$ CY 340 9,775.00
Fill & compact - gravel base GI-14 31.00$ CY
Fill & compact - screened topsoil GI-15 44.75$ CY
Gabion, 12" deep, stone filled mesh GI-16 74.50$ SY
Gabion, 18" deep, stone filled mesh GI-17 103.25$ SY
Gabion, 36" deep, stone filled mesh GI-18 172.00$ SY
Grading, fine, by hand GI-19 2.90$ SY
Grading, fine, with grader GI-20 2.30$ SY
Monuments, 3' Long GI-21 1,025.00$ Each
Sensitive Areas Sign GI-22 8.00$ Each
Sodding, 1" deep, sloped ground GI-23 9.25$ SY
Surveying, line & grade GI-24 975.00$ Day
Surveying, lot location/lines GI-25 2,050.00$ Acre
Topsoil Type A (imported)GI-26 32.75$ CY
Traffic control crew ( 2 flaggers )GI-27 137.75$ HR 40 5,510.00
Trail, 4" chipped wood GI-28 9.15$ SY
Trail, 4" crushed cinder GI-29 10.25$ SY
Trail, 4" top course GI-30 13.75$ SY
Conduit, 2"GI-31 5.75$ LF
Wall, retaining, concrete GI-32 63.00$ SF
Wall, rockery GI-33 17.25$ SF
SUBTOTAL THIS PAGE:6,662.00 9,983.25 60,494.50
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 4 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 34.50$ SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 18.25$ SY 1231 22,465.75
AC Grinding, 4' wide machine > 2000sy RI-3 11.50$ SY
AC Removal/Disposal RI-4 40.00$ SY
Barricade, Type III ( Permanent )RI-5 64.25$ LF
Guard Rail RI-6 34.50$ LF
Curb & Gutter, rolled RI-7 19.50$ LF
Curb & Gutter, vertical RI-8 14.25$ LF 443 6,312.75 1168 16,644.00
Curb and Gutter, demolition and disposal RI-9 20.50$ LF
Curb, extruded asphalt RI-10 6.25$ LF
Curb, extruded concrete RI-11 8.00$ LF
Sawcut, asphalt, 3" depth RI-12 3.00$ LF 1093 3,279.00
Sawcut, concrete, per 1" depth RI-13 5.00$ LF
Sealant, asphalt RI-14 2.25$ LF
Shoulder, gravel, 4" thick RI-15 17.25$ SY
Sidewalk, 4" thick RI-16 43.50$ SY 200 8,700.00 720 31,320.00
Sidewalk, 4" thick, demolition and disposal RI-17 37.00$ SY
Sidewalk, 5" thick RI-18 47.00$ SY 125 5,875.00
Sidewalk, 5" thick, demolition and disposal RI-19 46.00$ SY
Sign, Handicap RI-20 97.00$ Each
Striping, per stall RI-21 8.00$ Each
Striping, thermoplastic, ( for crosswalk )RI-22 3.50$ SF
Striping, 4" reflectorized line RI-23 0.55$ LF
Additional 2.5" Crushed Surfacing RI-24 4.15$ SY
HMA 1/2" Overlay 1.5" RI-25 16.00$ SY
HMA 1/2" Overlay 2"RI-26 20.75$ SY 1273 26,414.75
HMA Road, 2", 4" rock, First 2500 SY RI-27 32.25$ SY 2500 80,625.00
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 24.00$ SY 78 1,872.00
HMA Road, 4", 6" rock, First 2500 SY RI-29 51.75$ SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 42.50$ SY
HMA Road, 4", 4.5" ATB RI-31 43.50$ SY
Gravel Road, 4" rock, First 2500 SY RI-32 17.25$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 11.50$ SY
Thickened Edge RI-34 10.00$ LF
SUBTOTAL THIS PAGE:67,172.25 136,336.00
(B)(C)(D)(E)
Page 5 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 24.00$ SY
2" AC, 1.5" top course & 2.5" base course PL-2 32.00$ SY
4" select borrow PL-3 5.75$ SY
1.5" top course rock & 2.5" base course PL-4 16.00$ SY
SUBTOTAL PARKING LOT SURFACING:
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1 220.00$ EA 8 1,760.00 23 5,060.00
Median Landscaping LA-2 45.00$ SY
Right-of-Way Landscaping LA-3 45.00$ SY
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:1,760.00 5,060.00
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1 100.00$ 16 1,600.00
Street Light System ( # of Poles)TR-2 8,000.00$ EA 14 112,000.00
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:113,600.00
(B)(C)(D)(E)
WRITE-IN-ITEMS
SUBTOTAL WRITE-IN ITEMS:
STREET AND SITE IMPROVEMENTS SUBTOTAL:75,594.25 264,979.25 60,494.50
SALES TAX @ 10.1%7,635.02 26,762.90 6,109.94
STREET AND SITE IMPROVEMENTS TOTAL:83,229.27 291,742.15 66,604.44
(B)(C)(D)(E)
Page 6 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 30.00$ SY
* (CBs include frame and lid)
Beehive D-2 103.00$ Each
Through-curb Inlet Framework D-3 460.00$ Each
CB Type I D-4 1,725.00$ Each 3 5,175.00 15 25,875.00
CB Type IL D-5 2,000.00$ Each
CB Type II, 48" diameter D-6 3,500.00$ Each 2 7,000.00
for additional depth over 4' D-7 550.00$ FT
