HomeMy WebLinkAboutStorm Drainage Revision 6-13-2023From:Huy Huynh
To:navdeep gill; Steven
Cc:Patrick Decaro
Subject:RE: SD depth changes near deep vault for KP Development/NE 38th SP
Date:Tuesday, June 13, 2023 9:32:00 AM
Attachments:image001.pngimage002.png
Hello Navdeep and Steve,
Per our conversation, City of Renton finds the revision acceptable and has the following comments:
Please ensure that there is adequate pipe cover
Please ensure the inlet is 1’ submerge in accordance to the stormwater manual
To reduce the number of knockouts, we suggest keeping the configuration of the pipes on the
North side of the vault or route CB #3 to the existing manhole then to the vault (as shown
below)
Huy Huynh | Civil Engineer II
City of Renton | CED | Development Engineering Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center | Online Applications and Inspections
(425) 430 -7384 | HHuynh@rentonwa.gov
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
From: Jonathan Chavez <JChavez@Rentonwa.gov>
Sent: Thursday, June 8, 2023 10:14 AM
To: navdeep gill <navdeepgill@msn.com>
Cc: Patrick Decaro <PDecaro@Rentonwa.gov>; Huy Huynh <HHuynh@rentonwa.gov>
Subject: RE: SD depth changes near deep vault for KP Development/NE 38th SP
Navdeep,
I am no longer in Development Engineering. Huy Huynh will be your new project contact, I’ve cc’d
him on this email.
He will review the revision and respond to you moving forward, thank you.
JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III
City of Renton | PW | Water Utility Engineering Division
1055 S Grady Way | 5th Floor | Renton, WA 98057
(425) 430-7208 | jchavez@rentonwa.gov
From: navdeep gill <navdeepgill@msn.com>
Sent: Wednesday, June 7, 2023 6:29 PM
To: Jonathan Chavez <JChavez@Rentonwa.gov>
Cc: Patrick Decaro <PDecaro@Rentonwa.gov>
Subject: SD depth changes near deep vault for KP Development/NE 38th SP
Hi Jonathan,
Please find attached the redline proposed changes for your review to fix SDMH 1 type II storm
water .
Regards,
Navdeep Gill
From: Steven <steve@pellc.org>
Date: Wednesday, June 7, 2023 at 5:15 PM
To: Navdeep Gill <navdeepgill@msn.com>, Patrick Decaro <pdecaro@rentonwa.gov>, Joseph
Tilson <rockytopearthworkllc.jt@gmail.com>
Subject: SD depth changes near deep vault for KP Development/NE 38th SP
Navdeep,
Attached are the proposed changes that will revise the slopes to a lesser steepness so they can be installed. Seeattached redline proposal for City review.
Thanks,
Steven Lee206.501.5708