Loading...
HomeMy WebLinkAbout7945.04 E 2023 0613Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0613 Date Tue 6/13/2023 Weather Clear, 53-83°F Arrival/Departure Time(s) 7:00am/12:00pm Travel Time (hr) 0.75 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Eric Vernon, GIT, 206-234-7848 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was on site to observe and document shoring and Redi-Rock wall installation. Shoring Observations—Tie-Back Proof Testing: While onsite, ESNW rep observed the contractor preform proof testing on tie-backs (P30-P33, P35-P37). Each tie-back was observed to have a pressure applied to it by a certified hydraulic ram in equal increments up to 133% of the design load (see schedule for design load). Each tie-back was observed to be within the testing criteria. The contractor locked off the tie-back at 100% of the design load. Shoring Observations—Tie-Back Verification Testing: While onsite, ESNW rep observed the contractor preform verification testing on tie-back (P16). Each tie-back was observed to have a pressure applied to it by a certified hydraulic ram in equal increments up to 200% of the design load (see schedule for design load). Each tie-back was observed to be within the testing criteria. The contractor locked off the tie-back at 100% of the design load. Redi-Rock Gravity Wall Observations: ESNW rep observed the contractor install a Redi-Rock gravity wall along the east side of lots 33 to 40. ESNW rep observed the excavation for the wall to be in dense material with a 1H:1V slope and was stable at the time of visit. The contractor placed a lift of blocks as per design schedule and used 5/8-inch clean crushed aggregate as drain rock/backfill. The contractor backfilled with imported poorly graded sand with gravel in 10 to 12-inch loose lifts that were compacted with large plate compactor. Density test result indicated adequate compaction of at least 95% at the tested location. ESNW rep observed the wall to be installed as per approved plans and our geotechnical recommendations. Report ID 7945.04 E 2023 0613 Page 2 of 2 Earth Solutions NW, LLC Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 142 Redi-Rock Wall Backfill -6' 8 137.8 7.1 132.7 96 #142