CB Type II, 54" diameter D-8 4,075.00$ Each
for additional depth over 4'D-9 570.00$ FT
CB Type II, 60" diameter D-10 4,225.00$ Each
for additional depth over 4'D-11 690.00$ FT
CB Type II, 72" diameter D-12 6,900.00$ Each
for additional depth over 4'D-13 975.00$ FT
CB Type II, 96" diameter D-14 16,000.00$ Each
for additional depth over 4'D-15 1,050.00$ FT
Trash Rack, 12"D-16 400.00$ Each
Trash Rack, 15"D-17 470.00$ Each
Trash Rack, 18"D-18 550.00$ Each
Trash Rack, 21"D-19 630.00$ Each
Cleanout, PVC, 4"D-20 170.00$ Each
Cleanout, PVC, 6"D-21 195.00$ Each 11 2,145.00 15 2,925.00
Cleanout, PVC, 8"D-22 230.00$ Each
Culvert, PVC, 4" D-23 11.50$ LF
Culvert, PVC, 6" D-24 15.00$ LF 663 9,945.00 644 9,660.00
Culvert, PVC, 8" D-25 17.00$ LF
Culvert, PVC, 12" D-26 26.00$ LF 443 11,518.00 1245 32,370.00
Culvert, PVC, 15" D-27 40.00$ LF
Culvert, PVC, 18" D-28 47.00$ LF
Culvert, PVC, 24"D-29 65.00$ LF
Culvert, PVC, 30" D-30 90.00$ LF
Culvert, PVC, 36" D-31 150.00$ LF
Culvert, CMP, 8"D-32 22.00$ LF
Culvert, CMP, 12"D-33 33.00$ LF
SUBTOTAL THIS PAGE:23,693.00 70,335.00 12,585.00
(B)(C)(D)(E)
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Page 7 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 40.00$ LF
Culvert, CMP, 18"D-35 47.00$ LF
Culvert, CMP, 24"D-36 64.00$ LF
Culvert, CMP, 30"D-37 90.00$ LF
Culvert, CMP, 36"D-38 150.00$ LF
Culvert, CMP, 48"D-39 218.00$ LF
Culvert, CMP, 60"D-40 310.00$ LF
Culvert, CMP, 72"D-41 400.00$ LF
Culvert, Concrete, 8"D-42 48.00$ LF
Culvert, Concrete, 12"D-43 55.00$ LF
Culvert, Concrete, 15"D-44 89.00$ LF
Culvert, Concrete, 18"D-45 100.00$ LF
Culvert, Concrete, 24"D-46 120.00$ LF
Culvert, Concrete, 30"D-47 145.00$ LF
Culvert, Concrete, 36"D-48 175.00$ LF
Culvert, Concrete, 42"D-49 200.00$ LF
Culvert, Concrete, 48"D-50 235.00$ LF
Culvert, CPE Triple Wall, 6" D-51 16.00$ LF
Culvert, CPE Triple Wall, 8" D-52 18.00$ LF
Culvert, CPE Triple Wall, 12" D-53 27.00$ LF
Culvert, CPE Triple Wall, 15" D-54 40.00$ LF
Culvert, CPE Triple Wall, 18" D-55 47.00$ LF
Culvert, CPE Triple Wall, 24" D-56 64.00$ LF
Culvert, CPE Triple Wall, 30" D-57 90.00$ LF
Culvert, CPE Triple Wall, 36" D-58 149.00$ LF
Culvert, LCPE, 6"D-59 69.00$ LF
Culvert, LCPE, 8"D-60 83.00$ LF
Culvert, LCPE, 12"D-61 96.00$ LF
Culvert, LCPE, 15"D-62 110.00$ LF
Culvert, LCPE, 18"D-63 124.00$ LF
Culvert, LCPE, 24"D-64 138.00$ LF
Culvert, LCPE, 30"D-65 151.00$ LF
Culvert, LCPE, 36"D-66 165.00$ LF
Culvert, LCPE, 48"D-67 179.00$ LF
Culvert, LCPE, 54"D-68 193.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 8 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 206.00$ LF
Culvert, LCPE, 72"D-70 220.00$ LF
Culvert, HDPE, 6"D-71 48.00$ LF
Culvert, HDPE, 8"D-72 60.00$ LF
Culvert, HDPE, 12"D-73 85.00$ LF
Culvert, HDPE, 15"D-74 122.00$ LF
Culvert, HDPE, 18"D-75 158.00$ LF
Culvert, HDPE, 24"D-76 254.00$ LF
Culvert, HDPE, 30"D-77 317.00$ LF
Culvert, HDPE, 36"D-78 380.00$ LF
Culvert, HDPE, 48"D-79 443.00$ LF
Culvert, HDPE, 54"D-80 506.00$ LF
Culvert, HDPE, 60"D-81 570.00$ LF
Culvert, HDPE, 72"D-82 632.00$ LF
Pipe, Polypropylene, 6"D-83 96.00$ LF
Pipe, Polypropylene, 8"D-84 100.00$ LF
Pipe, Polypropylene, 12"D-85 100.00$ LF
Pipe, Polypropylene, 15"D-86 103.00$ LF
Pipe, Polypropylene, 18"D-87 106.00$ LF
Pipe, Polypropylene, 24"D-88 119.00$ LF
Pipe, Polypropylene, 30"D-89 136.00$ LF
Pipe, Polypropylene, 36"D-90 185.00$ LF
Pipe, Polypropylene, 48"D-91 260.00$ LF
Pipe, Polypropylene, 54"D-92 381.00$ LF
Pipe, Polypropylene, 60"D-93 504.00$ LF
Pipe, Polypropylene, 72"D-94 625.00$ LF
Culvert, DI, 6"D-95 70.00$ LF
Culvert, DI, 8"D-96 101.00$ LF
Culvert, DI, 12"D-97 121.00$ LF
Culvert, DI, 15"D-98 148.00$ LF
Culvert, DI, 18"D-99 175.00$ LF
Culvert, DI, 24"D-100 200.00$ LF
Culvert, DI, 30"D-101 227.00$ LF
Culvert, DI, 36"D-102 252.00$ LF
Culvert, DI, 48"D-103 279.00$ LF
Culvert, DI, 54"D-104 305.00$ LF
Culvert, DI, 60"D-105 331.00$ LF
Culvert, DI, 72"D-106 357.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 9 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Specialty Drainage Items
Ditching SD-1 10.90$ CY
