Loading...
HomeMy WebLinkAbout00-Response to Comments-2023-06-08.pdf June 8, 2023 Scott Warlick, Engineering Specialist III City of Renton Development Engineering Division 1055 S Grady Way, 6th Floor Renton, WA 98057 RE: Responses to Final Short Plat Comments Brennon Landing Final Short Plat (f.k.a. Vaughn Short Plat) City File No. LUA23-000136 / LND20-0653 Our Job No. 21348 Dear Scott: We have revised the plans and documents for the above-referenced project in accordance with your comments dated May 25, 2023. Enclosed are the following documents for your review and approval: 1. Revised Final Short Plat Map dated June 7, 2023 2. Revised CC&Rs dated June 7, 2023 3. Revised Right-of-Way Deed dated June 8, 2023 4. Revised REETA dated June 8, 2023 The following outline provides each of your comments in italics exactly as written, along with a narrative response describing how each comment was addressed: Final Short Plat Map Sheet 1 this is recorded with the CC&Rs not a shared maintenance agreement. Response: Reference to shared maintenance agreement has been replaced with blank for CC&R recording number. LUA23-000136 Response: City file number has been revised to LUA23-000136. Sheet 2 LUA23-000136 Response: City file number has been revised to LUA23-000136. Scott Warlick, Engineering Specialist III City of Renton Development Engineering Division -2- June 8, 2023 Covenants, Conditions and Restrictions please include recording numbers of each LLA as specified in title report Response: LLA recording numbers have been added to abbreviated legal description. REETA please add abbreviated legal description from title report and reference that full legal description is on Exhibit A. Response: Abbreviated legal description has been added and full legal description is referenced as Exhibit A. The code should be 45 - Highway and Street Right-of-way Response: Code has been changed to “45 - Highway and Street Right-of-Way.” please check box and add percentage of property being dedicated Response: Box has been checked and 18.15% filled in. please use date the Deed of Dedication is actually signed Response: Date of deed has been added to REETA. We believe that the above responses, together with the enclosed revised plans and documents, address all of the comments received May 25, 2023. Please review and approve the enclosed at your earliest convenience. If you have questions or need additional information, please do not hesitate to contact me at this office. Thank you. Sincerely, Margi Fosdick Project Administrator MF/kb 21348c.023.docx enc: As Noted cc: Vanessa Normandin, MainVue WA, LLC Allison Rothstein, MainVue WA, LLC Serena Dudaš, MainVue WA, LLC Tom Barghausen, Barghausen Consulting Engineers, Inc. Barry Talkington, Barghausen Consulting Engineers, Inc. George Newman, Barghausen Consulting Engineers, Inc.