HomeMy WebLinkAboutR-423024O
M
N
O
Q
LW
1-
I
SEE NOTE 4,
LIMIT OF PIPE ZONE
PIPE ZONE BEDDING AND
BACKFILL, SEE NOTE 5 -
FOUNDATION
LEVEL -
FOUNDATION MATERIAL,
IF REQUIRED, SEE NOTE 6
6"
O.D.
6"
®GRAVEL BACKFILL FOR PIPE ZONE BEDDING (WSDOT 9-03.12(3))
OR MAINTENANCE ROCK (WSDOT 9-03.9(4))
FLEXIBLE PIPE NOTES:
1. PROVIDE UNIFORM SUPPORT UNDER BARRELS.
2. HAND TAMP UNDER HAUNCHES.
3. DIRECTLY OVER PIPE, HAND TAMP ONLY.
4. SEE STANDARD WSDOT/APWA SPECIFICATIONS SECTION 2-09.4 FOR
TRENCH WIDTH.
5. PIPE ZONE BEDDING AND BACKFILL MATERIAL SHALL BE PLACED IN 6'
LOOSE LAYERS AND COMPACTED TO 95% MAXIMUM DENSITY.
6. EXCAVATE UNSTABLE MATERIAL DOWN TO FIRM SOIL AND REPLACE WITH
FOUNDATION MATERIAL CLASS A OR B PER STANDARD WSDOT/APWA
SPECIFICATIONS SECTION 9-03.17.
PIPE TYPE
PUBLIC?
PRIVATE?
ALLOWED IN ZONE 1
OF THE APA7
LINE CORRUGATED POLYETHYLENE PIPE (LCPE)
YES
YES
YES
CORRUGATED POLYETHYLENE PIPE (CPE) - TRIPLE WALLYES
T2.O
YES
YES
POLYVINYL CHLORIDE PIPE (PVC)
YES
YES
YES
SOLID WALL HIGH DENSITY POLYETHYLENE PIPE (HOPE)YES
YES
YES
POLYPROPYLENE PIPE (PP) - DUAL WALL
2.0
YES
YES
YES
MINIMUM DISTANCE
DIAMETER
BETWEEN BARRELS
12" TO 24"
12"
30" TO 96"
DIAMETER / 3
102" TO 180"
48"
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 220.10
11 • PUBLIC WORKS PIPE ZONE BEDDING AND 888Isr§Bca by:
RI DEPARTMENT COMPACTION - FLEXIBLE PIPE actin Pastucha 8/13/20
v4tw 11 i86=Tft1A86449D... DATE
SURFACE WATER STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION.
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE
WATER DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO
CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO
THE CITY.
4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER,
SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY
THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION
FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
6. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL
THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANTS
CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL
UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A
CONFLICT EXISTS.
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY.
REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS.
8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND
MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL
BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY.
9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE
APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS.
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE
DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE
APPROVED BY THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION
MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND
220.20.
13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE.
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT -LOCKING LIDS PER THE CITY STANDARD PLAN
204.10, 204.20, 204.30, 204.40, AND 204.50. STRUCTURES SHALL HAVE:
• RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY.
• ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE.
• ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE
PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO.
15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM.
16. LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH BASIN RIMS
SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN.
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE
DRIVEWAY TO THE BOTTOM OF THE DITCH.
UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS)
STD. PLAN - 267.00
• PUBLIC WORKS SURFACE WATER STANDARD PLAN e68Nrdby:
; DEPARTMENT NOTES (1 OF 2) artin Pastucha8/13/2020
lqkw18d9U88449D... DATE
18
18:4E
18" MAX. FROM CENTER OF
FRAME TO STRUCTURE
WALL FOR STEP ACCESS
WETPOOL
WIDTH
INLET
A
FRAME AND SOLID COVER
MARKED "DRAIN" WITH
LOCKING BOLTS PER STD.
PLANS 204.40 AND 204.50 -
FIRST CELL SIZED FOR
25% TO 35% OF
WETPOOLVOLUME
INLET '
SEE NOTE 7 (TYP.) a
3' MIN.