Flow Dispersal Trench (1,436 base+)SD-3 32.00$ LF
French Drain (3' depth)SD-4 30.00$ LF
Geotextile, laid in trench, polypropylene SD-5 3.40$ SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,300.00$ Each
Pond Overflow Spillway SD-7 18.25$ SY
Restrictor/Oil Separator, 12"SD-8 1,320.00$ Each
Restrictor/Oil Separator, 15"SD-9 1,550.00$ Each
Restrictor/Oil Separator, 18"SD-10 1,950.00$ Each
Riprap, placed SD-11 48.20$ CY
Tank End Reducer (36" diameter)SD-12 1,375.00$ Each
Infiltration pond testing SD-13 143.00$ HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:
(B)(C)(D)(E)
STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 Each
Detention Vault SF-3 Each
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:
(B)(C)(D)(E)
Page 10 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction) (B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
Detention Vault West WI-1 12.50$ CF 12120 151,500.00
Detention Vault South WI-2 6.50$ CF 51040 331,760.00
WI-3
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:483,260.00
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:23,693.00 553,595.00 12,585.00
SALES TAX @ 10.1%2,392.99 55,913.10 1,271.09
DRAINAGE AND STORMWATER FACILITIES TOTAL:26,085.99 609,508.10 13,856.09
(B) (C) (D) (E)
Page 11 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 3,400.00$ Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 58.00$ LF
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 65.00$ LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 75.00$ LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 80.00$ LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 145.00$ LF
Gate Valve, 4 inch Diameter W-7 1,225.00$ Each
Gate Valve, 6 inch Diameter W-8 1,350.00$ Each
Gate Valve, 8 Inch Diameter W-9 1,550.00$ Each
Gate Valve, 10 Inch Diameter W-10 2,100.00$ Each
Gate Valve, 12 Inch Diameter W-11 2,500.00$ Each
Fire Hydrant Assembly W-12 5,000.00$ Each
Permanent Blow-Off Assembly W-13 1,950.00$ Each
Air-Vac Assembly, 2-Inch Diameter W-14 3,050.00$ Each
Air-Vac Assembly, 1-Inch Diameter W-15 1,725.00$ Each
Compound Meter Assembly 3-inch Diameter W-16 9,200.00$ Each
Compound Meter Assembly 4-inch Diameter W-17 10,500.00$ Each
Compound Meter Assembly 6-inch Diameter W-18 11,500.00$ Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 23,000.00$ Each
WATER SUBTOTAL:
SALES TAX @ 10.1%
WATER TOTAL:
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 12 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
CED Permit #:22-001966
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 1,150.00$ Each 15 17,250.00
Grease Interceptor, 500 gallon SS-2 9,200.00$ Each
Grease Interceptor, 1000 gallon SS-3 11,500.00$ Each
Grease Interceptor, 1500 gallon SS-4 17,200.00$ Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 92.00$ LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 110.00$ LF 650 71,500.00
Sewer Pipe, PVC, 8 inch Diameter SS-7 120.00$ LF 254 30,480.00 930 111,600.00
Sewer Pipe, PVC, 12 Inch Diameter SS-8 144.00$ LF
Sewer Pipe, DI, 8 inch Diameter SS-9 130.00$ LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 150.00$ LF
Manhole, 48 Inch Diameter SS-11 6,900.00$ Each 2 13,800.00 8 55,200.00
Manhole, 54 Inch Diameter SS-13 6,800.00$ Each
Manhole, 60 Inch Diameter SS-15 7,600.00$ Each
Manhole, 72 Inch Diameter SS-17 10,600.00$ Each
Manhole, 96 Inch Diameter SS-19 16,000.00$ Each
Pipe, C-900, 12 Inch Diameter SS-21 205.00$ LF
Outside Drop SS-24 1,700.00$ LS
Inside Drop SS-25 1,150.00$ LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:44,280.00 166,800.00 88,750.00
SALES TAX @ 10.1%4,472.28 16,846.80 8,963.75
SANITARY SEWER TOTAL:48,752.28 183,646.80 97,713.75
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
Quantity Remaining
(Bond Reduction) (B)(C)
Page 13 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date:
Name: Project Name:
PE Registration No: CED Plan # (LUA):
Firm Name:CED Permit # (C):
Firm Address: Site Address:
Phone No. Parcel #(s):
Email Address:Project Phase:
Site Restoration/Erosion Sediment Control Subtotal (a)
Existing Right-of-Way Improvements Subtotal (b) (b)131,981.55$
Future Public Improvements Subtotal (c)475,388.95$
Stormwater & Drainage Facilities (Public & Private) Subtotal (d) (d)649,450.17$
(e)
(f)
Site Restoration
Civil Construction Permit
Maintenance Bond 251,364.14$
Bond Reduction 2
Construction Permit Bond Amount 3
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead, profit, and taxes.
EST1
((b) + (c) + (d)) x 20%
-$
MAINTENANCE BOND */**
(after final acceptance of construction)
38,848.79$
131,981.55$
847,422.50$
38,848.79$
-$
649,450.17$
-$
886,271.28$
P
(a) x 100%
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
4/27/2023
Sheri Murata
41846
Core Design Inc.
R
((b x 150%) + (d x 100%))
S
(e) x 150% + (f) x 100%
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2
T
(P +R - S)
Prepared by: Project Information
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
425.885.7877
shm@coredesigninc.com
Cyprus Lane
21-000287
5816 NE 4th Place
1123059023;1123059021;1123059031
FOR APPROVAL
22-001966
12100 NE 195th St, Suite #300, Bothell, WA 98011
Page 14 of 14
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 4/27/2023
Core Design, Inc. CYPRUS LANE PLAT Page 2
10. OPERATIONS AND MAINTENANCE
See the following pages for the operations and maintenance manual.
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 3 – DETENTION TANKS AND VAULTS
Maintenance
Component
Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height.
Grass or groundcover mowed to a
height no greater than 6 inches.
Tank or Vault
Storage Area
Trash and debris Any trash and debris accumulated in vault or
tank (includes floatables and non-floatables).
No trash or debris in vault.
Sediment
accumulation
Accumulated sediment depth exceeds 10% of
the diameter of the storage area for ½ length of
storage vault or any point depth exceeds 15% of
diameter. Example: 72-inch storage tank would
require cleaning when sediment reaches depth of
7 inches for more than ½ length of tank.
All sediment removed from storage
area.
Tank Structure Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of
shape
Any part of tank/pipe is bent out of shape more
than 10% of its design shape.
Tank repaired or replaced to design.
Gaps between
sections, damaged
joints or cracks or
tears in wall
A gap wider than ½-inch at the joint of any tank
sections or any evidence of soil particles entering
the tank at a joint or through a wall.
No water or soil entering tank
through joints or walls.
Vault Structure Damage to wall,
frame, bottom, and/or
top slab
Cracks wider than ½-inch, any evidence of soil
entering the structure through cracks or qualified
inspection personnel determines that the vault is
not structurally sound.
Vault is sealed and structurally
sound.
Inlet/Outlet Pipes Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-5
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 3 – DETENTION TANKS AND VAULTS
Maintenance
Component
Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place.
Any open manhole requires immediate
maintenance.
Manhole access covered.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access
doors/plate
Damaged or difficult
to open
Large access doors or plates cannot be
opened/removed using normal equipment.
Replace or repair access door so it
can opened as designed.
Gaps, doesn't cover
completely
Large access doors not flat and/or access
opening not completely covered.
Doors close flat; covers access
opening completely.
Lifting Rings missing,
rusted
Lifting rings not capable of lifting weight of door
or plate.
Lifting rings sufficient to lift or
remove door or plate.
4/24/2016 2016 Surface Water Design Manual – Appendix A
A-6
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Structure Trash and debris Trash or debris of more than ½ cubic foot which
is located immediately in front of the structure
opening or is blocking capacity of the structure
by more than 10%.
No Trash or debris blocking or
potentially blocking entrance to
structure.
Trash or debris in the structure that exceeds 1/3
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
No trash or debris in the structure.
Deposits of garbage exceeding 1 cubic foot in
volume.
No condition present which would
attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60% of the depth from the
bottom of the structure to the invert of the lowest
pipe into or out of the structure or the bottom of
the FROP-T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Sump of structure contains no
sediment.
Damage to frame
and/or top slab
Corner of frame extends more than ¾ inch past
curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches
or cracks wider than ¼ inch.
Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the frame from
the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom
Cracks wider than ½ inch and longer than 3 feet,
any evidence of soil particles entering structure
through cracks, or maintenance person judges
that structure is unsound.
Structure is sealed and structurally
sound.
Cracks wider than ½ inch and longer than 1 foot
at the joint of any inlet/outlet pipe or any
evidence of soil particles entering structure
through cracks.
No cracks more than 1/4 inch wide at
the joint of inlet/outlet pipe.
Settlement/
misalignment
Structure has settled more than 1 inch or has
rotated more than 2 inches out of alignment.
Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
the structure at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of inlet/outlet pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing
or unsafe
Ladder is unsafe due to missing rungs,
misalignment, rust, cracks, or sharp edges.
Ladder meets design standards and
allows maintenance person safe
access.
FROP-T Section Damage T section is not securely attached to structure
wall and outlet pipe structure should support at
least 1,000 lbs of up or down pressure.
T section securely attached to wall
and outlet pipe.
Structure is not in upright position (allow up to
10% from plumb).
Structure in correct position.
Connections to outlet pipe are not watertight or
show signs of deteriorated grout.
Connections to outlet pipe are water
tight; structure repaired or replaced
and works as designed.
Any holes—other than designed holes—in the
structure.
Structure has no holes other than
designed holes.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-7
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one
maintenance person.
Gate moves up and down easily and
is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orifice Plate Damaged or missing Control device is not working properly due to
missing, out of place, or bent orifice plate.
Plate is in place and works as
designed.
Obstructions Any trash, debris, sediment, or vegetation
blocking the plate.
Plate is free of all obstructions and
works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or having the
potential of blocking) the overflow pipe.
Pipe is free of all obstructions and
works as designed.
Deformed or
damaged lip
Lip of overflow pipe is bent or deformed. Overflow pipe does not allow
overflow at an elevation lower than
design
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Metal Grates
(If Applicable)
Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design
standards.
Trash and debris Trash and debris that is blocking more than 20%
of grate surface.
Grate free of trash and debris.
footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.
Any open structure requires urgent
maintenance.
Cover/lid protects opening to
structure.
Locking mechanism
Not Working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
Remove
One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
4/24/2016 2016 Surface Water Design Manual – Appendix A
A-8
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 – CATCH BASINS AND MANHOLES
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the
bottom of the catch basin to the invert of the
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
into or out of the catch basin.
Sump of catch basin contains no
sediment.
Trash and debris Trash or debris of more than ½ cubic foot which
is located immediately in front of the catch basin
opening or is blocking capacity of the catch basin
by more than 10%.
No Trash or debris blocking or
potentially blocking entrance to
catch basin.
Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert
the lowest pipe into or out of the basin.
No trash or debris in the catch
basin.
Dead animals or vegetation that could generate
odors that could cause complaints or dangerous
gases (e.g., methane).
No dead animals or vegetation
present within catch basin.
Deposits of garbage exceeding 1 cubic foot in
volume.
No condition present which would
attract or support the breeding of
insects or rodents.
Damage to frame
and/or top slab
Corner of frame extends more than ¾ inch past
curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches
or cracks wider than ¼ inch.
Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the frame from
the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom
Cracks wider than ½ inch and longer than 3 feet,
any evidence of soil particles entering catch
basin through cracks, or maintenance person
judges that catch basin is unsound.
Catch basin is sealed and is
structurally sound.
Cracks wider than ½ inch and longer than 1 foot
at the joint of any inlet/outlet pipe or any
evidence of soil particles entering catch basin
through cracks.
No cracks more than 1/4 inch wide at
the joint of inlet/outlet pipe.
Settlement/
misalignment
Catch basin has settled more than 1 inch or has
rotated more than 2 inches out of alignment.
Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
the catch basin at the joint of the inlet/outlet
pipes.
No cracks more than ¼-inch wide at
the joint of inlet/outlet pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-9
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 – CATCH BASINS AND MANHOLES
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Metal Grates
(Catch Basins)
Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design
standards.
Trash and debris Trash and debris that is blocking more than 20%
of grate surface.
Grate free of trash and debris.
footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate.
Any open structure requires urgent
maintenance.
Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.
Any open structure requires urgent
maintenance.
Cover/lid protects opening to
structure.
Locking mechanism
Not Working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
Remove
One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
4/24/2016 2016 Surface Water Design Manual – Appendix A
A-10
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 6 – CONVEYANCE PIPES AND DITCHES
Maintenance
Component
Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Pipes Sediment & debris
accumulation
Accumulated sediment or debris that exceeds
20% of the diameter of the pipe.