ACCESS COVER OR DOORS REQUIRED
" SHAPED BOTTOM
REMOVABLE BAFFLE OR WALL,
SEE NOTE 2
e °
WETPOOLLENGTH
4" MIN. PLAN VIEW
r 16" MAX.
5'x10' GRATE, GRATED ACCESS DOOR, OR LOCKING
ACCESS PANEL OVER SECOND CELL. FOR VAULTS
WHERE SURFACE AREA OF SECOND CELL IS
GREATER THAN 1,250 SQUARE FEET, 4% OF THE
TOTAL SURFACE AREA MUST BE GRATED AND A 5'x10'
REMOVABLE LOCKING PANEL SHALL BE PROVIDED
OUTLET_
-LADDER
8" MIN. GRAVITY DRAIN
SEE NOTE 7 (TYP.)
6" MAX. FROM EDGE OF
OPENING TO STRUCTURE
WALL FOR STEP ACCESS
12" MIN. VENTILATION PIPES AT
CORNERS (TYP.), SEE NOTE 6
SIZE TO CONVEY 100-YEAR
LADDER -
DESIGN FLOW WITHOUT
SHEAR GATE -
"
OVERTOPPING, 6" MIN.
WATER QUALITY IWO) DESIGN
L _ 12" MIN.
WATER SURFACE (WSJ
.IN.
12"
T j
OUTLET WITH CAPACITY TO
Jam_
CONVEY 100-YEAR DESIGN
12" MIN.
FLOW WITHOUT OVERTOPPING
WETPOOL -
DEPTH -
8' MAX.
REMOVABLE
BAFFLE 2' MIN.
BOTTOM SLOPE 0.5%-2% L
TOWARD INLET END
AVERAGE SEDIMENT STORAGE
12" MIN. (FIRST CELL)
VALVE
GRAVITY DRAIN (IF GRADE ALLOWS). PLACE
AS LOW AS GRADE ALLOWS BUT MUST BE 6"
MIN. ABOVE THE BASE ELEVATION OF VAULT
\ WALLS OR ABOVE SEDIMENT STORAGE AREA
BOTTOM SLOPE 0.5%-2% TOWARD OUTLET
END OF SECOND CELL (RECOMMENDED)
ACCESS DOORS OR REMOVABLE PANEL, SEE NOTE 5
MIN.
4' MIN.
" 5% MIN. ITYP.)
AVERAGE I2" SEDIMENT
NOTES: STORAGE (FIRST CELL) SECTION B
1. THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND
APPLICABLE DESIGN CRITERIA.
2. THE VAULT SHALL BE SEPARATED INTO TWO CELLS BY A WALL OR A REMOVABLE BAFFLE. IF A WALL OR NON REMOVABLE BAFFLE IS USED, A 5-FOOT x 10-FOOT
REMOVABLE MAINTENANCE ACCESS MUST BE PROVIDED FOR BOTH CELLS.
3. FOR VAULTS UNDER ROADWAYS, THE REMOVABLE PANEL MUST BE LOCATED OUTSIDE THE TRAVEL LANES. ALTERNATIVELY, MULTIPLE STANDARD LOCKING
MANHOLE COVERS MAY BE PROVIDED. SPACING OF MANHOLE COVERS SHALL BE 12 FEET, MEASURED ON CENTER, TO FACILITATE REMOVAL OF SEDIMENT.
LADDERS AND HAND -HOLDS NEED ONLY BE PROVIDED AT THE OUTLET PIPE AND INLET PIPE.
4. MINIMUM DIAMETER FOR ALL ACCESS OPENINGS (RISERS), EXCEPT THOSE COVERED BY REMOVABLE PANELS, IS 36 INCHES.
5. REMOVABLE PANEL SHALL BEAT GRADE, HAVE STAINLESS STEEL LIFTING EYES, AND WEIGH NO MORE THAN 5 TONS PER PANEL.
6. VAULTS PROVIDING MANHOLE ACCESS AT 12 FOOT SPACING NEED NOT PROVIDE CORNER VENTILATION PIPES. VENTILATION PIPES SHALL BE CAPPED OR
OTHERWISE COVERED, BUT DESIGNED SO THAT MAINTENANCE PERSONNEL CAN REMOVE FOR VENTILATION.