Water flows freely through pipes.
Vegetation/roots Vegetation/roots that reduce free movement of
water through pipes.
Water flows freely through pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damage to protective
coating or corrosion
Protective coating is damaged; rust or corrosion
is weakening the structural integrity of any part of
pipe.
Pipe repaired or replaced.
Damaged Any dent that decreases the cross section area
of pipe by more than 20% or is determined to
have weakened structural integrity of the pipe.
Pipe repaired or replaced.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000
square feet of ditch and slopes.
Trash and debris cleared from
ditches.
Sediment
accumulation
Accumulated sediment that exceeds 20% of the
design depth.
Ditch cleaned/flushed of all
sediment and debris so that it
matches design.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water
through ditches.
Water flows freely through ditches.
Erosion damage to
slopes
Any erosion observed on a ditch slope. Slopes are not eroding.
Rock lining out of
place or missing (If
Applicable)
One layer or less of rock exists above native soil
area 5 square feet or more, any exposed native
soil.
Replace rocks to design standards.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-11
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 17 – WETVAULT
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Treatment Area
Trash and debris Any trash and debris accumulated in vault
(includes floatables and non-floatables).
No trash or debris in vault.
Sediment
accumulation
Sediment accumulation in vault bottom exceeds
the depth of the sediment zone plus 6 inches.
No sediment in vault.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vault Structure Damage to wall,
frame, bottom, and/or
top slab
Cracks wider than ½-inch, any evidence of soil
entering the structure through cracks, vault does
not retain water or qualified inspection personnel
determines that the vault is not structurally
sound.
Vault is sealed and structurally
sound.
Baffles damaged Baffles corroding, cracking, warping and/or
showing signs of failure or baffle cannot be
removed.
Repair or replace baffles or walls to
specifications.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won’t seal Valve does not seal completely. Valve completely seals closed.
Access Manhole Access cover/lid
damaged or difficult to
open
Access cover/lid cannot be easily opened by one
person. Corrosion/deformation of cover/lid.
Access cover/lid can be opened by
one person.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
Access doors/plate
has gaps, doesn't
cover completely
Large access doors not flat and/or access
opening not completely covered.
Doors close flat; covers access
opening completely.
Lifting Rings missing,
rusted
Lifting rings not capable of lifting weight of door
or plate.
Lifting rings sufficient to lift or
remove door or plate.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-23
Core Design, Inc. CYPRUS LANE PLAT Page 3
Appendix A
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
King County
Area,
Washington
Cyprus Lane Short Plat
Natural
Resources
Conservation
Service
September 9, 2020
6
Custom Soil Resource Report
Soil Map
525987052598805259890525990052599105259920525993052599405259950525996052599705259980525999052600005260010525987052598805259890525990052599105259920525993052599405259950525996052599705259980525999052600005260010564660 564670 564680 564690 564700 564710 564720 564730 564740 564750 564760
564660 564670 564680 564690 564700 564710 564720 564730 564740 564750 564760
47° 29' 25'' N 122° 8' 30'' W47° 29' 25'' N122° 8' 24'' W47° 29' 20'' N
122° 8' 30'' W47° 29' 20'' N
122° 8' 24'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 35 70 140 210
Feet
0 10 20 40 60
Meters
Map Scale: 1:720 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 16, Jun 4, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 1, 2019—Jul 25,
2019
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
7
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AgC Alderwood gravelly sandy loam,
8 to 15 percent slopes
2.2 100.0%
Totals for Area of Interest 2.2 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
onsite investigation is needed to define and locate the soils and miscellaneous
areas.
Custom Soil Resource Report
8
An identifying symbol precedes the map unit name in the map unit descriptions.
Each description includes general facts about the unit and gives important soil
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for
differences in texture of the surface layer, all the soils of a series have major
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness,
salinity, degree of erosion, and other characteristics that affect their use. On the
basis of such differences, a soil series is divided into soil phases. Most of the areas
shown on the detailed soil maps are phases of soil series. The name of a soil phase
commonly indicates a feature that affects use or management. For example, Alpha
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate
pattern or in such small areas that they cannot be shown separately on the maps.
The pattern and proportion of the soils or miscellaneous areas are somewhat similar
in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or
miscellaneous areas that are shown as one unit on the maps. Because of present
or anticipated uses of the map units in the survey area, it was not considered
practical or necessary to map the soils or miscellaneous areas separately. The
pattern and relative proportion of the soils or miscellaneous areas are somewhat
similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas
that could be mapped individually but are mapped as one unit because similar
interpretations can be made for use and management. The pattern and proportion
of the soils or miscellaneous areas in a mapped area are not uniform. An area can
be made up of only one of the major soils or miscellaneous areas, or it can be made
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil
material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
9
King County Area, Washington
AgC—Alderwood gravelly sandy loam, 8 to 15 percent slopes
Map Unit Setting
National map unit symbol: 2t626
Elevation: 50 to 800 feet
Mean annual precipitation: 20 to 60 inches
Mean annual air temperature: 46 to 52 degrees F
Frost-free period: 160 to 240 days
Farmland classification: Prime farmland if irrigated
Map Unit Composition
Alderwood and similar soils:85 percent
Minor components:15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Alderwood
Setting
Landform:Ridges, hills
Landform position (two-dimensional):Shoulder
Landform position (three-dimensional):Nose slope, talf
Down-slope shape:Linear, convex
Across-slope shape:Convex
Parent material:Glacial drift and/or glacial outwash over dense glaciomarine
deposits
Typical profile
A - 0 to 7 inches: gravelly sandy loam
Bw1 - 7 to 21 inches: very gravelly sandy loam
Bw2 - 21 to 30 inches: very gravelly sandy loam
Bg - 30 to 35 inches: very gravelly sandy loam
2Cd1 - 35 to 43 inches: very gravelly sandy loam
2Cd2 - 43 to 59 inches: very gravelly sandy loam
Properties and qualities
Slope:8 to 15 percent
Depth to restrictive feature:20 to 39 inches to densic material
Drainage class:Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat):Very low to moderately
low (0.00 to 0.06 in/hr)
Depth to water table:About 18 to 37 inches
Frequency of flooding:None
Frequency of ponding:None
Available water capacity:Very low (about 2.7 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: B
Forage suitability group: Limited Depth Soils (G002XN302WA), Limited Depth
Soils (G002XF303WA), Limited Depth Soils (G002XS301WA)
Other vegetative classification: Limited Depth Soils (G002XN302WA), Limited
Depth Soils (G002XF303WA), Limited Depth Soils (G002XS301WA)
Custom Soil Resource Report
10
Hydric soil rating: No
Minor Components
Indianola
Percent of map unit:5 percent
Landform:Kames, terraces, eskers
Landform position (three-dimensional):Tread
Down-slope shape:Linear
Across-slope shape:Linear
Hydric soil rating: No
Everett
Percent of map unit:5 percent
Landform:Kames, eskers, moraines
Landform position (two-dimensional):Shoulder, footslope
Landform position (three-dimensional):Crest, base slope
Down-slope shape:Convex
Across-slope shape:Convex
Hydric soil rating: No
Shalcar
Percent of map unit:3 percent
Landform:Depressions
Landform position (three-dimensional):Dip
Down-slope shape:Concave
Across-slope shape:Concave
Hydric soil rating: Yes
Norma
Percent of map unit:2 percent
Landform:Drainageways, depressions
Landform position (three-dimensional):Dip
Down-slope shape:Linear, concave
Across-slope shape:Concave
Hydric soil rating: Yes
Custom Soil Resource Report
11
Core Design, Inc. CYPRUS LANE PLAT Page 4
Appendix B
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.58
Program License Number: 200210008
Project Simulation Performed on: 01/17/2023 1:29 PM
Report Generation Date: 01/17/2023 1:29 PM
—————————————————————————————————
Input File Name: Single POC Model.fld
Project Name: North Vault
Analysis Title:
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Full Period of Record Available used for Routing
Climatic Region Number: 16
Precipitation Station : 96004405 Puget East 44 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961044 Puget East 44 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 3
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 4.720 4.920
Area of Links that Include Precip/Evap (acres) 0.000 0.000
Total (acres) 4.720 4.920
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : West Basin ----------
-------Area (Acres) --------
Till Forest 4.660
Impervious 0.060
----------------------------------------------
Subbasin Total 4.720
Core Design, Inc. CYPRUS LANE PLAT Page 5
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 2
---------- Subbasin : West Vault Basin ----------
-------Area (Acres) --------
Till Grass 0.780
Impervious 0.380
----------------------------------------------
Subbasin Total 1.160
---------- Subbasin : South Vault Basin ----------
-------Area (Acres) --------
Till Grass 1.960
Impervious 1.800
----------------------------------------------
Subbasin Total 3.760
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Copy Lnk1
Link Type: Copy
Downstream Link: None
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 3
------------------------------------------
Link Name: North Vault
Link Type: Structure
Downstream Link Name: New Copy Lnk3
Prismatic Pond Option Used
Pond Floor Elevation (ft) : 0.00
Riser Crest Elevation (ft) : 5.10
Max Pond Elevation (ft) : 6.10
Storage Depth (ft) : 5.10
Pond Bottom Length (ft) : 40.0
Pond Bottom Width (ft) : 30.0
Pond Side Slopes (ft/ft) : Z1= 0.00 Z2= 0.00 Z3= 0.00 Z4= 0.00
Bottom Area (sq-ft) : 1200.
Area at Riser Crest El (sq-ft) : 1,200.
(acres) : 0.028
Core Design, Inc. CYPRUS LANE PLAT Page 6
Volume at Riser Crest (cu-ft) : 6,120.
(ac-ft) : 0.140
Area at Max Elevation (sq-ft) : 1200.