7. WHEN CONNECTING TO A NEW PIPE, USE A FLEXIBLE CONNECTOR (KOR-N-SEAL BOOT WITH CORRUGATED PIPE ADAPTER OR APPROVED EQUAL). WHEN
CONNECTING TO AN EXISTING PIPE, USE A FABRICATED SAND COLLAR OF THE SAME MATERIAL AS THE CONNECTING PIPE.
8. SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 249.20
c®61
• PUBLIC WORKS APP�OAD��
e1� DEPARTMENT WETVAULT Martin Pastucha 10/19/202
uc wo��smivacor� DATE
SURFACE WATER STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES.
18. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT
AND SHALL MEET THE FOLLOWING SPECIFICATIONS:
• 4-8INCH ROCK 140 - 70% PASSING;
• 2-4INCH ROCK / 30 - 40% PASSING; AND
• LESS THAN 2 INCH ROCK 110 - 20% PASSING.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS.
20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT -LOCKING LID MARKED "STORM" OR "DRAIN" SHALL BE LOCATED AT THE
PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00.
21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED
TO THE CITY PRIOR TO CONSTRUCTION.
22. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV
ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL
PROJECT CURBS, GUTTERS AND/OR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS
AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS
TESTED.
24. FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL
EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN
264.00.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY
CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM
SYSTEM PROVIDED DURING CONSTRUCTION.
26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF
THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED
RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT
STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY.
27. PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OF THE RENTON SWDM AND AQUIFER
PROTECTION REGULATIONS (RMC 4-3-050).
28. PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF
STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A
SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NON-SKID LID PER ADA REQUIREMENTS.
29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT.
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM.
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE
PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO
CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE
PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE
MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE,
THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE
WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING
ASTM C1781.
STD. PLAN - 267.10
C PUBLIC WORKS SURFACE WATER STANDARD PLAN [ammiftc1by:
DEPARTMENT NOTES (2 OF 2) artin PastuchA/13/2020
M"ni" »iucna DATE
i868 Pld 1F.O988k/®D.
1 2:5
8:48
1. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) SANITARY SEWER AND STORM DRAIN MAIN LINES SHALL BE
INSPECTED BY MEANS OF REMOTE CCTV. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY OF RENTON INSPECTOR
ASSIGNED TO THE PROJECT PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS, AND/OR PAVEMENT.
2. THE CONTRACTOR SHALL PERFORM ALL CCTV INSPECTIONS IN ACCORDANCE WITH THE NATIONAL ASSOCIATION OF SEWER SERVICE
COMPANIES (NASSCO) PIPELINE ASSESSMENT CERTIFICATION PROGRAM (PACP).
3. ALL CCTV OPERATORS SHALL HAVE CURRENT NASSCO PACP CERTIFICATION.
4. CCTV INSPECTIONS SHALL BE RECORDED IN A GRANITENET COMPATIBLE FORMAT DATABASE USING THE LATEST SOFTWARE VERSION
AND SUBMITTED WITH ELECTRONIC LINKS BETWEEN THE DATA AND THE VIDEO ON AN EXTERNAL HDD, DVD, OR FLASH DRIVE.
5. ALL CCTV INSPECTION REPORTS SHALL BE WITHIN -I- TWO (2) FEET OF THE MEASURED LINEAR FOOTAGE BETWEEN MANHOLES ALONG
THE EXISTING PIPELINE CENTERLINE FROM THE START OF PIPE TO END OF PIPE.
6. ALL OWNER AND PACP REQUIRED HEADER INFORMATION MUST BE FULLY AND ACCURATELY ENTERED ON ALL CCTV REPORTS. WORK NOT
FOLLOWING THESE SPECIFICATIONS WILL BE REJECTED AND THE CONTRACTOR SHALL BE REQUIRED TO RE -CCTV THE WORK.