(acres) : 0.028
Vol at Max Elevation (cu-ft) : 7,320.
(ac-ft) : 0.168
Hydraulic Conductivity (in/hr) : 0.00
Massmann Regression Used to Estimate Hydralic Gradient
Depth to Water Table (ft) : 100.00
Bio-Fouling Potential : Low
Maintenance : Average or Better
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 12.00
Common Length (ft) : 0.000
Riser Crest Elevation : 5.10 ft
Hydraulic Structure Geometry
Number of Devices: 3
---Device Number 1 ---
Device Type : Circular Orifice
Control Elevation (ft) : 0.00
Diameter (in) : 0.81
Orientation : Horizontal
Elbow : No
---Device Number 2 ---
Device Type : Circular Orifice
Control Elevation (ft) : 2.50
Diameter (in) : 1.19
Orientation : Horizontal
Elbow : Yes
---Device Number 3 ---
Device Type : Circular Orifice
Control Elevation (ft) : 3.85
Diameter (in) : 0.62
Orientation : Horizontal
Elbow : Yes
------------------------------------------
Link Name: South Vault
Link Type: Structure
Downstream Link Name: New Copy Lnk3
Prismatic Pond Option Used
Pond Floor Elevation (ft) : 0.00
Riser Crest Elevation (ft) : 10.00
Max Pond Elevation (ft) : 10.50
Storage Depth (ft) : 10.00
Pond Bottom Length (ft) : 100.0
Core Design, Inc. CYPRUS LANE PLAT Page 7
Pond Bottom Width (ft) : 58.0
Pond Side Slopes (ft/ft) : Z1= 0.00 Z2= 0.00 Z3= 0.00 Z4= 0.00
Bottom Area (sq-ft) : 5800.
Area at Riser Crest El (sq-ft) : 5,800.
(acres) : 0.133
Volume at Riser Crest (cu-ft) : 58,000.
(ac-ft) : 1.331
Area at Max Elevation (sq-ft) : 5800.
(acres) : 0.133
Vol at Max Elevation (cu-ft) : 60,900.
(ac-ft) : 1.398
Hydraulic Conductivity (in/hr) : 0.00
Massmann Regression Used to Estimate Hydralic Gradient
Depth to Water Table (ft) : 100.00
Bio-Fouling Potential : Low
Maintenance : Average or Better
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 12.00
Common Length (ft) : 0.000
Riser Crest Elevation : 10.00 ft
Hydraulic Structure Geometry
Number of Devices: 3
---Device Number 1 ---
Device Type : Circular Orifice
Control Elevation (ft) : 0.00
Diameter (in) : 0.81
Orientation : Horizontal
Elbow : No
---Device Number 2 ---
Device Type : Circular Orifice
Control Elevation (ft) : 5.67
Diameter (in) : 0.87
Orientation : Horizontal
Elbow : Yes
---Device Number 3 ---
Device Type : Circular Orifice
Control Elevation (ft) : 7.10
Diameter (in) : 1.13
Orientation : Horizontal
Elbow : Yes
------------------------------------------
Link Name: New Copy Lnk3
Link Type: Copy
Downstream Link: None
Core Design, Inc. CYPRUS LANE PLAT Page 8
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 1
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 2
Number of Links: 3
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: West Basin 886.518
Link: New Copy Lnk1 0.000
_____________________________________
Total: 886.518
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: West Vault Basin 100.461
Subbasin: South Vault Basin 252.440
Link: North Vault Not Computed
Link: South Vault Not Computed
Link: New Copy Lnk3 0.000
_____________________________________
Total: 352.901
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 5.611 ac-ft/year, Post Developed: 2.234 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 1
********** Link: New Copy Lnk1 **********
2-Year Discharge Rate : 0.130 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.09 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.05 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 597.30
Core Design, Inc. CYPRUS LANE PLAT Page 9
Inflow Volume Including PPT-Evap (ac-ft): 597.30
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 597.30
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 3
********** Link: New Copy Lnk3 **********
2-Year Discharge Rate : 0.078 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 999.00 cfs
Off-line Design Discharge Rate (91% Exceedance): 999.00 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 1767.00
Inflow Volume Including PPT-Evap (ac-ft): 1767.00
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 1767.00
Secondary Outflow To Downstream System (ac-ft): 0.00
Volume Lost to ET (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered+ET)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Link: New Copy Lnk1
Scenario Postdeveloped Compliance Link: New Copy Lnk3
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 0.130 2-Year 7.816E-02
5-Year 0.213 5-Year 0.118
10-Year 0.276 10-Year 0.179
25-Year 0.370 25-Year 0.213
50-Year 0.468 50-Year 0.256
100-Year 0.501 100-Year 0.306
200-Year 0.780 200-Year 0.333
500-Year 1.154 500-Year 0.368
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Core Design, Inc. CYPRUS LANE PLAT Page 10
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -3.8% PASS
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -3.8% PASS
Maximum Excursion from Q2 to Q50 (Must be less than 10%): -11.4% PASS
Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------