7. THE DOCUMENTATION OF THE WORK SHALL CONSIST OF PACP CCTV REPORTS, PACP DATABASE, LOGS, ELECTRONIC REPORTS, ETC.
NOTING IMPORTANT FEATURES ENCOUNTERED DURING THE INSPECTION. THE SPEED OF TRAVEL SHALL BE SLOW ENOUGH TO INSPECT
EACH PIPE JOINT, TEE CONNECTION, STRUCTURAL DETERIORATION, INFILTRATION AND INFLOW SOURCES, AND DEPOSITS, BUT SHOULD
NOT, AT ANY TIME, BE FASTER THAN 30 FEET PER MINUTE, EXCEPT AS NOTED OTHERWISE IN THIS DOCUMENT.
8. THE CAMERA MUST BE CENTERED IN THE PIPE TO PROVIDE ACCURATE DISTANCE MEASUREMENTS TO PROVIDE LOCATIONS OF FEATURES
IN THE SEWER AND THESE FOOTAGE MEASUREMENTS SHALL BE DISPLAYED AND DOCUMENTED ON THE VIDEO. ALL PACP OBSERVATIONS
SHALL BE IDENTIFIED BY AUDIO AND ON A PACP LOG. ALL VIDEO MUST BE CONTINUOUSLY METERED FROM MANHOLE TO MANHOLE. ALL
VIDEO RECORDING SHALL BE CONTINUOUS FROM STRUCTURE TO STRUCTURE WITH NO "PAUSING" OF THE VIDEO RECORDING DURING
EACH PIPELINE INSPECTION. THE PIPE SHALL BE CLEANED PRIOR TO THE CCTV INSPECTION TO ENSURE ALL DEFECTS, FEATURE, AND
OBSERVATIONS ARE SEEN AND LOGGED.
9. JUST PRIOR TO BEGINNING THE CCTV INSPECTION, WHILE THE CCTV CAMERA IS IN PLACE AND RECORDING, WATER (CONTAINING DYE)
SHALL BE INTRODUCED INTO THE UPSTREAM MANHOLE OF EACH PIPE SEGMENT UNTIL IT IS OBSERVED AND RECORDED FLOWING PAST
THE CAMERA'S FIELD OF VISION IN ITS ENTIRETY.
10. THE CCTV CAMERA SHALL HAVE A WATER -LEVEL MEASURING DEVICE (BALL, CYLINDER, ETC.) ATTACHED THAT HAS 1/4" MARKINGS TO
SHOW THE DEPTH OF WATER IN THE PIPE DURING THE CCTV INSPECTION.
11. ALL MANHOLES SHALL BE CHANNELED AND COATED PRIOR TO CCTV INSPECTION.
12. PER CITY OF RENTON SPECIFICATION 7-08.3(2)B, SEWER AND STORM DRAIN PIPELINE SHALL HAVE NO MORE THAN 1/2- OF PONDING TO BE
CONSIDERED ACCEPTABLE.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 266.00
�o PUBLIC WORKS CCTV INSPECTION SPECIFICATIONS 7&Z
9/28/2018'R DEPARTMENT
VAKOFuc work: Aemim:vawr DATE
:4S AN
PROJECT NO. 20134
,LLIDEKO
�,�a�•pF WAS,y�9
CIVIL ENGINEERING
f7 Z•
LANDSCAPE ARCHITECTURE
off•, ,p 41846 0 �
PLANNING
oA�s TONAL �NG\��� DESIGN SURVEYING
-5-23 72100 NE 795th St, Suite 300 Bothell, Washington 9807 1 425.885.7877
1
CITY COMMENTS
SES
10/12/2
SHM
Su`�D1 RDW
SCALE'
2
REVISE WALL
SES
3/7/23
SHIM
DESIGNED:
SHY
3
CITY COMMENTS
SES
1 /25/23
SHM
4
CITY COMMENTS
SES
6 5 23
SHM
DRAWN: SES
ONE INCH
CHECKED: SHM
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
NO.
REVISION
BY
DATE
APPR
APPROVED: SHM
VERTICAL: NAVD 1988
HORIZONTAL- NAD 1983/1991
DATU M
CITY OF
RENTON
Planning/Building/Public Works Dept.
R-423024
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
1 DEVELOPMENT ENGINEERING
Wanders 06/07/2023
DATE:
MARCH 2O22
STORM DETAILS oRAWI
C4.37
T. 24 OF: 40